Checklist SAS: Pos Checks Remarks Controlled

This checklist summarizes key information needed about an existing substation automation system (SAS) and remote terminal unit (RTU) that will be upgraded, including: 1) The number and types of existing I/O signals being sent from the RTU to the control center. 2) Pictures of existing SAS and RTU cubicles and where new cubicles will be located. 3) Details of any existing and new circuit breaker relay panels, line bays, and protocols used to communicate with the control center.

Uploaded by

Diepreye Binaebi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
105 views5 pages

Checklist SAS: Pos Checks Remarks Controlled

This checklist summarizes key information needed about an existing substation automation system (SAS) and remote terminal unit (RTU) that will be upgraded, including: 1) The number and types of existing I/O signals being sent from the RTU to the control center. 2) Pictures of existing SAS and RTU cubicles and where new cubicles will be located. 3) Details of any existing and new circuit breaker relay panels, line bays, and protocols used to communicate with the control center.

Uploaded by

Diepreye Binaebi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Checklist SAS

Pos Checks Remarks Controlled

Date Sign
Nos.. digital inputs
Number of hardwired I/Os to be connected Nos. digital outputs
1
to RTU/Gateway Nos. analog inputs
Nos. analog outputs
0-50
50-250
250-750
How many signals in each existing S/S are
750-1000
2 being sent from RTU/Gateway to control
1000-1500
center (LDC)?
1500-2000
2000-2500
2500-3000
Take pictures of the RTU cubicle. If the SAS
cubicle is not available, take pictures of SAS cubicle exists
3 Pictures taken
where it will be located. Please refer point SAS cubicle does not exist
no. 16 for details.

YES
Whether new CRPs to be supplied in the
4 NO
station under present tender?

YES (If yes, specify Voltage


Level for each line bay CRP -
kV
If yes, please collect the info asked in
kV
Whether new Line bay CRP is to be placed in point 6.
5 Kv
the station under present tender? kV

NO
Pos Checks Remarks Controlled

Date Sign
For remote end relay -
For remote end station line differential relay Manufacturer model Line length Protn. Port ProtectionProtocol
(if applicable as per point 5)

Remote end station name for each line bay –


Local-end Line bay voltage Remote end S/S name

No problem to put cubicle in place


Take pictures where the new RTU cubicle
or
and C&R Panel will be located. Are there any
The cubicle can maximum have these
problems to put the cubicle in place? The
7 Pictures taken dimensions:
cabinet dimensions are height = 2315mm,
Height = mm
width = 800mm depth = 800mm.
Width = mm
Depth = mm

220 VDC
8 Battery voltage. 110 VDC
48 VDC
Type of substation (e.g. 132/33/11 kV or
9 ……………….. kV
330/132/33 kV).
Does not exist - Yes No
Are they working and communicating - Yes No
RTU, SCS or HMI exist. Are they working and
10 RTU exists Make, Model and Version: ………………………..
communicating?
SCS exists Make, Model and Version:
HMI exists Make, Model and Version:
Pos Checks Remarks Controlled

Date Sign
Manufacturer model Voltage Level Port Protocol Quantity

Type of IEDs / Meters and other devices


which are to be integrated with SAS / RTU - .
11 For example IED Model: REF542plus,
REF620, 7SJ602, 7UT612, F650, DPR1000,
TAPCON240.

YES If Yes, then which protocol: for Example IEC101 or IEC104


Protocol used (existing) to the control
12 NO
center.

YES Which protocol: Opto plastic


Station bus implemented.
13 Opto glass
For example. SPA, LON, IEC103.
NO Electrical
YES Manufacturer: Used output: 0-20 mA
Type: for example 4-20 mA
ENERTEC 0-10 V
14 Type of transducers and its output. RIC Other output: ±1mA
ABB

NO
Pos Checks Remarks Controlled

Date Sign
Available at station: Documentation is according to
Circuit diagram of SAS actual system present at site:
15 Document status. Circuit diagram of charger system YES
Circuit diagram of RTU (if existing) NO

Pictures from all existing devices (like


meters, protection relays, AVR, PLC,
Reactor controller, CB Controller, Capacitor
16 controller of all voltage levels) & existing Picture should be taken
RTU cabinet (each front and backside view,
IO cards)

YES
Whether SAS and RTU shall be placed in
17 NO If No, then distance between RTU and SAS (HMI)
same room.
For example (below is the example, actual details to be filled in).
Substation layout is required to get an idea
Length of every device from SAS / Control room / RTU panel to be
about the needed cabling length (Control
collected) Marshaling and RTU cabinets are in the same room
cable, communication cable) between
(Control Room). Distance of cabling between marshaling terminals
18 Control Room (RTU/SAS cabinet) and of all
and RTU should be around 10m.
devices at different voltage levels
(integration)
Transducers are available in each bay control cabinet in a different
room than RTU (Control Room). Distance of cabling between
transducers terminals and RTU should be around 60m.
For all Substation of all voltage levels
Integration is foreseen, we need the HW
Schematic of the existing Panels (ABB
RTU560 only). We need to check the Binary YES
19
Input / Output and Transducer for Analog NO
Measurement (coming from the CT / VT)
could be connected.

We need Backup of ABB RTU560 RTUs


Software that will be upgraded in the YES
20
project NO
Pos Checks Remarks Controlled

Date Sign
Specify 100% correct numbers of Feeders
of all voltage levels including auxiliary SLD for bays as well auxiliary system
21
system (UPS, ACDB, DCDB, Aux. Trafo etc.). picture to be taken

Take picture of main SS Sign board showing YES


22
the name of the substation clearly. NO
Signal List of required signals to be
YES
23 integrated with RTU/SAS. Copy of existing
NO
signal list to be collected.
Pictures taken from existing Cable YES
24
Duct/trenches NO
Whether each bay in the station has bay YES
25
controller unit (BCU) device. NO
Manufacturer model Bay Name Port Protocol DI DO

If answer to point 25 is YES then please


26
provide the following -

Revision
Rev. ind. Description of revision Approved Date