Energy Measurement
Energy Measurement
Energy Measurement
MT83x
Energy measurement
Communication
Specification
Energy Measurement and Management
1. IEC62056-21 (former IEC1107) standard is used (for data formats, timeouts,...) – Mode C with
password
2. OBIS (Energy Data Information System) = Preliminary standard by IEC TC13 WG14 number
62056-61
4. Supported baudrates:
For optical interface – up to 9600 baud
For RS-232, RS-485 and 20-mA current loop – up to 19.200 baud (recommended 9600)
5. RS-232, RS-485 or 20-mA current loop interface can operate without switching of baudrate
from 300 to "Z" baud as stands in IEC 1107. In the case that there is fixed baudrate on RS-
232/485 or 20-mA current loop interface it is necessary to send some NUL characters (typ. 8
characters) or to implement "Retry" (two or three) of opening sequence (/?!CRLF) to "wake up"
the port and to prepare the MT830 for the right communication baudrate. The MT830 is always
waiting the very first character in request on 300 baud.
6. Optical interface always work with switch of baudrate from 300 to “z”.
Comm_des_MT830 1 14.11.12
Energy Measurement and Management
Data formats
The assignements for the formats in the tables/data representations have the following meaning:
For integer numbers and alphanumeric strings n specifies the total number of characters.
For floating decimals, the number in front of the brackets specifies the total number of digits. The
numbers within the brackets specify the range for the number of decimal positions.
For dates, times and timestamps the number specifies the total number of digits including any
separation characters between. Definition for seasonal parameter “y”:
y = 0: normal time
y = 1: daylight savings time
y = 2: UTC
Comm_des_MT830 2 14.11.12
Energy Measurement and Management
The following table describes returned ER_ as they are sent by meter device in cases of
unsuccessfully executed IEC1107 command. This mechanism is used by IEC1107 protocol to
inform the user why requested command can not be executed.
IEC1107_ERROR_NOTFOUND ER01
IEC1107_ERROR_NOTIMPLEMENTED ER02
IEC1107_ERROR_BADPARAM ER03
IEC1107_ERROR_BADINDEX ER04
IEC1107_ERROR_BADVALUE ER05
IEC1107_ERROR_BADCOMMAND ER06
IEC1107_ERROR_NOTAUTHORISED ER07
IEC1107_ERROR_NODATA ER08
IEC1107_ERROR_NORESOURCE ER09
IEC1107_ERROR_DEVICEERROR ER10
IEC1107_ERROR_BADADDRESS ER11
IEC1107_ERROR_UNKNOWN ER12
Example:
Comm_des_MT830 3 14.11.12
Energy Measurement and Management
Comm_des_MT830 4 14.11.12
Energy Measurement and Management
Logbook read is possible with commands R5 (all in one block) or R6 (in partial blocks).
Format:
<SOH>R5<STX>P.98(;) - Read all 255 events in one block
Comm_des_MT830 5 14.11.12
Energy Measurement and Management
LogBook Format :
Example:
1. R5 command – total
Comm_des_MT830 6 14.11.12
Energy Measurement and Management
<SOH>B0<ETX>q
984 ms elapsed -> IEC62056-21 changing baudrate to 300:
204 ms elapsed -> IEC1107 closing local connection
Comm_des_MT830 7 14.11.12
Energy Measurement and Management
Comm_des_MT830 8 14.11.12
Energy Measurement and Management
5. E2 command
Format:
Example:
Comm_des_MT830 9 14.11.12
Energy Measurement and Management
6. Load profile
Load profile read is possible with commands R5 (one block) or R6 (partial block).
Format:
By R6 command the reading device (PC or HHU) has to send <ACK> if block checksum is OK or
<NAK> if it is not OK. In latter case the meter will repeat sending the same block for 3 times (if
each time checksum is not OK).
Example:
Comm_des_MT830 10 14.11.12
Energy Measurement and Management
Comm_des_MT830 11 14.11.12
Energy Measurement and Management
Comm_des_MT830 12 14.11.12
Energy Measurement and Management
2. Reading all LP with R5 command (Multiples header formating) – for reading with P2S
Parameter “Map 1107 Mode” (in MeterView: group Common) must be set to Multiples in order to
get following readout.
Examples:
Comm_des_MT830 13 14.11.12
Energy Measurement and Management
/ISK5MT830-1034<_CR><_LF>
Comm_des_MT830 14 14.11.12
Energy Measurement and Management
There are four possibilities for set time and date in MT83x:
with command W1 and write of registers 0.9.1 and 0.9.2 - two steps
with command W5 and write of registers 0.9.1 and 0.9.2 - two steps
with command W1 and register 0.9.4 - one step
with command W5 and register 0.9.4 - one step
Remark:
In case of wrong format response will be 'ER05'
Remark:
In case of wrong format response will be 'ER05'
Example:
Comm_des_MT830 15 14.11.12
Energy Measurement and Management
<ACK>
14859 ms elapsed -> IEC62056-21 sending:
<SOH>W1<STX>0.9.2(060225)<ETX>^
578 ms elapsed -> IEC62056-21 received:
<ACK>
2454 ms elapsed -> IEC62056-21 sending:
<SOH>B0<ETX>q
984 ms elapsed -> IEC62056-21 changing baudrate to 300:
9484 ms elapsed -> IEC1107 closing local connection
Remark:
In case of wrong format response will be 'ER05'
Remark:
In case of wrong format response will be 'ER05'
Example:
<NUL><NUL><NUL><NUL>
547 ms elapsed -> IEC62056-21 sending:
/?!<_CR><_LF>
Comm_des_MT830 16 14.11.12
Energy Measurement and Management
Remark:
In case of wrong format response will be 'ER05'
Example:
Remark:
In case of wrong format response will be 'ER05'
Comm_des_MT830 17 14.11.12
Energy Measurement and Management
Example:
Example:
Comm_des_MT830 18 14.11.12
Energy Measurement and Management
<NUL><NUL><NUL><NUL>
547 ms elapsed -> IEC62056-21 sending:
/?!<_CR><_LF>
Example:
Comm_des_MT830 19 14.11.12
Energy Measurement and Management
<NUL><NUL><NUL><NUL>
547 ms elapsed -> IEC62056-21 sending:
/?!<_CR><_LF>
9. Data readout
ACK, 0, Z, 0, CR, LF
After reception of this command, the MT83x meter transmits values of all data which are stated in
the DRO sequence.
Example:
16437 ms elapsed -> IEC1107 opening local 218 ms elapsed -> IEC62056-21 changing baudrate
connection to 9600:
16 ms elapsed -> IEC62056-21 sending: 8500 ms elapsed -> IEC62056-21 received:
<NUL><NUL><NUL><NUL> <STX>0.0.0(00000000)<_CR><_LF>
547 ms elapsed -> IEC62056-21 sending: 0.9.1(180612)<_CR><_LF>
/?!<_CR><_LF> 0.9.2(060116)<_CR><_LF>
0.1.0(3)<_CR><_LF>
1172 ms elapsed -> IEC62056-21 received: 0.1.2*01(0601161742)<_CR><_LF>
/ISK5MT830-1013<_CR><_LF> 0.1.2*02(0601160134)<_CR><_LF>
0.1.2*03(0601152131)<_CR><_LF>
203 ms elapsed -> IEC62056-21 sending: 0.1.2*04()<_CR><_LF>
<ACK>050<_CR><_LF> 0.1.2*05()<_CR><_LF>
0.1.2*06()<_CR><_LF>
Comm_des_MT830 20 14.11.12
Energy Measurement and Management
0.1.2*07()<_CR><_LF> 9.6.0*10()<_CR><_LF>
0.1.2*08()<_CR><_LF> 9.6.0*11()<_CR><_LF>
0.1.2*09()<_CR><_LF> 9.6.0*12()<_CR><_LF>
0.1.2*10()<_CR><_LF> 9.6.0*13()<_CR><_LF>
0.1.2*11()<_CR><_LF> 9.6.0*14()<_CR><_LF>
0.1.2*12()<_CR><_LF> 9.6.0*15()<_CR><_LF>
0.1.2*13()<_CR><_LF> 1.8.0(00001.0 kWh)<_CR><_LF>
0.1.2*14()<_CR><_LF> 1.8.0*01(00000.9 kWh)<_CR><_LF>
0.1.2*15()<_CR><_LF> 1.8.0*02(00000.1 kWh)<_CR><_LF>
1.2.0(000.2008 kW)<_CR><_LF> 1.8.0*03(00000.0 kWh)<_CR><_LF>
1.6.0(0.0774 kW)(0060116180000)<_CR><_LF> 1.8.0*04()<_CR><_LF>
1.6.0*01(0.0516 kW)(0060116083000)<_CR><_LF> 1.8.0*05()<_CR><_LF>
1.6.0*02(0.0500 kW)(0060116013000)<_CR><_LF> 1.8.0*06()<_CR><_LF>
1.6.0*03(0.0992 kW)(0060115213000)<_CR><_LF> 1.8.0*07()<_CR><_LF>
1.6.0*04()<_CR><_LF> 1.8.0*08()<_CR><_LF>
1.6.0*05()<_CR><_LF> 1.8.0*09()<_CR><_LF>
1.6.0*06()<_CR><_LF> 1.8.0*10()<_CR><_LF>
1.6.0*07()<_CR><_LF> 1.8.0*11()<_CR><_LF>
1.6.0*08()<_CR><_LF> 1.8.0*12()<_CR><_LF>
1.6.0*09()<_CR><_LF> 1.8.0*13()<_CR><_LF>
1.6.0*10()<_CR><_LF> 1.8.0*14()<_CR><_LF>
1.6.0*11()<_CR><_LF> 1.8.0*15()<_CR><_LF>
1.6.0*12()<_CR><_LF> 1.8.1(00000.9 kWh)<_CR><_LF>
1.6.0*13()<_CR><_LF> 1.8.1*01(00000.8 kWh)<_CR><_LF>
1.6.0*14()<_CR><_LF> 1.8.1*02(00000.0 kWh)<_CR><_LF>
1.6.0*15()<_CR><_LF> 1.8.1*03(00000.0 kWh)<_CR><_LF>
1.6.1*01(0.0516 kW)(0060116083000)<_CR><_LF> 1.8.1*04()<_CR><_LF>
1.6.1*02(0.0500 kW)(0060116013000)<_CR><_LF> 1.8.1*05()<_CR><_LF>
1.6.1*03(0.0000 kW)(0000101000000)<_CR><_LF> 1.8.1*06()<_CR><_LF>
1.6.1*04()<_CR><_LF> 1.8.1*07()<_CR><_LF>
