0% found this document useful (0 votes)
24 views1 page

Compliance Statement: Va Tech Wabag LTD

The document discusses compliance requirements for a water supply project in Polgahawela, Sri Lanka. It addresses two client comments, confirming that design calculations and drawings have been submitted according to BS5395-3 standards, and that a method statement will be separately submitted for painting compliance.

Uploaded by

Sulakx Kuru
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views1 page

Compliance Statement: Va Tech Wabag LTD

The document discusses compliance requirements for a water supply project in Polgahawela, Sri Lanka. It addresses two client comments, confirming that design calculations and drawings have been submitted according to BS5395-3 standards, and that a method statement will be separately submitted for painting compliance.

Uploaded by

Sulakx Kuru
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

COMPLIANCE STATEMENT

POLGAHAWELA, POTHUHERA AND ALAWWA INTEGRATED WATER


Project
SUPPLY PROJECT
Client NATIONAL WATER SUPPLY & DRAINAGE BOARD, SRI LANKA

Location POLGAHAWELA, SRI LANKA


Submission of handrail sample and the company profile of schaupub
Doc. Title
Technik limited to utilize at WTP and Intake.
Commented Doc.
Rev No. 0
No.

Comments Ref : PD/PPAIWSP/ General /2021/C/712 , dated 17th May, 2021

Sl No Client Comments WABAG reply

The design calculation report and


drawing shall be carried out as Design calculation and drawing are attached
1. BS5395-3. As per OSHAS minimum for your checking as per BS5395-3 and
outer diameter of rails shall be 1.5” provided Rail diameter is 38 mm.
to 2”.
The method of statement shall be
Method of statement will be submitted
2. submitted for painting compliance
separately.
requirement of clause 1.10 Vol

Complied by (Signature): Date: 08.07.2021


Page 1
Name: K. Sulakxan Department: Engineering

VA TECH WABAG LTD