Ambo University
Ambo University
GROUP MEMBER
S/NO NAME ID NO SECTION
1 TSAGAYE ADISU A/UR26036/11 I
2 NADHI AYANA A/UR26081/11 II
3 DEGEFU SOLOMON A/UR25958/11 II
4 DANIEL MEKONNEN A/UR26061/11 II
Approval
The Project is our own and has not been presented for a degree in any other university with this functionalities and all the sources of
material used for the project/thesis have been duly acknowledged.
signature
1 .Jemal Tesfaye…………………………………………………..
2.Tsagaye Adisu………………………………………………….
3.Gudina Jirgna………………………………………………….
4.Yosef Tilahun…………………………………………………..
5.Adisu Baisa……………………………………………………..
6.Bilisuma Urgesa………………………………………………..
This is to certify that I have read this project and that in my opinion it is fully adequate, in scope and quality, as a project for the degree
of Bachelor of Science.
ii
1. Examiner 1 ………………………………….. ………………………
Acknowledgment
First of all ,I would like thanks to god for everything and then I would like to my deepest thankfulness to all my family ,my father , my
mother ,my sister and brother and my friends for your generous support .without you the completion of this work would not have been
possible.
I would like to express my grateful appreciation to my supportive adviser Dr. Biruk who shared his vast knowledge with me and also to
give me the confidence to accomplish this work, during the preparation of this thesis, you kindly guided me to develop critical thinking
and research skills Finally, I would like to express my thanks to all academic and professional staff in the school of civil and
environmental engineering of Addis Ababa University for supporting me during this research works.
iii
iv
Acronyms
CSS-Cascading Style Sheet
PC-personal Computer
UC-Use Case
v
Table of Contents
Approval.................................................................................................................................................................................................................... viii
Acknowledgment........................................................................................................................................................................................................ ix
Acronyms..................................................................................................................................................................................................................... x
Abstract..................................................................................................................................................................................................................... xiii
CHAPTER ONE............................................................................................................................................................................................................ xiv
Introduction of Whole Project Process..................................................................................................................................................................xiv
1.1 Introduction..................................................................................................................................................................................................... xiv
1.2 Literature Review and Related Work................................................................................................................................................................... xiv
1.3 Statement of the Problem................................................................................................................................................................................... xvi
1.4 Objective............................................................................................................................................................................................................ xvii
1.4.1 General Objective........................................................................................................................................................................................ xvii
1.4.2 Specific Objective......................................................................................................................................................................................... xvii
1.5 Scope and Limitation of project......................................................................................................................................................................... xviii
1.5.1 Scope of project.......................................................................................................................................................................................... xviii
1.5.2 Limitation of the project............................................................................................................................................................................... xix
1.6 Significance of the project................................................................................................................................................................................... xix
1.7 Beneficiaries of project......................................................................................................................................................................................... xx
1.7.1 Benefits to police station............................................................................................................................................................................... xx
1.7.2 Benefits to Citizens................................................................................................................................................................................... xxi
1.7.3 Benefits to Police Department..................................................................................................................................................................xxi
1.8 Methodology....................................................................................................................................................................................................... xxi
vi
1.8.1 Data gathering Methodology....................................................................................................................................................................... xxii
1.8.1 .1 Interview.................................................................................................................................................................................................. xxii
1.8.1.2 Observation.............................................................................................................................................................................................. xxii
1.8.1.3 Document Analysis...............................................................................................................................................................................xxii
1.9 Analysis and Design Methodology......................................................................................................................................................................xxii
1. 9.1 Development tool.......................................................................................................................................................................................... xxiii
1.10 Work plan........................................................................................................................................................................................................ xxiv
1.11 Budget Plan....................................................................................................................................................................................................... xxv
1.12 References....................................................................................................................................................................................................... xxvi
1.13 Appendix......................................................................................................................................................................................................... xxvii
vii
Abstract
The web based accident information management system solves and minimizes so many problems on the organization. The system is
with the client/server architected configuration. This means that there is a central application database to store data. This system uses
SQL database engine to manage the data and it has the front end with the web programming language PHP. This system help for the
employee of Ambo Town police station to communicate and also access their data easily. In general the system enables the transactions
to be easier and faster.
