0% found this document useful (0 votes)
13 views3 pages

Minerec

Uploaded by

Irvin Samaniego
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views3 pages

Minerec

Uploaded by

Irvin Samaniego
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

the company back-calculates the ore fed to the plant using metal contained in the concentrate and

tailings and, as a consequence, PR will always be 100%.

Another important consideration is that the indicator PR should not be misused as ‘plant recovery’ (64%
in the example of Fig. 2), which does not include the tailings in its calculation. A reconciliation system
must take into account all input and output data including inventory changes (2775 oz Au in Fig. 2)

You might also like