Standard Data 2020-21 Final
Standard Data 2020-21 Final
Standard Data 2020-21 Final
Part – 1
For IRRIGATION & CAD WORKS
and
LEADS & LIFTS (Common to all Department)
Sub:- A.P. Revised Standard Data with SoR 2020-21 for Water Resources Department works
(Part-I) - approved – Printing & Communication of Standard Data – Reg.,
Ref:- 1) G.O.Ms.No.49, I&CAD (PW: Reforms) Dept., Dt: 02.03.2009.
2) Minutes of BOCEs meeting for Schedule of Rates Dt: 14.08.2020.
3) SoR Procs.No.ENC/IW/SE (P&M)/EE.1/DEE-3/AEE(N)/SoR 2020-21/Vol.1 Dt:
16.09.2020.
*****
The BoCEs meetings for finalization of Schedule of Rates (SoR) for WR Dept. (Part-I),
Road & Bridges (Part-II) and Public Health Items (Part-IV) were held on 14.08.2020 and
approved minutes of meeting is placed on the Water Resources website i.e.,
http://irrigation.ap.gov.in.
Subsequently, based on the approved minutes of meeting, the rates pertaining to WR
items(Part-I), Roads & Bridges items(Part-II) & Public Health Items(Part-IV) are updated and
proceedings are issued for approved SoR-2020-21 for Parts-I,II & IV on 16.09.2019 by
Engineer-in-Chief(A.W/I.W), WR Dept. & Chairman, BoCEs.
Based on the approved rates of SoR-2020-21 for all the materials and capital cost of
machinery, the unit rate of work items related to Water Resources Department are arrived
for the year 2020-21.
By incorporating approved labour, material and Hire Charges for SoR 2020-21 &
Percentage Provision of 13.615% towards Contractor’s profit and overhead charges in the
items, the A.P. Revised Standard Data (unit rate for work items) for the year 2020-21 is
finalized.
The corrections issued to the data and lead calculations, vide correction slip
dt.30.01.2020, are incorporated in the present Standard Data.
Any additions or modifications or deletions in the existing data must be approved by
BOCEs only.
Encl: Soft copy of A.P Revised Standard Data for WR Department for the year 2020-21.
Sd/-K.Jalandhar,dt.16. 09.2020
Engineer-in-Chief(I.W.)
Chairman, BOCE(SoR)
I) Copy submitted to the Special Chief Secretary to Govt., WR Dept., 4th Block,
A.P.Secretariat Buildings, Velagapudi,Amaravathi.
II) Copy communicated to the following Heads of Departments along with enclosures
for information.
1. Chief Engineer (Admn)., Roads & Buildings Department.
2. Engineer-in-Chief, Public Health Department.
3. Engineer-in-Chief, Panchayath Raj Department.
4. Engineer-in-Chief, R W S, Department.
5. Chief Engineer (Buildings &RSW), R&B Department.
III) Copy of Scheduled of Rates 2020-21 & Standard data, part-1 (WR Dept. works) are
communicated to the respective E-mail ids of all the Engineers-in-Chief, Chief
Engineers and Regional Superintending Engineers of Irrigation circles of Vijayawada,
Guntur, Dowlaiswaram and Chittoor of Water Resources Department for taking
necessary action
IV) Copy to DEE(Computers), EnC(SAW) for uploading the approved SoR-2020-21
(part-I, Part-II & Part-IV) on the Water Resources Department website to forward this
letter to all the members of Board of Chief Engineers through E-
mail
Sd/-K.Jalandhar,dt.16. 09.2020
Engineer-in-Chief(A.W/I.W.)
Chairman, BOCE(SoR)
Indexing
code and index for work items of standard data
PART-1 IRRIGATION
Abstract of Items - Irrigation 1-46
Abstract of Leads and Lifts 47-49
IRR-DAW Dam And Allied Works
IRR-DAW-1 EXCAVATION & FOUNDATION TREATMENT WORKS: 50
IRR-DAW-2 REINFORCEMENT & CEMENT CONCRETE WORKS : 62
IRR-DAW-3 MASONRY & GUNITING WORKS : 82
IRR-DAW-4 CONTRACTION JOINT WORKS: 88
IRR-DAW-5 EARTH / ROCKFILL EMBANKMENT WORKS : 92
IRR-DAW-6 FILTER & PITCHING WORKS : 101
COM-LDLFT-2 334
LOADING AND UNLOADING CHARGES BY MANUAL
COM-LDLFT-3 MEANS (Idle hire charges of trucks are not added) 334
LOADING AND UNLOADING CHARGES BY MANUAL
COM-LDLFT-4 MEANS (including idle hire charges of trucks ) 334
LOADING AND UNLOADING CHARGES BY MECHANICAL
MEANS (including idle hire charges of trucks )
COM-LDLFT-5 334
COM-LDLFT-6 LIFT CHARGES FOR MATERIALS BY HEAD LOAD 335
COM-DTL-LDLFT-1 (Lead) Conveyance Charges for materials by head load 335
( Lead) Conveyance charges for machinery per kilometer for
transporting materials by tippers and trucks, excluding
loading, unloading and hire charges of machinery.
COM-DTL-LDLFT-2 336
LOADING AND UNLOADING CHARGES BY MANUAL
COM-DTL-LDLFT-3 MEANS (idle hire charges of trucks are not added) 342
LOADING AND UNLOADING CHARGES BY MANUAL
COM-DTL-LDLFT-4 MEANS (including idle hire charges of trucks ) 343
LOADING AND UNLOADING CHARGES BY MECHANICAL
MEANS (including idle hire charges of trucks )
COM-DTL-LDLFT-5 344
COM-DTL-LDLFT-6 LIFT CHARGES FOR MATERIALS BY HEAD LOAD 345
MACHINERY HIRE CHARGES 347
A.P. REVISED STANDARD DATA
PREAMBLE
The AP Revised Standard data for various construction items has come into existence as
per the Government orders G.O.Ms.No.49, I & CAD (PW: Reforms) Dept., dt:.2-3-2009.
Accordingly the data has been revised adopting the procedures and guidelines given by
CWC, Report on “committee on cost control of river valley Projects, BIS specifications, NHAI,
MORTH, MORD, CPWD and Government of Karnataka and revised data and formulated
schedule of rates for all infrastructure Departments (I&CAD, R&B, PR and PH). The team of
senior engineers interacted with the S.R Committee of Karnataka on implementation and
improvements needed. For Water Resources work items, the data pattern as adopted by
Karnataka has been considered and for other Departments, the data adopted by
MORTH,MORD and NHAI etc. is adopted
i
3. The Detailed draft data was communicated to all the HOD’s and interacted through many
seminars and discussions and incorporated the relevant features. The Board of chief
engineers in their meetings have recommended for acceptance to the data formulated and
schedule of rates. It was proposed to examine the recommendations on important
parameters, to refer to high level committee, for their specific recommendations for
adoption, as they are common to all departments.
The committee made in depth study on the methodology and systems followed by the
reputed National organizations and other States and made detailed deliberations with
HOD’s and representatives of Builders Association of India and made recommendations to
the Government, on adoption of such parameters in A.P.
4. The Chief Secretary held a detailed discussions on 04-07-2007, with the Secretaries of the
Departments and Heads of Departments.
ii
GUIDELINES
1) The Revised Standard Data is formulated under four Parts, which are applicable to all the
Engineering Departments and other Organisations.
PART -1: Water Resources Department work items (Dam and Allied Works,
Canals and Allied Works, Canal C.D. Works, Tunnels and Allied Works,
Preliminary and Maintenance Works, Hydraulic Gates and allied
works and Leads and Lifts applicable to all Departments
PART -2: Roads and Bridges
PART -3: Buildings including Electrical Works
PART -4: Drinking Water Supply and Public Health (ONLY FOR WORKS
DONE BY MANUAL MEANS)
iii
equipment planning and utilisation. The daily out-put is computed duly considering the
actual available working time and feed back from the field.
For gate and hoist works, it is the general practice to specify the quantity
of work in terms of number of sets of embedded parts / gates. The
requirement of machinery and work-force for cutting, bending,
fabrication, erection, painting etc., is assessed to commensurate with the
task involved.
The data for gates and E.M. Parts is arrived per Ton quantity.
The data for Hoists and Gantry Cranes is worked out on the basis of
capacity in tonnage
4) The lead and lift charges provided in PART-I (B) are generally applicable and common
to all Departments. For applicability of lead and lift charges for various materials and
other details, please refer to COM-LDLFT in lead and lift charges statement. For any item
not covered in this part, the rates as provided in the data of the relevant works may be
adopted in preparation of estimates.
5) The basic material inputs needed for all works are listed and incorporated in the data.
The requirements are analyzed and the specifications adopted shall confirm to
Standards published by the BIS.
For sand, gravel , murum, stones , course aggregates etc, the rates are to
be fixed for delivery at Quarry, adding loading charges by machinery /
manual means and idle hire charges of machinery (as per table under
chapter “ conveyance or lead and lift charges”), as applicable.
For steel, AC sheets, GI sheets, Hume pipes, wood and stone slabs, the
rates are to be taken prevailing at major commercial centre near project
area. The lead charges, as applicable are to be added in preparing
estimates.
iv
The specifications of the aggregates for sizes and gradation and its
adoption shall be as per IS 383.
The machinery and /or group of machinery for items of works and their output has been
worked based on the availability of machinery generally in the market and working in the field
successfully, duly considering cycle time, idle time, operator efficiency, type of work etc.
The hire charge of a machinery / equipment is worked out based on the
guidelines published by CWC and BIS codes.
For the other machinery not covered by the list, the R&B and other
users may adopt hire charges as recommended by the MORTH
8) Lead Charges
v
initial lead specified in the item rate. The Guidelines may be followed
regarding adding Lead charges as given against each chapter.
The lead charges per unit quantity for conveyance of the materials are
worked out, and included in the schedule of rates in increment of 50 m
for head load and in increment of 1 km for mechanical mode.
The rates for lead charges by head load up to 150 meters and by
machinery up to 5 km, shall be cumulative and inclusive of lead charges
for preceding lead. For lead beyond 5 km, the lead charges shall be
worked out on per km basis.
9) Loading and Unloading charges for Materials
The following features are considered:
1. Loading and unloading charges are not payable for conveyance by head load.
2. Loading and unloading charges are not payable for conveyance by mechanical
means, for disposal of excavated material unless specified.
3. The rates for unloading of materials except earth, sand, gravel, coarse aggregate,
rubble, size stone and cut stone, are inclusive of stacking wherever applicable.
The data includes initial lift charges of 3 meters ,for materials conveyance by
head load, Additional leads in the interval of 1.0 meters are worked out, as
additional labour input and incorporated in the chapter on” Lead and lifts” .
Where the conveyance / lifting of material is done by mechanical means, lift
charges shall not be considered, as the cycle time of operation of the
machine includes lifts involved.
The data and rates for lift charges is cumulative and are inclusive of rates for
preceding lifts also.
11) Wastage of Materials
vi
(ii)steel: The wastage of steel @ 2.5% is allowed for gates and allied structures. For
RCC works the wastage is @2.5% for the reinforcement rods above 36mm dia.
and @ 5% for rods below 36mm dia. including overlaps, if they are not welded.
