Scope
• In the project context, the term “scope” can refer to:
◦ Product scope: The features and functions that characterize a product,
service, or result.
◦ Example: function of fan is to provide cool air
◦ Project scope: The work performed to deliver a product, service, or
result with the specified features and functions.
◦ Example: project scope of producing fan: focus on model fan with a lot of functions (not normal
fan)
Processes
Initiating Planning Executing Monitoring& Closing
Controlling
1. Plan Scope 5. Control
Management Scope
2. Collect 6. Validate
Requirements Scope
3. Define
Scope
4. Create WBS
2
11/12/2021
3
11/12/2021
4
11/12/2021
10
5
11/12/2021
11
12
6
11/12/2021
13
14
7
11/12/2021
15
16
8
11/12/2021
17
18
9
11/12/2021
19
20
10
11/12/2021
21
22
11
11/12/2021
23
24
12
11/12/2021
25
26
13
11/12/2021
Create WBS
• Identifying and analyzing the deliverables and related work
• Structuring and organizing the WBS
• Decomposing the upper WBS levels into lower-level detailed
components
• Verifying that the degree of decomposition of the deliverables is
appropriate.
• Developing and assigning identification codes to the WBS components
• Get approved and baseline project scope documents
27
Create WBS
28
14
11/12/2021
29
30
15
11/12/2021
Master
Degree
courses Thesis
course 1
course 2 …. Supervisor Topic Report Defense
31
32
16
11/12/2021
Role of WBS
• Help manager know: work package, times, costs
• Manage duration of project, costs of project during Executing
process
• Help to Monitor and Control Project
33
Outputs
• Scope Baseline
• The approved version of a scope statement, WBS, and its associated
WBS dictionary
• Scope baseline is a component of the project management plan.
• It can be changed only through formal change control procedures
and is used as a basis for comparison.
34
17
11/12/2021
• WBS dictionary
• Document that supports the WBS where detail work descriptions are
documented.
• Information in the WBS dictionary may includes:
– Code of accounts: a numbering system used to uniquely identify
each component of the work
breakdown structure (WBS).
– Description of work
– Assumptions and constraints
– Responsible organization
– Schedule milestones
35
36
18
11/12/2021
37
38
19
11/12/2021
Control Scope
39
40
20
11/12/2021
41
42
21
11/12/2021
Exercise
• Apply to your project
43