Week 8 Electrical Installation Single Phase
Week 8 Electrical Installation Single Phase
MEASUREMENT (SBEQ3213)
Week 8 : Electrical Installations – Single Phase
Underground Drainage
MECHANICAL WORKS
Air Conditioning Installations
Unit/Split Package/Central
Two options
Internal
Three Phase
• From Supply • 240V with
substation • From DB to a less load • 415V with a
to power and bigger load
substation points and domestic and supply
fittings use needed for
External (commercial
Supply Single Phase and industrial)
SINGLE AND THREE PHASE THEORY
Single Phase
For domestic uses, three phase voltage are very high and dangerous to the
home owner
Therefore, low voltage electrical supply normally used for domestic use such
residential
Standard voltage for single phase is 240 v. Normally one live wire will be used
with one neutral wire. The code are as follows:
RN
YN
BN
Three Phase
Carrying voltage is 415 v and can exceed 880 v for industrial user. The
industries that use heavy machineries such as steel factory and cement
factory need to have three phase electrical system.
Three phase systems may have three live wire and neutral wire
Live wires identified based on colour coded and the code are as follows:
LI or R (red): Single Phase
L2 or Y (yellow): Second Phase
L3 or B (blue) : Three Phase
MAIN COMPONENTS
ELECTRICAL INSTALLATIONS – SINGLE PHASE
INCOMING SERVICES
MAIN INSTALLATION
POWER INSTALLATION
LIGHTING INSTALLATION
ELECTRICAL APPLIANCES
CABLES
TESTING
ELECTRICAL DISTRIBUTION IN BUILDING
INCOMING SERVICES TESTING POWER INSTALLATION
ELECTRICAL APPLIANCES
FINAL SUB-
LIGHTNING CIRCUIT
PROTECTION
MAIN INSTALLATION
LIGHTING INSTALLATION
CABLE
CONDUIT
MAIN COMPONENTS
ELECTRICAL INSTALLATIONS
POWER LIGHTING ELECTRICAL
INSTALLATION INSTALLATION APPLIANCES
3 pin switch socket Fluorescent light Exhaust fan
Wall light Sweep ceiling fan
EXIT sign
High bay light
EL light
TNB METER
29
TAKING OFF LIST
ELECTRICAL INSTALLATIONS
PREAMBLE 2) POWER INSTALLATION
GENERAL NOTES – Fittings and accessories
• Socket (no)
1) MAIN INSTALLATION • Point (no)
– Cables (m)
– Meter panel (no)
– Conduits (m)
– Main Switch Board (no) – Sundries
– Distribution Board (no) • Mark the holes (item)
Main & sub main cabling (m) • General earth bonding
Conduit and trunking (m) (item)
Sundries (no) • Testing (item)
Testing (item)
TAKING OFF LIST
ELECTRICAL INSTALLATIONS
3) LIGHTING INSTALLATION 5) LIGHTNING INSTALLATION (3 phase)
– Fittings & accessories – Copper tape (no)
• Swicth (no) – Test clamps (no)
• Point (no) – Air termination (no)
– Final sub-circuit (no) – Earth chamber(no)
– Sundries
• Mark the holes (item) 6) SUNDRIES
• General earth bonding (item) • Mark the holes (item)
• Testing (item) • Testing (item)
4) ELECTRICAL APPLIANCES
– Fittings & accessories 7) BUILDERS WORK
• Swicth (no) – Excavation trenches (m)
• Exhaust fan, ceiling fan
(no)
– Final sub-circuit (no)
– Sundries
• Mark the holes (item)
• General earth bonding
(item)
• Testing (item)
MEASUREMENT RULES
ELECTRICAL INSTALLATIONS
Cadangan Membina Dan Menyiapkan Sebuah Makmal Komputer Di Sekolah Kebangsaan Sri
Selangor, Petaling Jaya, Selangor.
BILLS OF
A Preamble
QUANTITIES FOR:
All quantities in this bill are provisional quantities
subject to remeasurement upon construction of the
said item. The tenderer must allow for testing the
electrical installation and handling over of test
certificate to S.O.
SERVICES
100mm UPVC class 'D' pipe complete with long
bend extended beyond drain for entry of TNB,
incoming cable to MSB inclusive of excavation and
backfilling. M 3.05
To Collection
MEASUREMENT RULES
ELECTRICAL INSTALLATIONS
MEASUREMENT RULES
ELECTRICAL INSTALLATIONS
EQUIPMENT AND CONTROL GEAR (NO)
R4 – Equipment (generator, motors)
Control gear (isolator, switch fuses)
B TNB metre board control gear complete with cut out fuse No 1
holder and neutral link with facilities for termination of
incoming supply cable for wiring connection main switch
distribution board and fuses 60A current operated ELCB
complete with earthing elctrode.