The system activity flow seems the following. When an accident occurs in a society, the society informs the occurrence and other
reliable information about the accident for the field officer. Then, the field officer informs the dispatcher by sending message on the form
available on the website to detect the accident. After the dispatcher retrieves the detail information from the message sent by the field
officer, he/she allocates resource.
viii
CHAPTER ONE
Introduction of Whole Project Process
1.1 Introduction
The development of one country is analyzed from many direction or factors such as peaceful, security of the people and their property
etc. Those are protected by accident management station such as police and society. The institution of accident management station is
standing to protect peoples and their property from danger. Our project aimed to develop new web based accident management system.
The proposed system applies to accident management institution all across the country and specially looks in the subject of accident
information management system of Ambo Town police station. It is well understood that accident prevention and detection of accident
depend on highly responsive back bone to information management system. The efficiency of the accident controlling and the
effectiveness with which it deals with accident depend on what quality of information it can drive or received from where the accident
is occur and how fast it can have response to it.
In this part of the study, basic and important literatures are reviewed to provide background information and current state of AIMS’s in
Ambo town. A comprehensive collection of applicable works to support this research will also be compiled.
ix
[ CITATION Fed22 \l 1033 ]The African countries remain to have the highest road traffic death rates. The situation of road traffic
accidents is most severe in sub-Saharan Africa, where the lives of millions are lost and a significant amount of property is
damaged. In Ethiopia, the condition has been crumbled as the number of vehicles has risen and accordingly because of
expanded traffic stream and experiences among vehicles and people on foot. Despite government efforts in road
development, road accidents remain to be one of the critical problems of the road transport sector in Ethiopia . Every year,
many lives are lost and much property is destroyed due to road traffic accidents in the country. The country has experienced
average annual road accidents of 8115 during 2000–2010.
[ CITATION daw19 \l 1033 ]In this part of the study, basic and important literatures are reviewed to provide background information and
current state of RTASE’s in Bole sub city. A comprehensive collection of applicable works to support this research will also be compiled.
“Road traffic injuries are major problem but neglected public health challenge that requires determined efforts for effective and
sustainable prevention. Of all the systems with which people have to deal every day, road traffic systems are the most complex and the
most dangerous. Worldwide, an estimated 1.2 million people are killed in road crashes each year and as many as 50 million are injured.
Projections indicate that these amounts will increase by about 65% over the next 20 years unless there is new commitment to
prevention. Nevertheless, the tragedy behind these amounts attracts less mass media attention than other, less frequent types of
tragedy. The World report on road traffic injury prevention is major report being jointly issued by the World Health Organization”
(WHO 2009).
This summary of the World report on road traffic injury prevention is primarily intended for people responsible for road safety policies
and programmers at the national level and those most closely in touch with road safety problems and needs at the local level. The
views expressed and the conclusions drawn are taken from the main report and on many studies to which that report refers”. (World
Health Organization, WHO 2009
x
[ CITATION wor21 \l 1033 ][ CITATION wor21 \l 1033 ]ETHIOPIA: ROAD TRAFFIC ACCIDENTS
In Ambo Town police station accident information management apply manual way of implementing tasks. The police station has the following
problem –:
❖ Difficult of getting real information at real time when accident occurred that help to have real time response to accident.
xi
❖ Difficult of communication of field office, society and the station to give and get real time response to the accident.
❖ If someone, come from other place suddenly die in accident, and if the person has not id or something about himself to be recognized
with, The Only thing they can do is write report and store it.
❖ Difficult in conducting consistent reports because the record is documented manually and require much time and human power to
search and get wanted information (file).
❖ There is no fast and efficient way of sharing critical information across the station as well as with the external environment.
❖ The current system high work load for staff of police department.
1.4 Objective
1.4.1 General Objective
The general objective of this project is developing new web based accident management system for Debre Berhan city police
station.
xii
1.4.2 Specific Objective
The specific objective of the accident management in Debre Berhan city police station include: -
Analyze the current system to design new data base system operated easily using web based system.
Enabling the workers to communicate easily across the station and with their external environment.
