Personal Statement: Key Skills
Personal Statement: Key Skills
Email. [email protected]
PERSONAL STATEMENT
Able to communicate clearly and effectively both orally and in written, self-motivated, willing to work
under maximum pressure, result oriented, trustworthy, God fearing, loyal, strong, management skills,
reliable and honest with experience in verbal communication since I used to communicate clearly to
over many students in Uganda institute of information and communications technology as a speaker of
Julius Nyerere hall.
KEY SKILLS
Customer relationship skills,
Knowledge in radio, microwave, fiber optics, GSM, CDMA, 3G, LTE and computer applications.
Knowledge in HUAWEI optical transmission terminal equipment like the OSN series.
Certified to work at heights, as a first aider and work on electricity by NCOSHA at HUAWEI.
PROFESSIONAL EXPERIENCE
Trainee (Wireless and Transmission), Installation World Ltd Ntinda. (November 2015 – May 2016)
Team Leader (wireless and Transmission), Installation world Ltd. (February 2017-November 2018)
Team Leader (wireless and Transmission), Kala Telecom Burundi. (December 2018- March 2019)
Project Coordinator (150 New Onatel sites), Kala Telecom Burundi. (March 2018-October 2019)
Site supervisor (wireless ,Transmission and quality ), Installation World Ltd. (November 2019-February
2020)
Projects coodinator KTB GLOBAL TELESERVICES UGANDA LTD ( March 2020-Feb 10th 2021)
Team Leader (wireless and Transmission), Emerald in Ethiopia (18 th Feb 2021 up to date)
Achievements and responsibilities:
Super vision of team members ensuring quality and neat work is done during installations as per
required plan, right azimuth, RSL, heights, tilts, proper bonding to avoid VSWR, proper earthling, proper
clapping of RF cables, IF cable , ensuring right power is used) for 2017 Airtel Expansion Project
performing MW and 2G cutover.
External Alarms extension and termination on the SLPU and EMUA boards in the BTS.
Swapped ten sites from ZTE equipment to HUAWEI without any fall back.
External Alarms extension and termination on the SLPU and EMUA boards in the BTS.
Ensuring Team members follow the proper EHS rules for working in the telecommunications sector to
avoid accidents.
Ensuring proper understanding of the site solution provided to me as the team leader to ensure that my
team members know exactly what to do on site.
2G and 3G installations.
Upgraded 15 sites from old equipment to new equipment without any roll back.
Configuration of microwave links using WEBLCT, 3G using WEBLMT software and loading of software on
the UMPT board which is the main processing board of a BTS/CELL.
Installation of hardware equipment in accordance with the link budget and solution.
Upgraded 10 links from ERRICSSON MINILINK to HUAWEI transmission equipment in the 254 hops
project
Wireless and Transmission (Trainee), installation world Ltd, Ntinda (June 2015 – August 2015)
Achievements and responsibilities: : New BTS/cell setup for transmission, 2G and 3G network bands.
Installation and commissioning of microwave links. Alarm mapping on SLPU AND EMUA. TRAINING
AND EXPERIENCE
HUAWEI TCHNOLOGIES LTD 26th April 2017: Work at heights and basic electricity training. HUAWEI
TECHNOLOGIES LTD 7thJuly 2015: Equipment Hardware Installation (wireless, Microwave and OSN),
Fibre Managed Service, Radio Network Optimization and Radio Network Performance, Passive Managed
Service.
Education
2014- 2016 Uganda institute of information and Diploma in Telecommunications
Communications technology Engineering
Making friends
Languages Spoken
English, Luganda, Swahili.
References
Senkayi Anthony MTN assistant project Manager Huawei technologies Ltd 0752421295
Opio Patrick Airtel assistant project Manager Huawei technologies Ltd 0703319606
DECLARATION
I declare that the information given above is true to the best of my knowledge.