SIA Scope of Service Matrix-20180814-For Website
SIA Scope of Service Matrix-20180814-For Website
BASIC SERVICE
STAGES
ROLE
Pre-Design Concept Design Schematic Design Design Development Documentation Construction Completion Post Completion
Assist the Client in Provide initial design to Develop the initial Develop the Schematic Prepare architectural Prepare architectural Inspect site to check
establishing the Design meet the Design Brief in design to sufficient level Design to sufficient level Tender Drawings and Construction Drawings the completed works
Brief general of detail required for of detail required for Specifications to Attend to construction against the design
Site investigation to Assist the Client to refine Development Control Building Plan sufficient level of detail issues relevant to the intent
ascertain site conditions the Design Brief submissions. submissions. to enable pricing design
Designer Prepare Outline appropriate to the Check Contractor's
Specifications to selected procurement submissions against the
determine preferred method. design intent
materials, quality and Inspect site to check the
construction method. works against the design
intent
Pre-design research on Ensure that the design Ensure that the design Ensure that the design Advise on regulatory Ensure permits and Submit architectural Obtain clearances
regulatory requirements complies with regulatory complies with regulatory complies with regulatory requirements to be clearances required prior as-built drawings required for statutory
Obtain previously requirements requirements requirements included in the building to commencement are Arrange for required completion from
approved drawings, if Consult authorities on Prepare submission Prepare submission contract. obtained authority inspections relevant authorities
necessary specific regulatory plans and submit to URA plans and submit to Monitor Contractor's Obtain clearances
Consult authorities on requirements, if necessary for Written Permission authorities for BP/DP compliance with statutory required for
Qualified Person general and/or site- Obtain land / building Prepare submission Clearances
1
requirements occupancy from
specific regulatory owner's consent, if plans and submit to Prepare submission Inspect site to check that relevant authorities,
requirements, if necessary other authorities for DC plans and submit to the works are carried out if necessary.
1
necessary Clearances BCA for BP Approval in accordance with Report to IRAS
2
Application for waivers Approved Plans
3
Amendment submissions
Advise on appropriate Advise on selection of Provide input on Check Client's Compile Tender Administer the building contract, including issuing Address latent
procurement method(s) form of building contract contractual matters for requirements for pricing Documents orders and certification in accordance with the defects and minor
Outline Specifications / procurement exercise Conduct pricing / tender building contract. outstanding works, if
Contract Identify items requiring Pre-qualify suitable process Conduct site meetings any
early procurement builders for tender Facilitate the award of Inspect site to check that the works are carried out in Work with the QS to
Administrator exercise conclude the Final
building contract(s) accordance with the building contract
Formulate tender Compile Contract Account and building
evaluation criteria Documents contract
Ascertain Client's budget Track the design process Coordinate and manage communication among the project team and other relevant parties
/ prepare Project Budget Assist Client in
Ascertain project timeline appointment of consultant
Track the design process Monitor construction cost Manage the
/ prepare the Project team Review QS's Cost Estimate against the Project Budget. against the budget handover process
Programme Prepare Project Plans / Monitor progress against the Project Programme Monitor construction
Design Manager / Advise on consultants Responsibility Matrices/
progress against the
Project Administrator Project Programme
needed Execution Plans
Establish communication Assist the QS to develop
protocols Preliminary Cost Estimate
Update the Project
Programme
Abbreviations
BP Building Plan BCA Building and Construction Authority C&S Civil & Structural Engineer CAD Computer Aided Drafting
DC Development Control IRAS Inland Revenue Authority of Singapore M&E Mechanical & Electrical Engineer BIM Building Information Model
DP Detailed Plan URA Urban Redevelopment Authority QS Quantity Surveyor GFA Gross Floor Area
1
In the consultancy agreement, the Architect can list the submissions to authorities included in the scope. A Provisional Sum may be provided for those not included.
2
In the consultancy agreement, the Architect can fill in rates for waiver applications.
3
In the consultancy agreement, the Architect can fill in rates for amendment submissions.
These are normally included in the Architect's scope, although there may be instances where these are not necessary, in which case there is usually no reduction in fee.
The process includes identifying design changes defined under Additional Service.
Updated 14 August 2018 Architect's Appointment Committee
SCOPE OF SERVICE MATRIX
ADDITIONAL SERVICE
STAGES
ROLE
Pre-Design Concept Design Schematic Design Design Development Documentation Construction Completion Post Completion
4
Conversion of Design change Performance-based design Documentation Revised and/or As-Built BIM Post-occupancy
4
drawings of existing Artist's impression / Design change resultant from design additional construction model evaluation
4
building(s) to Walk-through / Virtual Providing architectural content for Client's changes drawings resultant from Building
4
CAD/BIM Reality marketing purposes / public exhibition Artwork for hoarding design changes performance study
Designer Measured drawings of Review work by Basic Interior Design and gap analysis
existing building(s) previous Designer Signage Design Review tenancy
User / community Physical model layout by others
engagement Attending to other
Special or protracted Outline Application to Re-computation of existing GFA Protraction6 Green Mark parties (e.g.
negotiations with URA Checking and endorsement of Client's marketing Certification under Certification – purchasers, users)
authorities Consulting authorities material Housing Developers documentation for Witness of Fact
Checking existing not previously included Performance-based submissions (Control and Licensing) Verification and (preparing
building(s) for in scope of service Non-mandatory Green Mark Scheme – Act attendance to material,
Qualified Person compliance Review submissions by documentation for application, assessment & certification body statements and
5
previous Qualified presentation to certification body Assist in strata attendance to
Person Application for house number and/or land sub- hearings)
Application for change of use division
Application for advertisement licence Assist in vesting of
Application for operating licence land to the State
6
Input into drafting of Conduct pricing / Protraction
particular conditions tender process for Providing architectural staff resident on site
nominated sub- Coordinating the work of Client's direct
contract(s) contractor(s)
Contract Conduct pricing / Administering contracts other than standard
Administrator tender process for forms commonly used in Singapore
Client's direct Certification required under Client's sales and
contract(s) purchase agreement
Conduct pricing /
tender process for
early works contracts
Managing user / Coordination of consultants in addition to C&S, M&E & QS.
Design Manager /
community Coordination of and liaison with any other parties not previously included in scope of service.
Project Administrator
engagement Administration of engagement of Site Staff or any other parties not previously included in scope of service.
Abbreviations
BP Building Plan BCA Building and Construction Authority C&S Civil & Structural Engineer CAD Computer Aided Drafting
DC Development Control IRAS Inland Revenue Authority of Singapore M&E Mechanical & Electrical Engineer BIM Building Information Model
DP Detailed Plan URA Urban Redevelopment Authority QS Quantity Surveyor GFA Gross Floor Area
4
Design change means any change:
- resultant from a change to the Design Brief;
- requested by the Client subsequent to the Client's expressed or implied acceptance of the design;
- necessitated by new authority requirements; or
- necessitated by site conditions / construction method
5
Computer simulation , if required , is usually done by a specialist
6
In the consultancy agreement, the Architect can fill in rates for protraction
Updated 14 August 2018 Architect's Appointment Committee