A. PROJECT TITLE:
A prominent Husband and Wife Team of Lawyer with two (2) sons aged 14 and 16 is erecting a
One-Storey Residence (R1) in a 1,000sqm through lot at a low-density area in Makati. The lot has-a 2%
slope towards a 14m RROW at the West and has a 24m frontage. He intends to work at home so that he
can spend more time with his family. Observe proper setbacks
1. What is the AMBF of the Project? (show solution/ graphical illustration)10 PTS
2. What is the PSO (actual) of the Project? (show solution/ graphical illustration) 10 pts
a. 55% c. 50%
b. 60% d. 52%
C.BASIS OF GRADING
-TOTAL OF 100 %
D. DRAWING REQUIREMENTS
FRONT YARD - The part of the required Total Open Space within Lot (TOSL) created by setbacks
along RROW. The front yard shall not be used as parking space as it is to be used as the
transition area between the sidewalk or other similar portions of the RROW and the
building/structure. Driveways, spaces for parking of a very temporary nature and hard and soft
landscaping may be introduced for the front yard.
FRONT OF LOT - The side of a lot on which the main pedestrian and vehicular access into the
property shall be situated. In the case of all classes of corner lots, both sides shall be treated as
fronts of lot.
PERCENTAGE OF SITE OCCUPANCY (PSO) - A quantity related to the Allowable Maximum
Building Footprint (AMBF) and the Total Lot Area (TLA) via the equation “PSO equals AMBF
divided by TLA”. The PSO is expressed as the percentage (%) of the maximum allowable
enclosed floor area of any building/structure at the ground floor/ grade level in relation to the
TLA.
SETBACK - The horizontal distance measured 90º from the outermost face of the
building/structure to the property lines.
YARD – the required open space left between the outermost face of the building/structure and
the property lines, e.g., front, rear, right and left side yards. The width of the yard is the
setback.