Bản vẽ hoàn chỉnh ĐANM

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

400 400 400

4Ø25

600 100
4Ø25 4Ø25
F 2
1 1
4Ø25 2
1

100 300 150 250


100 300 150 250

100 300 150 250


5000
5 2Ø10 5 2Ø10
B B 5 2Ø10

1200

300

300

300

300
M1 Ø10a200 Ø10a200 Ø10a200 3

700
3 3

700

700
1800
400
E

100 600
9800
300 300 300 300 Ø10a200 7 6 2Ø12 6 2Ø12 6 2Ø12
2200 3 4Ø22 3 4Ø22 3 4Ø22

5000
1200 M2
±2.000

6000
1500 M3 Ø22a200 1
±2.000 ±2.000

1800
Ø22a200 2

100 300 4500 3500 3000 1800 100

21000
D

1500
3

Ø22a200 4
Ø22a200 3

600
13100 Ø10a200

3500 3000
Ø10a200 Ø10a200

350
7 7 7
3300 100 600 600 100
C A A A A 100 600 600 100 100 600 600 100

13100
1200 1200 1200

10000
B STRIP FOUNDATION PLAN M2
SC 1:50 15 15 15

4500
100 300 1150 2200 1150 950 1600 950 750 1500 750 450 1350 100 SECTION 1-1 SECTION 2-2 SECTION 3-3
A 4 Ø10a100 Ø10a200 Ø10a100 Ø10a100 Ø10a200 Ø10a100 Ø10a100 Ø10a200 Ø10a100 Ø10a100 Ø10a200

300
SC 1:25 SC 1:25 SC 1:25

5000
4500 4500 4500 4500 4500
22500 400
Steel Column 4Ø25
10 11 12 13 14 15 5 1

100 300 150 250


7700 7700 8150 1Ø28 L=1150(mm)
600 600 750 1520 5 2Ø10 8
SHAWLLOW FOUNDATION PLAN 4Ø25 2 4Ø25 1 Ø6 5 4Ø25 1 4Ø25 1 2Ø12 6 4Ø25 1 Ø10a200
3

700
D E F G

115
SC : 1:300 1 2 1 1 3 3 3 3 4 4 4
K

150
6 2Ø12
4 2Ø22
DEEP FOUNDATION PLAN

300

70
±0.000 ±2.000
SC : 1:300 ±2.000

150
K

115
K FillingSoils
Sandy
±1.300
1 4Ø22
3 Ø10a200 7 2 1 1 4Ø22 3 3 Ø10a200 7 3 3 3 4Ø22 3 4 4 2Ø22 4 4 3 4Ø22
Ø10a200
7
300 4500 3500 3000 1800 100 600 600 100
±2.000 450 5030 70
100
13100 1200

A B SECTION B-B C D 15 PILE TOE DETAIL


SC 1:50 SC 1:10
A A
SECTION 4-4
900

SC 1:25
2 Clay

300
±0.000
1100 1100 2222 1100 1100
Ø6a50 Ø6a100 Ø6a200 Ø6a100 Ø6a50
1800

200
15

900

1500
300
±7.200 Ø12a2002 1Ø14 7 1Ø14 7
Ø22a2003
900

900
±1.500 4Ø20 5 Ø6 6
Ø12a1501
MNN ±7.900 B
Ø22a200 1

300
900
100

Ø22a200 2

2000
Ø22a2001
B

5100
6000
1900 5200 1900
3 Clay
9000
100 1100 1100 100
H H

900
2200
±3.500 1100 1100 2250 1100 1100

100
Ø6a50 Ø6a100 Ø6a200 Ø6a100 Ø6a50
A CLEAN

Ø22a200 4
PILE TOE DETAIL

Ø22a200 3

900
±27.000 CONCRETE
PAD FOUNDATION PLAN M2
SC 1:25 1Ø14 7 1Ø14 7
SOLID PROFLIE FOR PAD 3 150300 600 300 600 300 600 300150
PILE HEAD DETAIL
4Ø20 5 Ø6 6

900
100 3300 100
FOUNDTION

350
SC 1:100 SECTION H-H

300
±0.000

300
SC 1:50

Ø6a200 4Ø20 300 900 900 900 300


±0.000 1900 5200 1900
2700
9000 450
3300

K Filling Sandy PILE DETAIL


Soils
±2.000
G ±0.000 SC 1:25
GroundBeam PILE ELEVATION FOUDATION PLAN (E1)
SC 1:50
STEEL COLUMN
50 50 Ø10a200 2
1Ø28 8
Ø12a150 1 5 4Ø20
250

100
GROUND BEAM
1 Mud and Plants R50
100 350

4 Ø12a200 Ø12a200 3
450

±2.000 A A

800

800
300
±7.700
100 1100 1100 100 1Ø14 7

1500
300

800
600
2200
2 Clay
±9.000 300 CLEAN CONCRETE
A 450 200 450

100
±2.000
300

SECTION A-A SECTION K-K HOOK DETAIL


SC 1:25 Ø16a150 1 SC 1:2 SC 1:25
2 Ø16a150 1
100

2 Ø16a150
3 Clay 100 300 450 450 300 100
±19.300
1500
250

2
100150 300 300 300 300 150100
0

150
25

±14.800 Ø30
PILE FOUNDATION PLAN M3 1500
SC 1:25
2 MATERIALS:
NOTE:
4 Mixed Clay
SECTION A-A
PAD FOUNDATION:
+ CONCRETE: B20
PILE:
SC 1:25 Ptk =590 (kN) 300x300 PILE
±17.300 + STEEL: CB300V,CB240-T
Pmax=1194.48 (kN)
PILE BOX DETAIL STRIP FOUNDATION:
+ CONCRETE: B20 Pmin=895.86 (kN)
SC 1:10
+ STEEL: CB300V,CB240-T
±19.300 2Ø20
2Ø20 5 PILE FOUNDATION:
5
STEEL + CONCRETE: B25
50

50

200x150x8 + STEEL: CB300V,CB240-T


50

50

5 Sand Mixed
50

50

5GRID
50
50

±40.000 Ø6a50
300

300

2Ø20 5 250x200x8
250

250

SOLID PROFLIE FOR PILE Ø6a50


150

FOUNDTION 300
2Ø20
5 Ø6a50 PROJECT OF R.C BUILDING STRUCTURES
SC 1:100 300 HCMC UNIVERSITY OF TECHNOLOGY ANH EDUCATION

SECTION B-B SECTION F-F STEEL FRAME F F 300


FACULITY FOR HIGH QUALITY TRANING

SC 1:10
SC 1:10 SC 1:10
DEPARMENT OF STRUCTURAL ENGINEERING
DESIGN OF R.C FOUNDATION
HEAD MSc. LE PHUONG DRAWING TITLE: DETAILS OF PAD FOUNDDATION SHALLOW FOUNDATION PLAN
300 300 DETAILS OF STRIP FOUNDDATION PILE FOUNDATION PLAN
DETAILS OF PILE FOUNDDATION
PILE HEAD DETAIL PILE CONNECTION DETAIL ADVISOR MSc. LE PHUONG
SC 1:10 SC 1:10
DESIGNER NGUYEN VAN HOANG STUDENT ID: 19149122 FINISH DATE 14/12/2021

You might also like