PRE-COMMISSIONING TEST REPORT FOR

NUMERICAL RELAY TESTING

Date:-08/11/2019

Client RAIL VIKAS NIGAM LIMITED.

Project Kolkata Metro Project- Dakshineswar TSS


Location 11 KV VCB SWITCHBOARD

Feeder Detail INCOMER 1 FROM NOAPARA TSS Feeder No. 1

NUMERICAL PROTECTION RELAY TESTING

I. GENERAL DETAILS

NAME PLATE DETAILS

Make:- ABB Type:-REF615-F

Sl. No:- 1VYV91309673 Year of Manufacture:- 2019

Model no:- HBFFAEAGNBA1BNA11G CT ratio:- 400/1 A

Operating voltage:- 220V DC PT ratio:- 11/√3 kV / 110/√3 V

II. MEASUREMENT

Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps

IR (Iy&Ib=0) 0 400 400

IY (Ir&Ib=0) -120 400 400

IB (Ir&Iy=0) 120 400 400

Page 1 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts

Vr & Vy (Vb=0) 0 11 Kv 11 kV

Vy & Vb (Vr=0) -120 11 Kv 11 kV

Vb & Vr (Vy=0) 120 11 Kv 11 kV

III. TIMING TEST

a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 10.029, 5t=4.280 )

Operated time and current


Injected Set TMS
2X 5X
Phase Current (A) (sec) Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 1 1 10.075 2 4.294 5

Y-N 1 1 10.075 2 4.294 5


B-N 1 1 10.075 2 4.294 5

b. High set Over Current : (PHIPTOC1) (50) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 4 4 0.500 0.502

Page 2 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Y-N 4 4 0.500 0.501
B-N 4 4 0.500 0.501
RYB 4 4 0.500 0.502

c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 10.029, 5t=4.280 )

Operated time and current


Injected Set Current 2X 5X
TMS
Phase (A) Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 0.1 1 10.06 sec 0.2 4.29 sec 0.5
Y-N 0.1 1 10.06 sec 0.2 4.29 sec 0.5
B-N 0.1 1 10.06 sec 0.2 4.29 sec 0.5

d. High set Earth Fault : (DEFHPTOC1) (50N) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 0.2 0.2 0.040 0.059


Y-N 0.2 0.2 0.040 0.059
B-N 0.2 0.2 0.040 0.059

e. Over Voltage : (PHPTOV1) (59) Curve: Definite Time

Page 3 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Operated time (Sec)
Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

R-N 70 70 0.040 0.060


Y-N 70 70 0.040 0.060
B-N 70 70 0.040 0.060

e. Residual Over Voltage : (ROVPTOV1) (59N) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

Uo 22 22 0.040 0.038

e. Under Voltage : (PHPTUV1) (27) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

R-N 56 56 0.060 0.074


Y-N 56 56 0.060 0.074
B-N 56 56 0.060 0.074

Page 4 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
IV. OPERATIONAL CHECKS

S.NO Description OK Remarks


1 Circuit Breaker Failure Test OK -
2 Inrush Current Test Check OK
3 Changeover of Contacts Ok -
4 Flag or LED Indication Ok -
5 Operation of Master Trip Ok -

All the Protection functions mentioned above is working properly.

Relay Found Healthy.

Page 5 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Client RAIL VIKAS NIGAM LIMITED.

Project Kolkata Metro Project- Dakshineswar TSS


Location 11 KV VCB SWITCHBOARD

Feeder Detail SPARE TIE FEEDER Feeder No. 3

NUMERICAL PROTECTION RELAY TESTING

I. GENERAL DETAILS

NAME PLATE DETAILS

Make:- ABB Type:-REF615-F

Sl. No:- 1VYV91309675 Year of Manufacture:- 2019

Model no:- HBFFAEAGNBA1BNA11G CT ratio:- 400/1 A

Operating voltage:- 220V DC PT ratio:- 11/√3 kV / 110/√3 V

II. MEASUREMENT

Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps

IR (Iy&Ib=0) 0 400 400

IY (Ir&Ib=0) -120 400 400

IB (Ir&Iy=0) 120 400 400

Page 6 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts

Vr & Vy (Vb=0) 0 11 Kv 11 Kv

Vy & Vb (Vr=0) -120 11 kV 11 Kv

Vb & Vr (Vy=0) 120 11 kV 11 Kv

III. TIMING TEST

a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 10.029, 5t=4.280 )

Operated time and current


Injected Set TMS
2X 5X
Phase Current (A) (sec) Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 1 1 10.07 2 4.292 5

Y-N 1 1 10.07 2 4.292 5


B-N 1 1 10.07 2 4.292 5

b. High set Over Current : (PHIPTOC1) (50) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 4 4 0.507 0.507


Y-N 4 4 0.502 0.502

Page 7 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
B-N 4 4 0.507 0.507
RYB 4 4 0.500 0.500

c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 10.029, 5t=4.280 )

Operated time and current


Injected Set Current 2X 5X
TMS
Phase (A) Operated Operated
Operated(sec) Operated(sec)
in kit current(A) in kit current(A)
R-N 0.1 1 10.07 sec 0.2 4.29 sec 0.5
Y-N 0.1 1 10.07 sec 0.2 4.29 sec 0.5
B-N 0.1 1 10.07 sec 0.2 4.29 sec 0.5

d. High set Earth Fault : (DEFHPTOC1) (50N) Curve: Definite


Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 0.2 0.2 0.040 0.056


Y-N 0.2 0.2 0.040 0.056
B-N 0.2 0.2 0.040 0.056
e. Over Voltage : (PHPTOV1) (59) Curve: Definite Time

Page 8 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Operated time (Sec)
Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

R-N 70 70 0.040 0.057


Y-N 70 70 0.040 0.057
B-N 70 70 0.040 0.057

e. Residual Over Voltage : (ROVPTOV1) (59N) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

Uo 22 22 0.040 0.039

e. Under Voltage : (PHPTUV1) (27) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

R-N 57 57 0.060 0.077


Y-N 57 57 0.060 0.077
B-N 57 57 0.060 0.077

Page 9 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
IV. OPERATIONAL CHECKS

S.NO Description OK Remarks


1 Circuit Breaker Failure Test OK -
2 Inrush Current Test Check OK
3 Changeover of Contacts Ok -
4 Flag or LED Indication Ok -
5 Operation of Master Trip Ok Auto Reset

All the Protection functions mentioned above is working properly.

Relay Found Healthy.

Client RAIL VIKAS NIGAM LIMITED.

Page 10 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019

Project Kolkata Metro Project- Dakshineswar TSS


Location 11 KV VCB SWITCHBOARD

Feeder Detail TRAFO FEEDER (2.3MVA) Feeder No. 4

NUMERICAL PROTECTION RELAY TESTING

I. GENERAL DETAILS

NAME PLATE DETAILS

Make:- ABB Type:-REF615-F

Sl. No:- 1VYV91309668 Year of Manufacture:- 2019

Model no:- HBFFAEAGNBA1BNA11G CT ratio:- 200/1 A

Operating voltage:- 220V DC PT ratio:- 11/√3 kV / 110/√3 V

II. MEASUREMENT

Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps

IR (Iy&Ib=0) 0 200 200

IY (Ir&Ib=0) -120 200 200

IB (Ir&Iy=0) 120 200 200

Page 11 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts

Vr & Vy (Vb=0) 0 11 Kv 11 Kv

Vy & Vb (Vr=0) -120 11 kV 11 Kv

Vb & Vr (Vy=0) 120 11 kV 11 Kv

III. TIMING TEST

a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 5.015, 5t=2.140 )

Operated time and current


Injected Set TMS
2X 5X
Phase Current (A) (sec) Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 1 0.5 5.047 2 2.150 5

Y-N 1 0.5 5.047 2 2.150 5


B-N 1 0.5 5.047 2 2.150 5

b. High set Over Current : (PHIPTOC1) (50) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 3.5 3.5 0.5 0.493


Y-N 3.5 3.5 0.5 0.492

Page 12 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
B-N 3.5 3.5 0.5 0.493
RYB 3.5 3.5 0.5 0.494

c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 5.015, 5t=2.140 )

Operated time and current


Injected Set Current 2X 5X
TMS
Phase (A) Operated Operated
Operated(sec) Operated(sec)
in kit current(A) in kit current(A)
R-N 0.1 0.5 5.05 sec 0.2 2.152 sec 0.5
Y-N 0.1 0.5 5.05sec 0.2 2.152sec 0.5
B-N 0.1 0.5 5.05 sec 0.2 2.152 sec 0.5

d. High set Earth Fault : (DEFHPTOC1) (50N) Curve: Definite


Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 0.2 0.2 0.040 0.059


Y-N 0.2 0.2 0.040 0.059
B-N 0.2 0.2 0.040 0.059

e. Over Voltage : (PHPTOV1) (59) Curve: Definite Time

Page 13 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Operated time (Sec)
Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

R-N 70 70 0.040 0.060


Y-N 70 70 0.040 0.060
B-N 70 70 0.040 0.060

e. Residual Over Voltage : (ROVPTOV1) (59N) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

Uo 22 22 0.040 0.053

e. Under Voltage : (PHPTUV1) (27) Curve: Definite Time

Injected Set Voltage Operated time (Sec)


Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

R-N 56 56 0.060 0.073


Y-N 56 56 0.060 0.073
B-N 56 56 0.060 0.073

Page 14 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
IV. OPERATIONAL CHECKS

S.NO Description OK Remarks


1 Circuit Breaker Failure Test OK -
2 Inrush Current Test Check OK
3 Changeover of Contacts Ok -
4 Flag or LED Indication Ok -
5 Operation of Master Trip Ok -

All the Protection functions mentioned above is working properly.

Relay Found Healthy.

Page 15 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Client RAIL VIKAS NIGAM LIMITED.

Project Kolkata Metro Project- Dakshineswar TSS


Location 11 KV VCB SWITCHBOARD

Feeder Detail TRAFO FEEDER-2 (2.3MVA) Feeder No. 5

NUMERICAL PROTECTION RELAY TESTING

I. GENERAL DETAILS

NAME PLATE DETAILS

Make:- ABB Type:-REF615-F

Sl. No:- 1VYV91309672 Year of Manufacture:- 2019

Model no:- HBFFAEAGNBA1BNA11G CT ratio:- 200/1 A

Operating voltage:- 220V DC PT ratio:- 11/√3 kV / 110/√3 V

II. MEASUREMENT

Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps

IR (Iy&Ib=0) 0 200 200

IY (Ir&Ib=0) -120 200 200

IB (Ir&Iy=0) 120 200 200

Page 16 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts

Vr & Vy (Vb=0) 0 11 Kv 11 kV

Vy & Vb (Vr=0) -120 11 kV 11 kV

Vb & Vr (Vy=0) 120 11 kV 11 kV

III. TIMING TEST

a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 5.015, 5t=2.140 )

Operated time and current


Injected Set TMS
2X 5X
Phase Current (A) (sec) Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 1 0.5 5.045 2 2.147 5

Y-N 1 0.5 5.045 2 2.147 5


B-N 1 0.5 5.045 2 2.147 5

b. High set Over Current : (PHIPTOC1) (50) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 3.5 3.5 0.5 0.508

Page 17 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Y-N 3.5 3.5 0.5 0.507
B-N 3.5 3.5 0.5 0.507
RYB 3.5 3.5 0.5 0.507

c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 5.015, 4t=2.490 )

Operated time and current


Injected Set Current
TMS 2X 4X
Phase (A)
Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 0.1 0.5 5.05 sec 0.2 2.509 sec 0.5
Y-N 0.1 0.5 5.05sec 0.2 2.509sec 0.5
B-N 0.1 0.5 5.05 sec 0.2 2.509 sec 0.5

d. High set Earth Fault : (DEFHPTOC1) (50N) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 0.2 0.2 0.040 0.060


Y-N 0.2 0.2 0.040 0.060
B-N 0.2 0.2 0.040 0.060

e. Over Voltage : (PHPTOV1) (59) Curve: Definite Time

Page 18 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Operated time (Sec)
Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

R-N 70 70 0.040 0.060


Y-N 70 70 0.040 0.060
B-N 70 70 0.040 0.060

e. Residual Over Voltage : (ROVPTOV1) (59N) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

Uo 22 22 0.040 0.061

e. Under Voltage : (PHPTUV1) (27) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

R-N 56 56 0.060 0.076


Y-N 56 56 0.060 0.076
B-N 56 56 0.060 0.076

IV. OPERATIONAL CHECKS

Page 19 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
S.NO Description OK Remarks
1 Circuit Breaker Failure Test OK -
2 Inrush Current Test Check OK
3 Changeover of Contacts Ok -
4 Flag or LED Indication Ok -
5 Operation of Master Trip Ok -

All the Protection functions mentioned above is working properly.