If welding is adopted for the reinforcement rods even for below 36mm dia, 2.5%
of wastage is only recommended.
13) In respect of RCC works the rate for cement concrete for 1 cum is worked
separately for all grades based on Indian Standards. The rate for ton is calculated
separately and to be added separately in the estimates of RCC works as a separate item.
1. all soils
2. Marshy soil
3. ordinary rock ( not requiring blasting),
4. hard rock
a. hard rock (requiring blasting)
b. hard rock (controlled blasting)
c. removable by chiseling(blasting prohibited)
Concrete admixtures such as Air-Entraining Agent ( AEA ) / Water reducing agent can be
used advantageously for better quality concrete. The high level committee has
recommended to adopt for super plasticizers and admixtures at 0.4% on cement for
concrete work as per MORTH standards for batching plants.
vii
16) Contractors overheads, profit and other provisions:
High Level Committee has recommended adding 14% towards contractor
overheads and profit including labour importation and amenities, insurance
etc., as given below which includes various items as recommended in MORTH
data.
The provision for GST for works contracts at 12% or as fixed by the Government
from time to time should be made separately in Part-B of the estimate. The
provisions allowed in G.O.Ms.No.94, I&CAD, dt: 01.07.03, need not be added
separately for the items covered in the contractor overhead charges.
viii
Work insurance/ compensation (Deleted as per the Government Orders G.O.Ms.No.62
I&CAD(Reforms) Department dt:11.11.2014 and consequently CP&OH component reduced to 13.615%
from 14%).
ix
USER GUIDELINES OF REVISED STANDARD DATA
1. Please select the item of work, as given in Index Code, and view the relevant
data.
2. The common data items like, lead, lift, conveyance and manual excavation
(without involving contracting agencies ) is applicable to all Departments
(Volume-1)
3. The departments have to adopt the relevant data from other Departments, if
such works are executed by them.
4. The unit rate /hire charges, of machinery not covered in the Irrigation data, the
MORTH data may be taken with the approval of Board of Chief Engineers.
5. For “Drinking water Supply works and Public Health Items(PART-IV)”, the data
incorporated is generally applicable only for manual means of execution. The
rates deploying machinery have to be worked out by the Board of Chief
engineers and approved for adoption.
x
ROLE OF CENTRAL COMPETENT AGENCY FOR SCHEDULE OF RATES ( BOARD OF CHIEF
ENGINEERS)
a) The Board of Chief Engineers under the chairman ship of Engineer-in- chief,
(administration) I&CAD Department is the competent authority to finalise and
recommend the Schedule of Rates applicable for all engineering Departments. The
board has to assess and incorporate only the three basic inputs required to
generate unit work item rates as below.
Materials rates:
The basic input material rates common to all departmental works are listed
out and incorporated (in the chapter “Basic inputs”) The material specifications
adopted shall confirm to Standards published by the BIS.
The Prevailing market rates for all basic input materials shall be obtained
from the major commercial centers near the project areas. Average of the rates,
ignoring freak rates, shall be reckoned as the prevailing market rate.
xi
For sand, gravel, murrum, stones, aggregates etc, the rates are for delivery
at Quarry including loading charges and idle hire charges. For steel, Cement, AC
sheets, GI sheets, Hume pipes, wood and stone slabs, the rates prevailing at major
commercial centre near project area has to be adopted.
The third parameter for incorporation in the Basic Inputs, is the use rate of machinery. To
arrive at the use rate of machinery, the inputs to be incorporated are
The list and capital cost of machinery required to be used in the construction activity,
The rate has to be obtained from major manufacturers and outlet sources and the rate
shall be the current market price inclusive of all duties and freight charges but exclusive GST.
The prevailing fuel charges of petrol and diesel are ascertained and average rate
adopted.
Borrow rate of interest as fixed by the Government/competent authority be indicated.
For the other machinery not covered by the list, the R&B and other users may adopt hire
charges as recommended by the MORTH
He shall communicate the uniform Schedule of rates arrived from Standard Data,
to all users for uniform and direct adoption in all infrastructure Departments, as
applicable
xii
Abstract of work items_UNit Rates for the year 2020-21
1
Abstract of work items_UNit Rates for the year 2020-21
Preparing foundation bed for cut-off trench filling in rock portion by removing
IRR-DAW-1-8 9 all loose materials by wedging / chiselling and disposing off the same as directed sqm 33.20
etc., complete with initial lead upto 50 m and all lifts.
Labour Component (including contractor's profit and Overheads) sqm 33.20
The item rate for drilling through rock / masonry / concrete includes redrilling
through partially set grout, if any, in the portion of the hole drilled and grouted.
Flushing grout holes of all sizes with water and air jets alternatively for an
IRR-DAW-1-10 11 average period of 30 minutes including water intake observations after flushing, Rm 59.30
cost of all materials, machinery, labour etc., complete.
Labour Component (including contractor's profit and Overheads) Rm 25.20
Curtain grouting with neat cement grout mix of suitable consistency under
IRR-DAW-1- specified pressure as directed in drilled holes by stage grouting method
13 including cost of all materials, machinery, labour, redrilling if necessary etc., tonne 10403.10
12(b)
complete with initial lead upto 1 km and all lifts.
Labour Component (including contractor's profit and Overheads) tonne 5186.50
Providing and fixing 25 mm dia 3 m long cold twisted deformed steel dowel
bars with one end driven into 45 to 50 mm diameter 1.50 m deep hole drilled in
bed rock and other end provided with L-bend for embedding in concrete /
IRR-DAW-1-13 14 masonry of over flow / non-over flow blocks and other appertenant works Each 974.80
including cost of drilling and cleaning hole, filling hole with cement mortar 1 : 1
proportion, driving anchor rod, cost of all materials, machinery, labour etc.,
complete with initial lead upto 1 km and all lifts.
Labour Component (including contractor's profit and Overheads) Each 146.90
Providing and fixing 25 mm dia. 2.75 m long ribbed steel anchor rods with
one end split and driven firmly using steel wedge into 1.25 m deep 45 to 50 mm
dia. hole drilled in bed rock and other end provided with L- bend for embedding
IRR-DAW-1-14 15 in concrete / masonry for spillway and appurtenant works including drilling and Each 906.70
cleaning hole, filling hole with thick cement slurry, driving anchor rod, cost of all
materials, machinery, labour, steel wedge etc., complete with initial lead upto 1
km and all lifts.
Labour Component (including contractor's profit and Overheads) Each 167.50
2
Abstract of work items_UNit Rates for the year 2020-21
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength
not less than 15 N / sq mm ) grade cement concrete using 80 mm down size
approved, clean, hard, graded aggregates including cost of all materials,
machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing,
IRR-DAW-2-2 18 placing in position, levelling, vibrating, finishing, curing etc.,complete for plain cum 3392.60
concrete works with initial lead upto 1 km and all lifts. ( Cement content : 250
kg /cum with use of super plasticiser equla to 0.4% of cement content, CA :
0.98 cum, Blending Ratio of CA -- 40:30:20:10, FA : 0.35 cum ))
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 80 mm down size
approved, clean, hard, graded aggregates including cost of all materials,
IRR-DAW-2-2A machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing,
(new Item1 2010- 19 placing in position, levelling, vibrating, finishing, curing etc.,complete for plain cum 3569.70
11) concrete works with initial lead upto 1 km and all lifts. ( Cement content : 300
kg /cum with use of super plasticiser equla to 0.4% of cement content, CA :
0.90 cum, Blending Ratio of CA -- 40:30:20:10, FA : 0.4 cum ))
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength
not less than 10 N / sq mm ) grade cement concrete using 80 mm down size
approved, clean, hard, graded aggregates including cost of all materials,
machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing,
IRR-DAW-2-3 20 placing in position, levelling, vibrating, finishing, curing etc.,complete for plain cum. 3261.50
concrete works with initial lead upto 1 km and all lifts. ( Cement content : 220
kg /cum with use of super plasticiser, CA: 0.98 cum, Blending Ratio of CA --
40:30:20:10, FA: 0.37 cum )
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates including cost of all materials,
machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC
IRR-DAW-2-4 21 cum. 4626.90
works of gallery, sluice, spillway crest, spillway d / s face, energy dissipating
structures, training walls, piers, abutments and such other locations with initial
lead upto 1 km and all lifts. ( Cement content : 310 kg / cum with use of super
plasticiser, CA : 0.90 cum, blending ratio of CA--50:30:20, FA : 0.40 cum)
Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength
not less than 25 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates including cost of all materials,
machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing,
IRR-DAW-2-4A
placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC
(new Item2 2010- 22 cum. 4867.50
works of gallery, sluice, spillway crest, spillway d / s face, energy dissipating
11)
structures, training walls, piers, abutments and such other locations with initial
lead upto 1 km and all lifts. ( Cement content : 360 kg / cum with use of super
plasticiser,CA : 0.90 cum, blending ratio of CA--50:30:20, FA : 0.40 cum)
3
Abstract of work items_UNit Rates for the year 2020-21
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength
not less than 15 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates including cost of all materials,
machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing,
IRR-DAW-2-5 24 placing in position, levelling, vibrating, finishing, curing etc.,complete for plain cum. 4704.00
concrete works with initial lead upto 1 km and all lifts. ( Cement content : 260
kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA --
50:30:20, FA : 0.40 cum)
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength
not less than 15 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates with placing and sinking plums of
size 150 to 80 mm upto 15 percent for gravity type structures including cost of
all materials, machinery, labour, formwork, scaffolding, cleaning, batching,
IRR-DAW-2-6 25 cum. 4559.80
mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete
with initial lead upto 1 km and all lifts. ( Cement content : 260 kg / cum of
concrete with use of plums and super plasticiser,, CA : 0.77 cum, Blending
Ratio of CA : 50:30:20,FA : 0.34 cum, plums of size 150 to 80 mm : 0.25 cum)
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength
not less than 10 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates including cost of all materials,
machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing,
IRR-DAW-2-7 26 cum. 4354.20
placing in position, levelling, vibrating, finishing, curing etc.,complete for plain
concrete works with initial lead upto 1 km and all lifts. ( Cement content 220
kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA :
50:30:20, FA : 0.40 cum )
Labour Component (including contractor's profit and Overheads) cum. 1572.80
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength
not less than 15 N / sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates including cost of all materials,
machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing,
IRR-DAW-2-8 27 placing in position, levelling, vibrating, finishing, curing etc.,complete for plain cum. 4525.20
concrete works with initial lead upto 1 km and all lifts. ( Cement content : 280
kg /cum with use of super plasticiser,CA : 0.80 cum, Blending Ratio of CA --
65:35, FA : 0.44 cum)
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates including cost of all materials,
machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC
IRR-DAW-2-9 28 cum. 6451.10
works of spillway bridge, blockouts and such other similar structures with
conjested reinforcement with initial lead upto 1 km and all lifts. ( Cement
content : 330 kg / cum with use of super plasticiser, CA : 0.80 cum, Blending
Ratio of CA -- 65:35, FA : 0.44 cum).
