Data Sheet CD-J0251 - Rev B (Existing)
Data Sheet CD-J0251 - Rev B (Existing)
PO NO.
REVISION INDEX
B REVISED AS MARKED
7 Barometric Type Barometric Type Barometric Type Element Capacity 1st 3rd
8 Surface type Surface type Surface type 2nd 4th
9
10 OPERATING CONDITION
11 Motive Steam : Nozzle Design Min. Pressure 8.5 (6) kg/cm2G Minimum Temperature 185 (6) ℃
12 Steam Chest Design Nor./ Max. Pressure 10.5 /12.7 (6) kg/cm2G Nor./ Max. Temp. 189 /193 (6) ℃
13 Cooling Water : Temp.(In) 35 ℃ Max. Temp.(Out) 43 ℃ Max. Pressure 4.0 kg/cm2G
14 Suction Pressure (Measured at Suction Inlet) 100 (4) mmHgA
15 Discharge Pressure (Measured at Discharge of Final Stage) 921 (5) mmHgA
16 Ejector to be designed for stability at shutoff ? Yes No
17 Normal Barometric Pressure at Site of Installation 1.033 kg/cm2A
18 Height Required for Barometric Leg Min.15.3 m
19 CAPACITY FOR ONE UNIT
20 Entrained Gas Total 1746x1.4 (1) kg/hr Avg. Mol. Wt. 31 Temperature 65 (4) ℃
21 Consisting of : 29x1.4 kg/hr 29 Mol. Wt. Air 10x1.4 kg/hr 57.4 Mol. Wt. Cracked Gas (3)
22 858x1.4 kg/hr 18 Mol. Wt. Water Vapor kg/hr Mol. Wt.
23 849x1.4 kg/hr 113.5 Mol. Wt. C5 + HC (2) kg/hr Mol. Wt.
24 Evacuation Requirement (if any) to evacua 91 m3 System filled with N2 (gas) at a temperature of 30 ℃ B
25 from an initial pressure o 1.03 kg/cm2A to a final pressure o 100 mmHg A
26 in minutes, with kg/hr Max. air in leakage during evacuation.
27
28 EJECTOR STAGES CONNECTIONS MATERIAL OF CONSTRUCTION
29 Size or Suction Discharge Steam inlet Steam Steam Suction
Stage Steam (kg/hr) Diffuser
30 Model No. (Size/rtg/fcg) (Size/rtg/fcg) (Size/rtg/fcg) Chest Nozzle Chamber
31 First By vendor By vendor By vendor By vendor By vendor CS (7) 316 SS CS (7) CS (7)
32 Second By vendor By vendor By vendor By vendor By vendor CS (7) 316 SS CS (7) CS (7)
33 Third
34 Fourth
35 Fifth
36 Sixth
37 Total Motive Steam Diffuser Steam Jackets on Stages None First Second Third
38
39 NOTE
40 (1) Flow 140% of normal for case "100N EOR".
41 (2) C5 + HC TBP distillation at 760 mm Hg(for 1, 10, 30, 50, 70, 90, 98 vol% distilled): 34, 49, 98, 144, 159, 179, 245℃.
42 (3) Cracked gas composition (mol%): H2=0.00003, H2S=0.003, NH3=0.0012, C1=0.002, C2=0.046, C3=4.79, C4=95.158.
43 (4) Pressure and temperature at precondenser inlet.
44 (5) Discharge pressure and temperature at aftercondenser outlet nozzle.
45 (6) Mechanical design for steam is 12.7 kg/cm2(g), 204℃.
46 (7) CA is 3 mm for CS parts.
47 (8) DELETED B
48 (9) Cooling water flow is parallel flow.