MEASUREMENT RULES
ELECTRICAL INSTALLATION
TAKING OFF LISTS
DOMESTIC – HOUSING SINGLE
PHASE
2. Power Installation
- fitting & accessories
= socket no
- cables m
- conduits m
- final sub-circuit no
- sundries
= mark holes item
= general bonding item
= testing item
MEASUREMENT RULES
ELECTRICAL INSTALLATIONS
Switch socket outlet & socket
point.
Different Types for different
capacity.
SMM2 Refer to clause R.18.2 (No.)
HEADING AND DESCRIPTION
POWER INSTALLATIONS
2. POWER INSTALLATIONS (Internally)
Item Description Unit Qty Note
Cables
Conduit
20mm diameter PVC conduit embedded into brickwall 1450mm above floor
finish level. m 35
1 Gang 13 Amp switch socket outlet with PVC face plate, steel box and fused No 18
plug top fixed to brickwall mounted and connected at 1450mm above floor
finish level
MEASUREMENT RULES
ELECTRICAL INSTALLATIONS
MEASUREMENT RULES
ELECTRICAL INSTALLATIONS
CONDUIT, TRUNKING AND CABLE TRAYS
R9.1 – Conduit and fittings. (m)
a) type
b) size
c) specification
d) saddles & crampets pattern
e) nature of background
PVC Conduit
Classification :
a) conduits fixed to surfaces
b) conduits fixed in chases
c) conduits embedded in floor screeds
d) conduits embedded in concrete
CONDUIT, TRUNKING AND METAL TRAY
ELECTRICAL INSTALLATIONS
CLASSIFICATION
a) drawn into conduits or ducts
b) laid or drawn into trunking
c) laid or drawn into trunking and laced into ciucuit
d) fixed to surfaces
e) wrapped around pipework
f) laid in trenches
g) fixed to insulators in overhead lines
h) suspended from catenary cables
CABLE CLASSIFICATION
ELECTRICAL INSTALLATIONS
CLASSIFICATION
a) Lighting points: one way or two way
b) Socket or switch socket points
c) Immersion heater points, cooker outlet points etc.
MEASUREMENT RULES
ELECTRICAL INSTALLATIONS
TAKING OFF LISTS
DOMESTIC – HOUSING SINGLE PHASE
3. Lighting Installation
- fittings & accessories
= switch no
- cables m
- conduits m
- final sub circuit no
- sundries
= mark holes item
= general bonding item
= testing item
HEADING AND DESCRIPTION
LIGHTING INSTALLATIONS
3. LIGHTING INSTALLATIONS (Internally)
Item Description Unit Qty Note
Cables
A 2 x 1.5mm2 Polyvinyl chloride (cu) and 1.5mm2 PVC green cable in concealed m 12
conduit, chased in brickwall 1450mm above floor finish.
B 2 x 2.5mm2 Polyvinyl chloride (cu) and 2.5mm2 PVC green cable in concealed
conduit, chased in brickwall 900 mm above floor finish. m 30
Conduit
C 20mm diameter PVC conduit embedded into brickwall 1450mm above floor finish
level. m 12
1 X 36w bare channel wall fluorescent light fitting come with prismatic diakon No 18
D diffuser
E 26W downlight complete with fittings wire, connector blocks and fixed to No 20
brickwork or concrete on ceiling surface. Connect to fix lamps
MEASUREMENT RULES
ELECTRICAL INSTALLATIONS
TAKING OFF LISTS
DOMESTIC – HOUSING SINGLE PHASE
4. Electrical Appliances
- fitting & accessories
= switch no
- cables m
- conduits m
- final sub circuit… no
- sundries
= mark holes item
= general bonding item
= testing item
HEADING AND DESCRIPTION
POWER INSTALLATIONS
4. ELECTRICAL APPLIANCES (Internally)
Item Description Unit Qty Note
Cables
A 2 x 8mm2 PVC cable in concealed galvanised iron conduit come with 1 x 8mm2 PVC m 15
CPC
Conduit
B 25mm diameter PVC galvanised iron conduit concealed to brickwall for exhaust fan
m 35
Fitting and Accessories
150mm x150mm metal exhaust fan install at high level complete with support brackets,
C flexible connectors and vibration.
No 5
1 gang 15 Amp switch outlet for exhaust fan with PVC plate box and fixed to brick wall
D No 5
Final Sub-Circuit
Final sub-circuit fir 15A socket point for metal exhaust fan of concealed conduit cable
installation consisting od 2 x 8mm2 single core cable drawn into galvanised iron conduit.
E No 5
ELECTRICAL APPLIANCE
ELECTRICAL INSTALLATIONS
Fan, MATV point and telephone
point.
SMM2 Refer to clause R.6, R.22.1
(NO.)
Socket
Cable
Life
Neutral
Power
Earth
Fuse Box
Light Point
Cable
Final Sub-circuit
Switch
Life
Neutral
Lighting
Fuse Box
FINAL SUB-CIRCUIT
ELECTRICAL INSTALLATIONS
Cable (m)
Final sub-
circuit (nos)