Multiregression
Multiregression
y x1 x2 x3 x4
Grade CS Quiz Exam TH SUMMARY OUTPUT
85 90 85 95 85
90 88 95 92 87 Regression Statistics
80 85 78 78 83 Multiple R 0.973808
78 79 82 80 85 R Square 0.948302
88 91 86 88 87 Adjusted R Squa 0.906943
85 85 87 80 78 Standard Error 1.617064
77 78 76 82 88 Observations 10
79 85 82 81 92
87 91 88 89 85 ANOVA
92 94 92 89 88 df
Regression 4
Residual 5
Total 9
Coefficients
Intercept 8.999057
CS 0.476015
Quiz 0.484066
Exam 0.049297
TH -0.134335
the proportion of the variation in y being explained by the variationin x df = n - k -1
10-3-1=6
SS MS F Significance F
239.8255 59.95638 22.92878 0.002048
13.07448 2.614897
252.9
Standard Error t Stat P-value Lower 95% Upper 95% Lower 95.0%
Upper 95.0%
15.48864 0.58101 0.586438 -30.81577 48.8138797 -30.81577 48.81388
0.162272 2.933449 0.032502 0.058883 0.89314741 0.058883 0.893147
0.140476 3.44589 0.018319 0.12296 0.84517101 0.12296 0.845171
0.140815 0.350085 0.74054 -0.312679 0.41127393 -0.312679 0.411274
0.154052 -0.872008 0.423093 -0.530339 0.26166944 -0.530339 0.261669
Multi- Regression:
Coefficients
Standard Error t Stat P-value
Intercept 2.745803 23.24856 0.118106 0.910581
Quizzes 0.354398 0.139487 2.540715 0.051849
CS 0.096904 0.251863 0.38475 0.716244
Exam 0.501964 0.115197 4.357436 0.007308
8x + 0.096904x + 0.501964x
Multi-regression
ŷ x1 x2 x3
GRADE QUIZ CS EXAM SUMMARY OUTPUT
90 88 85 92
75 75 80 77 Regression Statistics
88 85 85 95 Multiple R 0.992431 99% Very strong
79 79 84 80 R Square 0.98492
90 88 89 91 Adjusted R Squ 0.97738
84 85 83 85 Standard Error 0.817028
83 79 85 84 Observations 10
77 80 79 78
78 77 82 80 ANOVA
84 85 84 83 df SS MS F
Regression 3 261.5948 87.19826 130.6272
Residual 6 4.005212 0.667535
Total 9 265.6
ŷ = -26.07159
Coefficients
Standard Error t Stat P-value
Intercept -26.1532 9.037219 -2.893943 0.027551
QUIZ 0.469168 0.104781 4.477611 0.004203
CS 0.461817 0.149563 3.08778 0.021449
EXAM 0.376646 0.087492 4.304925 0.005065
INTERPRETATION:
RESIDUAL Df = N - k -1
6
SSR = SUM OF SQUARE DUE TO REGRESSION 𝑟^2= SSR/SST 0.98492
SSE = SUM O SQUARE DUE TO ERROR
SST = SUM OF SQUARE DUE TOTAL
Significance F
7.459E-06 7.46E-05 Significant
Coefficients
Standard Error t Stat P-value
Intercept -8.306496 3.296244 -2.519989 0.045288
QUIZ 0.54192 0.096381 5.622659 0.001352
ŷ = 0.54192x +0.422571x +0.127969x -8.3065 CS 0.422571 0.077516 5.451398 0.001585
0 EXAM 0.127969 0.105841 1.20907 0.272114
ŷ = 79.0903
Interpret:
r1 -1-10 sa company
r2-11-20 derived from r1 y = b0+b1x
r3= 11-20 project vs actual ng stock price
r4 = 1-20 actual company interpret
r3
r1-11-20
r2=1
r3 11-20
actual Vs Projected
Significicant
Significance F
5.52E-07 5.52E-07