The document describes modelling and energizing a 400kV transmission line in EMTP-RV. It involves: 1) Entering conductor and tower parameters to model the line; 2) Calculating line parameters using the modelling features in EMTP-RV; 3) Importing the calculated line parameters into the transmission line model; 4) Connecting a voltage source, switch and voltage meter to energize and monitor the line.

Uploaded by

arunmozhi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
130 views6 pages

Line Modelling and Energization

The document describes modelling and energizing a 400kV transmission line in EMTP-RV. It involves: 1) Entering conductor and tower parameters to model the line; 2) Calculating line parameters using the modelling features in EMTP-RV; 3) Importing the calculated line parameters into the transmission line model; 4) Connecting a voltage source, switch and voltage meter to energize and monitor the line.

Uploaded by

arunmozhi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

Transmission Line Modelling & Energization

Objective:
The objective is to calculate the transmission line parameters for single circuit
Transmission line and Energize the transmission line.
List of Inputs required for Modelling the Transmission line:
• Phase Conductor: ACSR Panther Conductor (DC Resistance: 0.067 Ohm/km,
Outer Diameter: 2.862cm)
• Ground Conductor: DC Resistance: 3.375 Ohm/km, Outer Diameter: 0.945 cm
• Tower Geometry: 400kV Single circuit Tower.

Figure 1 Typical parameters of Transmission Line

Modelling of Transmission Line:


Step-1: Drag and drop the line data from lines library into GUI.
Step-2: Double click on the line data and enter the parameters of conductor data and
transmission tower configuration represented in Figure 1.
Step-3: Enter number of conductors (wires): 4

PWSIM Engineering Solutions PVT LTD  B-378/1,Ring Road,1st Stage Peenya | Bangalore 560058
Tel: +91 806 816 0000 www.pwsim.com
PAN : AAJCP9604K TAN : AGRP12379D CIN: U74999KA2018PTC114410, PF Reg. N° : PY/PNY/1835463/000
Step-4 : Prepare the transmission line parameters required for the study.
• Conductor DC resistance and Outer diameter.
• Conductor coordinates.

Step-5 : Enter the line parameters to the Line Data. The Phase Number 1, 2, 3 in Line data
represents for the three Phases (A, B &C). P1, P2 & P3 in Figure 1 is represented as Phase
Number 1, 2, 3. Ground conductors are generally represented by phase number ‘0’.

Vertical Height at Midspan = Vertical height at tower – Sag.

For this line model, the transmission line height is considered as average height. Therefore,
the Vertical Height Midspan is same as vertical height at Tower.

PWSIM Engineering Solutions PVT LTD  B-378/1,Ring Road,1st Stage Peenya | Bangalore 560058
Tel: +91 806 816 0000 www.pwsim.com
PAN : AAJCP9604K TAN : AGRP12379D CIN: U74999KA2018PTC114410, PF Reg. N° : PY/PNY/1835463/000
Step 6: Go to Model tab.
• Select Model = FD
• Deselect check box “Find Model frequency automatically” and enter the
model frequency as “50 Hz”.
Step 7: Enter Length of Transmission Line
• Go to “Line Length” Tab
• Enter Line Length =400 km
• Soil Resistivity as “100 Ohm/km’’

Step 8: Generate Line Parameters


• Go to “Generate Data” Tab.
• Give the name of the Line Parameter output File.
• Select the Check box.
• Click “Ok”.

Step-9 : View the Output File.


• After Clicking “Ok” EMTP-RV calculates the line parameters and you can see the
status of your Line parameters as shown below.

• If you click on the output file, it opens normally in Notepad.


• The output file contains the both input parameters and Phase impedance matrix and
sequence impedance.

PWSIM Engineering Solutions PVT LTD  B-378/1,Ring Road,1st Stage Peenya | Bangalore 560058
Tel: +91 806 816 0000 www.pwsim.com
PAN : AAJCP9604K TAN : AGRP12379D CIN: U74999KA2018PTC114410, PF Reg. N° : PY/PNY/1835463/000
Step-10 : Import Line parameters
The calculated line parameters are saved to a text file. The parameters are linked to the
transmission line model for performing the simulations.
• Lines Library →Drag & Drop “Frequency dependent line” from lines library to GUI.
• Double click on the FD line and click “select data file”.
• Select the generated file name in line data and click ok. It loads the transmission line
parameters automatically.

400km

FDline1
+ FD model

LINE DATA
model in:
400km.mod

System Modelling:
Step-1: Goto the Sources library and Drag & drop the AC Voltage source (3-phase).
• Double click on the voltage source
o Enter the Voltage = 400kV RMSLL
o Frequency = 50Hz.
o Tclose = -1 S
o Topen = 1E15
Step-2 : Goto the switches library and Drag & drop the Ideal switch.
• Enter the switch parameters
o Tclose = 30 ms
o Topen = 1E15
(Or)
o Click on the tabs of "Closed in steady state" and "Never open".
Step-3 : Goto the Meters Library and Drag & drop the Voltage scope (1-Pin). If you want
change the name of the meter by select it → right-click → click on name.
PWSIM Engineering Solutions PVT LTD  B-378/1,Ring Road,1st Stage Peenya | Bangalore 560058
Tel: +91 806 816 0000 www.pwsim.com
PAN : AAJCP9604K TAN : AGRP12379D CIN: U74999KA2018PTC114410, PF Reg. N° : PY/PNY/1835463/000
Step-4 : Connect the components as shown in Figure 2.

Recieve
Send + v ?v
+ v ?v
VwZ1 FDline1
SW1 a a
+ +
+ b b
FD model
30ms|1E15|0 c c
400kVRMSLL /_0

Figure 2 Complete System Model

Step-5 : Go to Simulate tab →Simulation options


• Max.Time step (∆t) = 10us
• Simulation time (Tmax) = 200ms.
• Default power frequency =50Hz
• Click Ok.
• Run the Simulation.
Step-6 : Goto Simulate tab → click on the View scopes with scope view.
o Select the ‘Multiple’ in signal selection mode and ‘Superimposed’ in Graph creation.
o Select the Signals → Click on the Add Selected and Run the simulation.

3
4

1 2

The Sending end and receiving voltages are shown in below.

PWSIM Engineering Solutions PVT LTD  B-378/1,Ring Road,1st Stage Peenya | Bangalore 560058
Tel: +91 806 816 0000 www.pwsim.com
PAN : AAJCP9604K TAN : AGRP12379D CIN: U74999KA2018PTC114410, PF Reg. N° : PY/PNY/1835463/000
PWSIM Engineering Solutions PVT LTD  B-378/1,Ring Road,1st Stage Peenya | Bangalore 560058
Tel: +91 806 816 0000 www.pwsim.com
PAN : AAJCP9604K TAN : AGRP12379D CIN: U74999KA2018PTC114410, PF Reg. N° : PY/PNY/1835463/000

You might also like