Injection Pump Specification ©
Injection Pump Specification ©
FULL LOAD RPM: 1800 CUSTOMER PART NO.: RE-503742 MODEL NO.: DB4629-5652
GOV. REGULATION: 3-5 % CUSTOMER NAME: SUPERSEDES:
ENGINE: 6068TF150 JOHN DEERE DUBUQUE/SARAN EDITION NO.: 7
APPLICATION: 123 kW GEN-SET DATED: 01-13-04
NOTE: THIS SPECIFICATION DEVELOPED WITH ISO LONG INLET STUD.
ALL SPEEDS ARE IN ENGINE RPM UNLESS OTHERWISE NOTED.
USE LATEST REVISION FOR ALL REFERENCED DOCUMENTS.
TEST STAND: ISO 4008: PUMP SETTINGS: FOLLOWING PUMP SERVICE
1. CALIBRATING HIGH PRESSURE PIPES...SAE J1418/ISO 4093: 1. ROLLER-TO-ROLLER DIMENSION... 1.967" ± .0015"
.063" (1.6 mm) ID X 25" (635 mm) LONG. (49.96 mm ± 0.04 mm)
2. CALIBRATING INJECTORS........SAE J968/ISO 7440 MAXIMUM ECCENTRICITY: .004" (0.10 mm) T.I.R.
0.5 mm ORIFICE PLATE NOP: 3000 PSI (207 BAR) 2. GOVERNOR LINKAGE GAP: .125"-.145" (3.2-3.7 mm)
3. CALIBRATION FLUID: SAE J967/ISO 4113 (REF. S.B. 201) (USE KIT #23093 S.B. 95)
a. TEMPERATURE 110°-115°F (43°-46°C) AT INLET 3. 000 RPM (WOT):
b. SUPPLY PRESSURE (S.B. 334): 5.0 ± 0.5 PSI a. SPEED DROOP SETTING: ASSEMBLE SPEED DROOP PER S.B.
(34 ± 3 kPa) AT PUMP INLET. 97R. ENSURE CONTROL SPRING IS INSTALLED WITH 5 ± ½ TURNS
4. CAM MOVEMENT READ-OUT DEVICE: #23745 ON CONTROL ROD SPRING GUIDE.
b. TURN SPEED DROOP ADJUSTING CAP IN 7 TURNS CW FROM
PUMP INSTALLATION: IT-083 MINIMUM DROOP POSITION
ROTATION-C-* LEVER ANGLES (REF.) c. BACK-OUT HIGH IDLE SCREW.
NAME PLATE-L-SIDE** THOT MIN.(∠B) N/A d. ADJUST SPEED ADVANCE PLUG TO PLACE END OF PLUG FLUSH
#1 CYL.-5-O'CLOCK** THOT MAX.(∠C) N/A WITH END OF LIGHT LOAD ADVANCE PISTON.
THROTTLE-L-SIDE** S.O. (∠ E) N/A 4. 1000 RPM (WOT): OPERATE PUMP FOR 10 MINUTES TO BRING TO
TIMING MARK N/A S.O. (∠ F) N/A OPERATING TEMPERATURE AND CLEAR AIR FROM SYSTEM.
E.S.O. (12V E.T.R.) 5. 300 RPM (WOT): WITH SUPPLY PUMP ON, UNSCREW ADVANCE CAP
4 TURNS AND ALLOW FUEL TO BLEED FOR 30 SECONDS. RETORQUE
* VIEWED FROM DRIVE END ** VIEWED FROM TRANSFER PUMP END CAP TO 200-225 LBS/IN.
6. 400 RPM (WOT):
PUMP OPERATING SPEED...HALF...ENGINE SPEED a. CHECK SHUT-OFF: 4 mm³/STROKE, MAX.
AIR TIMED TO HOUSING FLANGE (S.B. 177)(SEE SPECIAL NOTES) b. CHECK FOR MINIMUM TRANSFER PUMP LIFT OF 18" HG.
(60 kPa)
PUMP CALIBRATION CHECKS: AS RECEIVED FOR SERVICE 7. 1800 RPM (WOT):
(REF. SL-222)(REF. S.B. 97R FOR SPEED DROOP) a. SET TRANSFER PUMP PRESSURE 91-93 PSI,
1. 1000 RPM WOT: OPERATE PUMP FOR 10 MINUTES TO BRING TO (627-641kPa)(SUPPLY SET PER TEST STAND NOTE 3B)
OPERATING TEMPERATURE AND CLEAR AIR FROM SYSTEM. b. ADJUST RETURN OIL TO 400-700 CC/MIN. RECHECK TRANSFER
2. TURN SPEED DROOP TO MINIMUM POSITION (CCW DIRECTION) PUMP PRESSURE.
AND THEN SET 7 TURNS (CW). c. CHECK HOUSING PRESSURE FOR 8.5-13.5 PSI, (59-93 kPa)
3. 1920 RPM (WOT): RESET HIGH IDLE SCREW IF NECESSARY TO d. CHECK ADVANCE FOR 0°. IF NECESSARY, ADJUST
OBTAIN 10-20 mm³/STROKE. SPEED ADVANCE PLUG FOR 0°.
4. CHECK POINTS: (SEQUENCE MUST BE FOLLOWED AS LISTED) e. SET ROLLER-TO-ROLLER FUEL DELIVERY 110-111
mm³/STROKE.
THROTTLE 8. 1800 RPM (ADJ. 40 mm³/STROKE): SET LIGHT LOAD ADVANCE
RPM POSITION mm³/STROKE ADVANCE ADJUSTING SCREW FOR 4.0°.
a. 150 WOT 48 MIN. --- 9. 300 RPM (WOT): WITH SUPPLY PUMP ON, UNSCREW ADVANCE CAP
b. 400 WOT* 4 MAX. --- 4 TURNS AND ALLOW FUEL TO BLEED FOR 30 SECONDS. RETORQUE
c. 1800 WOT 108-113 0° CAP TO 200-225 LBS/IN.
d. 1800 ADJ. 38-42 3.0°-5.0° 10. 1920 RPM (WOT): ADJUST HIGH IDLE SCREW TO OBTAIN 10-20
e. 1800 WOT* 4 MAX. --- mm³/STROKE.
f. 1920 WOT 10-20 --- 11. 1400 RPM (L.I.): SET LOW IDLE SCREW TO OBTAIN 10-14
g. 1970 WOT 5 MAX. 8.0°-9.0° mm3/STROKE. DO NOT BACK OUT SCREW FROM INTIAL SETTING.
12. CHECK POINTS:
* E.S.O. DE-ENERGIZED
THROTTLE T.P.
RPM POSITION mm³/STROKE ADVANCE PRESSURE
a. 150 WOT 50 MIN. --- 10 MIN.**
b. 400 WOT* 4 MAX. --- ---
c. 1400 L.I. 10-14 --- ---
d. 1800 WOT 110-111 0° 91-93***
e. 1800 ADJ. 39-41 3.5°-4.5° ---
f. 1800 WOT* 4 MAX. --- ---
g. 1920 WOT 10-20 --- ---
h. 1970 WOT 5 MAX. 8.0°-9.0° ---
* E.S.O. DE-ENERGIZED ** (69 kPa) *** (627-641 kPa)
13. SPECIAL NOTES:
a. TORQUE ALL FASTENERS PER S.B. 106.
b. ASSEMBLE THROTTLE LEVER SPACER AND ARM IN B4-L
POSITION PER S.B. 164.
c. ASSEMBLE DRIVE COMPONENTS PER S.B. 438.
d. SEAL FASTENERS PER S.B. 134R.
e. FOR SERVICE ONLY:
AIR TIME PUMP USING HARTRIDGE BASIC AIR TIMING TOOL
244-27 WITH INSERT 7244-30 AND PILOT RING 7244-26E.
CONNECT AIR SUPPLY WITH 60-100 PSI (4.1-6.9 BAR) TO #1
CYLINDER OUTLET. SET TOOL TO 210° AND INSTALL TO DRIVE
SHAFT. SLOWLY ROTATE TOOL CLOCKWISE UNTIL ROLLERS
STRIKE CAM RING AND TOOL STOPS, SCRIBE LINE ON HOUSING
FLANGE. REPEAT PROCEDURE TO ENSURE ACCURACY. IF
INTERFERENCE BETWEEN STRAIGHT EDGE AND HOUSING
FLANGE OCCURS, PLACE WASHER (i.e. 13521) BETWEEN
STRAIGHT EDGE AND TOOL.
© STANADYNE Corporation, all rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized in any
form or by any means, electronic or mechanical, including photocopying and microfilm, without permission in writing from the publisher.
DB4629-5652 EDITION 7 DATED 01/13/2004 PAGE 2 OF 4
DESCRIPTION QTY P/N HOUSING & DRIVE GROUP P/N QTY DESCRIPTION
(63548)
DRIVESHAFT 1 32880
26359 1 BEARING, NEEDLE
WASHER, DRIVESHAFT 1 32787
36534 1 SEAL, DRIVE SHAFT
NUT, HEX 1 26346
30804 1 SEAL, TEFLON LIP
KEY, WOODRUFF 1 30387
SCREW ASSY, VENT 1 21660
OR 21661-21665
DESCRIPTION QTY P/N HEAD & ROTOR GROUP P/N QTY DESCRIPTION
(61777)
34326 1 H&R ASSY, HYD 6 CYL
SCREW, LEAF SPR ADJ 2 15619
11056 2 PLUNGER, ROTOR
USE 11057-11060 (STD)
SHOE, CAM ROLLER 4 20120 OR 11062-11065 (O/S)
OR 20119 (-.010) OR AS IND. ON ROTOR S.B.60R
20118 (-.020) AS REQ'D
PER S.B.332 20101 2 PLUNGER, ROTOR
USE 20102-20105 (STD)
OR 20107-20110 (O/S)
AS IND. ON ROTOR S.B.60R
12216 1 SCREW, HEAD PLUG
SPRING, LEAF 2 29363 11438 1 SCREW, SET
NOTES:
NOTES: INSTALL GROUNDING STRAP ON LEFT SIDE VIEWING TRANSFER PUMP REFERENCE S.B. 108