0% found this document useful (0 votes)
21 views1 page

SPM MCQ

The document contains questions about project management topics like constraints in MS Project, setting deadlines, critical paths, and the objective of software project planning. Constraints in MS Project include as soon as possible and as late as possible. To set a deadline in MS Project, you double-click a task to open its properties, click the advanced tab, and select a date from the calendar in the deadline field. The critical path is the shortest path through the network and activities on it have zero slack.

Uploaded by

Satish Jadhao
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views1 page

SPM MCQ

The document contains questions about project management topics like constraints in MS Project, setting deadlines, critical paths, and the objective of software project planning. Constraints in MS Project include as soon as possible and as late as possible. To set a deadline in MS Project, you double-click a task to open its properties, click the advanced tab, and select a date from the calendar in the deadline field. The critical path is the shortest path through the network and activities on it have zero slack.

Uploaded by

Satish Jadhao
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

15What are the types of constraint available in MS project?

A. As soon as possible
B. As late as possible
C. Both A and B
D. None of these

16.How to set a deadline in MS project?


A. Double-click a task -> it will open a task information dialog box
B. Now, click on the advanced tab
C. Then click on the arrow in the deadline field to show the calendar and then choose a date
D. All of the above

17.Identify the field that must be unique in Primavera.


Project Name
Project Description
Project ID
Project Manager

18.Which of the following statements regarding critical paths is true?


a.                   The shortest of all paths through the network is the critical path.
b.                  Some activities on the critical path may have slack.
c.                   Every network has exactly one critical path.
d.                  On a specific project, there can be multiple critical paths, all with exactly the same
duration.
e.                  The duration of the critical path is the average duration of all paths in the project network.

19.Which of the following statements regarding critical paths is true?


a. The shortest of all paths through the network is the critical path.
b. Some activities on the critical path may have slack.
c. Every network has exactly one critical path.
d. On a specific project, there can be multiple critical paths, all with exactly the same
duration.
e. The duration of the critical path is the average duration of all paths in the project
network.

20.Activities falling on the critical path have


zero slack
maximum slack
minimum slack
negative slack

21.What is the main objective of Software Project Planning?


a. Estimation of resources
b. Estimation of cost
c. Estimation of schedule
d. All of the above

You might also like