1.6.1*05()<_CR><_LF> 1.8.1*08()<_CR><_LF>
1.6.1*06()<_CR><_LF> 1.8.1*09()<_CR><_LF>
1.6.1*07()<_CR><_LF> 1.8.1*10()<_CR><_LF>
1.6.1*08()<_CR><_LF> 1.8.1*11()<_CR><_LF>
1.6.1*09()<_CR><_LF> 1.8.1*12()<_CR><_LF>
1.6.1*10()<_CR><_LF> 1.8.1*13()<_CR><_LF>
1.6.1*11()<_CR><_LF> 1.8.1*14()<_CR><_LF>
1.6.1*12()<_CR><_LF> 1.8.1*15()<_CR><_LF>
1.6.1*13()<_CR><_LF> 1.8.2(00000.0 kWh)<_CR><_LF>
1.6.1*14()<_CR><_LF> 1.8.2*01(00000.0 kWh)<_CR><_LF>
1.6.1*15()<_CR><_LF> 1.8.2*02(00000.0 kWh)<_CR><_LF>
1.6.2*01(0.0000 kW)(0000101000000)<_CR><_LF> 1.8.2*03(00000.0 kWh)<_CR><_LF>
1.6.2*02(0.0194 kW)(0060115213716)<_CR><_LF> 1.8.2*04()<_CR><_LF>
1.6.2*03(0.0992 kW)(0060115213000)<_CR><_LF> 1.8.2*05()<_CR><_LF>
1.6.2*04()<_CR><_LF> 1.8.2*06()<_CR><_LF>
1.6.2*05()<_CR><_LF> 1.8.2*07()<_CR><_LF>
1.6.2*06()<_CR><_LF> 1.8.2*08()<_CR><_LF>
1.6.2*07()<_CR><_LF> 1.8.2*09()<_CR><_LF>
1.6.2*08()<_CR><_LF> 1.8.2*10()<_CR><_LF>
1.6.2*09()<_CR><_LF> 1.8.2*11()<_CR><_LF>
1.6.2*10()<_CR><_LF> 1.8.2*12()<_CR><_LF>
1.6.2*11()<_CR><_LF> 1.8.2*13()<_CR><_LF>
1.6.2*12()<_CR><_LF> 1.8.2*14()<_CR><_LF>
1.6.2*13()<_CR><_LF> 1.8.2*15()<_CR><_LF>
1.6.2*14()<_CR><_LF> 21.8.0(00000.0 kWh)<_CR><_LF>
1.6.2*15()<_CR><_LF> 21.8.0*01(00000.0 kWh)<_CR><_LF>
9.6.0(0.4842 kVA)(0060116180000)<_CR><_LF> 21.8.0*02(00000.0 kWh)<_CR><_LF>
9.6.0*01(0.4766 kVA)(0060116020000)<_CR><_LF> 21.8.0*03(00000.0 kWh)<_CR><_LF>
9.6.0*02(0.4088 kVA)(0060116010000)<_CR><_LF> 21.8.0*04()<_CR><_LF>
9.6.0*03(0.5182 kVA)(0060115213000)<_CR><_LF> 21.8.0*05()<_CR><_LF>
9.6.0*04()<_CR><_LF> 21.8.0*06()<_CR><_LF>
9.6.0*05()<_CR><_LF> 21.8.0*07()<_CR><_LF>
9.6.0*06()<_CR><_LF> 21.8.0*08()<_CR><_LF>
9.6.0*07()<_CR><_LF> 21.8.0*09()<_CR><_LF>
9.6.0*08()<_CR><_LF> 21.8.0*10()<_CR><_LF>
9.6.0*09()<_CR><_LF> 21.8.0*11()<_CR><_LF>
Comm_des_MT830 1 14.11.12
Energy Measurement and Management
21.8.0*12()<_CR><_LF> 3.8.0*14()<_CR><_LF>
21.8.0*13()<_CR><_LF> 3.8.0*15()<_CR><_LF>
21.8.0*14()<_CR><_LF> 23.8.0(00000.0 kvarh)<_CR><_LF>
21.8.0*15()<_CR><_LF> 23.8.0*01(00000.0 kvarh)<_CR><_LF>
41.8.0(00000.2 kWh)<_CR><_LF> 23.8.0*02(00000.0 kvarh)<_CR><_LF>
41.8.0*01(00000.2 kWh)<_CR><_LF> 23.8.0*03(00000.0 kvarh)<_CR><_LF>
41.8.0*02(00000.0 kWh)<_CR><_LF> 23.8.0*04()<_CR><_LF>
41.8.0*03(00000.0 kWh)<_CR><_LF> 23.8.0*05()<_CR><_LF>
41.8.0*04()<_CR><_LF> 23.8.0*06()<_CR><_LF>
41.8.0*05()<_CR><_LF> 23.8.0*07()<_CR><_LF>
41.8.0*06()<_CR><_LF> 23.8.0*08()<_CR><_LF>
41.8.0*07()<_CR><_LF> 23.8.0*09()<_CR><_LF>
41.8.0*08()<_CR><_LF> 23.8.0*10()<_CR><_LF>
41.8.0*09()<_CR><_LF> 23.8.0*11()<_CR><_LF>
41.8.0*10()<_CR><_LF> 23.8.0*12()<_CR><_LF>
41.8.0*11()<_CR><_LF> 23.8.0*13()<_CR><_LF>
41.8.0*12()<_CR><_LF> 23.8.0*14()<_CR><_LF>
41.8.0*13()<_CR><_LF> 23.8.0*15()<_CR><_LF>
41.8.0*14()<_CR><_LF> 43.8.0(00001.5 kvarh)<_CR><_LF>
41.8.0*15()<_CR><_LF> 43.8.0*01(00001.5 kvarh)<_CR><_LF>
61.8.0(00000.6 kWh)<_CR><_LF> 43.8.0*02(00000.1 kvarh)<_CR><_LF>
61.8.0*01(00000.6 kWh)<_CR><_LF> 43.8.0*03(00000.0 kvarh)<_CR><_LF>
61.8.0*02(00000.0 kWh)<_CR><_LF> 43.8.0*04()<_CR><_LF>
61.8.0*03(00000.0 kWh)<_CR><_LF> 43.8.0*05()<_CR><_LF>
61.8.0*04()<_CR><_LF> 43.8.0*06()<_CR><_LF>
61.8.0*05()<_CR><_LF> 43.8.0*07()<_CR><_LF>
61.8.0*06()<_CR><_LF> 43.8.0*08()<_CR><_LF>
61.8.0*07()<_CR><_LF> 43.8.0*09()<_CR><_LF>
61.8.0*08()<_CR><_LF> 43.8.0*10()<_CR><_LF>
61.8.0*09()<_CR><_LF> 43.8.0*11()<_CR><_LF>
61.8.0*10()<_CR><_LF> 43.8.0*12()<_CR><_LF>
61.8.0*11()<_CR><_LF> 43.8.0*13()<_CR><_LF>
61.8.0*12()<_CR><_LF> 43.8.0*14()<_CR><_LF>
61.8.0*13()<_CR><_LF> 43.8.0*15()<_CR><_LF>
61.8.0*14()<_CR><_LF> 63.8.0(00002.3 kvarh)<_CR><_LF>
61.8.0*15()<_CR><_LF> 63.8.0*01(00002.3 kvarh)<_CR><_LF>
2.8.0(00000.0 kWh)<_CR><_LF> 63.8.0*02(00000.3 kvarh)<_CR><_LF>
2.8.0*01(00000.0 kWh)<_CR><_LF> 63.8.0*03(00000.1 kvarh)<_CR><_LF>
2.8.0*02(00000.0 kWh)<_CR><_LF> 63.8.0*04()<_CR><_LF>
2.8.0*03(00000.0 kWh)<_CR><_LF> 63.8.0*05()<_CR><_LF>
2.8.0*04()<_CR><_LF> 63.8.0*06()<_CR><_LF>
2.8.0*05()<_CR><_LF> 63.8.0*07()<_CR><_LF>
2.8.0*06()<_CR><_LF> 63.8.0*08()<_CR><_LF>
2.8.0*07()<_CR><_LF> 63.8.0*09()<_CR><_LF>
2.8.0*08()<_CR><_LF> 63.8.0*10()<_CR><_LF>
2.8.0*09()<_CR><_LF> 63.8.0*11()<_CR><_LF>
2.8.0*10()<_CR><_LF> 63.8.0*12()<_CR><_LF>
2.8.0*11()<_CR><_LF> 63.8.0*13()<_CR><_LF>
2.8.0*12()<_CR><_LF> 63.8.0*14()<_CR><_LF>
2.8.0*13()<_CR><_LF> 63.8.0*15()<_CR><_LF>
2.8.0*14()<_CR><_LF> 4.8.0(00003.4 kvarh)<_CR><_LF>
2.8.0*15()<_CR><_LF> 4.8.0*01(00003.3 kvarh)<_CR><_LF>
3.8.0(00003.9 kvarh)<_CR><_LF> 4.8.0*02(00000.4 kvarh)<_CR><_LF>
3.8.0*01(00003.9 kvarh)<_CR><_LF> 4.8.0*03(00000.1 kvarh)<_CR><_LF>
3.8.0*02(00000.5 kvarh)<_CR><_LF> 4.8.0*04()<_CR><_LF>
3.8.0*03(00000.1 kvarh)<_CR><_LF> 4.8.0*05()<_CR><_LF>
3.8.0*04()<_CR><_LF> 4.8.0*06()<_CR><_LF>
3.8.0*05()<_CR><_LF> 4.8.0*07()<_CR><_LF>
3.8.0*06()<_CR><_LF> 4.8.0*08()<_CR><_LF>
3.8.0*07()<_CR><_LF> 4.8.0*09()<_CR><_LF>
3.8.0*08()<_CR><_LF> 4.8.0*10()<_CR><_LF>
3.8.0*09()<_CR><_LF> 4.8.0*11()<_CR><_LF>
3.8.0*10()<_CR><_LF> 4.8.0*12()<_CR><_LF>
3.8.0*11()<_CR><_LF> 4.8.0*13()<_CR><_LF>
3.8.0*12()<_CR><_LF> 4.8.0*14()<_CR><_LF>
3.8.0*13()<_CR><_LF> 4.8.0*15()<_CR><_LF>
Comm_des_MT830 2 14.11.12
Energy Measurement and Management
Comm_des_MT830 3 14.11.12
Energy Measurement and Management
9.8.0*04()<_CR><_LF> 33.7.0(0.033)<_CR><_LF>
9.8.0*05()<_CR><_LF> 53.7.0(1.000)<_CR><_LF>
9.8.0*06()<_CR><_LF> 73.7.0(0.013)<_CR><_LF>
9.8.0*07()<_CR><_LF> 14.7.0(49.9 Hz)<_CR><_LF>
9.8.0*08()<_CR><_LF> 81.7.40(88.0 deg)<_CR><_LF>
9.8.0*09()<_CR><_LF> 81.7.51(0.0 deg)<_CR><_LF>
9.8.0*10()<_CR><_LF> 81.7.62(89.2 deg)<_CR><_LF>
9.8.0*11()<_CR><_LF> !<_CR><_LF>
9.8.0*12()<_CR><_LF> <ETX>b
9.8.0*13()<_CR><_LF> 407 ms elapsed -> IEC1107 closing local connection
9.8.0*14()<_CR><_LF>
9.8.0*15()<_CR><_LF>
9.8.1(00007.2 kVAh)<_CR><_LF>
9.8.1*01(00007.1 kVAh)<_CR><_LF>
9.8.1*02(00000.6 kVAh)<_CR><_LF>
9.8.1*03(00000.0 kVAh)<_CR><_LF>
9.8.1*04()<_CR><_LF>
9.8.1*05()<_CR><_LF>
9.8.1*06()<_CR><_LF>
9.8.1*07()<_CR><_LF>
9.8.1*08()<_CR><_LF>
9.8.1*09()<_CR><_LF>
9.8.1*10()<_CR><_LF>
9.8.1*11()<_CR><_LF>
9.8.1*12()<_CR><_LF>
9.8.1*13()<_CR><_LF>
9.8.1*14()<_CR><_LF>
9.8.1*15()<_CR><_LF>
9.8.2(00000.3 kVAh)<_CR><_LF>
9.8.2*01(00000.3 kVAh)<_CR><_LF>
9.8.2*02(00000.3 kVAh)<_CR><_LF>
9.8.2*03(00000.2 kVAh)<_CR><_LF>
9.8.2*04()<_CR><_LF>
9.8.2*05()<_CR><_LF>
9.8.2*06()<_CR><_LF>
9.8.2*07()<_CR><_LF>
9.8.2*08()<_CR><_LF>
9.8.2*09()<_CR><_LF>
9.8.2*10()<_CR><_LF>
9.8.2*11()<_CR><_LF>
9.8.2*12()<_CR><_LF>
9.8.2*13()<_CR><_LF>
9.8.2*14()<_CR><_LF>
9.8.2*15()<_CR><_LF>
10.8.0(00000.0 kVAh)<_CR><_LF>
10.8.0*01(00000.0 kVAh)<_CR><_LF>
10.8.0*02(00000.0 kVAh)<_CR><_LF>
10.8.0*03(00000.0 kVAh)<_CR><_LF>
10.8.0*04()<_CR><_LF>
10.8.0*05()<_CR><_LF>
10.8.0*06()<_CR><_LF>
10.8.0*07()<_CR><_LF>
10.8.0*08()<_CR><_LF>
10.8.0*09()<_CR><_LF>
10.8.0*10()<_CR><_LF>
10.8.0*11()<_CR><_LF>
10.8.0*12()<_CR><_LF>
10.8.0*13()<_CR><_LF>
10.8.0*14()<_CR><_LF>
10.8.0*15()<_CR><_LF>
31.7.0(7.9 A)<_CR><_LF>
51.7.0(2.4 A)<_CR><_LF>
71.7.0(5.8 A)<_CR><_LF>
32.7.0(58.1 V)<_CR><_LF>
52.7.0(58.6 V)<_CR><_LF>
72.7.0(58.2 V)<_CR><_LF>
Comm_des_MT830 4 14.11.12
Energy measurement
Communication
Specification
Energy Measurement and Management
1. IEC62056-21 (former IEC1107) standard is used (for data formats, timeouts,...) – Mode C with
password
2. OBIS (Energy Data Information System) = Preliminary standard by IEC TC13 WG14 number
62056-61
4. Supported baudrates:
For optical interface – up to 9600 baud
For RS-232, RS-485 and 20-mA current loop – up to 19.200 baud (recommended 9600)
5. RS-232, RS-485 or 20-mA current loop interface can operate without switching of baudrate
from 300 to "Z" baud as stands in IEC 1107. In the case that there is fixed baudrate on RS-
232/485 or 20-mA current loop interface it is necessary to send some NUL characters (typ. 8
characters) or to implement "Retry" (two or three) of opening sequence (/?!CRLF) to "wake up"
the port and to prepare the MT830 for the right communication baudrate. The MT830 is always
waiting the very first character in request on 300 baud.
