0% found this document useful (0 votes)
39 views7 pages

Daily Time Sheet: Tuesdayu Clock-In:0 - Am

- The document is a daily timesheet for an employee named Man Sam in the department for March 3, 2020. - It tracks the employee's clock-in and clock-out times as well as activities performed throughout the day broken into hour-long intervals. - A variety of tasks are listed such as testing, disassembling, measurement, assembling, balancing, painting, varnishing, cleaning, removing coils, and troubleshooting along with their corresponding job numbers or cost allocations.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views7 pages

Daily Time Sheet: Tuesdayu Clock-In:0 - Am

- The document is a daily timesheet for an employee named Man Sam in the department for March 3, 2020. - It tracks the employee's clock-in and clock-out times as well as activities performed throughout the day broken into hour-long intervals. - A variety of tasks are listed such as testing, disassembling, measurement, assembling, balancing, painting, varnishing, cleaning, removing coils, and troubleshooting along with their corresponding job numbers or cost allocations.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

GENTURBO four Trustsd Eaineenna Parie DAILY TIME SHEET Date

DAY
3/
DAY MONTH
/2
MONTH YEAR YEAR

Employee Name: MAN SAM Employee No:_ Department:


Monday Z Tuesdayu Wednesday Thursday Friday Saturday Sundayu tick where appropriate

Clock-In Hour
:0_am
Minute
Clock-Out:_
rodr
: 0 0 pm
Minute
Lunch Clock-In: L y : O 0 pm Clock-Out: 2:3
Hour Minute
pm
Hour Minutej
08:00am to 01:00pm 01:00pm to 02:00pm 02:00pm to 07:00pm

Type of Activity Cost Allocation


tem Activity From: To: Net Hours
f Rework (Add 0 add front, example0A, OL) tick where appropriate
4uadasaaaaanaaaaaudaaaadaeaasee4aar
ENGLISH MALAY BENGAL Job Number (TN] Workshop Maintenance
Productive Non-Productive
Testing Ujian
B. Disassembling B. Pembongkaran
1 TN:
C. Measurement
C. Pengukuran
D. Assembling D. Berkumpul
D. 4F *****************************. ***************************i*******************e***oeuueaeeuanuassas* **nasooiaes**owwwwwsiaecaosu. anu.iaaans** anaagvonoo*****on*saeauneas***
E. Balancing Mengimbangkan E ZDTO 2 nen
F. Paint . Cat TN:
G. Varnishing
G. Varnishing ********************************************************************************;******************************************t************************************************************a***************asa***************da****saao*amaea***
H.Cleaningvarnish H. Membersihkan varnis
L. Remove coil . Tanggalkan gegelung 3 TN:
J. Form coil . Bentuk gegelung . PCHT TT
K. Rewind K Mundur *************************************************************************************,***************"***************************************************************************************e**a*********************************************a**
L Troubleshooting L Penyelesaian masalah
M. Workshop Fabrication M. Fabrikasi Bengke L N I NINI
4 TN:
N. Travelling Hour N. Waktu Perjalanan ***************s*as*************************************************************;************************************************************************************** ****************nauseeoda aoo***j**one*******o*o**.**as.
O. Site Work 0. Kerja Tapak
P. Toolbox/Housekeeping P. Kotak Alat / Pengemasan 5 TN:
Q. Wash motor part Q.Basuh bahagian motor
MIR/TGMR ************************* ***********a*s***sa***************a*******i ********o*******snneee******************************aaneannbo* *** uioneesonsnni v.

TN: L

Hour Mlnute Our Minute

Reason: Total Non-Productive Hour


Efficiency of aa****ve**************R********a*****ernuvo********* aannesevareavereeassuuesuasatemaua

Productive Hours *Total Productive Hour


******4*e**************** *********************a***********************************e*v***********************e*****a****************************a***********************e********a*e*e**********enansens**********************aoseasaaaaaa**aa*aeaee**********sssas**asss*s*s*svsssosssu easroneerea*ansonngna*oasstesse r aeaeeaseacoruvarnearev