This project will be developing new web based system for debre berhan city police station accident management system. On
completion of this project we expect the system will have
With less effort and cost the system is able to maintain and store information.
Post information (post unknown people die in accident) Report are cannot be visible to society.
xiii
Presence of centralized documented and organized record.
The system does not concern about the crime file management system.
Facilitate timely management decision making and enable to have real time response to the accident detect it.
Enabling the workers of the system to get reliable information where and when occurred as well as the type and level of
accident to give reliable to response on detecting the accident.
There are many constraints within our proposed system that limit their effectiveness of performance. Our system
is limited only in the process of web based accident management system of the Ambo Town police station, but
does not include about crime file management system, the system depends on electric power and network
connection. The above activities or subsystems are proposed system limitations because of the following reason
Time Is the main factor of limitation our proposed systems that limit its performance because while we are
developing the system it takes more time and we may not get enough time to automate the system.
xiv
Resource we have not laptop as an alternative when arbitrary failed the desktop and also when the power is off
for a long time.
The new web based accident management is system which is customized to the DebreBerhan city police station.
The most important feature of the new system is that it is an accurate , easy and efficient system to detect accident as well
as record accidental information such as date and time when the accident occur, location and level of the accident.
Also cause and effect of the accident of the accident carefully recorded and documented.
It is enable searching the required information by using keys and also the main function of the system is sharing of
information to the appropriate of different station.
xv
Generally, the purpose of this accident management system is to solve all the problem of the organization and to satisfy
the requirement of the people.
Neat investigation files in the station can be transfers from generation to generation
xvi
1.7.3 Benefits to Police Department
Reduced workload of the police station back-office activities such as preparation of reports and station records management
1.8 Methodology
The requirement of the system is gathered using primary data collecting techniques. These are listed below.
xvii
1.8.1 .1 Interview
One of data gathering methodologies or mechanism we used to collect information by making a formal meeting
at which we are asked some questions to debreberhan city police station manager and other member police as well as
some peoples who live in the city.
1.8.1.2 Observation
is the second data gathering methodology we used to collect information by direct watching some accidents
inside the university and other traffic accidents when we are going to town by taxi.
Document analysis is used to understand how the system is working. We used this method to know all about the police
station mission, vision, function and overall of their work in short and brief.
In this project, our team will going to use object oriented system development methodology (OOSD) for the design.
Object oriented analysis (OOA):- during this phase the team uses to models the function of the system (use case
modeling), finding and identify the business objects, organize the objective and identify the relationship between
them and finally model the behavior of the objects in detail.
xviii
Object oriented design (OOD):-During this phase our team uses Microsoft software to refine the use case model
and rational rose for designing the sequence collaboration, activity diagrams and to model object interaction and
behavior that support the use case scenario
Apache server
Web server
PHP
Server Side Script
Firefox 3.0, IE 5.5/6.0/7 etc….
Browser
Editors Notepad++
Documentation MS Word
Design Edromax
Months
xix
Dec20/20 Jan, March6/2
Nov3/2016 Nov14/201 May16/201
6- 16 16/2017 017 7
Phases -
Dec20/2016
- - - -
Nov11/2016
Jan15/20 Feb3,/20 May15/2 may20/201
1 1 0 7
7 7 17
Project proposal
preparation and
presentation
Requirement
gathering
and
Analysis
Design
Document
submission
and
presentation
Implementation
Testing&Mainte
n ance
xx
xxi
xxii
1.11 Budget Plan
The study the budget that we are going to allocate according to the plan considering the scope of the project from the very
beginning to the completion. This plan includes all the expenses spent from the starting of the proposal to the completion of the
project work..
xxiii
1.12 References
[1] F. D. R. o. E. transport, "leemhamnew.com," Aircraft Accident Investigation Bureau, 3 1 2022. [Online]. Available:
http://www.leemhamnew.com. [Accessed 3 1 2022].
[3] w. h. ranking, "https://www.worldlifeexpectancy.com," world health ranking organizatin, 2 2 2021. [Online]. Available:
https://www.worldlifeexpectancy.com. [Accessed 3 1 2022].
xxiv
1.13 Appendix
A: Paper Document in the Existing System,Accident report form for Ambo Town police station
xxv