ABSTRACT
STAGE 2
MASONRY WALL Sft
ELECTRICAL CONDUCTS Sft
PLASTERING Sft
STAGE 3
PUFF SHEET Sft
GUTTER SHEET Sft
FLASHING SHEET Sft
DOORS
MAIN DOOR LS
WPS DOOR LS
TOILET DOOR LS
WINDOW
ALUMINIUM FRAME FOR WINDOWS Sft
WINDOW LS
PENELLING
V BOARD OF 75MM THICK Sft
FLOORING AND DADOING
PLASTERING DONE BEFORE LAYING OF TILES Sft
GRANITE RUNNING ALL ROUND THE WELPSUN FLOORING LS
WELPSUN FLOORING (CABIN AND TOILET) LS
LEVELLER TILE (CABIN AND TOILET) LS
WALL TILES (TOILET) LS
PAINTING
INTERNAL LS
EXTERNAL LS
CEILING LS
TOILET LS
GLAZING
U SECTION FOR FIXING OF GLASS Sft
FAÇADE Sft
LACQUERED GLASS (FIXED) Sft
FALSE CEILING
FALSE CEILING (CABIN AND TOILET) Sft
FALSE CEILING HOLDINGS (CABIN AND TOILET) LS
FIXED FURNITUERES
WARDROBE
VANITY COUNTER
LOOSE FURNITURES
LIGHTING
PLUMBING
ELECTRICAL
MISCELLANEOUS
Providing and fixing in position fabricated stuctural frame work using channel/Beams/
Sl. No. Description weight(kg/m) Total length (m) Qty.(kg) Rate (Rs.) Amount (Rs.)
FLOORING
WALLS
18239.93614