Dakshineswar-TSS Relay Test Report
Dakshineswar-TSS Relay Test Report
Dakshineswar-TSS Relay Test Report
Date:-08/11/2019
I. GENERAL DETAILS
II. MEASUREMENT
Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps
Page 1 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts
Vr & Vy (Vb=0) 0 11 Kv 11 kV
a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse
Page 2 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Y-N 4 4 0.500 0.501
B-N 4 4 0.500 0.501
RYB 4 4 0.500 0.502
c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse
Page 3 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Operated time (Sec)
Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay
Uo 22 22 0.040 0.038
Page 4 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
IV. OPERATIONAL CHECKS
Page 5 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Client RAIL VIKAS NIGAM LIMITED.
I. GENERAL DETAILS
II. MEASUREMENT
Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps
Page 6 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts
Vr & Vy (Vb=0) 0 11 Kv 11 Kv
a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse
Page 7 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
B-N 4 4 0.507 0.507
RYB 4 4 0.500 0.500
c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse
Page 8 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Operated time (Sec)
Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay
Uo 22 22 0.040 0.039
Page 9 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
IV. OPERATIONAL CHECKS
Page 10 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
I. GENERAL DETAILS
II. MEASUREMENT
Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps
Page 11 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts
Vr & Vy (Vb=0) 0 11 Kv 11 Kv
a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse
Page 12 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
B-N 3.5 3.5 0.5 0.493
RYB 3.5 3.5 0.5 0.494
c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse
Page 13 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Operated time (Sec)
Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay
Uo 22 22 0.040 0.053
Page 14 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
IV. OPERATIONAL CHECKS
Page 15 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Client RAIL VIKAS NIGAM LIMITED.
I. GENERAL DETAILS
II. MEASUREMENT
Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps
Page 16 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts
Vr & Vy (Vb=0) 0 11 Kv 11 kV
a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse
Page 17 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Y-N 3.5 3.5 0.5 0.507
B-N 3.5 3.5 0.5 0.507
RYB 3.5 3.5 0.5 0.507
c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse
Page 18 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Operated time (Sec)
Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay
Uo 22 22 0.040 0.061
Page 19 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
S.NO Description OK Remarks
1 Circuit Breaker Failure Test OK -
2 Inrush Current Test Check OK
3 Changeover of Contacts Ok -
4 Flag or LED Indication Ok -
5 Operation of Master Trip Ok -
Page 20 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Client RAIL VIKAS NIGAM LIMITED.
I. GENERAL DETAILS
II. MEASUREMENT
Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps
Page 21 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts
Vr & Vy (Vb=0) 0 11 Kv 11 Kv
a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse
Page 22 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Y-N 3.5 3.5 0.02 0.022
B-N 3.5 3.5 0.02 0.021
RYB 3.5 3.5 0.02 0.022
c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse
Page 23 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Operated time (Sec)
Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay
Uo 22 22 0.040 0.061
Page 24 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
S.NO Description OK Remarks
1 Circuit Breaker Failure Test OK -
2 Inrush Current Test Check OK
3 Changeover of Contacts Ok -
4 Flag or LED Indication Ok -
5 Operation of Master Trip Ok -
Page 25 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Project Kolkata Metro Project- Dakshineswar TSS
Location 11 KV VCB SWITCHBOARD
I. GENERAL DETAILS
II. MEASUREMENT
Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps
Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts
Page 26 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Vr & Vy (Vb=0) 0 11 Kv 11 kV
a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse
Page 27 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
RYB 3.5 3.5 0.02 0.022
c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse
Page 28 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Operated time (Sec)
Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay
Uo 22 22 0.040 0.061
Page 29 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Page 30 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Location 11 KV VCB SWITCHBOARD
I. GENERAL DETAILS
II. MEASUREMENT
Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps
Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts
Vr & Vy (Vb=0) 0 11 Kv 11 kV
Page 31 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Vy & Vb (Vr=0) -120 11 kV 11 kV
a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse
Page 32 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse
Page 33 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
R-N 70 70 0.040 0.059
Y-N 70 70 0.040 0.059
B-N 70 70 0.040 0.059
Uo 22 22 0.040 0.060
Page 34 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
1 Circuit Breaker Failure Test OK -
2 Inrush Current Test Check OK
3 Changeover of Contacts Ok -
4 Flag or LED Indication Ok -
5 Operation of Master Trip Ok Auto Reset
Page 35 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Location 11 KV VCB SWITCHBOARD
I. GENERAL DETAILS
II. MEASUREMENT
Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps
IR (Iy&Ib=0) 0 30 30
IY (Ir&Ib=0) -120 30 30
IB (Ir&Iy=0) 120 30 30
Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts
Vr & Vy (Vb=0) 0 11 Kv 11 kV
Page 36 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Vy & Vb (Vr=0) -120 11 Kv 11 kV
a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse
Page 37 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse
Page 38 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
R-N 70 70 0.040 0.059
Y-N 70 70 0.040 0.059
