0% found this document useful (0 votes)
21 views2 pages

Research

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views2 pages

Research

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

The input box shows the requirement needed for the development of the proposed system.

Information requirements cover’s the clients information and how they are managed and

collected manually and what information needed. Also included the information of the staff

needed from the client. Health Record System develop for the health center do not have yet

an existing system and also for the staff who are the one recording the information of the

client. The hardware requirements needed should be a computer unit with the specs of Core i3

or equivalent processor with atleast 8 Gigabytes of memory for better system performance.

The software requirements needed to develop the system included the Eclipse, used for the

front end, is a free and open source for web application. With such framework, the researcher

worked either with the front end and back end independently at first without defining the at

the start database structure. However, once both were done, they were integrated with the use

of an Application Program Interface (API). This API integrated these two, front end and

backend. An API is a set of routines, protocols, and tools for building the proposed system.

It specifies how software components will interact with one another. For every sprint, this

cycle is being followed. PHP programming language was used in coding process with

MySQL, an open source relational database management system, for defining the database

structure. MySQL Workbench, a unified visual tool used, provided data modeling, SQL

development, and comprehensive administration tools for server configuration, user

administration and backup.

The process box shows the stages undergone during the conduct of the study. These

include its development and assessment. The development stage included a series of

iterations composed of analysis, design, development, testing and then evaluation based on an

International Standards using ISO/IEC 25010:2011 the system and software engineering. For

the system assessment and evaluation, the developed system were evaluated by the IT experts
according to system technical qualities and end-users with the system’s functionality and

usability.

The output box was the target developed and evaluated Real-Time Human Resource

Management System.

Feedbacks from IT experts and end-users were collected and they were incorporated to

the development of the system.

You might also like