Basement Level (1) Plan: Proposed
Basement Level (1) Plan: Proposed
Basement Level (1) Plan: Proposed
1050
4390
NP EA
0
10/04/21 10/04/21
CONTRACTOR
Status
PROPOSED
Contract
1/75@A3 NP 0
+5.62
1100
+4.63
930
815
1010
200
BIKE STORE
A
A
150
BIN STORE
8470 1250
1150
800
1100
1000
1000
1500
325 1830 2200
200
B
B
No 34
765
3255
3350
CHAIR LIFT
150
ATRIUM WITH GLASS BANISTER
2080
+4.63
1660
+5.62
1400
No 32
NP EA
0
10/04/21 10/04/21
CONTRACTOR
Status
PROPOSED
Contract
1/75@A3 NP 0
1000
1425
1425
1200
2280
2305
150
Open Plan
1000
2500
Open Plan
Living/Dining/Sleep
Living/Dining/Sleep 1000 1750 1000
Area
Area 900 900
Shower Shower
Room Room
1m² 1m²
Bin space
with 80l Storage Storage Bin space
capacity
BOILER
with 80l
capacity BOILER
NP EA
0
10/04/21 10/04/21
CONTRACTOR
Status
PROPOSED
Contract
1/75@A3 NP 0
1000
3
1425
1200
2280
150
Open Plan
1000
2500
Living/Dining/Sleep
1000 1750 1000
Area
900
Shower
Room
1m²
Storage Bin space
with 80l
capacity BOILER
NP EA
0
10/04/21 10/04/21
CONTRACTOR
Status
PROPOSED
Contract
1/75@A3 NP 0
1000
1095
4 1200
2280
2305
150
5
Open Plan
1000
2500
Open Plan
Living/Dining/Sleep
Living/Dining/Sleep 1000 1750 1000
Area
Area 1100
Shower Shower
Room Room
1m² 1m²
Bin space
with 80l Storage Storage Bin space
capacity
BOILER
with 80l
capacity BOILER
LOWER SECOND FLOOR BEDSIT FLAT 5 - 38m² int gross SECOND FLOOR BEDSIT FLAT 4 - 37m² int gross
CONTRACTOR
Status
PROPOSED
Contract
1/75@A3 NP 0
+14.75
2300
SECOND FLOOR +12.88
350
2485
+11.55
350
SECOND FLOOR
2300
+10.23
MEZZANINE FLOOR
350
11130
9175
2300
7176
+8.90
350
FIRST FLOOR
2300
+7.58
GOLDHAWK STREET
FIRST FLOOR
350
2900
REAR STREET
2600
+5.65
GROUND FLOOR
NP EA
0
10/04/21 10/04/21
CONTRACTOR
BASEMENT FLOOR
Status
PROPOSED
Contract
SECTION A-A
1/75@A3 NP 0
C1 P1
P1
A C1 C1
P1
C1
P1
P1
C1 C1
19210
STRUCTURE SCHEDULE
1050
UB 254 X 102 X 25 MARK W H D
4390
C1 UC 254 X 254 X 73
P1
P1
P1
P1
P1
P1
C1 C1 C1
B C1 C1 C1
NP EA
0
10/04/21 10/04/21
CONTRACTOR
Status
PROPOSED
Contract
1/75@A3 NP 0
C1
P1
A C1 C1
P1
P1
C1
P1
P1
C1 C1
19210
STRUCTURE SCHEDULE
UNDERPINNING
1050
UB 254 X 102 X 25 MARK W H D
4390
UNDERPINNING
C1 UC 254 X 254 X 73
P1
P1
P1
P1
P1
P1
300 600
C1 C1 C1
B C1 C1 C1
CONTRACTOR
Status
PROPOSED
Contract
1/75@A3 NP 0
3.790
75 MAX
PACK
DRY
MASS
CONC.
UNDERPIN
1200 x 1200 x 1200
1200
NP EA
1200 0
10/04/21 10/04/21
APPROVED BY
DESCRIPTION REVISED BY
REV.
AND DATE AND DATE
CONTRACTOR
CONCRETE PAD
FOUNDATION DETAIL
Status
PROPOSED
Contract
1/16@A3 NP 0
MARK W H D
B1 UC 203 X 203 X 71
C1 UC 203 X 203 X 71
BEAM UB
203 X 133 X 30
BEAM UB
1 254 X 102 X 25 2 3 4 5 6
No 36 - 38
4707 4595 2150 4005 4005
C1
A C1 C1 C1
C1 C1
+5.62
1100
+4.63
930
ADDITIONAL COLUMN FOR
815
1010
RETAINING WALL STABILITY
200
BIKE STORE
A
A
150
BIN STORE
UB 254 X 102 X25 8470 1250
1150
800
1100
1000
1000
1500
325 1830 2200
200
B
B
No 34
765
3255
3350
CHAIR LIFT
150
WALK OVER GLASS
ATRIUM WITH GLASS BANISTER
2m X 1m +4.63
1660
+5.62
1400
C1 C1 C1
B C1 C1 C1
No BEAM
32 UB
254 X 102 X 25
NP EA
0
10/04/21 10/04/21
CONTRACTOR
DESCRIPTION REVISED BY
AND DATE
APPROVED BY
AND DATE
Status
PROPOSED
Contract
1/75@A3 NP 0
CHAIR LIFT
+4.63
STEEL CONNECTION +5.62
CONNECTION (A)
C1 C1 C1
B C1 C1 C1
STEEL CONNECTION STEEL CONNECTION STEEL CONNECTION STEEL CONNECTION STEEL CONNECTION
CONNECTION (L) CONNECTION (L) STEEL CONNECTION
CONNECTION (L) CONNECTION (L) CONNECTION (L) CONNECTION (L)
NP EA
0
10/04/21 10/04/21
CONTRACTOR
Status
PROPOSED
Contract
1/75@A3 NP 0
4445
+14.88
4510
UC 203x203x71
UC 203x203x71
+11.55 +11.55
UC 203x203x71
UC 203x203x71
UC 203x203x71
UC 203x203x71
2650
+8.90 +8.90
UC 203x203x71
UC 203x203x71
UC 203x203x71
UC 203x203x71
3250
+5.65 +5.65
UC 203x203x71
UC 203x203x71
UC 203x203x71
NP EA
UC 203x203x71
UC 203x203x71
0
10/04/21 10/04/21
CONTRACTOR
+2.35 +2.35
PROPOSED
STRUCTURAL ELEVATIONS
ELEVATION @ AXIS (1) ELEVATION @ AXIS (2) JOB No.
W/ LEVELS TO TOP FINISHED FLOOR
SCALE DRG. INITIATED BY REVISIONS
1/75@A3 NP 0
+15.73
UC 203x203x71
UC 203x203x71
+12.88
UC 203x203x71
UC 203x203x71
+10.23
UC 203x203x71
UC 203x203x71
+7.58
UC 203x203x71
UC 203x203x71
+4.63
UC 203x203x71
UC 203x203x71
NP EA
0
10/04/21 10/04/21
CONTRACTOR
+2.35
+0.67 Status
PROPOSED
Contract
4265
34 Goldhawk Road London W12 8DH 0
Title
STRUCTURAL ELEVATIONS
ELEVATION @ AXIS (6) JOB No.
W/ LEVELS TO TOP FINISHED FLOOR
SCALE DRG. INITIATED BY REVISIONS
1/75@A3 NP 0
+14.88 57.41+
UC 203x203x71
UC 203x203x71
UC 203x203x71
UC 254x102x25
0032
UC 203x203x71
UC 203x203x71
+12.88 88.21+ ROO LF DNOCES
UC 254x102x25
053
UC 254x102x25
5842
UC 203x203x71
UC 203x203x71
UC 203x203x71
+11.55 55.11+
053
UC 254x102x25 UC 254x102x25
ROOLF DNOCES UC 254x102x25
0032
GOLDHAWK STREET
UC 203x203x71
UC 203x203x71
UC 203x203x71
+10.23 32.01+
ROUC
OLF ENINAZZEM
053
254x102x25
03111
UC 254x102x25
5719
0032
UC 203x203x71
UC 203x203x71
UC 203x203x71
6717
+8.90 09.8+
UC 254x102x25 UC 254x102x25 UC 254x102x25
053
ROOLF TSRIF
0032
REAR ROAD
UC 203x203x71
85.7+
TEERTS KWAHDLOG
+7.58
UC 203x203x71
UC 254x102x25 ROOLF TSRIF
053
UC 254x102x25
UC 203x203x71
0092
UC 203x203x71
UC 203x203x71
UC 203x203x71
TEERTS RAER
0062
UC 203x203x71
EA
UC 203x203x71
NP
0
10/04/21 10/04/21
REV.
UC 203x203x71
CONTRACTOR
Status
PROPOSED
Contract
1/75@A3 NP 0
+14.88
UC 203x203x71
UC 203x203x71
UC 203x203x71
UC 254x102x25
UC 203x203x71
UC 203x203x71
+12.88
UC 254x102x25 UC 254x102x25
UC 203x203x71
UC 203x203x71
UC 203x203x71
+11.55
UC 254x102x25 UC 254x102x25 UC 254x102x25
GOLDHAWK STREET
UC 203x203x71
UC 203x203x71
UC 203x203x71
+10.23
UC 254x102x25 UC 254x102x25
UC 203x203x71
UC 203x203x71
UC 203x203x71
+8.90
UC 254x102x25 UC 254x102x25 UC 254x102x25
REAR ROAD
UC 203x203x71
+7.58
UC 203x203x71
UC 254x102x25 UC 254x102x25
UC 203x203x71
UC 203x203x71
UC 203x203x71
UC 203x203x71
UC 254x102x25 +5.65
UC 254x102x25 UC 254x102x25
+4.63
UC 254x102x25 UC 254x102x25
UC 203x203x71
UC 203x203x71
UC 203x203x71
NP EA
0
10/04/21 10/04/21
UC 203x203x71
UC 203x203x71
UC 203x203x71
DESCRIPTION REVISED BY APPROVED BY
REV.
AND DATE AND DATE
CONTRACTOR
+2.35
Status
PROPOSED
Contract
1/75@A3 NP 0
CONCRETE PLACEMENT
1. BOTTOM EXCAVATION PREPARED FOR CONCRETE
TO ENSURE FLAT SURFACE
2. CONCRETE PLACED AND VIBRATED TO WITHIN
75mm OF EXISTING FOUNDATION
PROTECTION BOARD
DRYPACK AS PER SPECIFICATION
1. AFTER MINIMUM OF 24 HOURS CONCRETE BASE
CAN BE DRY PACKED USING A 1:1 MIXTURE OF
SHARP SAND AND CEMENT. RAMMED HARD WITH
MIN. WATER CONTENT TO ENSURE LITTLE
SHRINKAGE. NEW COLUMN H25@200
UB 254 X 102 X 25 LONGITUDINAL LOOSE REBARS
STEEL COLUMN C1
UC254X254X73
+4.79
EX. GRND.
1000
LAP
H25@200 O.C E.A
NIBBLE BACK FOOTING REINFORCEMENT
EXISTING CORBEC
150
STRUCTURAL SLAB
H25@200
+2.85 600 LONGITUDINAL LOOSE REBARS
+2.85 T.O.R 1000mm DEVELOPMENT LENGTH
T.O.R
600 250
200
BASE PLATE
STEEL ANCHOR BOLTS PIN / DOWEL
1200
NP EA
0
CONTRACTOR
NEW UNDERPINNING MASS CONCRETE
1200 (WIDTH) X 1200mm (DEPTH)
250
LONGITUDINAL REINFORCEMENT = H25@200mm
TRANSVERSE REINFORCEMENT = H25@200mm
USE REINFORCEMENT H25@600 O.C. E.A.
TO PREVENT SHRINKAGE FOR CONCRETE FOOTING REINFORCEMENT
Status
1/25@A3 NP 0
PROTECTION BOARD
AS PER SPECIFICATION
H25@200
LONGITUDINAL LOOSE REBARS
BRICK WALL
1000
LAP
H25@200 O.C E.A
STRUCTURAL SLAB FOOTING REINFORCEMENT
150
H25@200
+2.85 600 LONGITUDINAL LOOSE REBARS
T.O.R 1000mm DEVELOPMENT LENGTH
250
200
PIN / DOWEL
600
1200
NP EA
0
10/04/21 10/04/21
PROPOSED
HIGHER SIDE. ITS DOWELLED INTO THE PAD 34 Goldhawk Road London W12 8DH 0
SUPPORTING COLUMNS. AND THE LOWER Title
UNDERPINNING DETAIL
SIDE IS DOWELLED INTO THE TOE OF THE
RETAINING WALL JOB No. SCALE DRG. INITIATED BY REVISIONS
1/25@A3 NP 0
M20 BOLTS
CASING - MASS POUR OF
CONCRETE
EXISTING BRICK WALL
PROTECTION BOARD
AS PER SPECIFICATION
DRY PACKING
H25@200
LONGITUDINAL LOOSE REBARS
1000mm DEVELOPMENT LENGTH
STRUCTURAL SLAB 150
+2.85 600
T.O.R
BASE PLATE
200
FOOTING REINFORCEMENT 0
NP
10/04/21
EA
10/04/21
CONTRACTOR
Status
PROPOSED
BLINDING CONCRETE AS PER
SPECIFICATION Contract
1/25@A3 NP 0
REVISED BY
EA
10/04/21
APPROVED BY
REV. DESCRIPTION
AND DATE AND DATE
CONTRACTOR
Status
PROPOSED
Contract
ROOF DETAIL
1/15@A3 NP 0
A A
15mm MAX
0
10/04/21 10/04/21
Structural support Site applied structural fixing REV. DESCRIPTION REVISED BY APPROVED BY
for CONTRACTOR
product (by others) Structural upstand
54.1mm ref.
Status
PROPOSED
Contract
1/4@A3 NP 0