6. Optical interface always work with switch of baudrate from 300 to “z”.
Comm_des_MT830 1 14.11.12
Energy Measurement and Management
Data formats
The assignements for the formats in the tables/data representations have the following meaning:
For integer numbers and alphanumeric strings n specifies the total number of characters.
For floating decimals, the number in front of the brackets specifies the total number of digits. The
numbers within the brackets specify the range for the number of decimal positions.
For dates, times and timestamps the number specifies the total number of digits including any
separation characters between. Definition for seasonal parameter “y”:
y = 0: normal time
y = 1: daylight savings time
y = 2: UTC
Comm_des_MT830 2 14.11.12
Energy Measurement and Management
The following table describes returned ER_ as they are sent by meter device in cases of
unsuccessfully executed IEC1107 command. This mechanism is used by IEC1107 protocol to
inform the user why requested command can not be executed.
IEC1107_ERROR_NOTFOUND ER01
IEC1107_ERROR_NOTIMPLEMENTED ER02
IEC1107_ERROR_BADPARAM ER03
IEC1107_ERROR_BADINDEX ER04
IEC1107_ERROR_BADVALUE ER05
IEC1107_ERROR_BADCOMMAND ER06
IEC1107_ERROR_NOTAUTHORISED ER07
IEC1107_ERROR_NODATA ER08
IEC1107_ERROR_NORESOURCE ER09
IEC1107_ERROR_DEVICEERROR ER10
IEC1107_ERROR_BADADDRESS ER11
IEC1107_ERROR_UNKNOWN ER12
Example:
Comm_des_MT830 3 14.11.12
Energy Measurement and Management
Comm_des_MT830 4 14.11.12
Energy Measurement and Management
Logbook read is possible with commands R5 (all in one block) or R6 (in partial blocks).
Format:
<SOH>R5<STX>P.98(;) - Read all 255 events in one block
Comm_des_MT830 5 14.11.12
Energy Measurement and Management
LogBook Format :
Example:
1. R5 command – total
Comm_des_MT830 6 14.11.12
Energy Measurement and Management
<SOH>B0<ETX>q
984 ms elapsed -> IEC62056-21 changing baudrate to 300:
204 ms elapsed -> IEC1107 closing local connection
Comm_des_MT830 7 14.11.12
Energy Measurement and Management
Comm_des_MT830 8 14.11.12
Energy Measurement and Management
5. E2 command
Format:
Example:
Comm_des_MT830 9 14.11.12
Energy Measurement and Management
6. Load profile
Load profile read is possible with commands R5 (one block) or R6 (partial block).
Format:
By R6 command the reading device (PC or HHU) has to send <ACK> if block checksum is OK or
<NAK> if it is not OK. In latter case the meter will repeat sending the same block for 3 times (if
each time checksum is not OK).
Example:
Comm_des_MT830 10 14.11.12
Energy Measurement and Management
Comm_des_MT830 11 14.11.12
Energy Measurement and Management
Comm_des_MT830 12 14.11.12
Energy Measurement and Management
2. Reading all LP with R5 command (Multiples header formating) – for reading with P2S
Parameter “Map 1107 Mode” (in MeterView: group Common) must be set to Multiples in order to
get following readout.
Examples:
Comm_des_MT830 13 14.11.12
Energy Measurement and Management
/ISK5MT830-1034<_CR><_LF>
Comm_des_MT830 14 14.11.12
Energy Measurement and Management
There are four possibilities for set time and date in MT83x:
with command W1 and write of registers 0.9.1 and 0.9.2 - two steps
with command W5 and write of registers 0.9.1 and 0.9.2 - two steps
with command W1 and register 0.9.4 - one step
with command W5 and register 0.9.4 - one step
Remark:
In case of wrong format response will be 'ER05'
Remark:
In case of wrong format response will be 'ER05'
Example:
Comm_des_MT830 15 14.11.12
Energy Measurement and Management
<ACK>
14859 ms elapsed -> IEC62056-21 sending:
<SOH>W1<STX>0.9.2(060225)<ETX>^
578 ms elapsed -> IEC62056-21 received:
<ACK>
2454 ms elapsed -> IEC62056-21 sending:
<SOH>B0<ETX>q
984 ms elapsed -> IEC62056-21 changing baudrate to 300:
9484 ms elapsed -> IEC1107 closing local connection
Remark:
In case of wrong format response will be 'ER05'
Remark:
In case of wrong format response will be 'ER05'
Example:
<NUL><NUL><NUL><NUL>
547 ms elapsed -> IEC62056-21 sending:
/?!<_CR><_LF>
Comm_des_MT830 16 14.11.12
Energy Measurement and Management
Remark:
In case of wrong format response will be 'ER05'
Example:
Remark:
In case of wrong format response will be 'ER05'
Comm_des_MT830 17 14.11.12
Energy Measurement and Management
Example:
Example:
Comm_des_MT830 18 14.11.12
Energy Measurement and Management
<NUL><NUL><NUL><NUL>
547 ms elapsed -> IEC62056-21 sending:
/?!<_CR><_LF>
Example:
Comm_des_MT830 19 14.11.12
Energy Measurement and Management
<NUL><NUL><NUL><NUL>
547 ms elapsed -> IEC62056-21 sending:
/?!<_CR><_LF>
9. Data readout
ACK, 0, Z, 0, CR, LF
After reception of this command, the MT83x meter transmits values of all data which are stated in
the DRO sequence.
Example:
16437 ms elapsed -> IEC1107 opening local 218 ms elapsed -> IEC62056-21 changing baudrate
connection to 9600:
16 ms elapsed -> IEC62056-21 sending: 8500 ms elapsed -> IEC62056-21 received:
<NUL><NUL><NUL><NUL> <STX>0.0.0(00000000)<_CR><_LF>
547 ms elapsed -> IEC62056-21 sending: 0.9.1(180612)<_CR><_LF>
/?!<_CR><_LF> 0.9.2(060116)<_CR><_LF>
0.1.0(3)<_CR><_LF>
1172 ms elapsed -> IEC62056-21 received: 0.1.2*01(0601161742)<_CR><_LF>
/ISK5MT830-1013<_CR><_LF> 0.1.2*02(0601160134)<_CR><_LF>
0.1.2*03(0601152131)<_CR><_LF>
203 ms elapsed -> IEC62056-21 sending: 0.1.2*04()<_CR><_LF>
<ACK>050<_CR><_LF> 0.1.2*05()<_CR><_LF>
0.1.2*06()<_CR><_LF>
Comm_des_MT830 20 14.11.12
Energy Measurement and Management
0.1.2*07()<_CR><_LF> 9.6.0*10()<_CR><_LF>
0.1.2*08()<_CR><_LF> 9.6.0*11()<_CR><_LF>
0.1.2*09()<_CR><_LF> 9.6.0*12()<_CR><_LF>
0.1.2*10()<_CR><_LF> 9.6.0*13()<_CR><_LF>
0.1.2*11()<_CR><_LF> 9.6.0*14()<_CR><_LF>
0.1.2*12()<_CR><_LF> 9.6.0*15()<_CR><_LF>
0.1.2*13()<_CR><_LF> 1.8.0(00001.0 kWh)<_CR><_LF>
0.1.2*14()<_CR><_LF> 1.8.0*01(00000.9 kWh)<_CR><_LF>
0.1.2*15()<_CR><_LF> 1.8.0*02(00000.1 kWh)<_CR><_LF>
1.2.0(000.2008 kW)<_CR><_LF> 1.8.0*03(00000.0 kWh)<_CR><_LF>
1.6.0(0.0774 kW)(0060116180000)<_CR><_LF> 1.8.0*04()<_CR><_LF>
1.6.0*01(0.0516 kW)(0060116083000)<_CR><_LF> 1.8.0*05()<_CR><_LF>
1.6.0*02(0.0500 kW)(0060116013000)<_CR><_LF> 1.8.0*06()<_CR><_LF>
1.6.0*03(0.0992 kW)(0060115213000)<_CR><_LF> 1.8.0*07()<_CR><_LF>
1.6.0*04()<_CR><_LF> 1.8.0*08()<_CR><_LF>
1.6.0*05()<_CR><_LF> 1.8.0*09()<_CR><_LF>
1.6.0*06()<_CR><_LF> 1.8.0*10()<_CR><_LF>
1.6.0*07()<_CR><_LF> 1.8.0*11()<_CR><_LF>
1.6.0*08()<_CR><_LF> 1.8.0*12()<_CR><_LF>
1.6.0*09()<_CR><_LF> 1.8.0*13()<_CR><_LF>
1.6.0*10()<_CR><_LF> 1.8.0*14()<_CR><_LF>
1.6.0*11()<_CR><_LF> 1.8.0*15()<_CR><_LF>
1.6.0*12()<_CR><_LF> 1.8.1(00000.9 kWh)<_CR><_LF>
1.6.0*13()<_CR><_LF> 1.8.1*01(00000.8 kWh)<_CR><_LF>
1.6.0*14()<_CR><_LF> 1.8.1*02(00000.0 kWh)<_CR><_LF>
1.6.0*15()<_CR><_LF> 1.8.1*03(00000.0 kWh)<_CR><_LF>
1.6.1*01(0.0516 kW)(0060116083000)<_CR><_LF> 1.8.1*04()<_CR><_LF>
1.6.1*02(0.0500 kW)(0060116013000)<_CR><_LF> 1.8.1*05()<_CR><_LF>
1.6.1*03(0.0000 kW)(0000101000000)<_CR><_LF> 1.8.1*06()<_CR><_LF>
1.6.1*04()<_CR><_LF> 1.8.1*07()<_CR><_LF>
1.6.1*05()<_CR><_LF> 1.8.1*08()<_CR><_LF>
1.6.1*06()<_CR><_LF> 1.8.1*09()<_CR><_LF>
1.6.1*07()<_CR><_LF> 1.8.1*10()<_CR><_LF>
1.6.1*08()<_CR><_LF> 1.8.1*11()<_CR><_LF>
1.6.1*09()<_CR><_LF> 1.8.1*12()<_CR><_LF>
1.6.1*10()<_CR><_LF> 1.8.1*13()<_CR><_LF>
1.6.1*11()<_CR><_LF> 1.8.1*14()<_CR><_LF>
1.6.1*12()<_CR><_LF> 1.8.1*15()<_CR><_LF>
1.6.1*13()<_CR><_LF> 1.8.2(00000.0 kWh)<_CR><_LF>
1.6.1*14()<_CR><_LF> 1.8.2*01(00000.0 kWh)<_CR><_LF>
1.6.1*15()<_CR><_LF> 1.8.2*02(00000.0 kWh)<_CR><_LF>
