BQ JKR - Bumbung SMK (P) Sri Aman - Lama
BQ JKR - Bumbung SMK (P) Sri Aman - Lama
BQ JKR - Bumbung SMK (P) Sri Aman - Lama
1.0 GENERAL
1.1
1.2
1.3
1.4
1.5
1.6
1.7
A1/1 -
GENERAL (cont'd)
1.8
1.9
1.10
A1/2 -
2.0 MEASUREMENT
2.1
3.0 UNPRICED ITEM
3.1
4.0 G.ATTENDANCE
4.1
5.0 PHASING SEQUENCE
5.1
A1/3 -
6.0 TRIALS
6.1
7.0 EXISTING SERVICES
7.1
8.0 WORK UNDER WATER
7.1
9.0 PHRASEOLOGY
9.1
10.0 PV SUMS
10.1
11.0 CURRENCY PAYMENT
11.1
12.0 TEMPORARY DIVERSION
12.1
A1/4 -
13.0 ABBREVIATIONS
13.1
14.0 SCOPE OF WORKS
A
B
C
D
E
F
13.0 LOCATION OF SITE
H
A1/5 -
PROJECT SIGNBOARD
A 3,000.00
SITE SURVEY
B 3,000.00
TEMPORARY DIVERSION
CONSTRUCTION PLAN
C 1,000.00
CONTRACTOR PLANT
E 5,000.00
TEMPORARY WATER
F 1,000.00
A1/6 13,000.00
SITE SECURITY
A 3,000.00
TEMPORARY ACCESS & MAINTENANCE ROAD
B 3,000.00
C
D
CONTROL WORKMEN
E 1,000.00
CONTRACTOR ACCOMMODATION
F 3,000.00
CONTRACTOR OFFICE
G 5,000.00
CARE & PROTECTION
H 3,000.00
SHOP DRAWING
J 1,500.00
A1/7 19,500.00
PROGRESS PHOTOGRAPHS
A 1,000.00
MATERIAL TEST
B 1,000.00
OFFICE ACCOMMODATION
C 5,000.00
TELEPHONE
D 3,000.00
SURVEY ISTRUMENT
E 1,000.00
SITE ITEM
F 1,000.00
G 1,000.00
H 2,000.00
J 1,000.00
A1/8 16,000.00
A1/9 18,000.00
COORDINATION 0F MECHI
A
AS BUILT DRWG
B 1,000.00
CLEAR, CLEAN
C 3,000.00
FORM CONTRACT
D 500.00
CLAUSE 13
E PERFORMANCE BOND 500.00
CLAUSE 15
F 1,500.00
CLAUSE 16
G 100.00
CLAUSE 17
H 100.00
CLAUSE 18
J 2,000.00
A1/10 8,700.00
A1/11 7,000.00
COLLECTION
A1/1 -
A1/2 -
A1/3 -
A1/4 -
A1/5 -
A1/6 13,000.00
A1/7 19,500.00
A1/8 16,000.00
A1/9 18,000.00
A1/10 8,700.00
A1/11 7,000.00
A1/12 82,200.00
KERJA-KERJA MEMBAIKPULIH BUMBUNG DAN LAIN-LAIN KERJA BERKAITAN DI BLOK B,C ,D DAN E SMK (P) SRI
AMAN, PETALING JAYA, DALAM DAERAH PETALING
SK 2 - 1/2 297,660.00
7,000.00
MS TERKUMPUL
SK 2 - 1/2 297,660.00
SK 2 - 2/2 7,000.00
SK 2 - 2/2 304,660.00
KERJA-KERJA MEMBAIKPULIH BUMBUNG DAN LAIN-LAIN KERJA BERKAITAN DI BLOK B,C ,D DAN E SMK (P) SRI
AMAN, PETALING JAYA, DALAM DAERAH PETALING
SK 3 - 1/2 240,440.00
7,000.00
MS TERKUMPUL
SK 3 - 1/2 240,440.00
SK 3 - 2/2 7,000.00
SK 3 - 2/2 247,440.00
KERJA-KERJA MEMBAIKPULIH BUMBUNG DAN LAIN-LAIN KERJA BERKAITAN DI BLOK B,C ,D DAN E SMK (P) SRI
AMAN, PETALING JAYA, DALAM DAERAH PETALING
SK 4 - 1/2 240,440.00
7,000.00
MS TERKUMPUL
SK 4 - 1/2 240,440.00
SK 4 - 2/2 7,000.00
SK 4 - 2/2 247,440.00
KERJA-KERJA MEMBAIKPULIH BUMBUNG DAN LAIN-LAIN KERJA BERKAITAN DI BLOK B,C ,D DAN E SMK (P) SRI
AMAN, PETALING JAYA, DALAM DAERAH PETALING
SK 5 - 1/2 170,330.00
75,930.00
MS TERKUMPUL
SK 5 - 1/2 170,330.00
SK 5 - 2/2 75,930.00
SK 5 - 2/2 246,260.00