Banglo Pahang Estimate BQ
Banglo Pahang Estimate BQ
Banglo Pahang Estimate BQ
TOTAL TOTAL
ELEMENTAL ELEMENTAL
ELEMENT ELEMENTAL ELEMENTAL
COST COST PER FS
COST COST PER FS
SUB-STRUCTURE
Piling
Work Below Lowest Floor Level 88,613.14 88,613.14 10.82 10.82
SUPER-STRUCTURE
Frame 139,133.03 16.99
External Walls 106,950.00 13.06
Internal Walls 42,000.00 5.13
Staircase 27,471.54 3.36
Upper Floor Construction 84,310.82 10.30
Roof 255,000.00 31.15
Door 99,938.22 12.21
Windows 193,933.97 23.69
Ironmongeries 73,232.00 1,021,969.58 8.94 124.83
FINISHES
Wall Finishes 87,915.42 10.74
Floor Finishes 469,416.45 57.34
Ceiling Finishes 68,849.68 8.41
External Finishes 118,315.13 744,496.67 14.45 90.94
SERVICES AND ID
Sanitary Fittings 182,284.20 22.27
BWIC 79,647.42 9.73
EWWLB 335,854.76 597,786.37 41.02 73.02
ESTIMATE BQ
VOL 1
PRELIMINARIES ITEM
A Scope of Works
As specified in the tender documents, drawing and any other works are
obvious on inspection of the site
D Liaise with the relevant supply or service authorities for the expeditious
installation of the connection for temporary or permanent WATER and
ELECTRICITY supplies in the work on behalf of the Employer
3,000.00
E The contractor shall made an adequate allowance for the following utilities to
execute the works within the construction period:-
K Disposal of rubbish and un-used materials to Contractor's own dump site 1,000.00
PILING WORKS
To Collection :
Excavation
Concrete Grade 30 to
Fabric reinforcement
TOTAL 77,054.91
To Collection : 88,613.14
Concrete Grade 30
Total 120,985.25
To Collection : 139,133.03
C Formwork M2 0
TOTAL 73,313.76
TOTAL 222,000.00
To Collection : 255,000.00
TOTAL 23,888.30
To Collection : 27,471.54
C Coping m
TOTAL 93,000.00
To Collection : 106,950.00
TOTAL 42,000.00
42,000.00
To Collection :
TOTAL 86,902.80
To Collection : 99,938.22
To collection 193,933.97
Total 63,680.00
###
Allow For unmeasured Item Sum 1 9,552.00 9,552.00
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
73,232.00
TOTAL 76,448.19
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
To Collection : 87,915.42
TOTAL 408,188.45
To Collection : 469,416.45
TOTAL 59,869.28
To Collection : 68,849.68
Wall
Floor Finishes
CEILING FINISHES
TOTAL 102,882.72
To Collection : 118,315.13
G Mirror NO 3 -
TOTAL 158,508.00
To Collection : 182,284.20
To Collection : -
OTHER ITEMS
A Any other items not specified above but implied from the
drawings and/or indispensably for the works:-
i) ________________________________________
ii)________________________________________
iii)_______________________________________
iv)________________________________________
To Collection : -
COLLECTION
TOTAL 37,045.31
To Collection : 79,647.42
OTHER ITEMS
Any other items not specified above but implied from the
drawings and/or indispensably for the works:-
i) ________________________________________
ii)________________________________________
iii)_______________________________________
iv)________________________________________
To Collection : -
COLLECTION
D Main gate Including MnE and all accessories Sum 1 20,000.00 20,000.00
E Wall Fencing m
F Perimeter Drain m
TOTAL 292,047.61
0
0
BRIEF SPECIFICATION
Internal Wall Half clay brick including cement and mortar (1:3)
Door and Window 12mm thick clear tempered single leaf glass door
Single leaf timber flush door in selelected laminated with glass panel
Single leaf timber flush door with selected solid timber door jamb
Single leaf timber flush door with 8mm thick half glass panel
Single leaf mild steel grille door c/w mild steel frame
MECHANICAL &
ELECTRICAL ESTIMATE
APPENDICES
APPENDIX A
0
APPENDIX B
0
APPENDIX C
0
APPENDIX D