Relay Found Healthy.

Page 20 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Client RAIL VIKAS NIGAM LIMITED.

Project Kolkata Metro Project- Dakshineswar TSS


Location 11 KV VCB SWITCHBOARD

Feeder Detail TRAFO FEEDER-3 (2.3MVA) Feeder No. 6

NUMERICAL PROTECTION RELAY TESTING

I. GENERAL DETAILS

NAME PLATE DETAILS

Make:- ABB Type:-REF615-F

Sl. No:- 1VYV91310468 Year of Manufacture:- 2019

Model no:- HBFFAEAGNBA1BNA11G CT ratio:- 200/1 A

Operating voltage:- 220V DC PT ratio:- 11/√3 kV / 110/√3 V

II. MEASUREMENT

Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps

IR (Iy&Ib=0) 0 200 200

IY (Ir&Ib=0) -120 200 200

IB (Ir&Iy=0) 120 200 200

Page 21 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts

Vr & Vy (Vb=0) 0 11 Kv 11 Kv

Vy & Vb (Vr=0) -120 11 kV 11 kV

Vb & Vr (Vy=0) 120 11 kV 11 kV

III. TIMING TEST

a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 5.015, 5t=2.140 )

Operated time and current


Injected Set TMS
2X 5X
Phase Current (A) (sec) Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 1 0.5 5.048 2 2.149 5

Y-N 1 0.5 5.048 2 2.149 5


B-N 1 0.5 5.048 2 2.149 5

b. High set Over Current : (PHIPTOC1) (50) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 3.5 3.5 0.02 0.022

Page 22 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Y-N 3.5 3.5 0.02 0.022
B-N 3.5 3.5 0.02 0.021
RYB 3.5 3.5 0.02 0.022

c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 5.015, 5t=2.140 )

Operated time and current


Injected Set Current
TMS 2X 5X
Phase (A)
Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 0.1 0.5 5.039 sec 0.2 2.153 sec 0.5
Y-N 0.1 0.5 5.039 sec 0.2 2.153 sec 0.5
B-N 0.1 0.5 5.039 sec 0.2 2.153 sec 0.5

d. High set Earth Fault : (DEFHPTOC1) (50N) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 0.2 0.2 0.040 0.061


Y-N 0.2 0.2 0.040 0.061
B-N 0.2 0.2 0.040 0.061

e. Over Voltage : (PHPTOV1) (59) Curve: Definite Time

Page 23 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Operated time (Sec)
Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

R-N 70 70 0.040 0.058


Y-N 70 70 0.040 0.058
B-N 70 70 0.040 0.058

e. Residual Over Voltage : (ROVPTOV1) (59N) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

Uo 22 22 0.040 0.061

e. Under Voltage : (PHPTUV1) (27) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

R-N 56 56 0.060 0.075


Y-N 56 56 0.060 0.075
B-N 56 56 0.060 0.075

IV. OPERATIONAL CHECKS

Page 24 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
S.NO Description OK Remarks
1 Circuit Breaker Failure Test OK -
2 Inrush Current Test Check OK
3 Changeover of Contacts Ok -
4 Flag or LED Indication Ok -
5 Operation of Master Trip Ok -

All the Protection functions mentioned above is working properly.

Relay Found Healthy.

Client RAIL VIKAS NIGAM LIMITED.

Page 25 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Project Kolkata Metro Project- Dakshineswar TSS
Location 11 KV VCB SWITCHBOARD

Feeder Detail TRAFO FEEDER-4 (2.3MVA) Feeder No. 7

NUMERICAL PROTECTION RELAY TESTING

I. GENERAL DETAILS

NAME PLATE DETAILS

Make:- ABB Type:-REF615-F

Sl. No:- 1VYV91309611 Year of Manufacture:- 2019

Model no:- HBFFAEAGNBA1BNA11G CT ratio:- 200/1 A

Operating voltage:- 220V DC PT ratio:- 11/√3 kV / 110/√3 V

II. MEASUREMENT

Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps

IR (Iy&Ib=0) 0 200 200

IY (Ir&Ib=0) -120 200 200

IB (Ir&Iy=0) 120 200 200

Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts

Page 26 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Vr & Vy (Vb=0) 0 11 Kv 11 kV

Vy & Vb (Vr=0) -120 11 kV 11 kV

Vb & Vr (Vy=0) 120 11 kV 11 kV

III. TIMING TEST

a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 5.015, 5t=2.140 )

Operated time and current


Injected Set TMS
2X 5X
Phase Current (A) (sec) Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 1 0.5 5.048 2 2.151 5

Y-N 1 0.5 5.048 2 2.151 5


B-N 1 0.5 5.048 2 2.151 5

b. High set Over Current : (PHIPTOC1) (50) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 3.5 3.5 0.02 0.023


Y-N 3.5 3.5 0.02 0.023
B-N 3.5 3.5 0.02 0.023

Page 27 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
RYB 3.5 3.5 0.02 0.022

c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 5.015, 5t=2.140 )