Total Normal Hours

%
********a***w******eanno********ss*******sss*sa*********o**a****sesseatasae saaa sadss*******ssasn**s**nsasueee*oasesssssads*s*ruesnees*************sasssssssasanaeanaesoss*s*s**ss*sss**************s*ess*ssss**sssssssess***********************sse******s*********** erenanosenene ** ssasn

Total Over Time Hours

Submitted by Verified by Approved by

Date Date Date


GTI-TS-2021-R8
ENTURBO DAILY TIME SHEET Date:2? / 0 DAY DAY MONTH MONTH YEAR YEAR

Employee Name:_CMAN NHM Employee No: Department:


Monday Tuesday Wednesday ThursdaY Friday SaturdayZ Sunday tick where appropriate

Clock-In QL:2O am Clock-Out:L3:0pm Lunch Clock-In: pm Clock-Out: pm


Hour Minute Minute Hour Minute
Hour Minute Hour
08:00am to 01:00pm 02:00pm to 07:00pm
01:00pm to 02:00pm
Type of Actlvity Cost Allocation From: To: Net Hours
IfRework (Add 0 add front, example 0A, OL) Item Activity tick where appropriate
44d4tasreAaS
ENGLISH Job Number (TN) Workshop Maintenance
MALAY BENGALI
Productive Non-Productive
A Testing Uian
8.Disasenbling B. Pembongkaran 1 TN:
. Measurement C.Pengukuran
D. AsserSling |D Berkumpu ******* * *****essss*e********************eot*jt* ***********************a********** aa****************ar**************
. BalantinnE E Mengimbangkan D. P PAI
Paunt Cat E 3UTTE 2 TN:
( Varnishing G. Varnishing ********sce***********************************************************************;********************************************************* ut

H.Clean1ng varnish H Membersihkan vanis


. Remave co . Tanggalkan gegelung 3 TN:
orm coll
.Bentuk gegelung *************
***************$"***********************5***********************************************$**************************************************
Rewind K Mundur
Troubleshooting L Penyeiesaian masalah
M Fabrikasi Bengkel 4 TN:
M. Warkshop fabrication L NA TAITA
N Waktu Perjaíanan
NIraveling Hour * *********************************************************************************************************************"*"********************************************* **********************aar*an*a*aasa******dauebdaaaswrouva*****
0. Site Work O Kera Tapak
P. Toolbax/Housekeeping P. Kotsk Alat/ Pengemasan TN:
a Wash motot par a Basuh bahagian motor
T44/TGTI ************ ************"*******$********************************"***************a****************************************************************************a. ******************************************************
TN:

Reason:
Total Non-Productive Hour
Efficiency of
Productive Hours: Total Productive Hour
******"*************
Total Normal Hours
%
Total Over Time Hours

Submitted by Verified by Approved by

Date
2el2/ Date Date

GTI-TS-2021-R8
ENTURBO DAILY TIME SHEET Date
OAY OAY MONTH MONTH YEAR YEAR

Employee Name (AN MA Employee No Department


Monday Tuesday Wednesday, Thursday Friday SaturdayY Sunday tick where appropriate

Clock-In_ HOu
A am Clock-Out 2 0 pm Lunch Clock-In pm Clock-Out 7 9 pm
Minute Minute Minute Hour Minute
08:00am to 01:00pm 01:00pm to 02:00pm 02:00pm to 07:00pm

Type of Activity Cost Allocation


If Rework (Add 0 add ltem Activity From: TO: Net Hours
front, example 0A, 0L) rick where appropriate
********E********eeea****enneeanr*.e*etene-******* ?*************sges (*esenstbtn*ssesratu D*adenas**neendonecabsedatbaa
ENGLISH MALAY BENGALI 1ob Number (TN) Workshop Maintenance
Productive Non-Productive
A Testing A Ujian
8 Disassembling B Pembongkaran M TN:
CMeasurement
CPengukuran
O Assembling DBerkumpul .