B-N 70 70 0.040 0.059
Uo 22 22 0.040 0.061
Page 39 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
1 Circuit Breaker Failure Test OK -
2 Inrush Current Test Check OK
3 Changeover of Contacts Ok -
4 Flag or LED Indication Ok -
5 Operation of Master Trip Ok -
Page 40 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Location 11 KV VCB SWITCHBOARD
I. GENERAL DETAILS
II. MEASUREMENT
Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps
Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts
Vr & Vy (Vb=0) 0 11 Kv 11 kV
Page 41 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Vy & Vb (Vr=0) -120 11 Kv 11 kV
a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse
Page 42 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse
Page 43 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
R-N 70 70 0.040 0.056
Y-N 70 70 0.040 0.056
B-N 70 70 0.040 0.056
Uo 22 22 0.040 0.062
Page 44 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
1 Circuit Breaker Failure Test OK -
2 Inrush Current Test Check OK
3 Changeover of Contacts Ok -
4 Flag or LED Indication Ok -
5 Operation of Master Trip Ok -
Page 45 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Location 11 KV VCB SWITCHBOARD
I. GENERAL DETAILS
II. MEASUREMENT
Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps
Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts
Vr & Vy (Vb=0) 0 11 Kv 11 kV
Page 46 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Vy & Vb (Vr=0) -120 11 Kv 11 kV
a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse
Page 47 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse
Page 48 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
R-N 70 70 0.040 0.054
Y-N 70 70 0.040 0.054
B-N 70 70 0.040 0.054
Uo 22 22 0.040 0.061
Page 49 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
1 Circuit Breaker Failure Test OK -
2 Inrush Current Test Check OK
3 Changeover of Contacts Ok -
4 Flag or LED Indication Ok -
5 Operation of Master Trip Ok -
Page 50 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Location 11 KV VCB SWITCHBOARD
I. GENERAL DETAILS
II. MEASUREMENT
Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps
IR (Iy&Ib=0) 0 30 30
IY (Ir&Ib=0) -120 30 30
IB (Ir&Iy=0) 120 30 30
Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts
Vr & Vy (Vb=0) 0 11 Kv 11 kV
Page 51 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Vy & Vb (Vr=0) -120 11 Kv 11 kV
a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse
Page 52 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse
Page 53 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
R-N 70 70 0.040 0.059
Y-N 70 70 0.040 0.059
B-N 70 70 0.040 0.059
Uo 22 22 0.040 0.056
Page 54 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
1 Circuit Breaker Failure Test OK -
2 Inrush Current Test Check OK
3 Changeover of Contacts Ok -
4 Flag or LED Indication Ok -
5 Operation of Master Trip Ok -
Page 55 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Feeder Detail SPARE TIE FEEDER Feeder No. 15
I. GENERAL DETAILS
II. MEASUREMENT
Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps
Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts
Vr & Vy (Vb=0) 0 11 Kv 11 kV
Page 56 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Vy & Vb (Vr=0) -120 11 kV 11 kV
a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse
Page 57 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse
Page 58 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
R-N 70 70 0.040 0.056
Y-N 70 70 0.040 0.056
B-N 70 70 0.040 0.056
Uo 22 22 0.040 0.061
Page 59 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
1 Circuit Breaker Failure Test OK -
2 Inrush Current Test Check OK
3 Changeover of Contacts Ok -
4 Flag or LED Indication Ok -
5 Operation of Master Trip Ok -
Page 60 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Location 11 KV VCB SWITCHBOARD
I. GENERAL DETAILS
II. MEASUREMENT
Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps
Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts
Vr & Vy (Vb=0) 0 11 Kv 11 kV
Page 61 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Vy & Vb (Vr=0) -120 11 kV 11 kV
a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse
Page 62 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse
Page 63 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
R-N 70 70 0.040 0.061
Y-N 70 70 0.040 0.061
B-N 70 70 0.040 0.061
Uo 22 23 0.040 0.062
Page 64 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
1 Circuit Breaker Failure Test OK -
2 Inrush Current Test Check OK
3 Changeover of Contacts Ok -
4 Flag or LED Indication Ok -
5 Operation of Master Trip Ok -
Page 65 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Location 11 KV VCB SWITCHBOARD
I. GENERAL DETAILS
II. MEASUREMENT
Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps
Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts
Vr & Vy (Vb=0) 0 11 Kv 11 kV
Page 66 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Vy & Vb (Vr=0) -120 11 kV 11 kV
a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse
Page 67 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse
Page 68 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
R-N 70 70 0.040 0.058
Y-N 70 70 0.040 0.058
B-N 70 70 0.040 0.058
Uo 22 23 0.040 0.058
Page 69 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
1 Circuit Breaker Failure Test OK -
2 Inrush Current Test Check OK
3 Changeover of Contacts Ok -
4 Flag or LED Indication Ok -
5 Operation of Master Trip Ok -
Page 70 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Location 11 KV VCB SWITCHBOARD
I. GENERAL DETAILS
II. MEASUREMENT
Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps
Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts
Vr & Vy (Vb=0) 0 11 Kv 11 kV
Page 71 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
Vy & Vb (Vr=0) -120 11 kV 11 kV
a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse
Page 72 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse
Page 73 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
R-N 70 70 0.040 0.062
Y-N 70 70 0.040 0.062
B-N 70 70 0.040 0.062
Uo 22 23 0.040 0.059
Page 74 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING
Date:-08/11/2019
1 Circuit Breaker Failure Test OK -
2 Inrush Current Test Check OK
3 Changeover of Contacts Ok -
4 Flag or LED Indication Ok -
5 Operation of Master Trip Ok -
Page 75 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date: