Microsoft Project Tutorial 5 CPM

Uploaded by

50 Banks
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views2 pages

Microsoft Project Tutorial 5 CPM

Uploaded by

50 Banks
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Tutorial 5

Start: Thu 11/11/21ID: 1


Finish: Fri 7/29/22 Dur: 182 days
Comp: 0%

Mobilization
Start: Thu 11/11/21 ID: 2
Finish: Wed 11/17/21Dur: 5 days
Res:

Remove & Dispose Existing Building Remove Concrete Pavement Curb & Gutter
Start: Thu 11/18/21 ID: 3 Start: Thu 11/18/21 ID: 4
Finish: Mon 11/29/21Dur: 7 days Finish: Mon 11/29/21Dur: 7 days
Res: Res:

Grading
Start: Tue 11/30/21 ID: 5
Finish: Wed 12/8/21 Dur: 7 days
Res:

Rough-in Plumbing Rough-in Electrical


Start: Thu 12/9/21 ID: 6 Start: Thu 12/9/21 ID: 7
Finish: Wed 12/29/21Dur: 14 days Finish: Wed 12/29/21Dur: 14 days
Res: Res:

Rebar/Formwork
Start: Thu 12/30/21 ID: 8
Finish: Fri 1/7/22 Dur: 7 days
Res:

SOG
Start: Mon 1/10/22 ID: 9
Finish: Tue 1/11/22 Dur: 2 days
Res:

Rough Carpentry Framing


Start: Wed 1/12/22 ID: 10
Finish: Fri 1/21/22 Dur: 7 days
Res:

Doors & Windows


Start: Mon 1/24/22 ID: 11
Finish: Fri 1/28/22 Dur: 5 days
Res:

Finish Plumbing
Start: Mon 1/31/22 ID: 12
Finish: Tue 2/8/22 Dur: 7 days
Res:

Inspection - Plumbing
Start: Wed 2/9/22 ID: 13
Finish: Wed 2/9/22 Dur: 1 day
Res:

Finish Electrical
Start: Thu 2/10/22 ID: 14
Finish: Fri 2/18/22 Dur: 7 days
Res:

Inspection - Electrical
Start: Mon 2/21/22 ID: 15
Finish: Mon 2/21/22 Dur: 1 day
Res:

Roof TPO
Start: Tue 2/22/22 ID: 16
Finish: Fri 3/11/22 Dur: 14 days
Res:

Rough HVAC Dry Wall, Tape, & Mud


Start: Mon 3/14/22 ID: 17 Start: Mon 3/14/22 ID: 18
Finish: Thu 3/31/22 Dur: 14 days Finish: Tue 3/22/22 Dur: 7 days
Res: Res:

Finish HVAC Paint


Start: Fri 4/1/22 ID: 20 Start: Wed 3/23/22 ID: 19
Finish: Mon 4/11/22 Dur: 7 days Finish: Tue 4/5/22 Dur: 10 days
Res: Res:

Inspection - HVAC Base, Trim & ACC.


Start: Tue 4/12/22 ID: 22 Start: Wed 4/6/22 ID: 21
Finish: Tue 4/12/22 Dur: 1 day Finish: Tue 4/12/22 Dur: 5 days
Res: Res:

Masonry
Start: Wed 4/13/22 ID: 23
Finish: Mon 5/2/22 Dur: 14 days
Res:

Acoustical Ceilings & Light Fixtures


Start: Tue 5/3/22 ID: 24
Finish: Fri 5/20/22 Dur: 14 days
Res:

Floor & Wall Tile


Start: Tue 5/24/22 ID: 25
Finish: Fri 6/10/22 Dur: 14 days
Res:

Equipment & Seating Furniture


Start: Mon 6/13/22 ID: 26
Finish: Thu 6/30/22 Dur: 14 days
Res:

Dumpster Enclosure
Start: Fri 7/1/22 ID: 27
Finish: Fri 7/8/22 Dur: 5 days
Res:

Menu Board
Start: Mon 7/11/22 ID: 28
Finish: Fri 7/15/22 Dur: 5 days
Res:

Install Sign
Start: Mon 7/18/22 ID: 29
Finish: Tue 7/19/22 Dur: 2 days
Res:

Landscaping
Start: Wed 7/20/22 ID: 30
Finish: Thu 7/28/22 Dur: 7 days
Res:

Final Inspection
Start: Fri 7/29/22 ID: 31
Finish: Fri 7/29/22 Dur: 1 day
Res:

Project Complete

Milestone Date: Fri 7/29/22


ID: 32

Page 1
Project: Project2 Critical Noncritical Critical Milestone Milestone Critical Summary Summary Critical Inserted Inserted Critical Marked Marked Critical External External Project Summary Highlighted Critical Highlighted Noncritical
Date: Tue 12/7/21

Page 2