--***
EBalancing E Mengimbangkan
Paint Car TN
6Varnishing varn1shing
H Cleaning vamish
Membersinkan varnis
Remove co 'anggalkangegelung TN
Form coil Bentuk gegelung
K Rewind
K Mundu "********** ************** *

L Troubleshooting L Penyelesaian masalah


M Workshop Fabritation M Fabrikas1 Bengke L HYN AITA
4 TN
N Travelling Hour N waktu Perialanar
**********************--*
Site Work o Kerja iapak
P

a
ToolboxHousekeepng

wash motoi pan


P
a
Kotak Aiat/ Pengemasan
Basuh bahagian motor
TN
Minte

TN:
ute

Reason
Total Non-Productive Hour
Efficiency of ************************

Productive Hours
Total Productive Hour
.
****************************.

Total Normal Hours

Total Over Time Hours

Submitted by Verified by Approved by

Date Date Date


-----.

GTL-TS-2021-R8
ENTURBO DAILY TIME SHEET Date
DAY
L/O L / 2
DAY MONTH MONTH YEAR YEAR

Employee Name: mPN NDIM Employee No: Department:


Monday Tuesday C Wednesday Thursday Z Friday Saturday Sunday tick where appropriate

Clock-In :0-O am Clock-Out: 1 O Q pm Lunch Clock-In: v: 0pm Clock-Out:L2:3O pm


Hour Minute Hour Minute Rour 1Le hinute
08:00am to 01:00pm
01:00pmto 02:00pm 02:00pmto 07:00pm
Type of Activity Cost Allocation
IfRework {Add 0 add front, example 0A, 01) tem Activity tick where appropriate
From: To Net Hours
ENGLISH MALAY BENGALI JobWumber (TN) Workshop Maintenancee
Productive Non-Productive
A. Testing A. Uian
B. Disassembling Pembongkaran
C. Measurement C. Pengukuran 1 TN:
O. Assemblirng D. Berkumpul ******enae ***asreseno*******popi****rse***e*ar***e*****o*so***********e************o*****a********************e************i****************o********w*nosaauaewanab**a********************asaondreww******************a********a** **nenpe
D. FA
E.Balancirng
Paint
E Mengimbangkan
|F. Cat E. 5I Tamp TN:
G. Varnishing G.Varnishing 21N
H.Ceaning varnish H.Membersihkan varnis
Remove coll Tanggalkan gegelung 3 TN:
Zon
J.Formcoil Bentuk gegelung
Rewind K. Mundur avusopinssorusdyonsasoacnaropoaond4*seosntaone*onsseoaprsaosesssreso ssessavosss*vsssesesloosmaranso-*ossssosttaossnosnanags*sogusopar*oswoasango snov*aroosiso na oa*anaoonkoaosnennitoaroaroasa*******osauoormos*oenosaavae
L Troubleshooting L Penyelesaian masalah
4 TN:
M Workshop Fabrication IA Fabrikasi Bengkel
L 4A
N Travelling Hour N. Waktu Perjalanan *a**************?***********ee*****a* ******************************************************************"***********************************************************************************e***a***e******enop **2***a***********eapa*snaa*******
0. Site Work 0. Kerja Tapak
P.Toolbos/Housekeeping P. Kotak Alat/ Pengem3san 5 TN:
a Wash motor part a Basuh bahagian motor *******eae*****p*a****p*son**le**onseotsn*****aossns********esretaonuoe**eb**oesaeso*aoosse*oeeroosonn******************j************.***************************e*n****aobaa eraoasoeooonóor noossaavor*woneneresosnesv*

6 TN:
ou
Minase Hour Mote

Reason Total Non-Productive Hour


Efficiency of ***aneaaveew sas ***s4satorysaan*r*pop*sasi snapastan*dgpsaons pa**h*opbasts*r**t *s0pagv as**sss*ssdoso**2*soso*s*sba*****n**so*assaasa*d*********aea* ************a*no**a**** ********** ***a**** ****************************e********************************************* *=****so*ornoosne.