49
50
566801442.xls
This datasheet and information contained therein are
51
52
53
54
55 REVISION LOG
56 REVISION ISSUE STATUS DATE PRP'D BY CHK'D BY APP'D BY
57 A ISSUE FOR APPROVAL Aug.07 '06 I.K.Shin UCH/YNJ C.S.Koh
58 B REVISED AS MARKED Mar. 13 '07 U.C.Hwang Y.N.Joo J.H.Rha
59
60
566801442.xls
PAGE 3 OF 12
PROJECT NO. 06049D
PROJECT NAME L - Project
ITEM NO. CD - J0251 - E1 Q'TY One
S&T HEAT EXCHANGER SERVICE Vacuum System - Precondenser
DOC. NO. 06049D-CD-06-J0251 REV. B
1 SIZE : ID x L TYPE : Horiz. Connected in PARALLEL SERIES
2 SURFACE / UNIT : (Gro.)/(Eff.) m2 / SHELL / UNIT : SURFACE / SHELL : (Gro.)/(Eff.) m2 /
3 PERFORMANCE OF ONE UNIT
4 Fluid Allocation SHELL SIDE TUBE SIDE
5 Fluid Name HC / Water / Air Cooling Water
ation contained therein are the property of SK Engineering & Const. Co. Ltd (SKEC). They are merely loaned and shall not be disclosed to others or reproduced in any manner without written permission of SKEC.
566801442.xls
This datasheet and information contained therein 52 (4) Tropicalization is required.
53
54
55 REVISION LOG
56 REVISION ISSUE STATUS DATE PRP'D BY CHK'D BY APP'D BY
57 A ISSUE FOR APPROVAL Aug.07 '06 I.K.Shin UCH/YNJ C.S.Koh
58 B REVISED AS MARKED Mar. 13 '07 U.C.Hwang Y.N.Joo J.H.Rha
59
60
566801442.xls
PAGE 4 OF 12
PROJECT NO. 06049D
PROJECT NAME L - Project
ITEM NO. CD - J0251 - E2 Q'TY One
S&T HEAT EXCHANGER SERVICE Vacuum System - Intercondenser
DOC. NO. 06049D-CD-06-J0251 REV. B
1 SIZE : ID x L TYPE : Horiz. Connected in PARALLEL SERIES
2 SURFACE / UNIT : (Gro.)/(Eff.) m2 / SHELL / UNIT : SURFACE / SHELL : (Gro.)/(Eff.) m2 /
3 PERFORMANCE OF ONE UNIT
4 Fluid Allocation SHELL SIDE TUBE SIDE
5 Fluid Name HC / Water / Air Cooling Water
ation contained therein are the property of SK Engineering & Const. Co. Ltd (SKEC). They are merely loaned and shall not be disclosed to others or reproduced in any manner without written permission of SKEC.
566801442.xls
This datasheet and information contained therein 52
53
54
55 REVISION LOG
56 REVISION ISSUE STATUS DATE PRP'D BY CHK'D BY APP'D BY
57 A ISSUE FOR APPROVAL Aug.07 '06 I.K.Shin UCH/YNJ C.S.Koh
58 B REVISED AS MARKED Mar. 13 '07 U.C.Hwang Y.N.Joo J.H.Rha
59
60
566801442.xls
PAGE 5 OF 12
PROJECT NO. 06049D
PROJECT NAME L - Project
ITEM NO. CD -J0251 - E3 Q'TY One
S&T HEAT EXCHANGER SERVICE Vacuum System - Aftercondenser
DOC. NO. 06049D-CD-06-J0251 REV. B
1 SIZE : ID x L TYPE : Horiz. Connected in PARALLEL SERIES
2 SURFACE / UNIT : (Gro.)/(Eff.) m2 / SHELL / UNIT : SURFACE / SHELL : (Gro.)/(Eff.) m2 /
3 PERFORMANCE OF ONE UNIT
4 Fluid Allocation SHELL SIDE TUBE SIDE
5 Fluid Name HC / Water / Air Cooling Water
ation contained therein are the property of SK Engineering & Const. Co. Ltd (SKEC). They are merely loaned and shall not be disclosed to others or reproduced in any manner without written permission of SKEC.
