impacted by military operations and consists of land within the 65 decibel recommendations in the AICUZ Study to inform Land Use
Noise Zone 1 Noise Zone 2 Noise Zone 3 Compatibility with AICUZ APZs
<55 55-65 65-70 70-75 75-80 >85 Clear Zone APZ I APZ II
day-night average sound level (DNL) and greater noise zones and Accident local governments as they consider zoning and Single-Family Residential (1)
Potential Zones (APZs). Within the AICUZ footprint, the Navy seeks to development choices for areas within the AICUZ Multi-Family Residential and Hotels
ensure compatibility with local land use plans by clearly identifying areas footprint. Compatibility recommendations are
Public Assembly Areas and Auditoriums
Instruction (OPNAVINST) 11010.36C. The Land Outdoor Parks and Recreation Areas (4) (4)
V
U
Anacortes
Use Compatibility Recommendations table to the Business Services (2) (2) (3) (3)
20
V
U
237 Agriculture, Forestry, and Mining
right provides an overview of the recommendations KEY: Compatible Incompatible
Lopez
Island
using generic land use categories. Chapter 7 of the NOTES:
This generalized land use table provides an overview of recommended land use. To determine specific land use compatibility, see OPNAVINST 11010.36C.
2021 AICUZ Study provides detailed land use and (1) Maximum density of 1 to 2 dwellings per acre. (3) Maximum floor area ratio that limits people density may apply.
(2) Land use and related structures generally compatible; however, (4) Facilities must be low intensity.
Richardson zoning analyses that identify areas of compatibility measures to achieve recommended noise level reduction should be
incorporated into design and construction of the structures.
Similk Beach
V
U
536
concern surrounding Ault Field and Outlying
Mount Vernon
Landing Field Coupeville.
AULT
FIELD
14
LaConnor AICUZ STUDY RECOMMENDATIONS
Federal, state, and local governments; businesses; real estate
25
07
32
professionals; and residents, along with the Navy, all play an
SEAPLANE
BASE
Conway important role in successful implementation of the AICUZ Study.
To effectively accomplish the goal of the AICUZ Program, all involved contact
parties must be active participants. For questions or to obtain further
Salish Sea Oak Harbor information on the AICUZ Program,
Skagit
V
U 20 Bay
Chapter 7 of the 2021 AICUZ study contains a full list of please contact:
recommendations for each of these groups. These recommendations,
San de Fuca OLF when implemented, will continue to advance the goal:
COUPEVILLE V
U
532 Community Planning Liaison Officer
Camano Naval Air Station Whidbey Island
Coupeville Island
To achieve compatibility between air installations and the 1115 W. Lexington St. B103
community by encouraging compatible land uses that Oak Harbor, WA 98278
14
Port
(360) 257-1005
Legend
¯
65 dB DNL Runway
Primary Surface
70 dB DNL
Admiralty
Installation
Clear Zone Area
75 dB DNL
80 dB DNL
APZ I
APZ II
Inlet 0 4 Miles
85 dB DNL
L:\Buffalo\Whidbey_AICUZ\Maps\MXD\AICUZ_OUTREACH_2021\2021_01_28_Draft_\Ault_Coupeville_NoiseAPZ_combined_12x12_zoom_Poster5.mxd
AIR INSTAL L ATIO N S C O MPA T IBL E U S E ZO N ES S T U D Y EE1009240.4141