Productive Hours: Totai Productive Hour


a*9** dupevssdaes beo***1ODEvea esdarantge** *ieas"psdeobeopr6repasenebeansesspa etsgeseospaper****0oapeo**4*eesosdleseressess**eesessds** *ssespds*es snadsaas******seta********** **************************"*************************** *********** *****************e**** o*soenaensseeoneenassascodononasnasessosoresaaoueonessaeosanr 6e>*****a****************

Total Normal Hours


% Ar"74V4as**ad asia****a**os*""err dopeg**"ersverd"***7desdd****000e*70rce*"ge*e*******8"*************07*****************ad"*******2***7*****"****ea**a****************d*************raaes*os***********************e*u**e***aaaa**b2e******a*****a***** *************e*oreoonaevereoesso~aconpooo*euronpeiosdnonouug

Total Over Time Hours

Submitted by Verified by Approved by

Date gLIL. Date Date


GTI-TS-2021-R8
ENTURBO DAILY TIME SHEET Date DAY
?_/e _ /
DAY MONTH MONTH YEAR EAR

Employee Name aY M Employee No: Department.


Monday Tuesday Wednesday 2 Thursday Friday Saturday Sunday tick where appropriate

Ciock-In am Clock-Out: :20pm Lunch Clock-In:1Lq:e pm Hour ste


Clock-Out 7:J O pm
Hour Minute
01:00pm to 02:00pm 02:00pm to 07:00pm
08:00am to 01:00pm

Type of Activity Cost Allocation


From: To: Net Hours
H Rework (Add 0 add front, example DA, OL)
Item Activity tick where appropriate
*A******
assssareanosnapasanbo*essnensanapo***g****n*******.**.*.
Job Number (TN) Workshop Maintenance
ENGLISH MALAY BENGALI
Productive Non-Productive
Pemorgar 1 E TN:SoG
***********

rua n.**aosnunnado*********************** ***********.*************************** **


ier bangha E TAt 2 TN:SIo 3 6 o

a i k gegeug 3 TN:
M
* **"**********

msSaar.

*************"***
TN:oL
************ n**o*~o

TN:
------
-- -

TN:

Re2scn Total Non-Productive Hour


Eticiencv of - -..tno r - opayeese-**.*****-- ** "*********** *****************.*************** ******************************

Productive Hours Total Productive Hour

Total Normal Hourss

Total Over Time Hours

Subm 1ted by Verified by Approved by

Date Oate Date


GT-TS-2021-R8
ENTURBO ( o u r Tusted Enoncena Perie DAILY TIME SHEET Date
DAY
2/O /
DAY MONTH MONTH
2
YEAR YEAR

NOL
Employee Name: LnDAN EmployeeNo: Department:
Monday Tuesday Z Wednesday Thursday Friday Saturday Sunday tick where appropriate

Clock-In O o 0 am Clock-Out:1: 0 pm Lunch Clock-In: :0 pm Clock-Out: A: pm


Hour
Minute Hour
Minute Hour Minute
Hour Minute
02:00pm to 07:00pm
08:00am to 01:00pmn 01:00pm to02:00pm

Type of Activity Cost Allocation To: Net HouTs


If Rework {Add 0 add front, exampie 0A, 0L) Item Activity tick where appropriate From
Job Number (TN Workshop Maintenance
ENGLISH MALAY BENGALI Non-Productive
Productve
A Testing A. Ujian
a. Disassembling
C. Measurement
B. Pembongkaran
C. Pengukuran 1 P TN:
*aooo* ***nar******esnsaaweo a ssonesge*swenaonu***s****asopseess
D. Assembling D. Berkumpul D.4P P "******aa******
aa**********************************************************************************************************i***********a********nnveoseo

E. Balancing E. Mengimbangkan
F. Paint F Cat
E 3BITT 2 bon Tr TN: o O9.0o
SRP CORG Minrte Hour
oecneaoseeeveonraaa*o2*e*aa**eeannouveeo**********
G. Varnishing G.Varnishing
H. Cleaning varnish H. Membersihkan vamis m
Remove coil L. Tanggalkan gegelung 3 TN:S
J. Form coil J.Bentuk gegelung oafan
****************g"****************************************************************"*******e*****************************************************************ee*w******ao****************as********ae********aoaae*une2****weorueome*********aveo

K Rewind K. Mundu
L Troubleshooting L Penyelesaian masalah
4 TN:°
M. Workshop fabrication M. Fabrikasi Bengkel L A I ETA
N. Travelling Hour N. Waktu Perjalanan
O. Site Work 0. Kerja Tapak TN:/7o
P. Toolbox/Housekeeping
Q. Wash nmotor part
P. Kotak Alat / Pengemasan
Q Basuh bahagian motor
MI 2T/TGAA
sF 7,
Mnute
e
Winute

6 TN:
M

Reason: Total Non-Productive Hour


Efficiency of
Productive Hours Total Productive Hour
paenA

Total Normal Hours


** dapnosuoweaamasgsede*aamar vasa************4s4enra ****ndeo************sse*****e********e**da**********" asesas**ee******ee***********************es***************a***********nass************************s************************aa*a*e*w*s*************** **d****************mamwonwer -~**r*-roneu.-ndo
*****

% Total Over Time Hours

Submitted by Verified by Approved by

Date Date
Date L---.
GTI-TS-2021-R8
ENTURBO a Paner
DAILY TIME SHEET Date:
DAY DAY
/
MONTH
_/2/
MONTH YEAR YEAR

Employee Name: PM Hrn Employee No: Department:


Monday L Tuesday Wednesday Thursday Friday Saturday Sunday tick where appropriate

Clock-In__0: O0am Clock-Out: 3:Minute O pm Lunch Clock-In: L Y:Oo pm Clock-Out: 1 2 : 2pm


Hour Mnute Hour Hour Minute Hour Minute
08:00am to 01:00pm 01:00pm to 02:00pm 02:00pm to 07:00pm

Type of Activity Cost Allocation


Item Activity From: To: Net HourS
If Rework (Add 0 add front, example 0A, 0) tick where appropriate
ENGLISH MALAY BENGALI Job Number(TN Workshop Maintenance
Productive Non-Productive
A. Testing3 A Ujian
B.Disassembling B. Pembongkaran
C.Measurement C Pengukuran
1 TN:
,o Mt Minta
D.Assembling D.Berkumpul D. P A srarbe***********nsaouoeom*io**********esoraauae swano o**e**o***e*mo*eneeee********rtsonneove********va**************** *is*o*********i**set*seseanene*****************ia*e*ah******a***********a**e***eaeaga***********w**ddw********a*o**
E. Balancing E Mengimbangkan E ICT
F. Paint
G. Varnishing
F.Cat

G. Varnishing
2 M TN: 3, SM
***********aasa**a****************************-********************************s*******************************************************************w********a****************************a*******a"*n*o**ro**e********asos*aoerens****a***********
H Cleaning vamish H. Membersihkan varnis
IRemove coil . Tanggalkan gegelung 3 TN: I5lo M S7
J.Form coll J.Bentuk gegelung Hour Minu Haur
***************?********************"******t*************************************aa ***************************a*****************{°**********e ***a***e**************"********?*************e*******e*******a***********2*aeanvedaeedsa serese*nasague
K. Rewind K Mundur
LTroubleshooting L Penyelesaian masalah
4 TN:
M. Workshop Fabricaton M Fabrikasi Bengkel L SA5 TA
N. Travelling Hour N. Waktu Perjalanan ****************e ********************"****a********"*o****************a**s*s****"**********************a*************v**********a**************************a*******sea*<ta*******************seeo*****avaeasvearo a2*aaoaeeeaweossaaasoossunem
o Site Work O. Kerja Tapak
P. Tooibox/Housekesping |P. Kotak Alat / Pengemasan 5 TN:
a Wast motor part a Basuh bahagian motor ********u**~** **aa********************************a*********o******s********a******* *****e*riedsone********e**********o**a**** evieooeasedarnesoo*****************ro
Minute *songootonanavaerenawnsos'*o
*
sseegraesodno
sesoncunsoporous asanvisn**************a*a*********"

TN:

Reason: Total Non-Productive Hour


Efficiency of
Productive Hours:
Total Productive Hour

Total Normal Hours


***ie*a near***as*ensdec*resameassta*o*avavmavsossonaa vsasr*******a*eaom*o *v reysssamossasa*ees oo nara sse******o****eaavsrneranea*aoeeeesaaoeeveeerresenesereoeoeuecuseoeaonana sonaoneasusosso noassoaasoo*sonnaas sansoassasaroapsanseer areerouearursennaaneers oneeea ueoherarue. .

Total Over Time Hours

Submitted by Verified by Approved by

Date tlu.. Date Date


=

GTI-TS-2021-R8

You might also like