Operated time and current


Injected Set Current
TMS 2X 5X
Phase (A)
Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 0.1 0.5 5.078 sec 0.2 2.154 sec 0.5
Y-N 0.1 0.5 5.078 sec 0.2 2.154 sec 0.5
B-N 0.1 0.5 5.078 sec 0.2 2.154 sec 0.5

d. High set Earth Fault : (DEFHPTOC1) (50N) Curve: Definite


Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 0.2 0.2 0.040 0.058


Y-N 0.2 0.2 0.040 0.058
B-N 0.2 0.2 0.040 0.058

e. Over Voltage : (PHPTOV1) (59) Curve: Definite Time

Page 28 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Operated time (Sec)
Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

R-N 70 70 0.040 0.060


Y-N 70 70 0.040 0.060
B-N 70 70 0.040 0.060

e. Residual Over Voltage : (ROVPTOV1) (59N) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

Uo 22 22 0.040 0.061

e. Under Voltage : (PHPTUV1) (27) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

R-N 56 56 0.060 0.075


Y-N 56 56 0.060 0.075
B-N 56 56 0.060 0.075

IV. OPERATIONAL CHECKS

Page 29 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019

S.NO Description OK Remarks


1 Circuit Breaker Failure Test OK -
2 Inrush Current Test Check OK
3 Changeover of Contacts Ok -
4 Flag or LED Indication Ok -
5 Operation of Master Trip Ok -

All the Protection functions mentioned above is working properly.

Relay Found Healthy.

Client RAIL VIKAS NIGAM LIMITED.

Project Kolkata Metro Project- Dakshineswar TSS

Page 30 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Location 11 KV VCB SWITCHBOARD

Feeder Detail SPARE TIE FEEDER Feeder No. 8

NUMERICAL PROTECTION RELAY TESTING

I. GENERAL DETAILS

NAME PLATE DETAILS

Make:- ABB Type:-REF615-F

Sl. No:- 1VYV91310464 Year of Manufacture:- 2019

Model no:- HBFFAEAGNBA1BNA11G CT ratio:- 400/1 A

Operating voltage:- 220V DC PT ratio:- 11/√3 kV / 110/√3 V

II. MEASUREMENT

Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps

IR (Iy&Ib=0) 0 400 400

IY (Ir&Ib=0) -120 400 400

IB (Ir&Iy=0) 120 400 400

Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts

Vr & Vy (Vb=0) 0 11 Kv 11 kV

Page 31 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Vy & Vb (Vr=0) -120 11 kV 11 kV

Vb & Vr (Vy=0) 120 11 kV 11 kV

III. TIMING TEST

a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 10.029, 5t=4.280 )

Operated time and current


Injected Set TMS
2X 5X
Phase Current (A) (sec) Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 1 1 10.078 2 4.293 5

Y-N 1 1 10.078 2 4.293 5


B-N 1 1 10.078 2 4.293 5

b. High set Over Current : (PHIPTOC1) (50) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 4 4 0.02 0.028


Y-N 4 4 0.02 0.027
B-N 4 4 0.02 0.027
RYB 4 4 0.02 0.027

Page 32 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019

c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 10.029, 5t=4.280 )

Operated time and current


Injected Set Current
TMS 2X 5X
Phase (A)
Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 0.1 0.5 10.073 sec 0.2 4.294 sec 0.5
Y-N 0.1 0.5 10.073 sec 0.2 4.294 sec 0.5
B-N 0.1 0.5 10.073 sec 0.2 4.294 sec 0.5

d. High set Earth Fault : (DEFHPTOC1) (50N) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 0.2 0.2 0.040 0.060


Y-N 0.2 0.2 0.040 0.060
B-N 0.2 0.2 0.040 0.060

e. Over Voltage : (PHPTOV1) (59) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

Page 33 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
R-N 70 70 0.040 0.059
Y-N 70 70 0.040 0.059
B-N 70 70 0.040 0.059

e. Residual Over Voltage : (ROVPTOV1) (59N) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

Uo 22 22 0.040 0.060

e. Under Voltage : (PHPTUV1) (27) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

R-N 56 56 0.060 0.074


Y-N 56 56 0.060 0.074
B-N 56 56 0.060 0.074

IV. OPERATIONAL CHECKS

S.NO Description OK Remarks

Page 34 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
1 Circuit Breaker Failure Test OK -
2 Inrush Current Test Check OK
3 Changeover of Contacts Ok -
4 Flag or LED Indication Ok -
5 Operation of Master Trip Ok Auto Reset

All the Protection functions mentioned above is working properly.

Relay Found Healthy.

Client RAIL VIKAS NIGAM LIMITED.

Project Kolkata Metro Project- Dakshineswar TSS

Page 35 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Location 11 KV VCB SWITCHBOARD

Feeder Detail AUX TRAFO -1 (500 KVA) Feeder No. 9

NUMERICAL PROTECTION RELAY TESTING

I. GENERAL DETAILS

NAME PLATE DETAILS

Make:- ABB Type:-REF615-F

Sl. No:- 1VYV91309608 Year of Manufacture:- 2019

Model no:- HBFFAEAGNBA1BNA11G CT ratio:- 30/1 A

Operating voltage:- 220V DC PT ratio:- 11/√3 kV / 110/√3 V

II. MEASUREMENT

Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps

IR (Iy&Ib=0) 0 30 30

IY (Ir&Ib=0) -120 30 30

IB (Ir&Iy=0) 120 30 30

Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts

Vr & Vy (Vb=0) 0 11 Kv 11 kV

Page 36 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Vy & Vb (Vr=0) -120 11 Kv 11 kV

Vb & Vr (Vy=0) 120 11 kV 11 kV

III. TIMING TEST

a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 5.015, 5t=2.140 )

Operated time and current


Injected Set TMS
2X 5X
Phase Current (A) (sec) Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 1 0.5 5.046 2 2.151 5

Y-N 1 0.5 5.046 2 2.151 5


B-N 1 0.5 5.046 2 2.151 5

b. High set Over Current : (PHIPTOC1) (50) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 3.5 3.5 0.02 0.027


Y-N 3.5 3.5 0.02 0.026
B-N 3.5 3.5 0.02 0.028
RYB 3.5 3.5 0.02 0.027

Page 37 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019

c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 5.015, 5t=2.140 )