566801442.xls
This datasheet and information contained therein 52
53
54
55 REVISION LOG
56 REVISION ISSUE STATUS DATE PRP'D BY CHK'D BY APP'D BY
57 A ISSUE FOR APPROVAL Aug.07 '06 I.K.Shin UCH/YNJ C.S.Koh
58 B REVISED AS MARKED Mar. 13 '07 U.C.Hwang Y.N.Joo J.H.Rha
59
60
566801442.xls
PAGE 6 OF 12
PROJECT NO. 06049D
PROJECT NAME L - Project
ITEM NO. CD - J0251 Q'TY One
VACUUM SYSTEM SERVICE Vacuum System
DOC. NO. 06049D-CD-06-J0251 REV. B
1
2 1.0 Scope of Supply
3
4 1.1 The Vacuum system shall be a skid-mounted and piped unit consisting of the following:
5
6 - One precondenser (CD-J0251-E1) (NOT SKID-MOUNTED). Vendor to confirm economics of including a
tion contained therein are the property of SK Engineering & Const. Co. Ltd (SKEC). They are merely loaned and shall not be disclosed to others or reproduced in any manner without written permission of SKEC.
7 precondenser.
8
9 - Two first stage steam ejectors (CD-J0251-J1A and CD-J0251-J1B) in parallel designed for 1/3 (J1A)
10 and 2/3 (J1B) of the load.
11
12 - One first stage Intercondenser (CD-J0251-E2)
13
14 - Two second stage steam ejectors (CD-J0251-J2A and CD-J0251-J2B) in parallel, each design for 100%
15 of the load.
16
17 - One second stage aftercondenser (CD-J0251-E3)
18
19 1.2 The vendor package shall include all interconnecting piping and instrumentation.
20 Cooling water piping is by Owner.
21
22 1.3 The vendor package shall include isolating valves for process inlet, steam inlet and steam/precess outlet
23 of each ejector.
24
25 1.4 The vendor shall provide a recirculation loop with a control valve to control the suction pressure
26 of the system.
27
28 1.5 The vendor shall provide and guarantee steam consumption rate.
29
30 1.6 The flow rates noted on the ejector data sheet are for the percondenser. Vendor to determine actual
31 flow rates to ejector based on precondenser selection.
32
33 2.0 The following referance specifications are application to this unit:
34
35 SP-46810 Ejector Systems
36 ESS-40210 Shall and Tube Exchanger
37 Piping Spec 9902
38 ESS-70030 Instrumentation for packaged Unit
39 ESS-82110 Painting
40 ESS-90100 Equipment Noise Level
41
42 3.0 Data for precondenser and ejectors shown for 100N EOR(page 2,3) conditions.
43
44
45
46
47
48
49
50
51
566801442.xls
This datasheet and information contained therein
60
59
58
57
56
55
54
53
52
566801442.xls
PAGE 7 OF 12
PROJECT NO. 06049D
PROJECT NAME L - Project
ITEM NO. CD - J0251 Q'TY One
VACUUM SYSTEM SERVICE Vacuum System
DOC. NO. 06049D-CD-06-J0251 REV. B
1
2
3
4
5
6
tion contained therein are the property of SK Engineering & Const. Co. Ltd (SKEC). They are merely loaned and shall not be disclosed to others or reproduced in any manner without written permission of SKEC.
7
8
9
10
11
12
13
14
VACUUM SYSTEM PACKAGE
15
MP STEAM
16
17
18
19 CD-J0251-J1A CD-J0251-J2A
1ST STAGE 2ND STAGE
20 EJECTOR EJECTOR
21
VACUUM TOWER OVERHEAD
22 CD-J0251-J1B CD-J0251-J2B
1ST STAGE 2ND STAGE
23 EJECTOR EJECTOR
24 CWR
25
26 FORM PIC AT VAC
TOWER OVERHEAD
27
28 CWR CWR
65°
C 100mm Hg Abs
29
30 PRECONDENSER 1ST STAGE AFTERCONDENSER
INTERCONDENSER
31
CD-J0251-E1 CD-J0251-E2 CD-J0251-E3
32
CWS CWS CWS
33
* 45℃
45°
C 921mm Hg Abs
34 B
35 *
36 *
37 * TO VACUUM TOWER OVERHEAD DRUM CD-D0253
38
39
40
41
42
43
44
45
46
47
48
49
50
51
566801442.xls
This datasheet and information contained therein
60
59
58
57
56
55
54
53
52
566801442.xls
PAGE 8 OF 12
PROJECT NO. 06049D
PROJECT NAME L - Project
ITEM NO. CD - J0251 Q'TY One
VACUUM SYSTEM SERVICE Vacuum System
DOC. NO. 06049D-CD-06-J0251 REV. B
1
2
3
Heating Curve CD-J0251.HCURVE(0) Summary
4
Liquid Vapour
5 Number Temperature Pressure Enthalpy Liq Frac Latent Ht Density Density
6 C KG/CM2G M*KCAL/HR WT KCAL/KG KG/M3 KG/M3
tion contained therein are the property of SK Engineering & Const. Co. Ltd (SKEC). They are merely loaned and shall not be disclosed to others or reproduced in any manner without written permission of SKEC.
