Design

This document provides information for a proposed one-story lawyer's house on a 1,000 square meter through lot in Makati. It includes the project title, statement of problem, and requirements for the architectural design submission. Specifically, it requires: - Answering two questions calculating the allowable maximum building footprint and percentage of site occupancy. - Providing a site analysis, site development plan, floor plan, two elevations, two sections, and an exterior perspective in the design submission. - Basing the grading of the design on completeness, functionality, aesthetics, and drafting quality.

Uploaded by

Lenard Uson
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
526 views3 pages

Design

This document provides information for a proposed one-story lawyer's house on a 1,000 square meter through lot in Makati. It includes the project title, statement of problem, and requirements for the architectural design submission. Specifically, it requires: - Answering two questions calculating the allowable maximum building footprint and percentage of site occupancy. - Providing a site analysis, site development plan, floor plan, two elevations, two sections, and an exterior perspective in the design submission. - Basing the grading of the design on completeness, functionality, aesthetics, and drafting quality.

Uploaded by

Lenard Uson
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

ARCHITECTURAL DESIGN AND SITE PLANNING

A. PROJECT TITLE:

Proposed LAWYER'S HOUSE (R1)

B. STATEMENT of THE PROBLEM:

A prominent Husband and Wife Team of Lawyer with two (2) sons aged 14 and 16 is erecting a
One-Storey Residence (R1) in a 1,000sqm through lot at a low-density area in Makati. The lot has-a 2%
slope towards a 14m RROW at the West and has a 24m frontage. He intends to work at home so that he
can spend more time with his family. Observe proper setbacks

ANSWER THE FF QUESTIONS

1. What is the AMBF of the Project? (show solution/ graphical illustration)10 PTS

a. 522.72 sqm c. 892.50 sqm


b. 653.40 sqm d. 369.28 sqm

2. What is the PSO (actual) of the Project? (show solution/ graphical illustration) 10 pts

a. 55% c. 50%
b. 60% d. 52%

C.BASIS OF GRADING

• NO. 1 & 2 QUESTIONS – 20&


• COMPLETENESS OF DRAWING & DESIGN SOLUTION – 20%
• FUNCTIONALITY AND PLANNING – 20%
• ARCH’L CHARACTER & AESTHETIC – 20%
• DRAFTING – 20%

-TOTAL OF 100 %

D. DRAWING REQUIREMENTS

-SITE ANALYSIS -2 ELEVATIONS (FRONT & LEFT OR RIGHT SIDE)


-SDP -2 SECTIONS
-FLOOR PLAN -1 EXTERIOR PERSPECTIVE
STUDY TO ANSWER THE QUESTION NO. 1 AND 2
ALLOWABLE MAXIMUM BUILDING FOOTPRINT (AMBF) - The maximum portion of the lot that
may be occupied by the building/structure at grade level after satisfying setback, yard and court
requirements. The area of the AMBF is measured from the outermost face of the exterior walls
of the proposed building/structure. The AMBF is the true buildable area on which a fully
enclosed building/structure can be erected. The AMBF shall exclude provisions for courts at
grade level.

FRONT YARD - The part of the required Total Open Space within Lot (TOSL) created by setbacks
along RROW. The front yard shall not be used as parking space as it is to be used as the
transition area between the sidewalk or other similar portions of the RROW and the
building/structure. Driveways, spaces for parking of a very temporary nature and hard and soft
landscaping may be introduced for the front yard.

FRONT OF LOT - The side of a lot on which the main pedestrian and vehicular access into the
property shall be situated. In the case of all classes of corner lots, both sides shall be treated as
fronts of lot.
PERCENTAGE OF SITE OCCUPANCY (PSO) - A quantity related to the Allowable Maximum
Building Footprint (AMBF) and the Total Lot Area (TLA) via the equation “PSO equals AMBF
divided by TLA”. The PSO is expressed as the percentage (%) of the maximum allowable
enclosed floor area of any building/structure at the ground floor/ grade level in relation to the
TLA.
SETBACK - The horizontal distance measured 90º from the outermost face of the
building/structure to the property lines.

YARD – the required open space left between the outermost face of the building/structure and
the property lines, e.g., front, rear, right and left side yards. The width of the yard is the
setback.