Operated time and current


Injected Set Current
TMS 2X 5X
Phase (A)
Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 0.1 0.5 5.068 sec 0.2 2.152 sec 0.5
Y-N 0.1 0.5 5.068 sec 0.2 2.152 sec 0.5
B-N 0.1 0.5 5.068 sec 0.2 2.152 sec 0.5

d. High set Earth Fault : (DEFHPTOC1) (50N) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 0.2 0.2 0.040 0.061


Y-N 0.2 0.2 0.040 0.061
B-N 0.2 0.2 0.040 0.061

e. Over Voltage : (PHPTOV1) (59) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

Page 38 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
R-N 70 70 0.040 0.059
Y-N 70 70 0.040 0.059
B-N 70 70 0.040 0.059

e. Residual Over Voltage : (ROVPTOV1) (59N) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

Uo 22 22 0.040 0.061

e. Under Voltage : (PHPTUV1) (27) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

R-N 56 56 0.060 0.077


Y-N 56 56 0.060 0.077
B-N 56 56 0.060 0.077

IV. OPERATIONAL CHECKS

S.NO Description OK Remarks

Page 39 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
1 Circuit Breaker Failure Test OK -
2 Inrush Current Test Check OK
3 Changeover of Contacts Ok -
4 Flag or LED Indication Ok -
5 Operation of Master Trip Ok -

All the Protection functions mentioned above is working properly.

Relay Found Healthy.

Client RAIL VIKAS NIGAM LIMITED.

Project Kolkata Metro Project- Dakshineswar TSS

Page 40 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Location 11 KV VCB SWITCHBOARD

Feeder Detail BUSCOUPLER -1 Feeder No. 10

NUMERICAL PROTECTION RELAY TESTING

I. GENERAL DETAILS

NAME PLATE DETAILS

Make:- ABB Type:-REF615-F

Sl. No:- 1VYV91310485 Year of Manufacture:- 2019

Model no:- HBFFAEAGNBA1BNA11G CT ratio:- 400/1 A

Operating voltage:- 220V DC PT ratio:- 11/√3 kV / 110/√3 V

II. MEASUREMENT

Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps

IR (Iy&Ib=0) 0 400 400

IY (Ir&Ib=0) -120 400 400

IB (Ir&Iy=0) 120 400 400

Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts

Vr & Vy (Vb=0) 0 11 Kv 11 kV

Page 41 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Vy & Vb (Vr=0) -120 11 Kv 11 kV

Vb & Vr (Vy=0) 120 11 kV 11 kV

III. TIMING TEST

a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 8.023, 5t=3.424 )

Operated time and current


Injected Set TMS
2X 5X
Phase Current (A) (sec) Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 1 0.8 8.063 2 3.432 5

Y-N 1 0.8 8.063 2 3.432 5


B-N 1 0.8 8.063 2 3.432 5

b. High set Over Current : (PHIPTOC1) (50) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 4 4 0.02 0.022


Y-N 4 4 0.02 0.023
B-N 4 4 0.02 0.024
RYB 4 4 0.02 0.022

Page 42 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019

c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse

Calculated Tripping time (2t= 8.023, 5t=3.424)

Operated time and current


Injected Set Current
TMS 2X 5X
Phase (A)
Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 0.1 0.8 8.060 sec 0.2 3.442 sec 0.5
Y-N 0.1 0.8 8.060 sec 0.2 3.442 sec 0.5
B-N 0.1 0.8 8.060 sec 0.2 3.442 sec 0.5

d. High set Earth Fault : (DEFHPTOC1) (50N) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 0.2 0.2 0.040 0.059


Y-N 0.2 0.2 0.040 0.059
B-N 0.2 0.2 0.040 0.059

e. Over Voltage : (PHPTOV1) (59) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

Page 43 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
R-N 70 70 0.040 0.056
Y-N 70 70 0.040 0.056
B-N 70 70 0.040 0.056

e. Residual Over Voltage : (ROVPTOV1) (59N) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

Uo 22 22 0.040 0.062

e. Under Voltage : (PHPTUV1) (27) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

R-N 56 56 0.060 0.073


Y-N 56 56 0.060 0.073
B-N 56 56 0.060 0.073

IV. OPERATIONAL CHECKS

S.NO Description OK Remarks

Page 44 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
1 Circuit Breaker Failure Test OK -
2 Inrush Current Test Check OK
3 Changeover of Contacts Ok -
4 Flag or LED Indication Ok -
5 Operation of Master Trip Ok -

All the Protection functions mentioned above is working properly.

Relay Found Healthy.

Client RAIL VIKAS NIGAM LIMITED.

Project Kolkata Metro Project- Dakshineswar TSS

Page 45 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Location 11 KV VCB SWITCHBOARD

Feeder Detail BUSCOUPLER -2 Feeder No. 12

NUMERICAL PROTECTION RELAY TESTING

I. GENERAL DETAILS

NAME PLATE DETAILS

Make:- ABB Type:-REF615-F

Sl. No:- 1VYV91309612 Year of Manufacture:- 2019

Model no:- HBFFAEAGNBA1BNA11G CT ratio:- 400/1 A

Operating voltage:- 220V DC PT ratio:- 11/√3 kV / 110/√3 V

II. MEASUREMENT

Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps

IR (Iy&Ib=0) 0 400 400

IY (Ir&Ib=0) -120 400 400

IB (Ir&Iy=0) 120 400 400

Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts

Vr & Vy (Vb=0) 0 11 Kv 11 kV

Page 46 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Vy & Vb (Vr=0) -120 11 Kv 11 kV

Vb & Vr (Vy=0) 120 11 kV 11 kV

III. TIMING TEST

a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 8.023, 5t=3.424 )

Operated time and current


Injected Set TMS
2X 5X
Phase Current (A) (sec) Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 1 0.8 8.062 2 3.446 5

Y-N 1 0.8 8.062 2 3.446 5


B-N 1 0.8 8.062 2 3.446 5

b. High set Over Current : (PHIPTOC1) (50) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 4 4 0.02 0.026