1.6.2*01(0.0000 kW)(0000101000000)<_CR><_LF> 1.8.2*03(00000.0 kWh)<_CR><_LF>
1.6.2*02(0.0194 kW)(0060115213716)<_CR><_LF> 1.8.2*04()<_CR><_LF>
1.6.2*03(0.0992 kW)(0060115213000)<_CR><_LF> 1.8.2*05()<_CR><_LF>
1.6.2*04()<_CR><_LF> 1.8.2*06()<_CR><_LF>
1.6.2*05()<_CR><_LF> 1.8.2*07()<_CR><_LF>
1.6.2*06()<_CR><_LF> 1.8.2*08()<_CR><_LF>
1.6.2*07()<_CR><_LF> 1.8.2*09()<_CR><_LF>
1.6.2*08()<_CR><_LF> 1.8.2*10()<_CR><_LF>
1.6.2*09()<_CR><_LF> 1.8.2*11()<_CR><_LF>
1.6.2*10()<_CR><_LF> 1.8.2*12()<_CR><_LF>
1.6.2*11()<_CR><_LF> 1.8.2*13()<_CR><_LF>
1.6.2*12()<_CR><_LF> 1.8.2*14()<_CR><_LF>
1.6.2*13()<_CR><_LF> 1.8.2*15()<_CR><_LF>
1.6.2*14()<_CR><_LF> 21.8.0(00000.0 kWh)<_CR><_LF>
1.6.2*15()<_CR><_LF> 21.8.0*01(00000.0 kWh)<_CR><_LF>
9.6.0(0.4842 kVA)(0060116180000)<_CR><_LF> 21.8.0*02(00000.0 kWh)<_CR><_LF>
9.6.0*01(0.4766 kVA)(0060116020000)<_CR><_LF> 21.8.0*03(00000.0 kWh)<_CR><_LF>
9.6.0*02(0.4088 kVA)(0060116010000)<_CR><_LF> 21.8.0*04()<_CR><_LF>
9.6.0*03(0.5182 kVA)(0060115213000)<_CR><_LF> 21.8.0*05()<_CR><_LF>
9.6.0*04()<_CR><_LF> 21.8.0*06()<_CR><_LF>
9.6.0*05()<_CR><_LF> 21.8.0*07()<_CR><_LF>
9.6.0*06()<_CR><_LF> 21.8.0*08()<_CR><_LF>
9.6.0*07()<_CR><_LF> 21.8.0*09()<_CR><_LF>
9.6.0*08()<_CR><_LF> 21.8.0*10()<_CR><_LF>
9.6.0*09()<_CR><_LF> 21.8.0*11()<_CR><_LF>
Comm_des_MT830 1 14.11.12
Energy Measurement and Management
21.8.0*12()<_CR><_LF> 3.8.0*14()<_CR><_LF>
21.8.0*13()<_CR><_LF> 3.8.0*15()<_CR><_LF>
21.8.0*14()<_CR><_LF> 23.8.0(00000.0 kvarh)<_CR><_LF>
21.8.0*15()<_CR><_LF> 23.8.0*01(00000.0 kvarh)<_CR><_LF>
41.8.0(00000.2 kWh)<_CR><_LF> 23.8.0*02(00000.0 kvarh)<_CR><_LF>
41.8.0*01(00000.2 kWh)<_CR><_LF> 23.8.0*03(00000.0 kvarh)<_CR><_LF>
41.8.0*02(00000.0 kWh)<_CR><_LF> 23.8.0*04()<_CR><_LF>
41.8.0*03(00000.0 kWh)<_CR><_LF> 23.8.0*05()<_CR><_LF>
41.8.0*04()<_CR><_LF> 23.8.0*06()<_CR><_LF>
41.8.0*05()<_CR><_LF> 23.8.0*07()<_CR><_LF>
41.8.0*06()<_CR><_LF> 23.8.0*08()<_CR><_LF>
41.8.0*07()<_CR><_LF> 23.8.0*09()<_CR><_LF>
41.8.0*08()<_CR><_LF> 23.8.0*10()<_CR><_LF>
41.8.0*09()<_CR><_LF> 23.8.0*11()<_CR><_LF>
41.8.0*10()<_CR><_LF> 23.8.0*12()<_CR><_LF>
41.8.0*11()<_CR><_LF> 23.8.0*13()<_CR><_LF>
41.8.0*12()<_CR><_LF> 23.8.0*14()<_CR><_LF>
41.8.0*13()<_CR><_LF> 23.8.0*15()<_CR><_LF>
41.8.0*14()<_CR><_LF> 43.8.0(00001.5 kvarh)<_CR><_LF>
41.8.0*15()<_CR><_LF> 43.8.0*01(00001.5 kvarh)<_CR><_LF>
61.8.0(00000.6 kWh)<_CR><_LF> 43.8.0*02(00000.1 kvarh)<_CR><_LF>
61.8.0*01(00000.6 kWh)<_CR><_LF> 43.8.0*03(00000.0 kvarh)<_CR><_LF>
61.8.0*02(00000.0 kWh)<_CR><_LF> 43.8.0*04()<_CR><_LF>
61.8.0*03(00000.0 kWh)<_CR><_LF> 43.8.0*05()<_CR><_LF>
61.8.0*04()<_CR><_LF> 43.8.0*06()<_CR><_LF>
61.8.0*05()<_CR><_LF> 43.8.0*07()<_CR><_LF>
61.8.0*06()<_CR><_LF> 43.8.0*08()<_CR><_LF>
61.8.0*07()<_CR><_LF> 43.8.0*09()<_CR><_LF>
61.8.0*08()<_CR><_LF> 43.8.0*10()<_CR><_LF>
61.8.0*09()<_CR><_LF> 43.8.0*11()<_CR><_LF>
61.8.0*10()<_CR><_LF> 43.8.0*12()<_CR><_LF>
61.8.0*11()<_CR><_LF> 43.8.0*13()<_CR><_LF>
61.8.0*12()<_CR><_LF> 43.8.0*14()<_CR><_LF>
61.8.0*13()<_CR><_LF> 43.8.0*15()<_CR><_LF>
61.8.0*14()<_CR><_LF> 63.8.0(00002.3 kvarh)<_CR><_LF>
61.8.0*15()<_CR><_LF> 63.8.0*01(00002.3 kvarh)<_CR><_LF>
2.8.0(00000.0 kWh)<_CR><_LF> 63.8.0*02(00000.3 kvarh)<_CR><_LF>
2.8.0*01(00000.0 kWh)<_CR><_LF> 63.8.0*03(00000.1 kvarh)<_CR><_LF>
2.8.0*02(00000.0 kWh)<_CR><_LF> 63.8.0*04()<_CR><_LF>
2.8.0*03(00000.0 kWh)<_CR><_LF> 63.8.0*05()<_CR><_LF>
2.8.0*04()<_CR><_LF> 63.8.0*06()<_CR><_LF>
2.8.0*05()<_CR><_LF> 63.8.0*07()<_CR><_LF>
2.8.0*06()<_CR><_LF> 63.8.0*08()<_CR><_LF>
2.8.0*07()<_CR><_LF> 63.8.0*09()<_CR><_LF>
2.8.0*08()<_CR><_LF> 63.8.0*10()<_CR><_LF>
2.8.0*09()<_CR><_LF> 63.8.0*11()<_CR><_LF>
2.8.0*10()<_CR><_LF> 63.8.0*12()<_CR><_LF>
2.8.0*11()<_CR><_LF> 63.8.0*13()<_CR><_LF>
2.8.0*12()<_CR><_LF> 63.8.0*14()<_CR><_LF>
2.8.0*13()<_CR><_LF> 63.8.0*15()<_CR><_LF>
2.8.0*14()<_CR><_LF> 4.8.0(00003.4 kvarh)<_CR><_LF>
2.8.0*15()<_CR><_LF> 4.8.0*01(00003.3 kvarh)<_CR><_LF>
3.8.0(00003.9 kvarh)<_CR><_LF> 4.8.0*02(00000.4 kvarh)<_CR><_LF>
3.8.0*01(00003.9 kvarh)<_CR><_LF> 4.8.0*03(00000.1 kvarh)<_CR><_LF>
3.8.0*02(00000.5 kvarh)<_CR><_LF> 4.8.0*04()<_CR><_LF>
3.8.0*03(00000.1 kvarh)<_CR><_LF> 4.8.0*05()<_CR><_LF>
3.8.0*04()<_CR><_LF> 4.8.0*06()<_CR><_LF>
3.8.0*05()<_CR><_LF> 4.8.0*07()<_CR><_LF>
3.8.0*06()<_CR><_LF> 4.8.0*08()<_CR><_LF>
3.8.0*07()<_CR><_LF> 4.8.0*09()<_CR><_LF>
3.8.0*08()<_CR><_LF> 4.8.0*10()<_CR><_LF>
3.8.0*09()<_CR><_LF> 4.8.0*11()<_CR><_LF>
3.8.0*10()<_CR><_LF> 4.8.0*12()<_CR><_LF>
3.8.0*11()<_CR><_LF> 4.8.0*13()<_CR><_LF>
3.8.0*12()<_CR><_LF> 4.8.0*14()<_CR><_LF>
3.8.0*13()<_CR><_LF> 4.8.0*15()<_CR><_LF>
Comm_des_MT830 2 14.11.12
Energy Measurement and Management
Comm_des_MT830 3 14.11.12
Energy Measurement and Management
9.8.0*04()<_CR><_LF> 33.7.0(0.033)<_CR><_LF>
9.8.0*05()<_CR><_LF> 53.7.0(1.000)<_CR><_LF>
9.8.0*06()<_CR><_LF> 73.7.0(0.013)<_CR><_LF>
9.8.0*07()<_CR><_LF> 14.7.0(49.9 Hz)<_CR><_LF>
9.8.0*08()<_CR><_LF> 81.7.40(88.0 deg)<_CR><_LF>
9.8.0*09()<_CR><_LF> 81.7.51(0.0 deg)<_CR><_LF>
9.8.0*10()<_CR><_LF> 81.7.62(89.2 deg)<_CR><_LF>
9.8.0*11()<_CR><_LF> !<_CR><_LF>
9.8.0*12()<_CR><_LF> <ETX>b
9.8.0*13()<_CR><_LF> 407 ms elapsed -> IEC1107 closing local connection
9.8.0*14()<_CR><_LF>
9.8.0*15()<_CR><_LF>
9.8.1(00007.2 kVAh)<_CR><_LF>
9.8.1*01(00007.1 kVAh)<_CR><_LF>
9.8.1*02(00000.6 kVAh)<_CR><_LF>
9.8.1*03(00000.0 kVAh)<_CR><_LF>
9.8.1*04()<_CR><_LF>
9.8.1*05()<_CR><_LF>
9.8.1*06()<_CR><_LF>
9.8.1*07()<_CR><_LF>
9.8.1*08()<_CR><_LF>
9.8.1*09()<_CR><_LF>
9.8.1*10()<_CR><_LF>
9.8.1*11()<_CR><_LF>
9.8.1*12()<_CR><_LF>
9.8.1*13()<_CR><_LF>
9.8.1*14()<_CR><_LF>
9.8.1*15()<_CR><_LF>
9.8.2(00000.3 kVAh)<_CR><_LF>
9.8.2*01(00000.3 kVAh)<_CR><_LF>
9.8.2*02(00000.3 kVAh)<_CR><_LF>
9.8.2*03(00000.2 kVAh)<_CR><_LF>
9.8.2*04()<_CR><_LF>
9.8.2*05()<_CR><_LF>
9.8.2*06()<_CR><_LF>
9.8.2*07()<_CR><_LF>
9.8.2*08()<_CR><_LF>
9.8.2*09()<_CR><_LF>
9.8.2*10()<_CR><_LF>
9.8.2*11()<_CR><_LF>
9.8.2*12()<_CR><_LF>
9.8.2*13()<_CR><_LF>
9.8.2*14()<_CR><_LF>
9.8.2*15()<_CR><_LF>
10.8.0(00000.0 kVAh)<_CR><_LF>
10.8.0*01(00000.0 kVAh)<_CR><_LF>
10.8.0*02(00000.0 kVAh)<_CR><_LF>
10.8.0*03(00000.0 kVAh)<_CR><_LF>
10.8.0*04()<_CR><_LF>
10.8.0*05()<_CR><_LF>
10.8.0*06()<_CR><_LF>
10.8.0*07()<_CR><_LF>
10.8.0*08()<_CR><_LF>
10.8.0*09()<_CR><_LF>
10.8.0*10()<_CR><_LF>
10.8.0*11()<_CR><_LF>
10.8.0*12()<_CR><_LF>
10.8.0*13()<_CR><_LF>
10.8.0*14()<_CR><_LF>
10.8.0*15()<_CR><_LF>
31.7.0(7.9 A)<_CR><_LF>
51.7.0(2.4 A)<_CR><_LF>
71.7.0(5.8 A)<_CR><_LF>
32.7.0(58.1 V)<_CR><_LF>
52.7.0(58.6 V)<_CR><_LF>
72.7.0(58.2 V)<_CR><_LF>
Comm_des_MT830 4 14.11.12
Energy measurement
Communication
Specification
Energy Measurement and Management
1. IEC62056-21 (former IEC1107) standard is used (for data formats, timeouts,...) – Mode C with
password
2. OBIS (Energy Data Information System) = Preliminary standard by IEC TC13 WG14 number
62056-61
4. Supported baudrates:
For optical interface – up to 9600 baud
For RS-232, RS-485 and 20-mA current loop – up to 19.200 baud (recommended 9600)
5. RS-232, RS-485 or 20-mA current loop interface can operate without switching of baudrate
from 300 to "Z" baud as stands in IEC 1107. In the case that there is fixed baudrate on RS-
232/485 or 20-mA current loop interface it is necessary to send some NUL characters (typ. 8
characters) or to implement "Retry" (two or three) of opening sequence (/?!CRLF) to "wake up"
the port and to prepare the MT830 for the right communication baudrate. The MT830 is always
waiting the very first character in request on 300 baud.
6. Optical interface always work with switch of baudrate from 300 to “z”.
Comm_des_MT830 1 14.11.12
Energy Measurement and Management
Data formats
The assignements for the formats in the tables/data representations have the following meaning:
For integer numbers and alphanumeric strings n specifies the total number of characters.
For floating decimals, the number in front of the brackets specifies the total number of digits. The
numbers within the brackets specify the range for the number of decimal positions.
For dates, times and timestamps the number specifies the total number of digits including any
separation characters between. Definition for seasonal parameter “y”:
y = 0: normal time
y = 1: daylight savings time
y = 2: UTC
Comm_des_MT830 2 14.11.12
Energy Measurement and Management
The following table describes returned ER_ as they are sent by meter device in cases of
unsuccessfully executed IEC1107 command. This mechanism is used by IEC1107 protocol to
inform the user why requested command can not be executed.
IEC1107_ERROR_NOTFOUND ER01
IEC1107_ERROR_NOTIMPLEMENTED ER02
IEC1107_ERROR_BADPARAM ER03
IEC1107_ERROR_BADINDEX ER04
IEC1107_ERROR_BADVALUE ER05
IEC1107_ERROR_BADCOMMAND ER06
IEC1107_ERROR_NOTAUTHORISED ER07
IEC1107_ERROR_NODATA ER08
IEC1107_ERROR_NORESOURCE ER09
IEC1107_ERROR_DEVICEERROR ER10
IEC1107_ERROR_BADADDRESS ER11
IEC1107_ERROR_UNKNOWN ER12
Example:
Comm_des_MT830 3 14.11.12
Energy Measurement and Management
Comm_des_MT830 4 14.11.12
Energy Measurement and Management
Logbook read is possible with commands R5 (all in one block) or R6 (in partial blocks).
Format:
<SOH>R5<STX>P.98(;) - Read all 255 events in one block
Comm_des_MT830 5 14.11.12
Energy Measurement and Management
LogBook Format :
Example:
1. R5 command – total
Comm_des_MT830 6 14.11.12
Energy Measurement and Management
<SOH>B0<ETX>q
984 ms elapsed -> IEC62056-21 changing baudrate to 300:
204 ms elapsed -> IEC1107 closing local connection
Comm_des_MT830 7 14.11.12
Energy Measurement and Management
Comm_des_MT830 8 14.11.12
Energy Measurement and Management
5. E2 command
Format:
Example:
Comm_des_MT830 9 14.11.12
Energy Measurement and Management
6. Load profile
Load profile read is possible with commands R5 (one block) or R6 (partial block).
Format:
By R6 command the reading device (PC or HHU) has to send <ACK> if block checksum is OK or
<NAK> if it is not OK. In latter case the meter will repeat sending the same block for 3 times (if
each time checksum is not OK).
Example:
Comm_des_MT830 10 14.11.12
Energy Measurement and Management
Comm_des_MT830 11 14.11.12
Energy Measurement and Management
Comm_des_MT830 12 14.11.12
Energy Measurement and Management
2. Reading all LP with R5 command (Multiples header formating) – for reading with P2S
Parameter “Map 1107 Mode” (in MeterView: group Common) must be set to Multiples in order to
get following readout.
Examples:
Comm_des_MT830 13 14.11.12
Energy Measurement and Management
/ISK5MT830-1034<_CR><_LF>
Comm_des_MT830 14 14.11.12
Energy Measurement and Management
There are four possibilities for set time and date in MT83x:
with command W1 and write of registers 0.9.1 and 0.9.2 - two steps
with command W5 and write of registers 0.9.1 and 0.9.2 - two steps
with command W1 and register 0.9.4 - one step
with command W5 and register 0.9.4 - one step
Remark:
In case of wrong format response will be 'ER05'
Remark:
In case of wrong format response will be 'ER05'
Example:
Comm_des_MT830 15 14.11.12
Energy Measurement and Management
<ACK>
14859 ms elapsed -> IEC62056-21 sending:
<SOH>W1<STX>0.9.2(060225)<ETX>^
578 ms elapsed -> IEC62056-21 received:
<ACK>
2454 ms elapsed -> IEC62056-21 sending:
<SOH>B0<ETX>q
984 ms elapsed -> IEC62056-21 changing baudrate to 300:
9484 ms elapsed -> IEC1107 closing local connection
Remark:
In case of wrong format response will be 'ER05'
Remark:
In case of wrong format response will be 'ER05'
Example:
<NUL><NUL><NUL><NUL>
547 ms elapsed -> IEC62056-21 sending:
/?!<_CR><_LF>
Comm_des_MT830 16 14.11.12
Energy Measurement and Management
Remark:
In case of wrong format response will be 'ER05'
Example:
Remark:
In case of wrong format response will be 'ER05'
Comm_des_MT830 17 14.11.12
Energy Measurement and Management
Example:
Example:
Comm_des_MT830 18 14.11.12
Energy Measurement and Management
<NUL><NUL><NUL><NUL>
547 ms elapsed -> IEC62056-21 sending:
/?!<_CR><_LF>
Example:
Comm_des_MT830 19 14.11.12
Energy Measurement and Management
<NUL><NUL><NUL><NUL>
547 ms elapsed -> IEC62056-21 sending:
/?!<_CR><_LF>
9. Data readout
ACK, 0, Z, 0, CR, LF
After reception of this command, the MT83x meter transmits values of all data which are stated in
the DRO sequence.
Example:
16437 ms elapsed -> IEC1107 opening local 218 ms elapsed -> IEC62056-21 changing baudrate
connection to 9600:
16 ms elapsed -> IEC62056-21 sending: 8500 ms elapsed -> IEC62056-21 received:
<NUL><NUL><NUL><NUL> <STX>0.0.0(00000000)<_CR><_LF>
547 ms elapsed -> IEC62056-21 sending: 0.9.1(180612)<_CR><_LF>
/?!<_CR><_LF> 0.9.2(060116)<_CR><_LF>
0.1.0(3)<_CR><_LF>
1172 ms elapsed -> IEC62056-21 received: 0.1.2*01(0601161742)<_CR><_LF>
/ISK5MT830-1013<_CR><_LF> 0.1.2*02(0601160134)<_CR><_LF>
0.1.2*03(0601152131)<_CR><_LF>
203 ms elapsed -> IEC62056-21 sending: 0.1.2*04()<_CR><_LF>
<ACK>050<_CR><_LF> 0.1.2*05()<_CR><_LF>
0.1.2*06()<_CR><_LF>
Comm_des_MT830 20 14.11.12
Energy Measurement and Management
0.1.2*07()<_CR><_LF> 9.6.0*10()<_CR><_LF>
0.1.2*08()<_CR><_LF> 9.6.0*11()<_CR><_LF>
0.1.2*09()<_CR><_LF> 9.6.0*12()<_CR><_LF>
0.1.2*10()<_CR><_LF> 9.6.0*13()<_CR><_LF>
0.1.2*11()<_CR><_LF> 9.6.0*14()<_CR><_LF>
0.1.2*12()<_CR><_LF> 9.6.0*15()<_CR><_LF>
0.1.2*13()<_CR><_LF> 1.8.0(00001.0 kWh)<_CR><_LF>
0.1.2*14()<_CR><_LF> 1.8.0*01(00000.9 kWh)<_CR><_LF>
0.1.2*15()<_CR><_LF> 1.8.0*02(00000.1 kWh)<_CR><_LF>
1.2.0(000.2008 kW)<_CR><_LF> 1.8.0*03(00000.0 kWh)<_CR><_LF>
1.6.0(0.0774 kW)(0060116180000)<_CR><_LF> 1.8.0*04()<_CR><_LF>
1.6.0*01(0.0516 kW)(0060116083000)<_CR><_LF> 1.8.0*05()<_CR><_LF>
1.6.0*02(0.0500 kW)(0060116013000)<_CR><_LF> 1.8.0*06()<_CR><_LF>
1.6.0*03(0.0992 kW)(0060115213000)<_CR><_LF> 1.8.0*07()<_CR><_LF>
1.6.0*04()<_CR><_LF> 1.8.0*08()<_CR><_LF>
1.6.0*05()<_CR><_LF> 1.8.0*09()<_CR><_LF>
1.6.0*06()<_CR><_LF> 1.8.0*10()<_CR><_LF>
1.6.0*07()<_CR><_LF> 1.8.0*11()<_CR><_LF>
1.6.0*08()<_CR><_LF> 1.8.0*12()<_CR><_LF>
1.6.0*09()<_CR><_LF> 1.8.0*13()<_CR><_LF>
1.6.0*10()<_CR><_LF> 1.8.0*14()<_CR><_LF>
1.6.0*11()<_CR><_LF> 1.8.0*15()<_CR><_LF>
1.6.0*12()<_CR><_LF> 1.8.1(00000.9 kWh)<_CR><_LF>
1.6.0*13()<_CR><_LF> 1.8.1*01(00000.8 kWh)<_CR><_LF>
1.6.0*14()<_CR><_LF> 1.8.1*02(00000.0 kWh)<_CR><_LF>
1.6.0*15()<_CR><_LF> 1.8.1*03(00000.0 kWh)<_CR><_LF>
1.6.1*01(0.0516 kW)(0060116083000)<_CR><_LF> 1.8.1*04()<_CR><_LF>
1.6.1*02(0.0500 kW)(0060116013000)<_CR><_LF> 1.8.1*05()<_CR><_LF>
1.6.1*03(0.0000 kW)(0000101000000)<_CR><_LF> 1.8.1*06()<_CR><_LF>
1.6.1*04()<_CR><_LF> 1.8.1*07()<_CR><_LF>
1.6.1*05()<_CR><_LF> 1.8.1*08()<_CR><_LF>
1.6.1*06()<_CR><_LF> 1.8.1*09()<_CR><_LF>
1.6.1*07()<_CR><_LF> 1.8.1*10()<_CR><_LF>
1.6.1*08()<_CR><_LF> 1.8.1*11()<_CR><_LF>
1.6.1*09()<_CR><_LF> 1.8.1*12()<_CR><_LF>
1.6.1*10()<_CR><_LF> 1.8.1*13()<_CR><_LF>
1.6.1*11()<_CR><_LF> 1.8.1*14()<_CR><_LF>
1.6.1*12()<_CR><_LF> 1.8.1*15()<_CR><_LF>
1.6.1*13()<_CR><_LF> 1.8.2(00000.0 kWh)<_CR><_LF>
1.6.1*14()<_CR><_LF> 1.8.2*01(00000.0 kWh)<_CR><_LF>
1.6.1*15()<_CR><_LF> 1.8.2*02(00000.0 kWh)<_CR><_LF>
1.6.2*01(0.0000 kW)(0000101000000)<_CR><_LF> 1.8.2*03(00000.0 kWh)<_CR><_LF>
1.6.2*02(0.0194 kW)(0060115213716)<_CR><_LF> 1.8.2*04()<_CR><_LF>
1.6.2*03(0.0992 kW)(0060115213000)<_CR><_LF> 1.8.2*05()<_CR><_LF>
1.6.2*04()<_CR><_LF> 1.8.2*06()<_CR><_LF>
1.6.2*05()<_CR><_LF> 1.8.2*07()<_CR><_LF>
1.6.2*06()<_CR><_LF> 1.8.2*08()<_CR><_LF>
1.6.2*07()<_CR><_LF> 1.8.2*09()<_CR><_LF>
1.6.2*08()<_CR><_LF> 1.8.2*10()<_CR><_LF>
1.6.2*09()<_CR><_LF> 1.8.2*11()<_CR><_LF>
1.6.2*10()<_CR><_LF> 1.8.2*12()<_CR><_LF>
1.6.2*11()<_CR><_LF> 1.8.2*13()<_CR><_LF>
1.6.2*12()<_CR><_LF> 1.8.2*14()<_CR><_LF>
1.6.2*13()<_CR><_LF> 1.8.2*15()<_CR><_LF>
1.6.2*14()<_CR><_LF> 21.8.0(00000.0 kWh)<_CR><_LF>
1.6.2*15()<_CR><_LF> 21.8.0*01(00000.0 kWh)<_CR><_LF>
9.6.0(0.4842 kVA)(0060116180000)<_CR><_LF> 21.8.0*02(00000.0 kWh)<_CR><_LF>
9.6.0*01(0.4766 kVA)(0060116020000)<_CR><_LF> 21.8.0*03(00000.0 kWh)<_CR><_LF>
9.6.0*02(0.4088 kVA)(0060116010000)<_CR><_LF> 21.8.0*04()<_CR><_LF>
9.6.0*03(0.5182 kVA)(0060115213000)<_CR><_LF> 21.8.0*05()<_CR><_LF>
9.6.0*04()<_CR><_LF> 21.8.0*06()<_CR><_LF>
9.6.0*05()<_CR><_LF> 21.8.0*07()<_CR><_LF>
9.6.0*06()<_CR><_LF> 21.8.0*08()<_CR><_LF>
9.6.0*07()<_CR><_LF> 21.8.0*09()<_CR><_LF>
9.6.0*08()<_CR><_LF> 21.8.0*10()<_CR><_LF>
9.6.0*09()<_CR><_LF> 21.8.0*11()<_CR><_LF>
Comm_des_MT830 1 14.11.12
Energy Measurement and Management
21.8.0*12()<_CR><_LF> 3.8.0*14()<_CR><_LF>
21.8.0*13()<_CR><_LF> 3.8.0*15()<_CR><_LF>
21.8.0*14()<_CR><_LF> 23.8.0(00000.0 kvarh)<_CR><_LF>
21.8.0*15()<_CR><_LF> 23.8.0*01(00000.0 kvarh)<_CR><_LF>
41.8.0(00000.2 kWh)<_CR><_LF> 23.8.0*02(00000.0 kvarh)<_CR><_LF>
41.8.0*01(00000.2 kWh)<_CR><_LF> 23.8.0*03(00000.0 kvarh)<_CR><_LF>
41.8.0*02(00000.0 kWh)<_CR><_LF> 23.8.0*04()<_CR><_LF>
41.8.0*03(00000.0 kWh)<_CR><_LF> 23.8.0*05()<_CR><_LF>
41.8.0*04()<_CR><_LF> 23.8.0*06()<_CR><_LF>
41.8.0*05()<_CR><_LF> 23.8.0*07()<_CR><_LF>
41.8.0*06()<_CR><_LF> 23.8.0*08()<_CR><_LF>
41.8.0*07()<_CR><_LF> 23.8.0*09()<_CR><_LF>
41.8.0*08()<_CR><_LF> 23.8.0*10()<_CR><_LF>
41.8.0*09()<_CR><_LF> 23.8.0*11()<_CR><_LF>
41.8.0*10()<_CR><_LF> 23.8.0*12()<_CR><_LF>
41.8.0*11()<_CR><_LF> 23.8.0*13()<_CR><_LF>
41.8.0*12()<_CR><_LF> 23.8.0*14()<_CR><_LF>
41.8.0*13()<_CR><_LF> 23.8.0*15()<_CR><_LF>
41.8.0*14()<_CR><_LF> 43.8.0(00001.5 kvarh)<_CR><_LF>
41.8.0*15()<_CR><_LF> 43.8.0*01(00001.5 kvarh)<_CR><_LF>
61.8.0(00000.6 kWh)<_CR><_LF> 43.8.0*02(00000.1 kvarh)<_CR><_LF>
61.8.0*01(00000.6 kWh)<_CR><_LF> 43.8.0*03(00000.0 kvarh)<_CR><_LF>
61.8.0*02(00000.0 kWh)<_CR><_LF> 43.8.0*04()<_CR><_LF>
61.8.0*03(00000.0 kWh)<_CR><_LF> 43.8.0*05()<_CR><_LF>
61.8.0*04()<_CR><_LF> 43.8.0*06()<_CR><_LF>
61.8.0*05()<_CR><_LF> 43.8.0*07()<_CR><_LF>
61.8.0*06()<_CR><_LF> 43.8.0*08()<_CR><_LF>
61.8.0*07()<_CR><_LF> 43.8.0*09()<_CR><_LF>
61.8.0*08()<_CR><_LF> 43.8.0*10()<_CR><_LF>
61.8.0*09()<_CR><_LF> 43.8.0*11()<_CR><_LF>
61.8.0*10()<_CR><_LF> 43.8.0*12()<_CR><_LF>
61.8.0*11()<_CR><_LF> 43.8.0*13()<_CR><_LF>
61.8.0*12()<_CR><_LF> 43.8.0*14()<_CR><_LF>
61.8.0*13()<_CR><_LF> 43.8.0*15()<_CR><_LF>
61.8.0*14()<_CR><_LF> 63.8.0(00002.3 kvarh)<_CR><_LF>
61.8.0*15()<_CR><_LF> 63.8.0*01(00002.3 kvarh)<_CR><_LF>
2.8.0(00000.0 kWh)<_CR><_LF> 63.8.0*02(00000.3 kvarh)<_CR><_LF>
2.8.0*01(00000.0 kWh)<_CR><_LF> 63.8.0*03(00000.1 kvarh)<_CR><_LF>
2.8.0*02(00000.0 kWh)<_CR><_LF> 63.8.0*04()<_CR><_LF>
2.8.0*03(00000.0 kWh)<_CR><_LF> 63.8.0*05()<_CR><_LF>
2.8.0*04()<_CR><_LF> 63.8.0*06()<_CR><_LF>
2.8.0*05()<_CR><_LF> 63.8.0*07()<_CR><_LF>
2.8.0*06()<_CR><_LF> 63.8.0*08()<_CR><_LF>
2.8.0*07()<_CR><_LF> 63.8.0*09()<_CR><_LF>
2.8.0*08()<_CR><_LF> 63.8.0*10()<_CR><_LF>
2.8.0*09()<_CR><_LF> 63.8.0*11()<_CR><_LF>
2.8.0*10()<_CR><_LF> 63.8.0*12()<_CR><_LF>
2.8.0*11()<_CR><_LF> 63.8.0*13()<_CR><_LF>
2.8.0*12()<_CR><_LF> 63.8.0*14()<_CR><_LF>
2.8.0*13()<_CR><_LF> 63.8.0*15()<_CR><_LF>
2.8.0*14()<_CR><_LF> 4.8.0(00003.4 kvarh)<_CR><_LF>
2.8.0*15()<_CR><_LF> 4.8.0*01(00003.3 kvarh)<_CR><_LF>
3.8.0(00003.9 kvarh)<_CR><_LF> 4.8.0*02(00000.4 kvarh)<_CR><_LF>
3.8.0*01(00003.9 kvarh)<_CR><_LF> 4.8.0*03(00000.1 kvarh)<_CR><_LF>
3.8.0*02(00000.5 kvarh)<_CR><_LF> 4.8.0*04()<_CR><_LF>
3.8.0*03(00000.1 kvarh)<_CR><_LF> 4.8.0*05()<_CR><_LF>
3.8.0*04()<_CR><_LF> 4.8.0*06()<_CR><_LF>
3.8.0*05()<_CR><_LF> 4.8.0*07()<_CR><_LF>
3.8.0*06()<_CR><_LF> 4.8.0*08()<_CR><_LF>
3.8.0*07()<_CR><_LF> 4.8.0*09()<_CR><_LF>
3.8.0*08()<_CR><_LF> 4.8.0*10()<_CR><_LF>
3.8.0*09()<_CR><_LF> 4.8.0*11()<_CR><_LF>
3.8.0*10()<_CR><_LF> 4.8.0*12()<_CR><_LF>
3.8.0*11()<_CR><_LF> 4.8.0*13()<_CR><_LF>
3.8.0*12()<_CR><_LF> 4.8.0*14()<_CR><_LF>
3.8.0*13()<_CR><_LF> 4.8.0*15()<_CR><_LF>
Comm_des_MT830 2 14.11.12
Energy Measurement and Management
Comm_des_MT830 3 14.11.12
Energy Measurement and Management
9.8.0*04()<_CR><_LF> 33.7.0(0.033)<_CR><_LF>
9.8.0*05()<_CR><_LF> 53.7.0(1.000)<_CR><_LF>
9.8.0*06()<_CR><_LF> 73.7.0(0.013)<_CR><_LF>
9.8.0*07()<_CR><_LF> 14.7.0(49.9 Hz)<_CR><_LF>
9.8.0*08()<_CR><_LF> 81.7.40(88.0 deg)<_CR><_LF>
9.8.0*09()<_CR><_LF> 81.7.51(0.0 deg)<_CR><_LF>
9.8.0*10()<_CR><_LF> 81.7.62(89.2 deg)<_CR><_LF>
9.8.0*11()<_CR><_LF> !<_CR><_LF>
9.8.0*12()<_CR><_LF> <ETX>b
9.8.0*13()<_CR><_LF> 407 ms elapsed -> IEC1107 closing local connection
9.8.0*14()<_CR><_LF>
9.8.0*15()<_CR><_LF>
9.8.1(00007.2 kVAh)<_CR><_LF>
9.8.1*01(00007.1 kVAh)<_CR><_LF>
9.8.1*02(00000.6 kVAh)<_CR><_LF>
9.8.1*03(00000.0 kVAh)<_CR><_LF>
9.8.1*04()<_CR><_LF>
9.8.1*05()<_CR><_LF>
9.8.1*06()<_CR><_LF>
9.8.1*07()<_CR><_LF>
9.8.1*08()<_CR><_LF>
9.8.1*09()<_CR><_LF>
9.8.1*10()<_CR><_LF>
9.8.1*11()<_CR><_LF>
9.8.1*12()<_CR><_LF>
9.8.1*13()<_CR><_LF>
9.8.1*14()<_CR><_LF>
9.8.1*15()<_CR><_LF>
9.8.2(00000.3 kVAh)<_CR><_LF>
9.8.2*01(00000.3 kVAh)<_CR><_LF>
9.8.2*02(00000.3 kVAh)<_CR><_LF>
9.8.2*03(00000.2 kVAh)<_CR><_LF>
9.8.2*04()<_CR><_LF>
9.8.2*05()<_CR><_LF>
9.8.2*06()<_CR><_LF>
9.8.2*07()<_CR><_LF>
9.8.2*08()<_CR><_LF>
9.8.2*09()<_CR><_LF>
9.8.2*10()<_CR><_LF>
9.8.2*11()<_CR><_LF>
9.8.2*12()<_CR><_LF>
9.8.2*13()<_CR><_LF>
9.8.2*14()<_CR><_LF>
9.8.2*15()<_CR><_LF>
10.8.0(00000.0 kVAh)<_CR><_LF>
10.8.0*01(00000.0 kVAh)<_CR><_LF>
10.8.0*02(00000.0 kVAh)<_CR><_LF>
10.8.0*03(00000.0 kVAh)<_CR><_LF>
10.8.0*04()<_CR><_LF>
10.8.0*05()<_CR><_LF>
10.8.0*06()<_CR><_LF>
10.8.0*07()<_CR><_LF>
10.8.0*08()<_CR><_LF>
10.8.0*09()<_CR><_LF>
10.8.0*10()<_CR><_LF>
10.8.0*11()<_CR><_LF>
10.8.0*12()<_CR><_LF>
10.8.0*13()<_CR><_LF>
10.8.0*14()<_CR><_LF>
10.8.0*15()<_CR><_LF>
31.7.0(7.9 A)<_CR><_LF>
51.7.0(2.4 A)<_CR><_LF>
71.7.0(5.8 A)<_CR><_LF>
32.7.0(58.1 V)<_CR><_LF>
52.7.0(58.6 V)<_CR><_LF>
72.7.0(58.2 V)<_CR><_LF>
Comm_des_MT830 4 14.11.12
Energy measurement
MT830/MT831 !
Technical Description
Version 1.4
Energy Measurement and Management
Table of contents:
MT830/MT831 – Three-phase electronic multi-function meter .............................. 3
1. Meter characteristics ............................................................................................. 4
2. Constituent parts ................................................................................................... 5
2.1. Measuring system ............................................................................................. 6
2.2. Microcomputer ................................................................................................... 7
2.3. Real time clock .................................................................................................. 7
2.4. LEDs .................................................................................................................. 7
3. Multi-tariff registration ........................................................................................... 7
4. Maximum demand indicator ................................................................................. 8