566801442.xls
This datasheet and information contained therein
60
59
58
57
56
55
54
53
52
566801442.xls
PAGE 9 OF 12
PROJECT NO. 06049D
PROJECT NAME L - Project
ITEM NO. CD - J0251 Q'TY One
VACUUM SYSTEM SERVICE Vacuum System
DOC. NO. 06049D-CD-06-J0251 REV. B
1
2
3
Heating Curve CD-J0251.HCURVE(1) Summary
4
Liquid Vapour
5 Number Temperature Pressure Enthalpy Liq Frac Latent Ht Density Density
6 C KG/CM2G M*KCAL/HR WT KCAL/KG KG/M3 KG/M3
tion contained therein are the property of SK Engineering & Const. Co. Ltd (SKEC). They are merely loaned and shall not be disclosed to others or reproduced in any manner without written permission of SKEC.
566801442.xls
This datasheet and information contained therein
60
59
58
57
56
55
54
53
52
566801442.xls
PAGE 10 OF 12
PROJECT NO. 06049D
PROJECT NAME L - Project
ITEM NO. CD - J0251 Q'TY One
VACUUM SYSTEM SERVICE Vacuum System
DOC. NO. 06049D-CD-06-J0251 REV. B
1
2
3
Heating Curve CD-J0251.HCURVE(2) Summary
4
Liquid Vapour
5 Number Temperature Pressure Enthalpy Liq Frac Latent Ht Density Density
6 C KG/CM2G M*KCAL/HR WT KCAL/KG KG/M3 KG/M3
tion contained therein are the property of SK Engineering & Const. Co. Ltd (SKEC). They are merely loaned and shall not be disclosed to others or reproduced in any manner without written permission of SKEC.
566801442.xls
This datasheet and information contained therein
60
59
58
57
56
55
54
53
52
566801442.xls
PAGE 11 OF 12
PROJECT NO. 06049D
PROJECT NAME L - Project
ITEM NO. CD - J0251 Q'TY One
VACUUM SYSTEM SERVICE Vacuum System
DOC. NO. 06049D-CD-06-J0251 REV. B
1
2
3
Heating Curve CD-J0251.HCURVE(3) Summary
4
Liquid Vapour
5
Number Temperature Pressure Enthalpy Liq Frac Latent Ht Density Density
6 C KG/CM2G M*KCAL/HR WT KCAL/KG KG/M3 KG/M3
tion contained therein are the property of SK Engineering & Const. Co. Ltd (SKEC). They are merely loaned and shall not be disclosed to others or reproduced in any manner without written permission of SKEC.
566801442.xls
This datasheet and information contained therein
60
59
58
57
56
55
54
53
52
566801442.xls
PAGE 12 OF 12
PROJECT NO. 06049D
PROJECT NAME L - Project
ITEM NO. CD - J0251 Q'TY One
VACUUM SYSTEM SERVICE Vacuum System
DOC. NO. 06049D-CD-06-J0251 REV. B
1
2
3
Heating Curve CD-J0251.HCURVE(4) Summary
4
Liquid Vapour
5 Number Temperature Pressure Enthalpy Liq Frac Latent Ht Density Density
6 C KG/CM2G M*KCAL/HR WT KCAL/KG KG/M3 KG/M3
tion contained therein are the property of SK Engineering & Const. Co. Ltd (SKEC). They are merely loaned and shall not be disclosed to others or reproduced in any manner without written permission of SKEC.
566801442.xls
This datasheet and information contained therein
60
59
58
57
56
55
54
53
52
566801442.xls