Measurement Sheet #9 (VO)

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 10

Design, Manufacture, Supply, Installation, Testing and Commissioning of Plant for 500/220/132 kV Faisalabad West Substation

Schedule No.4 Payment Plan (1st Oct, 2021 to 31 Oct, 2021) For Installation Services
Measurement Sheet No. 09 (VO)

Item Remarks/ Measurement


Description Unit BOQ Qty. Actual QTY Previous Todate
No. Reference Sheet No. 08

1 2 3 4 5 6 10

F Civil Works (500kV Switchyard Extension Works):

F.1 Site Clearance and Earthwork:

Clearing and grubbing of the complete site area as per Drawings &
F.1.1 Lot 1 Appendix i 1.000 1.000
Specifications as approved by the Engineer.

Filling, levelling, dressing and compaction of the complete site area


(Switchyard) with fill material to raise the level of the area including
F.1.2 20cm above the main road compaction of soil in 150mm thick
layers with 95% proctor density as per Drawings & Specifications
as approved by the Engineer.

Using borrow fill material /sand with compaction 95% proctor


density with mechanical means with any lead and lift for raising
i. Cu.m. 14000 Appendix ii 5,247.129 5,247.129
(after clearing, grubbing of site, joint level survey will establish the
backfilling quality).

ii. Using fill material excavated from the other foundations on Site. Cu.m. 4000 Appendix iii 2,908.761 2,908.761

Excavation of earthwork in hard soil and disposal to the required


iii. Cu.m. 400 Appendix iv
disposal area as directed by the Engineer.

Sub-total of Item F.1


F.3 Switchyard Cable Trenches

Providing RCC cable trenches type 1, 2, 3 and 4 inclusive


excavation, dewatering, lean concrete (140kg/cm2), steel re-
inforcement (grade-60), curing for specfic period, application of
three coats of protective bitumen from sika or equivalent on face in
F.3.A contact with soil, compacted backfilling, removal of surplus material
for cable trenches, all types of crossings, slopes and attached
kiosk, LCC, civil works for installation of tie channels embedded in
walls at 2m interval etc. complete in all respects as per Drawings
and Specifications.

F.3.A.1 Cable trench Type-1 Li.m 5


F.3.A.2 Cable trench Type-2 Li.m 160 483.880 Appendix CA 483.880 0.389 484.269
F.3.A.3 Cable trench Type-3 Li.m 50 150.720 Appendix CB 145.360 5.360 150.720
F.3.A.4 Cable trench Type-4 Li.m 60 256.225 Appendix CC 255.100 1.125 256.225

Providing expansion joints filling compund with sealant material to


F.3.B make it water proof in following type of cable trenches, complete in
all respects as per Drawings and Specifications.

F.3.B.1 Cable trench Type-1 No. 2 0 Appendix CD


F.3.B.2 Cable trench Type-2 No. 10 37 Appendix CE 30 30.000
F3.B.3 Cable trench Type-3 No. 6 6 Appendix CF 4 4.000
F.3.B.4 Cable trench Type-4 No. 6 Appendix CG

Name: ___________ Name: ___________ Name: ___________

Signature: ________ Signature: ________ Signature: ________


Designation: ______ Designation: ______ Designation: ______
NETRACON Technologies GENERAL ELECTRIC NESPAK .
Design, Manufacture, Supply, Installation, Testing and Commissioning of Plant for 500/220/132 kV Faisalabad West Substation

Schedule No.4 Payment Plan (1st Oct, 2021 to 31 Oct, 2021) For Installation Services
Measurement Sheet No. 09 (VO)

Item Remarks/ Measurement


Description Unit BOQ Qty. Actual QTY Previous Todate
No. Reference Sheet No. 08

1 2 3 4 5 6 10

F Civil Works (500kV Switchyard Extension Works):

F.3.C Supply & Construction of Precast, Prestress RCC covers 63mm


thick, 457mm wide and length as per drawing for covering of Cable
Trenches having 28 days cylinder strength of 210kg/cm2 including
reinforcement and hooks / holes for lifting as per Drawings and
Specifications.

F.3.C.1 Cable Trench Type-1 No. 12 Appendix CH


F.3.C.2 Cable Trench Type-2 No. 400 3231.000 Appendix CI 255 255.000
F.3.C.3 Cable Trench Type-3 No. 180 307.000 Appendix CJ 85 85.000
F.3.C.4 Cable Trench Type-4 No. 180 518.000 Appendix CK 170 170.000

F.3.D
Providing & Fixing hot dip galvanized steel brackets (hangers),
cable trays, channels in the cable trenches type 1,2,3 & 4 including
fixer and all accessories complete as per specification and
drawings approved by the Engineer. Lot 1

Construction of RCC culverts over cable trenches of type 1,2,3 & 4


F.3.E including excavation, PCC (140kg/cm ), RCC (210kg/cm ) works,
2 2

re-inforcement (grade-60), backfilling upto 95% of standard proctor


density etc. complete in all respect as per specifications and
drawings.

F.3.E.1 RCC Culverts over Cable Trench Type-1 No. 1


F.3.E.2 RCC Culverts over Cable Trench Type-2 No. 1 1.000 1.000
F.3.E.3 RCC Culverts over Cable Trench Type-3 No. 1
Sub-total of Item F.3
F.7 Switchyard Water Drainage

Construction of switchyard surface water / rain / storm water


drainage and cable trenches water drainage system, road
crossings its disposal system, draw pits / soakage pits with its
efficient disposal system having pumping arrangements (pump
having minimum power 3HP and PVC/VPVC pipe line minimum dia
(150mm & 225mm) with proper jointing and its testing after filling
the line with water for 24 hrs and noting leakage if any and
accordingly make the improvement) to dispose water from
switchyard to switchyard outside area approved by the Engineer
complete in all respects including PVC/UPVC pipes with
manholes, its connection with cable trenches, manhole with covers,
as per Drawings and Specifications as approved by the Engineer.

F.7.1 500kV Switchyard Lot 1 Appendix CO 0.885 0.885


Sub-total of Item F.7

Name: ___________ Name: ___________ Name: ___________

Signature: ________ Signature: ________ Signature: ________


Designation: ______ Designation: ______ Designation: ______
NETRACON Technologies GENERAL ELECTRIC NESPAK .
Faisalabad West-500 KV

Design, Manufacture, Supply, Installation, Testing and Commissioning of Plant for 500/220/132 kV Faisalabad
West Substation
Measurement Sheet No.09 (VO)
Reference Documents:
Boq. Item No. F.3.C.2 Appendix - (CI) Item Detailed Breakdown 1.

RCC Trench Covers for Approved


Item Description Actual Length As per Drawing As per Measurement Sheet No. 09 Trench Covers (Nos.) 3231.000
Cable Trench Type-2 Weightage
Executed Percentage Total
Total Nos. Completed (%) Nos. claimed
Sr. Nos. Nos. Previous
Description Unit No L W H Actual No Percentage (%) (D) Todate
No. (A) Actual (C) claimable QTY (F)
(B) (E)

Supply & Construction of


Precast, Prestress RCC covers
63mm thick, 457mm wide and
lenght as per drawing for
covering of Cable Trenches
Nos. 3231 3231
having 28 days cylinder
strength of 210kg/cm2
including reinforcement and
hooks / holes for lifting as per
drawings and specifications:

1 Casting Nos. 3231 3231.000 300.00 9.29% 85% 255.000 0 255.000


2 Placing Nos. 3231 3231.000 0.00 15% 0.000

Total 255.000 0.000 255.000

Name: ___________ Name:________ Name:___________


Signature: ________ Signature: ________ Signature:___________
Designation: ______ Designation: ______ Designation: ___________
NETRACON Technologies GENERAL ELECTRICAL NESPAK
Faisalabad West-500 KV

Design, Manufacture, Supply, Installation, Testing and Commissioning of Plant for 500/220/132 kV Faisalabad
West Substation
Measurement Sheet No.09 (VO)
Reference Documents:
Boq. Item No. F.3.C.2 Appendix - (CJ) Item Detailed Breakdown 1.

RCC Trench Covers for Approved


Item Description Actual Length As per Drawing As per Measurement Sheet No. 09 Trench Covers (Nos.) 307.000
Cable Trench Type-3 Weightage
Executed Percentage Total
Total Nos. Completed (%) Nos. claimed
Sr. Nos. Nos. Previous
Description Unit No L W H Actual No Percentage (%) (D) Todate
No. (A) Actual (C) claimable QTY (F)
(B) (E)

Supply & Construction of


Precast, Prestress RCC covers
63mm thick, 457mm wide and
lenght as per drawing for
covering of Cable Trenches
Nos. 307 307
having 28 days cylinder
strength of 210kg/cm2
including reinforcement and
hooks / holes for lifting as per
drawings and specifications:

1 Casting Nos. 307 307.000 100.00 32.57% 85% 85.000 0 85.000


2 Placing Nos. 307 307.000 0.00 15% 0.000

Total 85.000 0.000 85.000

Name: ___________ Name:________ Name:___________


Signature: ________ Signature: ________ Signature:___________
Designation: ______ Designation: ______ Designation: ___________
NETRACON Technologies GENERAL ELECTRICAL NESPAK
Faisalabad West-500 KV

Design, Manufacture, Supply, Installation, Testing and Commissioning of Plant for 500/220/132 kV Faisalabad
West Substation
Measurement Sheet No.09(VO)
Reference Documents:
Boq. Item No. F.3.C.4 Appendix - (CK) Item Detailed Breakdown 1.

RCC Trench Covers for Approved


Item Description Actual Length As per Drawing As per Measurement Sheet No. 09 Trench Covers (Nos.) 518.000
Cable Trench Type-4 Weightage
Executed Percentage Total
Total Nos. Completed (%) Nos. claimed
Sr. Nos. Nos. Previous
Description Unit No L W H Actual No Percentage (%) (D) Todate
No. (A) Actual (C) claimable QTY (F)
(B) (E)

Supply & Construction of


Precast, Prestress RCC covers
63mm thick, 457mm wide and
lenght as per drawing for
covering of Cable Trenches
Nos. 518 518
having 28 days cylinder
strength of 210kg/cm2
including reinforcement and
hooks / holes for lifting as per
drawings and specifications:

1 Casting Nos. 518 518.000 200.00 38.61% 85% 170.000 0 170.000


2 Placing Nos. 518 518.000 0.00 15% 0.000

Total 170.000 0.000 170.000

Name: ___________ Name:________ Name:___________


Signature: ________ Signature: ________ Signature:___________
Designation: ______ Designation: ______ Designation: ___________
NETRACON Technologies GENERAL ELECTRICAL NESPAK
Faisalabad West-500 KV

Design, Manufacture, Supply, Installation, Testing and Commissioning of Plant for 500/220/132 kV Faisalabad
West Substation
Measurement Sheet No.09 (VO)
Reference Documents:
Boq. Item No. F.3.B.2 Appendix - (CE) Item Detailed Breakdown 1.

Expansion Joints for Approved


Item Description Actual Length As per Drawing As per Measurement Sheet No. 09 Expansion Joints (Nos.) 37.000
Cable Trench Type-2 Weightage
Executed Percentage Total
Total Nos. Completed (%) Nos. claimed
Sr. Nos. Nos. Previous
Description Unit No L W H Actual No Percentage (%) (D) Todate
No. (A) Actual (C) claimable QTY (F)
(B) (E)

Providing expansion joints


filling compund with sealant
material to make it water
proof in following type of Nos. 37 37 30.00 81.08% 30.00 - 30.00
cable trenches, complete in all
respects as per Drawings and
Specifications.

Total 30.000 0.000 30.000

Name: ___________ Name:________ Name:___________


Signature: ________ Signature: ________ Signature:___________
Designation: ______ Designation: ______ Designation: ___________
NETRACON Technologies GENERAL ELECTRICAL NESPAK
Faisalabad West-500 KV

Design, Manufacture, Supply, Installation, Testing and Commissioning of Plant for 500/220/132 kV Faisalabad
West Substation
Measurement Sheet No.09 (VO)
Reference Documents:
Boq. Item No. F.3.B.3 Appendix - (CF) Item Detailed Breakdown 1.

Expansion Joints for Approved


Item Description Actual Length As per Drawing As per Measurement Sheet No. 09 Expansion Joints (Nos.) 6.000
Cable Trench Type-3 Weightage
Executed Percentage Total
Total Nos. Completed (%) Nos. claimed
Sr. Nos. Nos. Previous
Description Unit No L W H Actual No Percentage (%) (D) Todate
No. (A) Actual (C) claimable QTY (F)
(B) (E)

Providing expansion joints


filling compund with sealant
material to make it water
proof in following type of Nos. 6 6 4.00 66.67% 4.00 - 4.00
cable trenches, complete in all
respects as per Drawings and
Specifications.

Total 4.000 0.000 4.000

Name: ___________ Name:________ Name:___________


Signature: ________ Signature: ________ Signature:___________
Designation: ______ Designation: ______ Designation: ___________
NETRACON Technologies GENERAL ELECTRICAL NESPAK
Design, Manufacture, Supply, Installation, Testing and Commissioning of Plant for 500/220/132 kV
Faisalabad West Substation
Measurement Sheet No.09 (VO)
Reference Documents:
Boq. Item No. F.3.A.2 Appendix - ( CA ) Item Detailed Breakdown 1.

500kV Yard RCC Cable Approved


Item Description Actual Length As per Drawing As per Measurement Sheet No. 09 Trench Length (L.m) 484.269
Trench Type -2 Weightage
Executed Percentage Total
Sr. Total Length Length Completed (%) Length Previous Length claimed
Actual Actual Percentage (%) (D) Todate
No. claimable QTY (F)
Description Unit No L W H (A) No (B) (C) (E)
1 Excavation and Levelling L.m 484.269 484.269 100.00% 5% 0.000 24.194 24.194
2 Lean concrete L.m 484.269 484.269 100.00% 10% 0.000 48.388 48.388

3 Trench Pad L.m 484.269 484.269 100.00% 40% 0.000 193.552 193.552

4 Trench Walls L.m 484.269 484.269 100.00% 40% 0.000 193.552 193.552

Trench Length ( Linear Meter) 484.269

5 Backfilling L.m 484.27 484.27 19.450 100.0% 5% 0.389 24.194 24.583

Total 0.389 483.880 484.269

Name: __________________ Name: __________________ Name: __________________

Signature: _______________ Signature: _______________ Signature: _______________

Designation: _____________ Designation: _____________ Designation: _____________


NETRACON Technologies GENERAL ELECTRIC NESPAK
Faisalabad West-500 KV

Design, Manufacture, Supply, Installation, Testing and Commissioning of Plant for 500/220/132 kV
Faisalabad West Substation
Measurement Sheet No.09 (VO)
Reference Documents:
Boq. Item No. F.3.A.3 Appendix - ( CB ) Item Detailed Breakdown 1.

Item Description RCC Cable Trench Type -3 Actual Length As per Drawing As per Measurement Sheet No. 09 Approved Trench Length (L.m) 150.720
Weightage
Executed Percentage Total
Total Length Length Completed (%) Length claimed
Sr. Length Previous
No. Actual Actual Percentage (%) (D) claimable QTY Todate
Description Unit No L W H (A) No (B) (C) (F)
(E)
1 Excavation and Levelling L.m 150.720 150.720 100.00% 5% 0.000 7.268 7.268
2 Lean concrete L.m 150.720 150.720 100.00% 10% 0.000 14.536 14.536

3 Trench Pad L.m 150.720 150.720 100.00% 40% 0.000 58.144 58.144

4 Trench Walls L.m 150.720 150.720 100.00% 40% 0.000 58.144 58.144

Trench Length ( Linear Meter) 150.720

5 Backfilling L.m 150.720 150.720 107.2 100.00% 5% 5.360 7.268 12.628

Total 5.360 145.360 150.720

Name: ___________ Name:________ Name:___________

Signature: ________ Signature: ________ Signature:___________


Designation: ______ Designation: ______ Designation: ___________
NETRACON Technologies GENERAL ELECTRICAL NESPAK
Faisalabad West-500 KV

Design, Manufacture, Supply, Installation, Testing and Commissioning of Plant for 500/220/132 kV Faisalabad
West Substation
Measurement Sheet No.09 (VO)
Reference Documents:
Boq. Item No. F.3.A.4 Appendix - (CC) Item Detailed Breakdown 1.

Item Description RCC Cable Trench Type -4 Actual Length As per Drawing As per Measurement Sheet No. 09 Approved Trench Length (L.m) 256.225
Weightage
Executed Percentage Total
Total Length Length Completed (%) Length claimed
Sr. Length Previous
Actual Actual Percentage (%) (D) Todate
No. claimable QTY (F)
Description Unit No L W H (A) No (B) (C) (E)
1 Excavation and Levelling L.m 256.225 256.225 100.00% 5% 0.000 12.755 12.755
2 Lean concrete L.m 256.225 256.225 100.00% 10% 0.000 25.510 25.510

3 Trench Pad L.m 256.225 256.225 100.00% 40% 0.000 102.040 102.040

4 Trench Walls L.m 256.225 256.225 0.000 100.00% 40% 0.000 102.040 102.040

Trench Length ( Linear Meter) 256.225

5 Backfilling L.m 256.225 256.225 22.500 100.00% 5% 1.125 12.755 13.880

Total 1.125 255.100 256.225

Name: ___________ Name:________ Name:___________


Signature: ________ Signature: ________ Signature:___________
Designation: ______ Designation: ______ Designation: ___________
NETRACON Technologies GENERAL ELECTRICAL NESPAK

You might also like