Y-N 4 4 0.02 0.024
B-N 4 4 0.02 0.024
RYB 4 4 0.02 0.023

Page 47 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019

c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse

Calculated Tripping time (2t= 8.023, 5t=3.424)

Operated time and current


Injected Set Current
TMS 2X 5X
Phase (A)
Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 0.1 0.8 8.097 sec 0.2 3.448 sec 0.5
Y-N 0.1 0.8 8.097 sec 0.2 3.448 sec 0.5
B-N 0.1 0.8 8.097 sec 0.2 3.448 sec 0.5

d. High set Earth Fault : (DEFHPTOC1) (50N) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 0.2 0.2 0.040 0.056


Y-N 0.2 0.2 0.040 0.056
B-N 0.2 0.2 0.040 0.056

e. Over Voltage : (PHPTOV1) (59) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

Page 48 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
R-N 70 70 0.040 0.054
Y-N 70 70 0.040 0.054
B-N 70 70 0.040 0.054

e. Residual Over Voltage : (ROVPTOV1) (59N) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

Uo 22 22 0.040 0.061

e. Under Voltage : (PHPTUV1) (27) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

R-N 56 56 0.060 0.073


Y-N 56 56 0.060 0.073
B-N 56 56 0.060 0.073

IV. OPERATIONAL CHECKS

S.NO Description OK Remarks

Page 49 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
1 Circuit Breaker Failure Test OK -
2 Inrush Current Test Check OK
3 Changeover of Contacts Ok -
4 Flag or LED Indication Ok -
5 Operation of Master Trip Ok -

All the Protection functions mentioned above is working properly.

Relay Found Healthy.

Client RAIL VIKAS NIGAM LIMITED.

Project Kolkata Metro Project- Dakshineswar TSS

Page 50 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Location 11 KV VCB SWITCHBOARD

Feeder Detail AUX TRAFO -2 (500 KVA) Feeder No. 14

NUMERICAL PROTECTION RELAY TESTING

I. GENERAL DETAILS

NAME PLATE DETAILS

Make:- ABB Type:-REF615-F

Sl. No:- 1VYV91309678 Year of Manufacture:- 2019

Model no:- HBFFAEAGNBA1BNA11G CT ratio:- 30/1 A

Operating voltage:- 220V DC PT ratio:- 11/√3 kV / 110/√3 V

II. MEASUREMENT

Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps

IR (Iy&Ib=0) 0 30 30

IY (Ir&Ib=0) -120 30 30

IB (Ir&Iy=0) 120 30 30

Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts

Vr & Vy (Vb=0) 0 11 Kv 11 kV

Page 51 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Vy & Vb (Vr=0) -120 11 Kv 11 kV

Vb & Vr (Vy=0) 120 11 kV 11 kV

III. TIMING TEST

a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 5.015, 5t=2.140 )

Operated time and current


Injected Set TMS
2X 5X
Phase Current (A) (sec) Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 1 0.5 5.045 2 2.148 5

Y-N 1 0.5 5.045 2 2.148 5


B-N 1 0.5 5.045 2 2.148 5

b. High set Over Current : (PHIPTOC1) (50) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 3.5 3.5 0.02 0.029


Y-N 3.5 3.5 0.02 0.028
B-N 3.5 3.5 0.02 0.028
RYB 3.5 3.5 0.02 0.028

Page 52 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019

c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 5.015, 5t=2.140 )

Operated time and current


Injected Set Current
TMS 2X 5X
Phase (A)
Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 0.1 0.5 5.061 sec 0.2 2.154 sec 0.5
Y-N 0.1 0.5 5.061 sec 0.2 2.154 sec 0.5
B-N 0.1 0.5 5.061 sec 0.2 2.154 sec 0.5

d. High set Earth Fault : (DEFHPTOC1) (50N) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 0.2 0.2 0.040 0.062


Y-N 0.2 0.2 0.040 0.062
B-N 0.2 0.2 0.040 0.062

e. Over Voltage : (PHPTOV1) (59) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

Page 53 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
R-N 70 70 0.040 0.059
Y-N 70 70 0.040 0.059
B-N 70 70 0.040 0.059

e. Residual Over Voltage : (ROVPTOV1) (59) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

Uo 22 22 0.040 0.056

e. Under Voltage : (PHPTUV1) (27) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

R-N 56 56 0.060 0.074


Y-N 56 56 0.060 0.074
B-N 56 56 0.060 0.074

IV. OPERATIONAL CHECKS

S.NO Description OK Remarks

Page 54 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
1 Circuit Breaker Failure Test OK -
2 Inrush Current Test Check OK
3 Changeover of Contacts Ok -
4 Flag or LED Indication Ok -
5 Operation of Master Trip Ok -

All the Protection functions mentioned above is working properly.

Relay Found Healthy.

Client RAIL VIKAS NIGAM LIMITED.

Project Kolkata Metro Project- Dakshineswar TSS


Location 11 KV VCB SWITCHBOARD

Page 55 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Feeder Detail SPARE TIE FEEDER Feeder No. 15

NUMERICAL PROTECTION RELAY TESTING

I. GENERAL DETAILS

NAME PLATE DETAILS

Make:- ABB Type:-REF615-F

Sl. No:- 1VYV91309669 Year of Manufacture:- 2019

Model no:- HBFFAEAGNBA1BNA11G CT ratio:- 400/1 A

Operating voltage:- 220V DC PT ratio:- 11/√3 kV / 110/√3 V

II. MEASUREMENT

Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps

IR (Iy&Ib=0) 0 400 400

IY (Ir&Ib=0) -120 400 400

IB (Ir&Iy=0) 120 400 400

Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts

Vr & Vy (Vb=0) 0 11 Kv 11 kV

Page 56 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Vy & Vb (Vr=0) -120 11 kV 11 kV

Vb & Vr (Vy=0) 120 11 kV 11 kV

III. TIMING TEST

a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 10.029, 5t=4.280 )

Operated time and current


Injected Set TMS
2X 5X
Phase Current (A) (sec) Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 1 1 10.078 2 4.295 5

