Directorate of Erbil Borehole log
Construction Laboratory Based on ASTM D1587-00 & D6032-02
.Test Form No S - 12 Revision 05 Approve date 04.04.2019
Field Data
Project Name
Location Erbil BH No. A3 Lab No.
Drilling Method WASH DRILLING Groundwater level N.W.T Starting Date 22-8-2021
Machine Name massenza Level & Coordinate Sending Date 24-8-2021
Climat
e&
Sample Lab Material Description CR RQD No. of Blows
S Depth (m) (%) (%) Field
Type No. (30 cm)
Remar
ks
21 26.5 29.0 D 2426 Br. Silty clay with gravel
22 29.0 29.5 SS 2427 Br. Silty clay with gravel 36 50″5
23 29.5 32.5 D 2428 Br. Silty clay with gravel
24 32.5 33.0 SS 2429 Br. Silty clay with gravel 50″4
25 33.0 35.5 D 2430 Br. Silty clay with gravel
26 35.5 36.0 SS 2431 Br. Silty clay with gravel 50″3
27 36.0 38.5 D 2432 Br. Silty clay with gravel
28 38.5 39.0 SS 2433 Br. Silty clay with gravel 50″3
29 39.0 41.5 D 2434 Br. Silty clay with gravel
30 41.5 42.0 SS 2435 Br. Silty clay with gravel 50″4
Remarks:
2-2
Tested by: Checked by: Approved by:
(Title/Name/Date/Signature)