NWCC Meeting
Bellingham, WA
February 25, 2004
Schedule
Cost
Cost Pred.
Schedule Pred.
Operability
All Objectives
• IPA Background
• Best Practices: Research and Metrics
• The Challenge
• Petroleum Industry
• Chemical Industry
• Pharmaceutical Industry
• Contractors
• IPA Background
• The Challenge
Business Technology
Strategy Strategy
Alignment
of Lo
w
Functions Discipline Co
st
Leading SAFETY
Technology Optimal Executed
Scope for With Fast Cycle
Business Minimum Time
Use of
Needs Change
Value Improving BETTER
Practices
ROI
y
Timely Involvement of cilit
Front-End Fa ality
Loading Contractors/Vendors Qu
Schedule
Histories
Management
Contingencies
Strategies
IPA
Databases
Cost
Performance
Histories
Project Technical
Definition Characteristics
Parametric
Statistical
Techniques
Team Project
FEL VIPs Technology
Practices Controls
Parametric
Statistical
Techniques
Operational
Safety Cost Schedule
Performance
– Front-End Loading
– VIPs
– Project Controls
• The Challenge
CONFIDENTIAL 13 INDEPENDENT PROJECT ANALYSIS
Drivers of Project Safety
Team Project
FEL VIPs
Practices Controls
Technology
Parametric
Statistical
Techniques
Operational
Safety Cost Schedule
Performance
-- Why
-- What
-- When
-- Where
-- How
-- Who
CONFIDENTIAL 16 INDEPENDENT PROJECT ANALYSIS
What Is Front-End Loading?
FEL is
the primary
Best Practice
in project execution
Business
Appraisal Value Creation
EXECUTION
Conceptual
Planning Value Addition
Basic Project
Planning
Detailed
Engineering Value
Maintenance
Construction
Startup and
Front-End Loading Value
Turnover
Production
Operations
1.2
(Project Cost / Industry Avg. Cost)
Relative Capital Cost
1.1
Industry Average Cost
1.0
0.9
FEL Rating
1.10 Construction
(Industry Average = 1.0)
Execution
1.05
Relative Schedule
Schedule
1.00
Industry Average
Cycle Time
0.95
0.90
0.85
Best Practical Good Fair Poor Screening
3 4 5 6 7 8 9
Front-End Loading
Team Project
FEL VIPs Technology
Practices Controls
Parametric
Statistical
Techniques
Operational
Safety Cost Schedule
Performance
1.2
• Formal, documented
R e la t iv e C a p it a l C o s t
Authorization
Parametric
Statistical
Techniques
Operational
Safety Cost Schedule
Performance
– Faster projects
Parametric
Statistical
Techniques
Operational
Safety Cost Schedule
Performance
– Conceptual Design
– Environmental/Permitting
– Safety
– Project Management
– Continuous Improvement
CONFIDENTIAL 30 INDEPENDENT PROJECT ANALYSIS
Non-Core Competencies
• The following competencies are usually considered non-
core by owner companies:
– Detailed Engineering
– Construction
– estimating
– scheduling
– procurement
– controls
Parametric
Statistical
Techniques
Operational
Safety Cost Schedule
Performance
20%
15%
Percentage Schedule Deviation
10%
5%
0%
-5%
-10%
-15%
-20%
0 1 2 3 4 5 6 7 8
Worse Better
• IPA Background
More
More
Front-End
Front-End Execution
Execution Other
OtherDrivers
Drivers Construction
Construction
Loading
Loading Factors
Factors for
forthe
theMoney
Money
• IPA Background
• The Challenge
BEST Strategy
PRACTICES
Process People