Y-N 1 1 10.078 2 4.295 5


B-N 1 1 10.078 2 4.295 5

b. High set Over Current : (PHIPTOC1) (50N) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 4 4 0.02 0.026


Y-N 4 4 0.02 0.026
B-N 4 4 0.02 0.027
RYB 4 4 0.02 0.027

Page 57 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019

c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 10.029, 5t=4.280 )

Operated time and current


Injected Set Current
TMS 2X 5X
Phase (A)
Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 0.1 0.5 10.113 sec 0.2 4.298 sec 0.5
Y-N 0.1 0.5 10.113 sec 0.2 4.298 sec 0.5
B-N 0.1 0.5 10.113 sec 0.2 4.298 sec 0.5

d. High set Earth Fault : (DEFHPTOC1) (50N) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 0.2 0.2 0.040 0.058


Y-N 0.2 0.2 0.040 0.058
B-N 0.2 0.2 0.040 0.058

e. Over Voltage : (PHPTOV1) (59) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

Page 58 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
R-N 70 70 0.040 0.056
Y-N 70 70 0.040 0.056
B-N 70 70 0.040 0.056

e. Residual Over Voltage : (ROVPTOV1) (59N) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

Uo 22 22 0.040 0.061

e. Under Voltage : (PHPTUV1) (27) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

R-N 56 56 0.060 0.074


Y-N 56 56 0.060 0.074
B-N 56 56 0.060 0.074

IV. OPERATIONAL CHECKS

S.NO Description OK Remarks

Page 59 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
1 Circuit Breaker Failure Test OK -
2 Inrush Current Test Check OK
3 Changeover of Contacts Ok -
4 Flag or LED Indication Ok -
5 Operation of Master Trip Ok -

All the Protection functions mentioned above is working properly.

Relay Found Healthy.

Client RAIL VIKAS NIGAM LIMITED.

Project Kolkata Metro Project- Dakshineswar TSS

Page 60 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Location 11 KV VCB SWITCHBOARD

Feeder Detail SPARE TIE FEEDER Feeder No. 16

NUMERICAL PROTECTION RELAY TESTING

I. GENERAL DETAILS

NAME PLATE DETAILS

Make:- ABB Type:-REF615-F

Sl. No:- 1VYV91310463 Year of Manufacture:- 2019

Model no:- HBFFAEAGNBA1BNA11G CT ratio:- 400/1 A

Operating voltage:- 220V DC PT ratio:- 11/√3 kV / 110/√3 V

II. MEASUREMENT

Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps

IR (Iy&Ib=0) 0 400 400

IY (Ir&Ib=0) -120 400 400

IB (Ir&Iy=0) 120 400 400

Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts

Vr & Vy (Vb=0) 0 11 Kv 11 kV

Page 61 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Vy & Vb (Vr=0) -120 11 kV 11 kV

Vb & Vr (Vy=0) 120 11 kV 11 kV

III. TIMING TEST

a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 10.029, 5t=4.280 )

Operated time and current


Injected Set TMS
2X 5X
Phase Current (A) (sec) Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 1 1 10.075 2 4.298 5

Y-N 1 1 10.075 2 4.298 5


B-N 1 1 10.075 2 4.298 5

b. High set Over Current : (PHIPTOC1) (50) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 4 4 0.02 0.027


Y-N 4 4 0.02 0.027
B-N 4 4 0.02 0.027
RYB 4 4 0.02 0.026

Page 62 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019

c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 10.029, 5t=4.280 )

Operated time and current


Injected Set Current
TMS 2X 5X
Phase (A)
Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 0.1 0.5 10.050 sec 0.2 4.297 sec 0.5
Y-N 0.1 0.5 10.050 sec 0.2 4.297 sec 0.5
B-N 0.1 0.5 10.050 sec 0.2 4.297 sec 0.5

d. High set Earth Fault : (DEFHPTOC1) (50N) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 0.2 0.2 0.040 0.059


Y-N 0.2 0.2 0.040 0.059
B-N 0.2 0.2 0.040 0.059

e. Over Voltage : (PHPTOV1) (59) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

Page 63 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
R-N 70 70 0.040 0.061
Y-N 70 70 0.040 0.061
B-N 70 70 0.040 0.061

e. Residual Over Voltage : (ROVPTOV1) (59N) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

Uo 22 23 0.040 0.062

e. Under Voltage : (PHPTUV1) (27) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

R-N 56 56 0.060 0.073


Y-N 56 56 0.060 0.073
B-N 56 56 0.060 0.073

IV. OPERATIONAL CHECKS

S.NO Description OK Remarks

Page 64 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
1 Circuit Breaker Failure Test OK -
2 Inrush Current Test Check OK
3 Changeover of Contacts Ok -
4 Flag or LED Indication Ok -
5 Operation of Master Trip Ok -

All the Protection functions mentioned above is working properly.

Relay Found Healthy.

Client RAIL VIKAS NIGAM LIMITED.

Project Kolkata Metro Project- Dakshineswar TSS

Page 65 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Location 11 KV VCB SWITCHBOARD

Feeder Detail SPARE TIE FEEDER Feeder No. 17

NUMERICAL PROTECTION RELAY TESTING

I. GENERAL DETAILS

NAME PLATE DETAILS

Make:- ABB Type:-REF615-F

Sl. No:- 1VYV91309670 Year of Manufacture:- 2019

Model no:- HBFFAEAGNBA1BNA11G CT ratio:- 400/1 A

Operating voltage:- 220V DC PT ratio:- 11/√3 kV / 110/√3 V

II. MEASUREMENT

Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps

IR (Iy&Ib=0) 0 400 400

IY (Ir&Ib=0) -120 400 400

IB (Ir&Iy=0) 120 400 400

Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts

Vr & Vy (Vb=0) 0 11 Kv 11 kV

Page 66 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Vy & Vb (Vr=0) -120 11 kV 11 kV

Vb & Vr (Vy=0) 120 11 kV 11 kV

III. TIMING TEST

a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 10.029, 5t=4.280 )

Operated time and current


Injected Set TMS
2X 5X
Phase Current (A) (sec) Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 1 1 10.076 2 4.271 5

Y-N 1 1 10.076 2 4.271 5


B-N 1 1 10.076 2 4.271 5

b. High set Over Current : (PHIPTOC1) (50) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 4 4 0.02 0.021


Y-N 4 4 0.02 0.022
B-N 4 4 0.02 0.021
RYB 4 4 0.02 0.022

Page 67 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019

c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 10.029, 5t=4.280 )

Operated time and current


Injected Set Current
TMS 2X 5X
Phase (A)
Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 0.1 0.5 10.077 sec 0.2 4.29 sec 0.5
Y-N 0.1 0.5 10.077 sec 0.2 4.29 sec 0.5
B-N 0.1 0.5 10.077 sec 0.2 4.29 sec 0.5

d. High set Earth Fault : (DEFHPTOC1) (50N) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 0.2 0.2 0.040 0.062


Y-N 0.2 0.2 0.040 0.062
B-N 0.2 0.2 0.040 0.062

e. Over Voltage : (PHPTOV1) (59) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

Page 68 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
R-N 70 70 0.040 0.058
Y-N 70 70 0.040 0.058
B-N 70 70 0.040 0.058

e. Residual Over Voltage : (ROVPTOV1) (59N) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

Uo 22 23 0.040 0.058

e. Under Voltage : (PHPTUV1) (27) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

R-N 56 56 0.060 0.073


Y-N 56 56 0.060 0.073
B-N 56 56 0.060 0.073

IV. OPERATIONAL CHECKS

S.NO Description OK Remarks

Page 69 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
1 Circuit Breaker Failure Test OK -
2 Inrush Current Test Check OK
3 Changeover of Contacts Ok -
4 Flag or LED Indication Ok -
5 Operation of Master Trip Ok -

All the Protection functions mentioned above is working properly.

Relay Found Healthy.

Client RAIL VIKAS NIGAM LIMITED.

Project Kolkata Metro Project- Dakshineswar TSS

Page 70 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Location 11 KV VCB SWITCHBOARD

Feeder Detail INCOMER-2 FROM BARANAGAR TSS Feeder No. 19

NUMERICAL PROTECTION RELAY TESTING

I. GENERAL DETAILS

NAME PLATE DETAILS

Make:- ABB Type:-REF615-F

Sl. No:- 1VYV91310475 Year of Manufacture:- 2019

Model no:- HBFFAEAGNBA1BNA11G CT ratio:- 400/1 A

Operating voltage:- 220V DC PT ratio:- 11/√3 kV / 110/√3 V

II. MEASUREMENT

Input CT-
Phase Angle(deg) Expected Current Displayed Current
Injected :1 Amps

IR (Iy&Ib=0) 0 400 400

IY (Ir&Ib=0) -120 400 400

IB (Ir&Iy=0) 120 400 400

Input PT-
Phase Angle(deg) Expected Voltage Displayed Voltage
Injected :110 Volts

Vr & Vy (Vb=0) 0 11 Kv 11 kV

Page 71 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
Vy & Vb (Vr=0) -120 11 kV 11 kV

Vb & Vr (Vy=0) 120 11 kV 11 kV

III. TIMING TEST

a. Low set Over Current : (DPHHPTOC1) (51) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 10.029, 5t=4.280 )

Operated time and current


Injected Set TMS
2X 5X
Phase Current (A) (sec) Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 1 1 10.072 2 4.292 5

Y-N 1 1 10.072 2 4.292 5


B-N 1 1 10.072 2 4.292 5

b. High set Over Current : (PHIPTOC1) (50) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 4 4 0.02 0.023


Y-N 4 4 0.02 0.023
B-N 4 4 0.02 0.023
RYB 4 4 0.02 0.022

Page 72 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019

c. Low Set Earth Fault : (EFHPTOC1) (51N) Curve: IEC Normal Inverse

Calculated Tripping time ( 2t= 10.029, 5t=4.280 )

Operated time and current


Injected Set Current
TMS 2X 5X
Phase (A)
Operated(sec) Operated Operated(sec) Operated
in kit current(A) in kit current(A)
R-N 0.1 0.5 10.092 sec 0.2 4.293 sec 0.5
Y-N 0.1 0.5 10.092 sec 0.2 4.293 sec 0.5
B-N 0.1 0.5 10.092 sec 0.2 4.293 sec 0.5

d. High set Earth Fault : (DEFHPTOC1) (50N) Curve: Definite Time

Operated time (Sec)


Injected Set Current
Operated Current (A) Set time (Sec)
Phase (A)
On Relay

R-N 0.2 0.2 0.040 0.059


Y-N 0.2 0.2 0.040 0.059
B-N 0.2 0.2 0.040 0.059

e. Over Voltage : (PHPTOV1) (59) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

Page 73 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
R-N 70 70 0.040 0.062
Y-N 70 70 0.040 0.062
B-N 70 70 0.040 0.062

e. Residual Over Voltage : (ROVPTOV1) (59N) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

Uo 22 23 0.040 0.059

e. Under Voltage : (PHPTUV1) (27) Curve: Definite Time

Operated time (Sec)


Injected Set Voltage
Operated Voltage (v) Set time (Sec)
Phase (V)
On Relay

R-N 56 56 0.060 0.076


Y-N 56 56 0.060 0.076
B-N 56 56 0.060 0.076

IV. OPERATIONAL CHECKS

S.NO Description OK Remarks

Page 74 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date:
PRE-COMMISSIONING TEST REPORT FOR
NUMERICAL RELAY TESTING

Date:-08/11/2019
1 Circuit Breaker Failure Test OK -
2 Inrush Current Test Check OK
3 Changeover of Contacts Ok -
4 Flag or LED Indication Ok -
5 Operation of Master Trip Ok -

All the Protection functions mentioned above is working properly.

Relay Found Healthy.

Page 75 of 75
Tested by:(L&T) Witness by:(PMC- Witness by: (RVNL)
Voyants Solution Pvt
Ltd)
Name:
Designation:
Sign:
Date: