Checklist SAS: Pos Checks Remarks Controlled
Checklist SAS: Pos Checks Remarks Controlled
Date Sign
Nos.. digital inputs
Number of hardwired I/Os to be connected Nos. digital outputs
1
to RTU/Gateway Nos. analog inputs
Nos. analog outputs
0-50
50-250
250-750
How many signals in each existing S/S are
750-1000
2 being sent from RTU/Gateway to control
1000-1500
center (LDC)?
1500-2000
2000-2500
2500-3000
Take pictures of the RTU cubicle. If the SAS
cubicle is not available, take pictures of SAS cubicle exists
3 Pictures taken
where it will be located. Please refer point SAS cubicle does not exist
no. 16 for details.
YES
Whether new CRPs to be supplied in the
4 NO
station under present tender?
NO
Pos Checks Remarks Controlled
Date Sign
For remote end relay -
For remote end station line differential relay Manufacturer model Line length Protn. Port ProtectionProtocol
(if applicable as per point 5)
220 VDC
8 Battery voltage. 110 VDC
48 VDC
Type of substation (e.g. 132/33/11 kV or
9 ……………….. kV
330/132/33 kV).
Does not exist - Yes No
Are they working and communicating - Yes No
RTU, SCS or HMI exist. Are they working and
10 RTU exists Make, Model and Version: ………………………..
communicating?
SCS exists Make, Model and Version:
HMI exists Make, Model and Version:
Pos Checks Remarks Controlled
Date Sign
Manufacturer model Voltage Level Port Protocol Quantity
NO
Pos Checks Remarks Controlled
Date Sign
Available at station: Documentation is according to
Circuit diagram of SAS actual system present at site:
15 Document status. Circuit diagram of charger system YES
Circuit diagram of RTU (if existing) NO
YES
Whether SAS and RTU shall be placed in
17 NO If No, then distance between RTU and SAS (HMI)
same room.
For example (below is the example, actual details to be filled in).
Substation layout is required to get an idea
Length of every device from SAS / Control room / RTU panel to be
about the needed cabling length (Control
collected) Marshaling and RTU cabinets are in the same room
cable, communication cable) between
(Control Room). Distance of cabling between marshaling terminals
18 Control Room (RTU/SAS cabinet) and of all
and RTU should be around 10m.
devices at different voltage levels
(integration)
Transducers are available in each bay control cabinet in a different
room than RTU (Control Room). Distance of cabling between
transducers terminals and RTU should be around 60m.
For all Substation of all voltage levels
Integration is foreseen, we need the HW
Schematic of the existing Panels (ABB
RTU560 only). We need to check the Binary YES
19
Input / Output and Transducer for Analog NO
Measurement (coming from the CT / VT)
could be connected.
Date Sign
Specify 100% correct numbers of Feeders
of all voltage levels including auxiliary SLD for bays as well auxiliary system
21
system (UPS, ACDB, DCDB, Aux. Trafo etc.). picture to be taken
Revision
Rev. ind. Description of revision Approved Date