5. Load Profile ............................................................................................................ 8
6. Registration of energy / power ............................................................................. 8
7. Display .................................................................................................................... 9
7.1. Keys................................................................................................................. 10
8. Communication interfaces .................................................................................. 10
8.1. IR communication interface ............................................................................. 10
8.1.1. Meter reading in absence of measuring voltages (option) ....................... 10
8.2. RS-485 interface ............................................................................................. 10
8.3. RS-232 interface ............................................................................................. 11
8.4. CS-communication interface ........................................................................... 11
9. Input /output module (MT831 meter only) ......................................................... 12
10. Communication module (MT831 meter only) .................................................. 14
11. Fraud protection ................................................................................................ 15
11.1. Detection of meter cover and terminal cover opening .................................. 15
12. Handling with the meter .................................................................................... 16
13. Connection procedure....................................................................................... 16
14. Housing ............................................................................................................... 17
15. Terminal block .................................................................................................... 20
15.1. Terminal block ............................................................................................... 20
15.2. Current terminals ........................................................................................... 20
15.3. Auxiliary voltage terminals: ........................................................................... 20
15.4. Sliding voltage bridge .................................................................................... 20
15.5. Dimensions .................................................................................................... 21
16. Maintenance: ...................................................................................................... 22
17. Lifetime: .............................................................................................................. 22
18. Technical data .................................................................................................... 22
19. Type designation ............................................................................................... 25
19.1. Meter marking ............................................................................................... 25
20. Input-output module marking (for MT831 meter only) ................................... 26
21. Communication module marking (for MT831 meters only) ........................... 27
22. Configuring a PC modem .................................................................................. 30
Appendix A: OBIS codes and data names ............................................................ 36
Appendix B: Log book events ................................................................................ 43
Appendix C: Connection diagrams ........................................................................ 45
MT830/MT831 ─ Three-phase electronic multi-function meter
MT831 – a modular meter version with communication (MK) and input/output (MIO) module which could be
subsequently built into the meter and six additional terminals
3
MT830/MT831 ─ Three-phase electronic multi-function meter
1. Meter characteristics
Communication with the meter is performed in compliance with the IEC 62056-21 standard, mode C. The meter
operation is not affected during communication.
Type of communication:
Serial asynchronous half-duplex ISO 1177
1 start bit
7 data bits
1 bit parity - even
1 stop bit
data transfer rate: 300, 600, 1200, 2400, 4800, 9600 Baud
Each communication port supports “fix” baud rate (for use of transparent telephone modems) or communication protocol
according to IEC 62056-21 standard (communication sequence is started with 300 baud). Communication parameters in
the meter are programmable.
The meter enables separate read out (different data) via IR and other communication interface at the same time.
The MT831 meter could be equipped with different communication modules (MK).
Two inputs (3 terminals) are used
Functional or
Impulse inputs
4
MT830/MT831 ─ Three-phase electronic multi-function meter
2. Constituent parts
The meter consists of the following units:
Measuring systems
Microcontroller with external memory
Real time clock
LCD
Optical interface
Keys
LEDs
Power supply :
o Internal three phase switcher
o external power supply
o power supply via optical probe (“no power” reading option with SONDA 6 )
5
MT830/MT831 ─ Three-phase electronic multi-function meter
A measuring system measures induced voltage on measuring coils which is proportional to the current on input. The
first coil measures “load” energy and the second one is a compensation coil which measures outside disturbances.
Compensation value is subtracted from a measuring element.
An output signal from Rogowsky coils is related to the input of the measuring integrated current. A signal is integrated,
amplified and multiplied with measuring voltage and sent to the microprocessor.
Sensors and circuits are protected from overvoltage. Influences of disturbance quantities are negligible, which assures
high meter reliability.
6
MT830/MT831 ─ Three-phase electronic multi-function meter
2.2. Microcomputer
A microcomputer enables:
Meter functions by customer's specification
Storing measuring data and parameters
Storing measuring data for previous billing periods (factory settings is 15 billing periods)
Demand calculations
Load Profile function
Compensating measuring protocol of voltage and current transformers
Logbook
Display control
Certain supervision and control meter functions for measuring phase voltages
Measuring phase voltages
Measuring harmonic components in current and voltage
Measuring frequency
2.4. LEDs
Two LEDs are built in the meter:
Left active (imp/kWh)
Right reactive (imp/kvarh) or apparent (imp/kVAh) (programmable)
They enable meter calibration. Impulse constants depend on nominal current and voltage and are programmable
values.
Factory settings:
Direct connected meter
o 3x230/400 V, 5(60) A 1.000 imp/kWh
o 3x230/400 V, 5(120) A 500 imp/kWh
To reduce the control time a special factory test mode is built in the meter, which increases LED constants 10 times
higher, in comparison with a normal operating mode. After power down/up event, all constants take the original
factory settings.
3. Multi-tariff registration
The meter enables registration of energy and power by separate tariff schemes. Up to 8 tariffs for energy and demand
could be registered (factory settings 4 tariffs). The meter is equipped with 160 tariff registers. Time of switching
individual tariff is defined by hour and minute with a resolution of 1 minute. A number of periods in a day where one or
several tariffs can be valid is defined with configuration. The same is valid for different daily tariff programs. Up to 32
various types of a day (a day in a week and a holiday) can be defined. A number of seasons in a year (factory settings
4 seasons) is defined with configuration. Besides a current tariff program, the so-called slipping tariff programs can
be defined. They are activated at previously defined dates. An optional number of holidays can be defined. A century-
old callendar is built in the meter.
7
MT830/MT831 ─ Three-phase electronic multi-function meter
5. Load Profile
A programmable data recorder enabling registration of a load profile is built in the meter:
Active, apparent power and energy (cumulative or absolute values) three-phase values in both energy flow
directions
Reactive power or energy (cumulative or absolute values) in four or combined quadrants (e.g. Q1+Q2 and
Q3+Q4)
Rms values of phase voltages
Distortion factor
Individual meter statuses (power supply failure, alarms)
A registration period or a load profile can be set within the range from 1 to 60 minutes. Two load profiles (P.01 and
P.02) could be implemented in the meter. The first one (P.01) is normaly used for registering energy or demand, and the
second one for registering the last average of voltage, current and power factor. Last average registration is related to
the measuring period. Load profile periods and measurment period are independend from each other.
Registration types:
Vector registration ( Li),
when the vector sum of energies is positive, the meter registers A+ energy; when the vector sum of energies
is negative, the meter registers A- energy
Arithmetical registration the meter could register A+ and A- energy in the same time
Total registration
Positive direction (1.8.0) (+A) + (+A) = 2*(+A)
Negative direction (2.8.0) -A
If the second phase is wrongly connected, the meter also registers this energy with such registration type.
8
MT830/MT831 ─ Three-phase electronic multi-function meter
Phase: L1 L2 L3
Load: +A -A +A
Total registration
Positive direction (1.8.0) +A+-A++A=3*(+A)
With such registration the meter registers only “imported” energy, also in case of “wrong” connection.
For measuring reactive energy a natural connection is used. Internal register provides for a corresponding voltage and
current phase shift.
7. Display
LCD is designed according to the VDEW requirements.
Figure 6 - LCD
The measuring data on LCD are displayed with eight 7-segment 8 mm x 4 mm high numbers. Displayed data are
identified with five-digit OBIS identification codes (IEC 62056 – 61), 6 mm x 3 mm high numbers. Dimension of LCD
(visible area) is 69 mm x 20 mm.
Meters have back-light illumination for easy data reading at metering place with bad light condition. The LCD is
illuminated when any pushbutton is pressed. The illumination is switched-off after 3 minutes if no pushbutton was
pressed at that time.
A meter operates in different display modes
Format and data units are programmed. At transformer connected meters, displayed measuring data can be primary, or
secondary.
Besides measuring data, the energy flow direction, presence of phase voltages, display of individual events, meter
statuses and alarms can be displayed.
9
MT830/MT831 ─ Three-phase electronic multi-function meter
7.1. Keys
The meter is equipped with three keys.
Black dislay key is used for transition from a basic to an extended data display mode.
Red reset key is used for billing meter reset or, in combination with the DISPLAY key, for setting certain meter
parameters (SET, TEST or Intrusion restart meter operation mode). The RESET key is sealed separately or it can be
locked.
Param key is under the meter cover and is used for setting meter parameters in the laboratory.
8. Communication interfaces
An optical communication interface is located on the meter basic board. One of communication interfaces that are
intended for remote meter readout (CS or RS-232 or RS-485) can be mounted on customer demand. The meter is
provided with two independent communication channels.
Figure 7 – “No power” meter reading option with SONDA 6 (option for MT830/MT831)
10
MT830/MT831 ─ Three-phase electronic multi-function meter
address! For longer distances (more than few hundred meters), the use of termination resistor of 120 Ohm on each
edge is recommended.
Terminal Additional
Terminal
designation explanation
27 A A terminal
29 B B terminal
Table1 – RS-485 terminals designation
The RS 232 serial interface enables communication with maximum transmission rate 9600 bauds. The MT830 meters
with built-in RS 232 interface are equipped with three auxiliary terminals
Terminal Additional
Terminal
designation explanation
27 RxD Rx terminal
28 GND Common terminal
29 TxD Tx terminal
Table 2 – RS-232 terminals designation
or RJ11 connector.
11
MT830/MT831 ─ Three-phase electronic multi-function meter
Terminal Additional
Terminal
designation explanation
23 CS+ CS+ terminal
24 CS- CS- terminal
Table 3 – CS interface terminals designation
.
9. Input /output module (MT831 meter only)
I/O modules are plug & play. Two versions regarding the internal programming are available:
12
MT830/MT831 ─ Three-phase electronic multi-function meter
Impulse inputs are realized as passive inputs. An impulse constant is programmable and could be different for each
impulse input. Maximum impulse frequency is 25 imp/sec.
13
MT830/MT831 ─ Three-phase electronic multi-function meter
Each module, except the RS-232 module with a 25-pin DB connector, has two independent communication interfaces,
which enables simultaneous meter reading. Communication interfaces are isolated from each other.
Additional special programming (for example: PSTN modem) is possible with the MeterView 4 program.
For example:
MK – f38 – 3
First communication interface (MK – f38 – 3):
8 GSM modem
+
14
MT830/MT831 ─ Three-phase electronic multi-function meter
3 RS-485 interface
+
f active CS interface
(it is possible to establish multi drop communication via RS-485 and CS communication interface)
Besides communication towards the centre, the modules also offer possibility of cascade connection (a CS interface
and an RS-485 interface). The module enables hot swap installation (modules can be changed or built into the meter
during the meter operation). The modules are located under the terminal cover and are not sealed with a metrological
seal. On costumer’s request, modules could be sealed with an unremovable sticker.
The same communication module can be built into different meter types: MT831 and MT860. All modules are »plug &
play« type. When the module is built in, it sends its identification code via a data bus. The module is automatically
recognized by the meter and is correspondingly controlled.
The error on the communication module does not influence in the meter operation.
MT830/MT831 meter detects the meter cover (MCO) and terminal cover (TCO) opening. Time and date of such
occurrence are written in the meter logbook. The state of the MCO and TCO opening could also be presented in the
status flags on the LCD.
When the meter is powered via measuring voltages or auxiliary power supply, the opening time stamp present the real
(actual) time.
Example:
(a terminal and a meter cover were opened during “normal” meter operation meter was powered by measuring
voltages)
(060317125820)(0040) power up
15
MT830/MT831 ─ Three-phase electronic multi-function meter
The meter also detects the TCO and MCO in case of power down but without the real time of such event. Meter
electronics detects only opening event, while date and time in such case are related to the first power up.
Example:
(060317145820)(0040) power up
After installing the meter, at least MCO event is registered in the meter Log Book or in the status flag on the LCD. To
restart the TCO and MCO registering “Intrusion Restart” function must be implemented. This function is accessible by
using the black and the red button or remotely by sending a special command into the meter. Intrusion Restart function
is automatically done after power up event, parameter changing (when meter goes through the “Standby”).
After “Intrusion Restart”, the meter detects only one TCO and MCO opening.
Note: to detect the opening of the meter and the terminal cover, “Intrusion Restart” must be implemented!
16
MT830/MT831 ─ Three-phase electronic multi-function meter
14. Housing
The meter housing is made of self-extinguishable polycarbonate that can be recycled. The housing assures double
isolation and IP53 protection degree against dust and water penetration. Meter dimensions and fixing dimensions
comply with the DIN 43857 standard. A hook fixing is adapted by height. In case of a simple version, the mask does not
have any bed for modules and the meter cover is extended
17
MT830/MT831 ─ Three-phase electronic multi-function meter
1. LCD
14 2. Meter technical data
1
3. IR optical interface
4. Input/output module mark
5. Legend of displaying registers on
2 LCD
13
6. Meter cover sealing screw
12 7. Terminal cover
10 8. Terminal cover sealing screw
3 9. Communication module mark
4 9 10. RESET key blocking element
11. RESET key
5 12. DISPLAY key
13. Impulse diode – active and
reactive energy
6 14. Meter cover
7
Switch for detecting terminal cover
opening
18
MT830/MT831 ─ Three-phase electronic multi-function meter
Meter cover
sealing screw
Position 0
Position 1
19
MT830/MT831 ─ Three-phase electronic multi-function meter
Internal connection (voltages bridges are accessible only by opening the meter cover)
20
MT830/MT831 ─ Three-phase electronic multi-function meter
Cop5 terminal (voltage terminals are covered) – also for transformer connected meter
Figure 20: Meter terminals are covered with special Cop5 cover
15.5. Dimensions
Meter fixing dimensions comply with the DIN 43857 standard.
21
MT830/MT831 ─ Three-phase electronic multi-function meter
16. Maintenance:
The meter is designed and manufactured in such a way that it does not need any maintenance interventions in the
entire lifetime. Measuring stability assures that no recalibration is required. The meter with the internal battery assures
sufficient capacity for performing battery-supported functions for the entire lifetime
17. Lifetime:
The meter is designed for 20-year lifetime at normal operating conditions.
22
MT830/MT831 ─ Three-phase electronic multi-function meter
Currents (A)
Transmission distance Up to 1 km
Inputs
Voltage level 100 – 240 V AC
ON: U 80 V
OFF: U 20 V
Self consumption of 0.5 W / 1.1 VA (self consumption of voltage circuits, when meter is
voltage circuits supplied from the measuring voltages)
CS Max. 9600 Baud, passive, CL0 in compliance with DIN 66348, Part 1.
23
MT830/MT831 ─ Three-phase electronic multi-function meter
24
MT830/MT831 ─ Three-phase electronic multi-function meter
25
MT830/MT831 ─ Three-phase electronic multi-function meter
MIO – V12L51
MIO – V42L81
MIO – V12L41B11
Module marking:
Connection diagram
Input/output module
terminals
26
MT830/MT831 ─ Three-phase electronic multi-function meter
Example of factory preprogrammed module (function of the terminals are defined in the module) :
Common G 15
External synchronization (for
Active MPE 16
clock/demand period)
Common G 35
Measuring period make contact MPA 37
Common G 40
Pulse output for active energy +A make contact +AA 41
Pulse output for active energy -A make contact +AA 42
Pulse output for reactive energy +R make contact +RA 43
Pulse output for reactive energy -R make contact -AA 44
MK – f3n - m
MK Communication module
f active CS- interface (20 mA current loop) – for multidrop communication
1 passive CS- interface (20 mA current loop)
2 RS-232 interface
3 RS-485 interface–for multidrop communication (module with modem)
n = 7..9,a,e the first communication interface (type of modem)
n=7 PSTN modem
n=8 GSM modem
n=9 ISDN modem
n=a GSM/GPRS modem
n=e Ethernet
m the second communication interface
m=1 passive CS - interface (20 mA current loop)
m=2 RS-232 interface
m=3 RS-485 interface
27
MT830/MT831 ─ Three-phase electronic multi-function meter
MK – f38a – 3 (GSM/GPRS modem+CS+RS-485 interface & RS-485 interface) module enables multidrop
communication
MK – 3e – 3 (Ethernet+RS-485 & RS-485 interface) module enables multidrop communication
MK-MB-3-e-3 (MODBUS; Etherne interface+ RS-485 & RS-485 interface) module enables multidrop
communication
Module marking:
Connection diagram
Installation of the SIM card (SIM card must be enabled for data transfer)
1. Remove the GSM/GPRS modem from the meter
28
MT830/MT831 ─ Three-phase electronic multi-function meter
6. With the DIAG menu on the meter (accessible with the black button), the following can be checked:
C.C.3 a signal level (should be higher than 17)
C.C.4 GSM provider (1 – home provider, 5 – roaming)
29
MT830/MT831 ─ Three-phase electronic multi-function meter
The most effective way to use a modem with Meter View is to properly install it in Windows. To do this, launch Windows
Control Panel (click the Windows Start button, click Settings if you see this option, then click Control Panel) and start the
Phone and Modem Settings applet.
Click the Modems tab and you should see the following window.
30
MT830/MT831 ─ Three-phase electronic multi-function meter
Communication with the MT8xx meters is performed in compliance with the IEC 1107 standard with Mode C protocol.
31
MT830/MT831 ─ Three-phase electronic multi-function meter
32
MT830/MT831 ─ Three-phase electronic multi-function meter
33
MT830/MT831 ─ Three-phase electronic multi-function meter
Advanced
34
MT830/MT831 ─ Three-phase electronic multi-function meter
or
35
MT830/MT831 ─ Three-phase electronic multi-function meter
36
MT830/MT831 ─ Three-phase electronic multi-function meter
37
MT830/MT831 ─ Three-phase electronic multi-function meter
38
MT830/MT831 ─ Three-phase electronic multi-function meter
39
MT830/MT831 ─ Three-phase electronic multi-function meter
40
MT830/MT831 ─ Three-phase electronic multi-function meter
41
MT830/MT831 ─ Three-phase electronic multi-function meter
42
MT830/MT831 ─ Three-phase electronic multi-function meter
43
MT830/MT831 ─ Three-phase electronic multi-function meter
44
MT830/MT831 ─ Three-phase electronic multi-function meter
Connection diagram for indirect connected meter (4-wire connection, connection via current and (or) voltage
transformer)
Connection diagram for indirect connected meter (3-wire connection, connection via current and voltage transformer)
45
MT830/MT831 ─ Three-phase electronic multi-function meter
Connection diagram for indirect connected meter (3P3W connection, connection via current and voltage transformer)
Note: Such connection could be used only for maximal nominal voltage 3x230V and with vector registration
only!
Owing to periodical improvements of our products the supplied products can differ in some details from the data stated in the prospectus material.
Iskraemeco d.d., Energy Measurement and Management
4000 Kranj, Savska loka 4, Slovenia
Telephone (+386 4) 206 40 00, Fax: (+386 4) 206 43 76
http://www.iskraemeco.si, E-mail: [email protected]
Published by Iskraemeco. Data subject to alteration without notice. MT830/MT831 -Eng V1.2.doc
46