Inspection Report: Overall Conclusion (Grade) : D
Inspection Report: Overall Conclusion (Grade) : D
Factory Audit
Report No. : H-XXXXXXX
INSPECTION INFORMATION
Client XXX
Factory XXX
Factory Address XXX
Contact Person XXX Telephone XXX
Mobile Phone XXX Fax. XXX
E-mail XXX Web: XXX
Date of Audit 2013/6/7 Auditor(s) Mr. Nick Lin
Audit Stage Initial Audit Follow-up Audit Re-Audit (Previous report No.: ________ )
Audit Regulation GWI-PE-TQA-020-HQT
FOLLOW UP SUGGESTIONS
For factory:
1 It was recommended factory to correct their internal work instruction sheet, to make sure all AQL was
suitable.
2 It was recommended factory to send their all test facilities to calibrate in time, to make sure their precision.
3 It was recommended factory to provide enough test facilities for PCB quality checking, and also could use
them for PCB checking.
4 It was recommended factory to compile related work instruction sheet for Game Console.
For client:
1 The production was performed in XXX.
2 It was recommended client to add more detail items in PO, such as all technical requirement, and quality
responsibility, etc.
3 It was recommended client to place a small order at first.
4 It was recommended client to conduct a During-producing Inspection and Pre-shipment Inspection to
make sure the bulk goods was confirmed to client’s requirement.
1 Factory office
Page 6 of 15
3 Organization Code Certificate 4 ISO9001 Certificate of registration
Page 7 of 15
3 Raw material warehouse 4 Finished product warehouse
04 Workshop
3 Work instruction for SMT machine 2 4 Work instruction for SMT machine 3
Page 8 of 15
5 Work instruction for SMT machine 4 6 Work instruction for SMT machine 5
7 Work instruction for SMT machine 6 8 Work instruction for SMT machine 7
9 Work instruction for SMT machine 8 10 Work instruction for SMT machine 9
Page 9 of 15
11 Daily producing record 12 SMT daily maintain record
13 Workline 1 14 Workline 2
15 Workline 3 16 Packing
Page 10 of 15
05 QC
Page 11 of 15
7 SMT first article inspection record 2 8 SMT first article inspection record 3
Page 12 of 15
13 FQC 2 14 Test facility for outside QC
Page 13 of 15
19 Test facility 4 20 Test facility 5
23 Finished product inspection work instruction for table 24 Finished product inspection work instruction for
PC table PC
Page 14 of 15
06 Global Circuit Document system
Page 15 of 15