Providing and forming porous concrete body drain of size 68.5 x 68.5 cm with 23
cm diameter central hole using cement and 20 mm down approved, clean, hard,
graded coarse aggregates in 1 : 3.50 proportion by volume including cost of all
IRR-DAW-2-10 29 Rm 2349.90
materials, machinery, labour, formwork, curing etc., complete with initial lead
upto 1 km and all lifts.(M15 Cement content : 400kg/cum, CA : 1cum, Blending
Ratio of CA -- 65:35)
Labour Component (including contractor's profit and Overheads) Rm 779.50
4
Abstract of work items_UNit Rates for the year 2020-21
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates including cost of all materials,
machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC
solid parapet consisting of 35 cm x 20 cm kerb, 35 cm x 35 cm x 1 m pillars
IRR-DAW-2- spaced approximately at 3.35 m c / c, 12.5 cm thick wall 80 cm height with 12.5
30 Rm 2496.00
11(a) cm thick and 35 cm wide coping slab for wall and 12 .5 cm thick 40 cm x 40 cm
coping for pillars with top edges of kerb and coping chamferred / rounded as
directed etc., complete ( excluding cost of providing and placing
reinforcement steel and gate ) with initial lead upto 1 km and all lifts. (
Cement content 350 kg / cum with use of super plasticiser( 0.4% by wt.of
cement), CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.44 cum)
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates including cost of all materials,
machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC
ornamental parapet consisting of 35 cm x 20 cm kerb, 35 cm x 35 cm x 1 m
IRR-DAW-2- pillars spaced approximately at 3.5 m apart, 20 cm x 15 cm posts 80 cm height
31 Rm 2592.50
12(b) approximately 30 cm c / c with 12.5 cm thick and 35 cm wide coping slab for
posts and pillars with top edges of kerb and coping chamferred or rounded as
directed etc., complete ( excluding cost of providing and placing reinforcement
steel and gate ) with initial lead upto 1 km and all lifts. ( Cement content : 350
kg / cum with use of super plasticiser, CA : 0.80 cum, Blending Ratio of CA--
65:35, FA : 0.44 cum)
Providing and laying insitu M- 25 ( 28 days cube compressive strength not less
than 25 N / sq mm ) grade cement concrete using 20 mm down size approved,
clean, hard, graded aggregates for wearing coat including cost of all materials,
machinery, labour, formwork, cleaning, batching, mixing, placing in position in
IRR-DAW-2-13 32 alternate panels, levelling, compacting, finishing, curing, packing joints with cum 5176.40
asphalt mortar etc., complete with initial lead upto 1 km and all lifts. ( Cement
content : 380 kg / cum with use of super plasticiser, CA : 0.80 cum, Blending
Ratio of CA--65:35, FA : 0.45 cum)
Conveying and fixing elastomeric bearing for spillway bridge including cleaning
and preparing surface, mixing and applying adhesive, fixing bearing in correct
IRR-DAW-2-15 34 Each 457.80
position etc., including cost of all materials except bearings, machinery, labour
etc., complete with all leads and lifts.
Labour Component (including contractor's profit and Overheads) Each 411.90
Providing and constructing 150 mm dia hume pipe weep holes for concrete /
masonry walls including providing 20 x 20 x 20 cm size porous concrete block
made of cement and 20 mm down coarse aggregate in 1 : 4 proportion
IRR-DAW-2-16 35 Rm 389.60
including 10 cm thick sand backing at the junction of wall and soil back fill, cost
of all materials, machinery, labour etc., complete with lead upto 1 km and all
lifts.
Labour Component (including contractor's profit and Overheads) Rm 90.90
5
Abstract of work items_UNit Rates for the year 2020-21
Providing and constructing coursed rubble face stone masonry using approved
rubble stones in cement mortar 1 : 3 proportion including cost of all materials,
machinery, labour, scaffolding, ramps, cleaning, packing mortar, wedging stone
chips, curing etc., with initial lead upto 1 km and all lifts.( Thickness of the CR
IRR_DAW-3-3 39 cum 3275.50
face assumed: 0.75 m, Cement content : 178 kg/cum of masonry, rubble stones
: 0.35 cum, stone chips : 0.15 cum/cum, FA : 0.375 cum, CR stones 30 x 30 x 45
cm : 9.75 No, CR stones 30 x 30 x 60 cm : 3.25 No)
Providing and constructing coursed rubble face stone masonry using approved
rubble stones in cement mortar 1 : 4 proportion including cost of all materials,
machinery, labour, scaffolding,ramps, cleaning, packing mortar, wedging stone
IRR_DAW-3-4 40 chips, curing etc., with initial lead upto 1 km and all lifts. ( Cement content : cum 3091.90
134 kg/cum of masonry, rubble stones : 0.35 cum, stone chips : 0.15
cum/cum, FA : 0.375 cum, CR stones 30 x 30 x 45 cm : 9.75 No, CR stones 30 x
30 x 60 cm : 3.25 No)
Labour Component (including contractor's profit and Overheads) cum 1621.50
Providing and constructing chisel drafted and hammer dressed face stone
masonry with approved stones in cement mortar 1 : 3 proportion including cost
of all materials, machinery, labour, scaffolding, ramps, cleaning, packing mortar,
wedging stone chips, curing etc.,complete with initial lead upto 1 km and all
IRR_DAW-3-5 41 cum 3569.60
lifts.( Cement content : 167 kg/cum of masonry, rubble stones : 0.35 cum,
stone chips : 0.15 cum/cum, FA : 0.35 cum, Dressed stones 30 x 30 x 45 cm : 10
No, Dressed stones 30 x 30 x 60 cm : 3.40 No)
Providing and constructing chisel drafted and hammer dressed face stone
masonry with approved stones in cement mortar 1 : 4 proportion including
cost of all materials, machinery, labour, scaffolding, ramps, cleaning, packing
mortar, wedging stone chips, curing etc.,complete with initial lead upto 1 km
IRR-DAW-3-6 42 cum 3394.40
and all lifts.( Cement content : 125 kg/cum of masonry, rubble stones : 0.35
cum, stone chips : 0.15 cum/cum, FA : 0.35 cum, Dressed stones 30 x 30 x 45
cm : 10 No, Dressed stones 30 x 30 x 60 cm : 3.40 No)
6
Abstract of work items_UNit Rates for the year 2020-21
Providing cut-off trench filling using selected impervious soil from approved
borrow areas in layers of 25 to 30 cm before compaction including cost of all
materials, machinery, labour, all operations such as excavation, sorting out,
transportation, spreading soil to specified thickness, breaking clods, sectioning,
IRR-DAW-5-2 51 cum 161.20
watering, compacting to density control of not less than 95 percent using Sheep
foot roller / Vibratory roller/ 8 to 10 tonne power roller as stipulated etc.,
complete with initial lead upto 1 km and all lifts.
7
Abstract of work items_UNit Rates for the year 2020-21
Providing and constructing dry rubble rock-toe using rubble and stone chips
from approved source including cost of all materials, machinery, labour, hand
IRR-DAW-5-8 58 cum 589.70
packing rubble and stone chips, finishing top and sides to required slopes etc.,
complete with initial lead upto 1 km and all lifts.
Labour Component (including contractor's profit and Overheads) cum 267.40
Providing and constructing dry rubble rock-toe with rubble and stone chips
from dump yard including cost of all materials, machinery, labour, hand packing
rubble and stone chips, finishing top and sides to required slopes etc., complete
with initial lead upto 1 km and all lifts.
IRR-DAW-5-9 59 cum 524.40
Note: Useful rubble and stone chips will be issued at dump yard at the issue rate
for usefull rubble /stone chips. Sorting out and breaking charges included in rate
analysis.
Labour Component (including contractor's profit and Overheads) cum 188.90
Providing and constructing dry rock pitching for groynes/platform using un-
IRR-DAW-5-9-A coursed rubble stone of size 300 mm thick from quarry to site of work including
(New Item1-2020- 60 cost of all materials, machinery, labour charge hand picking un-coursed rubble cum 673.00
21) stone to the designed profile with all leads and all lifts etc for Above Water
level.
Labour Component (including contractor's profit and Overheads) cum 188.90
Providing and constructing dry rock pitching for groynes using un-coursed rubble
IRR-DAW-5-9-B stone of size 300 mm thick and un-coursed rubble stone chips from quarry to
(New Item2(2020- 61 site of work including cost of all materials,machinery, labour charge hand cum 505.30
21) picking un-coursed rubble stone and chips to the designed profile with all leads
and all lifts etc for Below Water level.
Labour Component (including contractor's profit and Overheads) cum 21.20
8
Abstract of work items_UNit Rates for the year 2020-21
Providing and constructing longitudinal and cross graded filter drains using
sand and 80-20 mm and 20 mm down graded aggregates satisfying specified
filter creteria in layers as per specifications including cost of all materials,
IRR-DAW-6-2 64 cum 1062.40
machinery, labour, laying to required slopes, compaction etc. complete with
initial lead upto 50 m and all lifts.
Providing and constructing graded filter media below and behind rock-toe
consisting of 20 cm thick sand, 25 cm thick 20 - 4.75 mm and 40 cm thick 80 -
20 mm size graded coarse aggregates satisfying filter creteria as per
IRR-DAW-6-4 66 cum 1078.20
specifications including cost of all materials, labour, machinery, laying to
required slope, compaction etc., complete with initial lead upto 50 m and all
lifts.
Labour Component (including contractor's profit and Overheads) cum 184.50
Providing and constructing graded filter media below and behind rock-toe
IRR-DAW-6-4-A consisting of 30 cm thick, 80 - 20 mm size graded coarse aggregates
(New Item2 2011- 67 satisfying filter creteria as per specifications including cost of all materials, cum 1186.00
12) labour, machinery, laying to required slope, compaction etc., complete with
initial lead upto 50 m and all lifts.
Labour Component (including contractor's profit and Overheads) cum 69.50
Providing and laying filter media consisting of 2 layers of 250 gsm poly-
propeline non-woven filter fabric and 400 mm thick 20 mm down graded
coarse aggregate for vertical / inclined and horizontal filter blanket for
IRR-DAW-6-5 68 sqm 903.40
embankment including cost of all materials, machinery, labour etc., complete
with lead upto 50 m for aggregate and all leads for fabric and all lifts.
9
Abstract of work items_UNit Rates for the year 2020-21
Providing and constructing 60 cm thick hand packed rough stone riprap over
a backing of 45 cm thick graded filter media consisting of sand, 10 mm and 40
mm size graded approved aggregates laid in layers of 15 cm thick each
IRR-DAW-6-10 73 sqm 890.40
including cost of all materials, machinery, labour, laying to required slopes,
wedging with stone chips etc., complete with initial lead upto 50 m and all
lifts.
Labour Component (including contractor's profit and Overheads) sqm 181.60
Providing and constructing 75 cm thick hand packed rough stone riprap over
a backing of 45 cm thick graded filter media consisting of sand, 10 mm and 40
mm size graded approved aggregates laid in layers of 15 cm thick each including
IRR-DAW-6-11 74 sqm 970.00
cost of all materials, machinery, labour, laying to required slopes, wedging with
stone chips, etc., complete with initial lead upto 50 m and all lifts.
Providing and constructing 90 cm thick hand packed rough stone riprap over
a backing of 45 cm thick graded filter media consisting of sand, 10 mm and 40
mm size graded approved aggregates laid in layers of 15 cm thick each including
IRR-DAW-6-12 75 sqm 1067.80
cost of all materials, machinery, labour, laying to required slopes, wedging with
stone chips etc., complete with initial lead upto 50 m and all lifts.
Providing and laying Hariyala or other approved quality turfing sods for the
slopes of earthen embankments over 20 mm thick sand backing including cost of
IRR-DAW-6-13 76 all materials, machinery, labour including preparing surface, spreading sand, sqm 129.60
watering for 15 days etc., complete with initial lead upto 1 km and all lifts.
Chapter II
IRR-TAW TUNNEL AND ALLIED WORKS
IRR-TAW-1 EXCAVATION :
Excavation for adit by tunnelling methods in all types of rock including cost
of all materials, machinery, labour, scaling excavated surface, ventilation,
lighting, drainage, removing and hauling the excavated muck outside adit upto
IRR-TAW-1-1 77 cum 1934.70
specified dump area and all other ancillary operations etc., complete with
initial lead upto 50 m and all lifts.
Excavation for vertical / inclined shaft in all types of soft / hard rock
including cost of all materials, machinery, labour, shoring, strutting, scaling
excavated surface, ventilation, lighting, drainage, removing and hauling
IRR-TAW-1-2 78 cum 2783.80
excavated muck outside shaft upto specified dump area and all other ancillary
operations etc., complete with initial lead upto 1 km and all lifts.
10
Abstract of work items_UNit Rates for the year 2020-21
NOTE: Where mucking is to be carried out through shaft using winch and
mucking tub system increase the basic rates for items 3, 4 & 5 by 8 percent.
Providing and fixing 25 mm diameter steel rock bolts with resin bond cement
capsule anchorage including drilling 35 mm dia holes, inserting grout capsule,
driving bolt,fixing 10 mm thick plate washers and nuts and tightening the same
IRR-TAW-3-2 87 by torque wrench after hardening of cement grout, cost of all materials, Rm 1135.60
machinery, labour, ventilation, lighting, drainage and other ancillary operations
etc., complete with lead upto 1 km and all lifts.
Labour Component (including contractor's profit and Overheads) Rm 388.00
11
Abstract of work items_UNit Rates for the year 2020-21
Providing and fixing hard variety cut jungle wood for lagging / blocking
locations in tunnel wherever required including cost of all materials, machinery,
IRR-TAW-3-5 90 cum 27606.70
labour, fixing in position, lighting, ventilation, drainage etc complete with all
leads and lifts.
Labour Component (including contractor's profit and Overheads) cum 2104.80
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength
not less than 10 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates crushed from tunnel excavated muck
for filling and levelling over-cuts in bed due to geological faults etc., including
cost of all materials, machinery, labour, cleaning bed, batching, mixing,
IRR-TAW-5-2 93 cum 5437.20
conveying and laying, levelling, compacting, finishing, curing, lighting,
ventilation, drainage etc., complete with initial lead upto 1 km and all lifts. (
Cement content : 220 kg / cum, CA : 0.90cum, Blending Ratio of CA--50:30:20,
FA : 0.40 cum, Superplasticizer 0.4% by wt. of cement)
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sqmm ) grade cement concrete using 40 mm and down size
approved clean, hard, graded aggregates crushed from tunnel muck for kerb and
bed lining including cost of all materials, machinery, labour, formwork, batching,
mixing, conveying upto placing point in agitator cars, placing in position,
IRR-TAW-5-3 94 cum 6486.40
levelling, vibrating, finishing, curing, ventilation, lighting, drainage and all other
ancillary operations etc., complete with lead upto 1 km and all lifts. ( Cement
content 330 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA :
0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sqmm ) grade cement concrete using 40 mm and down size
approved clean, hard, graded aggregates crushed from tunnel muck for sides
and arch lining including cost of all materials, machinery, labour, formwork,
batching, mixing, conveying upto placing point in agitator cars, placing in
IRR-TAW-5-4 95 cum 7236.30
position, levelling, vibrating, finishing, curing, ventilation, lighting, drainage and
all other ancillary operations etc., complete with lead upto 1 km and all lifts. (
Cement content 330 kg / cum for use of super plasticiser(0.4% by wt. of
cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
12
Abstract of work items_UNit Rates for the year 2020-21
Chapter III
IRR-CAW CANAL AND ALLIED WORKS
Excavation in all kinds of soil including boulders upto 0.30 m dia for field
channels, seating of embankment for field channels etc., including dressing of
bed and sides to required profile, cost of all materials, machinery, labour, placing
the excavated stuff for formation of service road / embankment as directed etc.,
IRR-CAW-1-2 100 cum 59.20
complete with lead upto 10 m and lift upto 3 m.
13
Abstract of work items_UNit Rates for the year 2020-21
Excavation in hard rock of all toughness including boulders above 1.2 m dia.
by approved controlled blasting methods for canals, cut-off trench of
embankment, filter / catch-water drains etc., including controlling fly-rock by
muffling arrangements such as placing 50 x 50 mm opening chain link mesh or
waste tyres and sand bags, monitoring ground vibrations at specified locations,
costof all materials, machinery, labour, placing excavated rock neatly in
approved dump area or other place as directed etc., complete with lead upto 1
IRR-CAW-1-7 (b) 105 cum 676.40
km and all lifts.
i) The rate under this item shall be adopted for canals designed for carrying
capacity of less than 15 cumecs or where the average depth excavation in hard
rock is less than 3 m.
ii ) The rate under this item shall be adopted where the control of fly-rock and
ground vibrations is required.
Labour Component (including contractor's profit and Overheads) cum 184.30
Excavation in hard rock of all toughness including boulders above 1.2 m dia.
for dressing canal sides neatly on either side to required profile by line drilling
and smooth blasting including removing under-cuts by chiselling / hammering,
placing the excavated rock neatly in dump area or other place as directed, cost
of all materials, machinery, labour etc., complete with lead upto 1 km and all
lifts.
i) For excavation of canal below free board level combination of normal
controlled blasting and line drilling and smooth blasting shall be adopted to
obtain neat side slopes. For the purpose of payment 1 m width of excavation on
either side shall be treated as excavation by line drilling and smooth blasting and
remaining portion shall be treated as excavation by normal / controlled blasting
IRR-CAW-1-8( c) 106 as the case may be. cum 1263.70
ii ) The rate under this item shall be adopted for canals designed for carrying
capacity of less than 15 cumecs or where the average depth of excavation in
hard rock is less than 3 m.
iii ) The rate includes controlling fly-rock wherever required.
iv ) The rate under this item shall be paid only on ascertaining that the
excavated face has come off neatly as per specifications or atleast 50 percent of
smooth blast holes are visible for inspection and are spaced at specified
interval.
v ) In case, where the above criteria is not fulfilled payment shall be restricted to
the rate provided for excavation by normal blasting or controlled blasting as the
case may be.
Labour Component (including contractor's profit and Overheads) cum 490.20
Excavation in hard rock by blasting including boulders above 1.2 m dia. for
canals, seating embankment etc., including levelling bed by removing all
projections by hammering / chiselling, cost of all materials, machinery, labour,
placing the excavated rock neatly in approved dump area and levelling the same
as directed etc.,complete with initial lead upto 1 km and all lifts.
IRR-CAW-1-9(a) 107 cum 322.10
i ) The rate under this item shall be adopted for canals designed for carrying
capacity of more than 15 cumecs or where the average depth of excavation in
hard rock is more than 3 m.
ii ) The rate includes levelling canal bed by hammering /chiselling all rock
projections wherever required.
14
Abstract of work items_UNit Rates for the year 2020-21
Excavation in hard rock of all toughness including boulders above 1.2 m dia.
for dressing canal sides neatly on either side to required profile by line drilling
and smooth blasting including removing under-cuts by chiselling / hammering,
placing the excavated rock neatly in dump area or other place as directed, cost
of all materials, machinery, labour etc., complete with lead upto 1 km and all
lifts.
i ) For excavation of canal below free board level combination of normal
controlled blasting and line drilling and smooth blasting shall be adopted to
IRR-CAW-1- obtain neat side slopes. For the purpose of payment 1 m width of excavation on
109 cum 804.50
11(c) either side shall be treated as excavation by line drilling and smooth blasting and
remaining portion shall be treated as excavation by normal / controlled blasting
as the case may be.
ii ) The rate under this item shall be adopted for canals designed for carrying
capacity of more than 15 cumecs or where the average depth of excavation in
hard rock is more than 3 m.
iii ) The rate includes controlling fly-rock wherever required.
iv ) The rate under this item shall be paid only on ascertaining that the
excavated face has come off neatly as per specifications or atleast 50 percent
of smooth
Labour blast holes
Component are visible
(including for inspection
contractor's profitand
andare spaced at specified
Overheads) cum 150.20
15
Abstract of work items_UNit Rates for the year 2020-21
16
Abstract of work items_UNit Rates for the year 2020-21
17
Abstract of work items_UNit Rates for the year 2020-21
Providing rubble and sand filling in layers of 22.5 to 30 cm including cost of all
IRR-CAW-5-1 129 materials, machinery, labour, watering, ramming etc., complete with initial lead cum 748.70
upto 50 m and all lifts.
Labour Component (including contractor's profit and Overheads) cum 209.10
IRR-CAW-5-3-A Providing and laying sand blanket below embankment including cost of all
(New Item 3 - 132 materials, machinery, labour, spreading to specified thickness etc., complete cum 530.60
2011-12) with initial lead upto 50 m and all lifts.
Labour Component (including contractor's profit and Overheads) cum 104.50
Providing and constructing dry rubble rock-toe using rubble and stone chips
from approved source including cost of all materials, machinery, labour, hand
IRR-CAW-5-4 133 cum 576.70
packing rubble and stone chips, finishing top and sides to required slopes etc.,
complete with initial lead upto 50 m and all lifts.
Labour Component (including contractor's profit and Overheads) cum 145.90
Providing and constructing longitudinal and cross graded filter drains using
sand and 20 mm down graded aggregates satisfying specified filter creteria in
IRR-CAW-5-5 134 layers as per specifications including cost of all materials, machinery, labour, cum 940.70
laying to required slopes, compaction etc., complete with initial lead upto 50 m
and all lifts.
Labour Component (including contractor's profit and Overheads) cum 195.00
Laying Longitudinal Drains and Transverse drains of Size 600 x600 x750 mm
in Bed and filling with 12 mm to 40 mm HG machine Crushed metal and sand in
IRR-CAW-5-6 135 Rm 446.50
bed including excavation of drains and Cost of procuring of all materials
133 Rm 36.90
Laying and fixing of 100 mm Dia 300 mm long precast porus CC plugs in bed
and sides using 1.181 Kgs of cement per each using 20 mm HG metal and
IRR-CAW-5-7 136 one plug 450.94
placing in local filters of size 600x600x750 mm in size including excavation of
drains and Cost of procuring of all materials
Labour Component (including contractor's profit and Overheads) one plug 156.79
Providing and constructing graded filter media below and behind rock-toe
consisting of 20 cm thick sand, 15 cm thick 20 mm down and 15 cm thick 40 mm
down size graded coarse aggregates satisfying filter creteria behind rock-toe and
15 cm thick sand, 20 cm thick 20 mm down coarse aggregate and 65 cm thick 40
IRR-CAW-5-9 138 cum 1256.70
mm down size coarse aggregate satisfying filter creiteria below rock-toe as per
specifications including cost of all materials, machinery, labour, laying to
required slope, compaction etc., complete with initial lead upto 50 m and all
lifts.
Labour Component (including contractor's profit and Overheads) cum 182.00
18
Abstract of work items_UNit Rates for the year 2020-21
Stones and spalls available in dump yard will be issued at specified issue rate.
Providing cohesive non-swelling ( CNS ) soil lining to canals using soil from
approved borrow area including spreading soil in layers of thickness not
IRR-CAW-7-1 143 more than 15 cm, breaking clods, watering, compacting to density control of not cum 250.20
less than 98 percent or as stipulated, dressing to required profile etc., complete
with initial lead upto 1 km and all lifts.
Labour Component (including contractor's profit and Overheads) cum 90.70
Providing cohesive non-swelling ( CNS ) soil lining to canals using soil from
approved borrow area including spreading soil in layers of thickness not
IRR-CAW-7-2 144 more than 15 cm, breaking clods, watering, compacting to density control of not cum 244.00
less than 95 percent or as stipulated, dressing to required profile etc., complete
with initial lead upto 1 km and all lifts.
Labour Component (including contractor's profit and Overheads) cum 89.50
Providing cohesive non-swelling ( CNS ) soil lining to canal using soil collected
in heaps along the edge of canal requiring CNS soil lining as part of the
disposal of excavated soil from canal excavation in CNS soil reach including
IRR-CAW-7-3 145 spreading in layers of thickness not more than 15 cm, breaking clods, watering, cum 136.70
compacting to density control of not less than 95 percent or as stipulated,
dressing to required profile etc., complete with lead upto upto 50 m and all lifts.
Providing, fabricating and placing in position reinforcement steel bars for RCC
works including cleaning, straightening, cutting, bending, hooking, lapping, tying
with 1.25 mm dia.soft annealed steel wire, welding wherever required including
IRR-CAW-7-5 147 kg 59.50
cost of all materials, machinery, labour etc., complete with initial lead upto 50
and all lifts.(1.05 tonne/tonne of steel)
19
Abstract of work items_UNit Rates for the year 2020-21
Providing and laying 100 mm thick in situ M-15 (28 days cube compressive
strength not less than 15 N /Sqmm ) grade cement concrete with 20 mm down
size approved, clean, hard, graded aggregates for canal lining using, vibrating,
cylinder type mechanical paver including cost of all materials, machinery, labour,
cleaning, batching, mixing, placing in position, finishing, forming contraction
joints, fixing PVC joint sealing strips, curing, shifting of paver from one side to
IRR-CAW-7-8 150 sqm 499.00
othere side of canal etc., complete with initial lead upto 1 Km and all lifts. ( 43
Gr Cement content: (300kg /cum) 30 kg / sqm for use of super
plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35,
FA : 0.45 cum, equivalent concrete volume:88 cum including the extra
quantity of concrete for curvatures and bends etc.,)
Note: Local shifting and re-erection of paver for LH and RH side lining included
in concrete lining rates under items IRR-CAW-7-7 and IRR-CAW-7-8 and
saperate rate for shifting shall not be allowed.
Labour Component (including contractor's profit and Overheads) shifting 8834.20
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength
not less than 10 N /sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates for bed and side lining of
canal(150mm thick) including finishing the junction of bed and sides to required
curveture, cost of all materials, machinery, labour, formwork including supports,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing,
IRR-CAW-7-10 152 cum 4756.50
curing etc., complete with initial lead upto 50 m and all lifts. ( 43 Gr Cement
content: 250 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA :
0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
20
Abstract of work items_UNit Rates for the year 2020-21
Providing and laying 100mm thick insitu vibrated M-10 (28 days cube
compressive strength-not less than 10.00 N / sq mm) grade cement concrete
using 40 mm down size approved, clean, hard, graded aggregates for bed and
side lining of canal lining using vibrating cylindertype mechanical paver
including cost of all materials mechinery labour batching mixing placing in
IRR-CAW-7-12 154 sqm 482.50
position forming contraction joints fixing pvc joint seiling strips shifting of paver
from one side of canal to other side etc.complete with all leads & lifts.
(Cement content: 250 kg / cum for use of super plasticiser(0.4% by wt. of
cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength
not less than 10 N /sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates for bed and side lining of canal
including finishing the junction of bed and sides to required curveture, cost of all
materials, machinery, labour, formwork including supports, cleaning, batching,
IRR-CAW-7-13 155 cum 4897.60
mixing, placing in position, levelling, vibrating, finishing, curing etc., complete
with initial lead upto 50 m and all lifts. (Cement content: 250 kg / cum for use
of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA-
-65:35, FA : 0.45 cum)
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength
not less than 15 N /sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates for bed and side lining(150 mm thick)
of canal including finishing the junction of bed and sides to required curveture,
cost of all materials, machinery, labour, formwork including supports, cleaning,
IRR-CAW-7-14 156 cum 5124.70
batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,
complete with initial lead upto 50 m and all lifts. (Cement content: 290 kg /
cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum,
Blending Ratio of CA--50:30:20, FA : 0.40 cum)
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength
not less than 15 N /sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates for bed and side lining(of thickness
100 mm) of canal including finishing the junction of bed and sides to required
curveture, cost of all materials, machinery, labour, formwork including supports,
IRR-CAW-7-15 157 cum 5355.60
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing,
curing etc., complete with initial lead upto 50 m and all lifts. (Cement content:
300 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.80
cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
Providing and laying 150mm thick insitu vibrated M-15 (28 days cube
compressive strength-not less than 15.00 N / sq mm) grade cement concrete
using 20 mm down size approved, clean, hard, graded aggregates for bed and
side lining of canal lining using vibrating cylindertype mechanical paver including
cost of all materials mechinery labour batching mixing placing in position forming
contractiom joints fixing pvc joint seiling strips shifting of paver from one side of
IRR-CAW-7-16 158 sqm 641.40
canal to other side etc.complete with all leads & lifts. (Cement content: 300
kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.80 cum,
Blending Ratio of CA--65:35, FA : 0.44 cum)
(Paver)
21
Abstract of work items_UNit Rates for the year 2020-21
Providing and fixing 100 mm dia perforated PVC pipes 40 cm long for Weep
IRR-CAW-7-23 165 holes including cost of all materials, labour, drilling 8 mm dia holes etc. Each 206.60
complete with all leads and lifts.
Labour Component (including contractor's profit and Overheads) Each 30.60
Drilling 32 mm dia pressure relief hole below pressure relief pipe for bed and
IRR-CAW-7-24 166 side lining of canal laid on rock including cost of all materials, machinery, labour Each 325.80
etc., complete with all leads and lifts.
Labour Component (including contractor's profit and Overheads) Each 121.70
22
Abstract of work items_UNit Rates for the year 2020-21
Providing and fixing LDPE sheet for bed and sides of canal including cost of all
materials, labour, laying, joining etc., complete with all leads and lifts.
IRR-CAW-7-30 172 sqm 114.70
Using 500 micron thick LDPE sheet.
Providing and fixing LDPE sheet for bed and sides of canal including cost of all
materials, labour, laying, joining etc., complete with all leads and lifts.
IRR-CAW-7-31 173 sqm 167.80
Using 750 micron thick LDPE sheet.
Providing and fixing LDPE sheet for bed and sides of canal including cost of all
materials, labour, laying, joining etc., complete with all leads and lifts.
IRR-CAW-7-32 174 sqm 229.20
Using 1000 micron thick LDPE sheet.
Providing and fixing 12 mm thick 380 mm depth tarfelt expansion joint filler
IRR-CAW-7-33 175 boards for stone masonry lining of canal including cost of all materials, labour Rm 161.90
etc., complete with all leads and lifts.
Labour Component (including contractor's profit and Overheads) Rm 10.90
Providing and fixing 20 mm thick 100 mm depth tarfelt expansion joint filler
IRR-CAW-7-34 176 boards for cement concrete lining of canal including cost of all materials, Rm 70.00
labour etc., complete with all leads and lifts.
Labour Component (including contractor's profit and Overheads) Rm 10.90
Providing and fixing 20 mm thick 150 mm depth tarfelt expansion joint filler
IRR-CAW-7-35 177 boards for cement concrete lining of canal including cost of all materials, Rm 101.30
labour etc., complete with all leads and lifts.
Labour Component (including contractor's profit and Overheads) Rm 10.90
Manufacturing 550 x 300 x 55 mm size PCC lug slabs in M-15 grade ( 28 days
cube compressive strength not less than 15 N / sqmm ) cement concrete using
20 mm down graded coarse aggregate including cost of all materials,
machinery, labour, batching, mixing, laying, compacting, formwork, finishing,
IRR-CAW-7-38 180 Each 70.70
curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content :
300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.80 cum,
Blending Ratio of CA : 65:35, FA : 0.45cum)
23
Abstract of work items_UNit Rates for the year 2020-21
Manucturing 450 x 150 x 30 mm size PCC lug slabs in M-15 grade ( 28 days
cube compressive strength not less than 15 N / sqmm ) cement concrete using
10 mm down graded coarse aggregate including cost of all materials,
IRR-CAW-7-40 182 machinery, labour, batching, mixing, laying, compacting, formwork, finishing, Each 30.80
curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content :
300 kg / cum with super plastcizer (0.4% by wt. of cement),CA : 0.68 cum, FA :
0.43cum)
Labour Component (including contractor's profit and Overheads) Each 22.60
Manufacturing 600 x 300 x 100mm size PCC lining slabs in M-15 grade (28
days cube compressive strength not less than 15 N/Sqmm) cement concrete
using 20 mm down grades coarse aggregate including cost of all materials,
machinery, labour, batching, mixing, laying, compacting, formwork, finishing,
IRR-CAW-7-41 183 Each 78.60
curing etc., complete with initial lead upto 50 m and all lifts. ( Cement content
: 300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.80 cum,
FA : 0.45cum, Blending Ratio of CA--65:35)
Manucturing 400 x 400 x 30 mm size PCC lining slabs in M-15 grade ( 28 days
cube compressive strength not less than 15 N / sqmm )cement concrete using
10 mm down graded coarse aggregate including cost of all materials,
IRR-CAW-7-42 184 machinery, labour, batching, mixing, laying, compacting, formwork, finishing, Each 39.20
curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content :
300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.68 cum, FA
: 0.43cum)
Labour Component (including contractor's profit and Overheads) Each 22.60
Manufacturing 400 x 150 x 30 mm size PCC lug slabs in M-15 grade ( 28 days
cube compressive strength not less than 15 N /sqmm ) cement concrete using
10 mm down graded coarse aggregate including cost of all materials,
IRR-CAW-7-43 185 machinery, labour, batching, mixing, laying, compacting, formwork, finishing, Each 30.30
curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content :
300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.68 cum, FA
: 0.43cum)
Labour Component (including contractor's profit and Overheads) Each 22.60
Providing and laying uncoursed rubble stone masonry in CM 1:5 proportion for
canal side lining using stones from approved quarry including cost of all
materials, machinery, labour, forming weep holes at specified intervals, finishing,
IRR-CAW-7-45 187 cum 3911.40
curing etc., complete with initial lead upto 50m and all lifts.(with no pin
headers)(Thickness of the Masonry assumed:0.3 m, rubble stones : 1.1 cum)
24
Abstract of work items_UNit Rates for the year 2020-21
Providing and constructing 25 cm thick dry rubble stone pitching with pin
headers at 2 per sqm including cost of all materials, labour, hand packing,
IRR-CAW-8-1 190 finishing etc., complete with initial lead upto 50 m and all lifts.( rubble stones : sqm 219.00
0.23 cum/sqm, Stone Chips : 0.0375cum/sqm, Pin Headers 30cm : 2/sqm)
Providing and constructing 22.5 cm thick dry rubble stone pitching with pin
IRR-CAW-8-1-A headers at 2 per sqm including cost of all materials, labour, hand packing,
(New Item4 - 191 finishing etc., complete with initial lead upto 50 m and all lifts.( rubble stones : sqm 209.00
2011-12) 0.207 cum/sqm, Stone Chips : 0.3375cum/sqm, Pin Headers 30cm : 2/sqm)
(For Maintenance Works)
Labour Component (including contractor's profit and Overheads) sqm 66.60
Providing and constructing 225 mmm thick dry rubble stone pitching
IRR-CAW-8-2 -
including cost of all materials, labour, hand packing, finishing etc., complete with
A (New Item5 - 193 sqm 200.50
initial lead upto 50 m and all lifts.(with no pin headers)( rubble stones :
2011-12)
0.2475 cum/sqm) (For Maintenance Works)
Labour Component (including contractor's profit and Overheads) sqm 144.50
Providing and constructing 30 cm thick dry rubble stone pitching with pin
headers at 2 per sqm including cost of all materials, labour, hand packing,
IRR-CAW-8-3 194 finishing etc., complete with initial lead upto 50 m and all lifts.( rubble stones : sqm 238.60
0.275 cum/sqm, Stone Chips : 0.045cum/sqm, Pin Headers 30cm : 2/sqm)
Providing and constructing 45 cm thick dry rubble stone pitching with pin
headers at 2 per sqm including cost of all materials, labour, hand packing,
IRR-CAW-8-5 196 finishing etc., complete with initial lead upto 50 m and all lifts.( rubble stones : sqm 359.60
0.40 cum/sqm, Stone Chips : 0.0675cum/sqm, Pin Headers 45cm : 2/sqm)
25
Abstract of work items_UNit Rates for the year 2020-21
with no sand
Labour Component (including contractor's profit and Overheads) sqm 49.10
Chapter IV
IRR-CCDW CANAL CROSS DRAINAGE WORKS
Excavation in all kinds of soil including boulders upto 0.30 m dia. for
IRR-CCDW-1-1 206 foundations of canal cross drainage and other appurtenant structures and cum 330.60
placing the excavated stuff neatly in specified dump area or disposing off the
same as directed etc., complete with initial lead upto 50 m and initial lift upto
3 m.
Labour Component (including contractor's profit and Overheads) cum 330.60
26
Abstract of work items_UNit Rates for the year 2020-21
Providing and fixing 25 mm dia 2.50 m long cold twisted deformed steel
anchor rods with 1.25 m length driven into 32 mm dia hole drilled in bed rock
and remaining length embedded in concrete / masonry including cost of all
IRR-CCDW-1-8 213 Each 953.30
materials, machinery, labour, drilling and cleaning hole, driving anchor rod,
grouting hole with thick cement slurry etc., complete with initial lead upto 50 m
and all lifts.
Labour Component (including contractor's profit and Overheads) Each 274.20
27
Abstract of work items_UNit Rates for the year 2020-21
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength
not less than 15 N / sq mm ) grade cement concrete using 80 mm down size
approved, clean, hard, graded aggregates for foundation filling including cost of
all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in
IRR-CCDW-2-4 217 position, levelling, vibrating, finishing, curing etc., complete with initial lead cum 4728.70
upto 50 m and all lifts. (Cement content: 250 kg / cum with use of super
plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA--
35:30:20:15, FA : 0.35 cum)
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength
not less than 10 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates for foundation filling including cost of
all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in
IRR-CCDW-2-5 218 position, levelling, vibrating, finishing, curing etc., complete with initial lead cum 4468.70
upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super
plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--
50:30:20, FA : 0.40 cum)
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength
not less than 10 N / sq mm ) grade cement concrete using 80 mm down size
approved, clean, hard, graded aggregates for foundation filling including cost of
all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in
IRR-CCDW-2-6 219 position, levelling, vibrating, finishing, curing etc., complete with initial lead cum 4582.60
upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super
plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA--
35:30:20:15, FA : 0.35 cum)
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates for foundation filling including cost
of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing
IRR-CCDW-2-7 220 in position, levelling, vibrating, finishing, curing etc., complete with initial lead cum 5036.30
upto 50 m and all lifts. (Cement content: 310 kg / cum with use of super
plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--
50:30:20, FA : 0.40 cum)
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates for sub-structure / super- structure
works including cost of all materials, machinery, labour, formwork, scaffolding,
IRR-CCDW-2-8 221 cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, cum 5461.00
curing etc., complete with initial lead upto 50 m and all lifts.(Cement content:
320 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA :
0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates for sub-structure / super- structure
works including cost of all materials, machinery, labour, formwork, scaffolding,
IRR-CCDW-2-9 222 cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, cum 5480.70
curing etc., complete with initial lead upto 50 m and all lifts.(Cement content:
330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA :
0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
28
Abstract of work items_UNit Rates for the year 2020-21
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength
not less than 15 N / sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates for sub-structure / super- structure
works including cost of all materials, machinery, labour, formwork, scaffolding,
IRR-CCDW-2-10 223 cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, cum 5264.80
curing etc., complete with initial lead upto 50 m and all lifts.(Cement content:
280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA :
0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength
not less than 10 N / sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates for sub-structure / super- structure
works including cost of all materials, machinery, labour, formwork, scaffolding,
IRR-CCDW-2-11 224 cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, cum 4847.80
curing etc., complete with initial lead upto 50 m and all lifts. (Cement content:
220 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA :
0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates for well kerb including cost of all
materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc., complete with
IRR-CCDW-2-12 225 initial lead upto 50 m and all lifts. (Cement content: 350 kg / cum with use of cum 6871.80
super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--
65:35, FA : 0.45 cum)
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
Labour Component (including contractor's profit and Overheads) cum 2270.90
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates for well steining including cost of all
materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc., complete with
IRR-CCDW-2-13 226 initial lead upto 50 m and all lifts. (Cement content: 320 kg / cum with use of cum 6221.80
super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--
50:30:20, FA : 0.40 cum)
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
Labour Component (including contractor's profit and Overheads) cum 2076.70
Providing and laying insitu M-15 ( 28 days cube compressive strength not less
than 15 N / sq mm ) grade cement concrete using 20 mm down size approved,
clean, hard, graded aggregates for well bottom plug by tremie or skip box
IRR-CCDW-2-14 227 method including cost of all materials, complete with initial lead upto 50 m and cum 4604.60
all lifts.(Cement content: 350 kg / cum with use of super plasticiser(0.4% by
wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength
not less than 15 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates for well top plug including cost of all
materials, machinery, labour, cleaning, batching, mixing, placing in position,
levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m
IRR-CCDW-2-15 228 and all lifts. (Cement content: 280 kg / cum with use of super plasticiser(0.4% cum 4355.60
by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
If water is to be brought from other place add only lead charges @ 500 ltrs /
cum
29
Abstract of work items_UNit Rates for the year 2020-21
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
Labour Component (including contractor's profit and Overheads) cum 1638.20
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength
not less than 15 N / sq mm ) grade cement concrete using 80 mm down size
approved, clean, hard, graded aggregates for piers and abutments including
cost of all materials, labour, machinery, formwork, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc., complete with
initial lead upto 50 m and all lifts. (Cement content: 250 kg / cum with use of
IRR-CCDW-2-17 230 cum 5823.00
super plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA--
35:30:20:15, FA : 0.35 cum)
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength
not less than 10 N / sq mm ) grade cement concrete using 80 mm down size
approved, clean, hard, graded aggregates for piers and abutments including
cost of all materials, labour, machinery, formwork, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc., complete with
initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of
IRR-CCDW-2-18 231 cum 5676.70
super plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA--
35:30:20:15, FA : 0.35 cum)
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength
not less than 10 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates for piers and abutments including
cost of all materials, labour, machinery, formwork, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc., complete with
initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of
IRR-CCDW-2-19 232 cum 5527.60
super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--
50:30:20, FA : 0.40 cum)
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates for cantiliver / counterfort retaining
walls including cost of all materials, machinery, labour, formwork, scaffolding,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing,
curing etc., complete with initial lead upto 50 m and all lifts. (Cement content:
IRR-CCDW-2-20 233 cum 6124.50
320 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA :
0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
30
Abstract of work items_UNit Rates for the year 2020-21
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength
not less than 15 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard,graded aggregates for cast in-situ pipes including cost of
all materials, machinery, labour, cleaning, batching, mixing, placing in position,
levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m
IRR-CCDW-2-22 235 and all lifts.(Cement content: 260 kg / cum with use of super plasticiser(0.4% cum 5171.60
by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength
not less than 15 N / sq mm ) grade cement concrete using 80 mm down size
approved, clean, hard, graded aggregates for cast in-situ pipes including cost of
all materials, labour, machinery, formwork, cleaning, batching, mixing, placing in
position, levelling, vibrating, finishing, curing etc., complete with initial lead
upto 50 m and all lifts. (Cement content: 250 kg / cum with use of super
IRR-CCDW-2-23 236 cum 5177.80
plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA--
35:30:20:15, FA : 0.35 cum)
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates for deck slab & kerb including cost of
all materials,machinery, labour, formwork, scaffolding, cleaning, batching,
mixing, placing in position, levelling, vibrating, finishing, curing etc., complete
with initial lead upto 50 m and all lifts. (Cement content: 330 kg / cum with
IRR-CCDW-2-24 237 cum 8531.00
use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio
of CA--65:35, FA : 0.45 cum)
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates for columns and beams including
cost of all materials, labour, machinery, formwork, scaffolding, cleaning,
batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc.,complete with initial lead upto 50 m and all lifts. (Cement content: 330 kg
IRR-CCDW-2-25 238 cum 7411.40
/ cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum,
Blending Ratio of CA--65:35, FA : 0.45 cum)
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
31
Abstract of work items_UNit Rates for the year 2020-21
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates for troughs including cost of all
materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing,
placing in position,levelling, vibrating, finishing, curing etc., complete with initial
IRR-CCDW-2-27 240 lead upto 50 m and all lifts. (Cement content: 330 kg / cum with use of super cum 6713.90
plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35,
FA : 0.45 cum)
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
Labour Component (including contractor's profit and Overheads) cum 2303.50
Sinking RCC wells vertically for foundation of piers and abutments in all
kinds of soil, sand and soft rock by approved well sinking method including
cost of all materials, machinery, labour, kent - ledge arrangements, disposal of
IRR-CCDW-3-1 241 excavated material as disposal of excavated material as directed etc., complete *Rm 4432.60
with lead upto 50 m for disposal of excavated material.(diameter of well
6.00m) (Data adopted from MORTH)
32
Abstract of work items_UNit Rates for the year 2020-21
33
Abstract of work items_UNit Rates for the year 2020-21
Providing and fixing 10 cm thick roughly dressed burnt stone slabs for coping
set in CM 1: 6 proportion by volume with pointing to joints in CM 1 : 3 proportion
by volume including cost of all materials, machinery, labour, finishing, curing
IRR-CCDW-5-1 253 sqm 658.60
etc., complete with initial lead upto 50 m and all lifts.(Cement content: 7.5 kg /
sqm, FA : 0.030 cum/sqm, Burnt stone slab 10 cm thick 1.05 sqm/ sqm)
Providing and fixing 10 cm thick one line dressed burnt stone slabs for coping
set in CM 1: 6 proportion by volume with pointing to joints in CM 1 : 3 proportion
by volume including cost of all materials, machinery, labour, finishing, curing
IRR-CCDW-5-2 254 sqm 849.50
etc., complete with initial lead upto 50 m and all lifts.(Cement content: 7.5 kg /
sqm, FA : 0.030 cum/sqm, Burnt stone slab 10 cm thick 1.05 sqm/ sqm)
Providing and fixing 10 cm thick two line dressed burnt stone slabs for coping
set in CM 1: 6 proportion by volume with pointing to joints in CM 1 : 3 proportion
by volume including cost of all materials, machinery, labour, finishing, curing
IRR-CCDW-5-3 255 sqm 1097.20
etc., complete with initial lead upto 50 m and all lifts.(Cement content: 7.5 kg /
sqm, FA : 0.030 cum/sqm, Burnt stone slab 10 cm thick 1.05 sqm/ sqm)
Providing and laying insitu M-15 ( 28 days cube compressive strength not less
than 15 N / sqmm ) grade cement concrete using 20 mm down size approved
clean, hard, graded aggregates for coping slab including cost of all materials,
machinery, labour, formwork, cleaning surface, batching, mixing, placing in
IRR-CCDW-5-4 256 cum 6486.00
position, levelling, compacting, finishing, curing etc., complete with initial lead
upto 50 m and initial lift upto 3 m. (Cement content: 300 kg / cum with use of
super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--
65:35, FA : 0.45 cum)
Labour Component (including contractor's profit and Overheads) cum 2190.40
Laying and jointing 300 mm dia. NP- 2 class or IRC standard hume pipes in
CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes
and collars ), machinery, labour, aligning, packing joints with hemp, finishing,
IRR-CCDW-6-1 258 Joint 393.90
curing etc., complete with initial lead upto 50 m and all lifts.(Cement content:
9.9 kg / joint, FA : 0.01cum/joint, Hemp Yarn : 0.091kg/joint)
Laying and jointing 450 mm dia. NP- 2 class or IRC standard hume pipes in
CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes
and collars ), machinery, labour, aligning, packing joints with hemp, finishing,
IRR-CCDW-6-2 259 Joint 436.20
curing etc., complete with initial lead upto 50 m and all lifts.(Cement content:
17.4 kg / joint, FA : 0.022cum/joint, Hemp Yarn : 0.127kg/joint)
Laying and jointing 600 mm dia. NP- 2 class or IRC standard hume pipes in
CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes
and collars ), machinery, labour, aligning, packing joints with hemp, finishing,
IRR-CCDW-6-3 260 Joint 557.10
curing etc., complete with initial lead upto 50 m and all lifts.(Cement content:
24.8 kg / joint, FA : 0.025cum/joint, Hemp Yarn : 0.22kg/joint)
34
Abstract of work items_UNit Rates for the year 2020-21
Laying and jointing 800 mm dia. NP- 2 class or IRC standard hume pipes in
CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes
and collars ), machinery, labour, aligning, packing joints with hemp, finishing,
IRR-CCDW-6-5 262 Joint 716.20
curing etc., complete with initial lead upto 50 m and all lifts.(Cement content:
39.6 kg / joint, FA : 0.039cum/joint, Hemp Yarn : 0.31kg/joint)
Laying and jointing 900 mm dia. NP- 2 class or IRC standard hume pipes in
CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes
and collars ), machinery, labour, aligning, packing joints with hemp, finishing,
IRR-CCDW-6-6 263 Joint 743.60
curing etc., complete with initial lead upto 50 m and all lifts.(Cement content:
44.6 kg / joint, FA : 0.045cum/joint, Hemp Yarn : 0.34kg/joint)
Laying and jointing 1000 mm dia. NP- 2 class or IRC standard hume pipes in
CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes
and collars ), machinery, labour, aligning, packing joints with hemp, finishing,
IRR-CCDW-6-7 264 Joint 822.60
curing etc., complete with initial lead upto 50 m and all lifts.(Cement content:
49.5 kg / joint, FA : 0.05cum/joint, Hemp Yarn : 0.377kg/joint)
Laying and jointing 1100 mm dia. NP- 2 class or IRC standard hume pipes in
CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes
and collars ), machinery, labour, aligning, packing joints with hemp, finishing,
IRR-CCDW-6-8 265 Joint 862.00
curing etc., complete with initial lead upto 50 m and all lifts.(Cement content:
56.9 kg / joint, FA : 0.058cum/joint, Hemp Yarn : 0.415kg/joint)
Laying and jointing 1200 mm dia. NP- 2 class or IRC standard hume pipes in
CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes
and collars ), machinery, labour, aligning, packing joints with hemp, finishing,
IRR-CCDW-6-9 266 Joint 1022.90
curing etc., complete with initial lead upto 50 m and all lifts.(Cement content:
66.8 kg / joint, FA : 0.069cum/joint, Hemp Yarn : 0.453kg/joint)
Providing rubble / boulder and sand filling behind abutment and return
walls in layers including cost of all materials, machinery, labour, watering,
IRR-CCDW-7-1 267 cum 839.60
ramming etc., complete with initial lead upto 50 m and initial lift upto 3 m.
Providing and filling murrum / gravely soil ( CNS soil ) for foundation or
around pipes including breaking clods, spreading in layers of 10 to 15 cm,
IRR-CCDW-7-2 268 watering, compaction by earth masters to achieve density control of not less cum 658.40
than 95 percent etc., complete with lead upto 50 m and all lifts.
Providing and filling murum / gravely soil ( CNS soil ) for foundation or
above pipes including breaking clods, spreading in layers of 10 to 15 cm,
IRR-CCDW-7-3 269 watering, compaction by power roller to achieve density control of not less cum 450.80
than 98 percent etc., complete with lead upto 50 m and all lifts.
35
Abstract of work items_UNit Rates for the year 2020-21
Providing and fixing one line dressed 65x15x10 cm thick IRC standard
hectometre stone in cement concrete M-10 grade with 40 mm down size
aggregates including excavating pit of size 50x45x40 cm, embedding the stone
IRR-CCDW-7-5 271 by 30 cm in concrete, providing 2 coats synthetic enamel paint of approved Each 1161.50
quality and colour to exposed surfaces and lettering as directed, cost of all
materials, labour, finishing, curing etc., complete with initial lead upto 50 m
and all lifts.
Labour Component (including contractor's profit and Overheads) Each 530.50
Chapter V
IRR-GAW GATES / HOISTS AND ALLIED WORKS
RADIAL GATES
fabrication, supply, erection, testing and commissioning of radial gate
consisting of skin plate, stiffeners, horizontal girders, radial arms, trunnion
assemblies, tie beam, pulley supports, bracings, rubber seals, clamps etc., with
all accessories for spillway/canals including cost of all materials, machinery,
IRR-GAW-1-2 273 tonne 148864.00
labour, seal fixing etc., complete as per specifications and approved
drawings
(without painting on sand-blasted or mechanical cleaning surfaces which are added
extra as per scedule of rates under itemsinthis chapter and add as applicable
separately)
Labour Component (including contractor's profit and Overheads) tonne 44163.70
RADIAL GATES
Walk way(cat walk)
Design, fabrication, supply, erection and commissioning of 1 metre wide
walkway connecting spillway piers / abutments at trunnion platform level
IRR-GAW-1-4 275 including cost of all materials, machinery, labour, cutting, etc., complete as per Rm 113629.80
specifications and approved drawings
(without painting on sand-blasted or mechanical cleaning surfaces which are added
extra as per scedule of rates under items in this chapter and add as applicable
separately)
Labour Component (including contractor's profit and Overheads) Rm 42411.80
36
Abstract of work items_UNit Rates for the year 2020-21
vertical lift gates and stop log gate elements ( SLIDING GATES)
37
Abstract of work items_UNit Rates for the year 2020-21
38
Abstract of work items_UNit Rates for the year 2020-21
39
Abstract of work items_UNit Rates for the year 2020-21
HOISTS:STRUCTURAL COMPONENTS--
painting structurals on sand blasted surfaces with two coats of zinc
phosphate primer (airless spray preferred) 40microns/coat and one coat 65+/-
IRR-GAW-3-4 293 sqm 504.30
5 of alkyd based micaccous iron oxide paint followed by two coats of synthetic
enamel paint 25 microns/coat cost of all materials, labour, scaffolding etc.,
complete with all leads and all lifts
Labour Component (including contractor's profit and Overheads) sqm 262.00
HOISTS:machineryCOMPONENTS--
painting hoist machinery, on sand blasted surfaces with one coats of zinc
phosphate primer (airless spray preferred) 50microns/coat and three coats of
IRR-GAW-3-5 294 sqm 467.10
aluminium paint or synthetic enamel , 25 microns/coat cost of all materials,
labour, scaffolding etc., complete with all leads and all lifts
Chapter VI
IRR-PMW PRELIMINARY AND MAINTENANCE WORKS
40
Abstract of work items_UNit Rates for the year 2020-21
Removing stumps, tree roots, roots of bamboo clusters etc., upto 1.50 m girth
IRR-PMW-1-3 300 including excavation, stacking the materials neatly and levelling the surface etc., Each 67.50
complete with initial lead upto 50 m and all lifts.
Labour Component (including contractor's profit and Overheads) Each 67.50
Removing stumps, tree roots, roots of bamboo cluster etc., with girth above
1.50 m and upto 3.0 m including excavation, stacking the materials neatly and
IRR-PMW-1-4 301 Each 152.00
levelling the area etc., complete with initial lead upto 50 m and all lifts.
Removing stumps, tree roots, roots of bamboo cluster etc., with girth above
3.0 m and upto 5.0 m including excavation, stacking the materials neatly and
IRR-PMW-1-5 302 Each 486.30
levelling the area etc., complete with initial lead upto 50 m and all lifts.
Cutting and stacking bamboos excluding removing stumps and roots etc.,
IRR-PMW-1-7 304 Each 19.70
complete with initial lead upto 50 m and all lifts.
Labour Component (including contractor's profit and Overheads) Each 19.70
Cutting and removing jauliflora bushes upto 1.5 m girth excluding removal of
IRR-PMW-1-8 305 stumps and including burning or disposing off the materials as directed with Each 19.10
initial lead upto 50 m and all lifts.
Labour Component (including contractor's profit and Overheads) Each 19.10
Cutting and removing jauliflora bushes above 1.5 m upto 3.0 m girth
IRR-PMW-1-9 306 excluding removal of stumps and including burning or disposing off the materials Each 38.20
as directed with initial lead upto 50 m and all lifts.
Labour Component (including contractor's profit and Overheads) Each 38.20
Cutting trees above 0.3 m and upto 0.6 m girth excluding removal of stumps
IRR-PMW-1-10 307 and including stacking the materials neatly as directed with initial lead upto 50 Each 127.40
m and all lifts.
Labour Component (including contractor's profit and Overheads) Each 124.20
Cutting trees above 0.6 m and upto 1.2 m girth excluding removal of stumps
IRR-PMW-1-11 308 and including stacking the materials neatly as directed with initial lead upto 50 Each 445.90
m and all lifts.
Labour Component (including contractor's profit and Overheads) Each 434.60
Cutting trees above 1.2 m and upto 1.8 m girth excluding removal of stumps
IRR-PMW-1-12 309 and including stacking the materials neatly as directed with initial lead upto 50 Each 891.90
m and all lifts.
Labour Component (including contractor's profit and Overheads) Each 869.20
Cutting trees above 1.8 m and upto 2.4 m girth excluding removal of stumps
IRR-PMW-1-13 310 and including stacking the materials neatly as directed with initial lead upto 50 Each 1783.80
m and all lifts.
Labour Component (including contractor's profit and Overheads) Each 1738.30
Cutting trees above 2.4 m and upto 3.0 m girth excluding removal of stumps
IRR-PMW-1-14 311 and including stacking the materials neatly as directed with initial lead upto 50 Each 2874.50
m and all lifts.
Labour Component (including contractor's profit and Overheads) Each 2783.60
Cutting and burning or disposing off Apu / Jondu from marshy areas as
IRR-PMW-1-16 313 sqm 7.00
directed with initial lead upto 50 m and all lifts.
Labour Component (including contractor's profit and Overheads) sqm 6.90
41
Abstract of work items_UNit Rates for the year 2020-21
Earthwork excavation for trial pits / borrow pits and other investigation works
in all kinds of soil including boulders upto 30 cm dia and disposing off
IRR-PMW-2-1 314 cum 347.70
excavated soil as directed with lead upto 10 m and lift upto 3 m.
Earthwork excavation for trial pits / borrow pits and other investigation works
IRR-PMW-2-2 315 in soft rock including disposing off the excavated rock as directed with lead cum 482.90
upto 10 m and lift upto 3 m.
Labour Component (including contractor's profit and Overheads) cum 482.90
Drilling 80 mm dia hole through over-burden using casing shoe bit vertical or
inclined upto 10 degrees to vertical as directed including cost of all materials,
machinery, labour, water charges, reaming, collection of wash samples at
suitable intervals, logging and lebelling, supplying honne wood core box, fixing
casing pipes ( excluding cost of casing pipes ) etc., complete for depth
IRR-PMW-2-4 317 upto 30 m from surface. Rm 1317.00
1. For driiling through over-burden beyond 30 m from surface increase the rate
per Rm by 10 percent.
2. For providing HDPE or light black MS casing pipe add the cost of pipe per
Rm.
Labour Component (including contractor's profit and Overheads) Rm 581.10
Drilling 76 mm dia ( NX ) core hole in hard rock using diamond core bit
vertical / inclined upto 10 degree to vertical as directed including cost of all
materials, machinery, labour, water charges, collection of core samples, logging
and lebelling, supplying honne wood core box and redrilling in case of collapse
of sides etc., complete for depth upto 30 m from surface.
IRR-PMW-2-5 318 Rm 6681.80
1. For driiling in hard rock beyond 30 m upto 60 m from surface increase the rate
per Rm by 25 percent.
2. For driiling in hard rock beyond 60 m upto 90 m from surface increase the rate
per Rm by 40 percent.
Drilling 76 mm dia ( NX ) core hole in all types of rocks (other than Hard
Rock) including Masonry/CC (where drilling is not possible by casing
shoe) using diamond core bit vertical / inclined upto 10 degree to vertical as
directed including cost of all materials, machinery, labour, water charges, and
redrilling in case of collapse of sides etc., complete for depth upto 30 m from
IRR-PMW-2-5-A surface for Primary and Secondary Holes
(New Item2015- 319 Rm 4341.20
16)-5 1. For drilling in all types of rocks (other than hard rock) including masonry/CC
beyond 30 m upto 60 m from surface increase the rate per Rm by 25 percent.
2. For drilling in all types of rocks (other than hard rock) including masonry/CC
beyond 60 m upto 90 m from surface increase the rate per Rm by 40 percent.
42
Abstract of work items_UNit Rates for the year 2020-21
Drilling 47 mm (BX )dia core hole in hard rock using diamond core bit vertical
/ inclined upto 10 degree to vertical as directed including cost of all materials,
machinery, labour, water charges,collection of core samples,logging, lebelling,
supplying honne wood core box and redrilling in case of collapse of sides etc.,
complete for depth upto 30 m from surface.
IRR-PMW-2-6 321 Rm 6516.30
1. For drilling in hard rock beyond 30 m upto 60 m from surface increase the rate
per Rm by 25 percent.
2. For drilling in hard rock beyond 60 m upto 90 m from surface increase the rate
per Rm by 40 percent.
Drilling 47 mm (BX )dia core hole in all types of rocks (other than Hard
Rock) including Masonry/CC (where drilling is not possible by casing shoe)
using diamond core bit vertical / inclined upto 10 degree to vertical as directed
including cost of all materials, machinery, labour, water charges, and redrilling
in case of collapse of sides etc., complete for depth upto 30 m
IRR-PMW-2-6-A
(New Item2015- 322 1. For drilling in all types of rocks (other than hard rock) including masonry/CC Rm 4106.40
16)-7 beyond 30 m upto 60 m from surface increase the rate per Rm by 25 percent.
2. For drilling in all types of rocks (other than hard rock) including masonry/CC
beyond 60 m upto 90 m from surface increase the rate per Rm by 40 percent.
Removing dry stone rock-toe / rivetment and filter layers below rock-toe/
IRR-PMW-3-1 326 rivetment including stacking all materials separately as directed with initial cum 277.90
lead upto 50 m and all lifts.
Labour Component (including contractor's profit and Overheads) cum 277.90
43
Abstract of work items_UNit Rates for the year 2020-21
Re-constructing dry rubble rock-toe and filter media for rock-toe consisting
of sand 20 mm and 80 mm size graded aggregates satisfying filter criteria laid in
layers of 15 cm thick each using sand from approved quarry and stones and filter
IRR-PMW-3-3 328 aggregates obtained from rock-toe removed for re-construction including cost of cum 354.20
all machinery, labour, laying filter and stones to specified slopes, wedging with
chips, finishing etc. complete with initial lead upto 50 m and all lifts.
44
Abstract of work items_UNit Rates for the year 2020-21
Repairing rain cuts / resectioning canal slopes to required lines and grades
IRR-PMW-3-12 337 as directed using available soil including dressing, clod breaking, packing, sqm 4.90
tamping etc., complete with all leads and lifts.
Labour Component (including contractor's profit and Overheads) sqm 4.90
Cleaning dam parapet inner face and top using oxalic acid and water by
IRR-PMW-3-14 339 scrubbing / brushing and washing to remove all surface coatings etc., complete Rm 43.20
.
Labour Component (including contractor's profit and Overheads) Rm 31.40
Excavation and removal of silt and silt mixed with sand from canal bed in
dry condition including disposing off the same in spoil bank or on the canal
IRR-PMW-3-20 340 cum 209.10
embankment in layers as directed etc., complete with initial lead upto 50 m
and all lifts.
Labour Component (including contractor's profit and Overheads) cum 209.10
Excavation and removal of silt or silt mixed with sand in slussy condition
from canal bed including disposing off the same in spoil bank or on the canal
IRR-PMW-3-21 341 cum 261.30
embankment in layers as directed etc., complete with initial lead upto 50 m and
all lifts.
Labour Component (including contractor's profit and Overheads) cum 261.30
45
Abstract of work items_UNit Rates for the year 2020-21
IRR-PMW-3-27
Lifting of water from rivers/drains to agricultural fields and where there is no
New Item2018-
element of excavation
19
COM-MWRK New extra items-- common item for all earth works using only manual labour for all other works
without involving contractors
(Manual)Excavation in all kinds of soil including boulders upto 0.30 m dia. for
foundations of canal cross drainage and other appurtenant structures and
placing excavated stuff neatly in specified dump area or disposing off the same
COM-MWRK-1 352 as directed etc., complete with initial lead upto 10 m and initial lift upto 1.5 m. cum 153.30
(WIthout involving the contractors for specified works )
With 3 Cum per day output
46
Abstract of leads and lifts - for the year 2020-21
COM-LDLFT Abstract
LEAD, LIFT, LOADING AND UNLOADING CHARGES FOR MATERIALS
FOR THE YEAR: 2020-21
COM-LDLFT 1 For total lead upto 150 m ( including initial lead ) lead charges by head load only shall be adopted irrespective of
mode of conveyance.
2 For total lead exceeding 150 m conveyance by mechanical means only shall be adopted irrespective of
mode of conveyance.
3 The rates for loading at quarry including idle hire charges of trucks and hire charges per for each kilometer and
upto 5 km are cumulative and inclusive of total charges for preceding lead.
4 Unless otherwise specified lead charges for Earth / Sand / Gravel / Aggregates and Stones are for loose volume and
not for compacted or in-situ volume.
5 The rates for lift charges,lead charges hire charges are cumulative and inclusive of rates for preceeding
lift,load and hire charges
6 Lift charges are not payable where conveyance of materials is by mechanical means to final placing point.
7 Loading and unloading charges are not payable for conveyance by head load.
8 Loading charges are not payable for conveyance by mechanical means for disposal of excavated materials beyond
initial lead of 50 m wherever specified.
9 Loading and unloading charges are not payable for conveyance by mechanical means for disposal of excavated
materials beyond initial lead of 1 km wherever specified.
10 The rates for unloading of materials except earth, sand, gravel, coarse aggregate, rubble, size stone and cut stone
are inclusive of stacking.
11 Hire charges are per 1KM for tippers and trucks for tranport of materials from work site
to dump yard & other places are cumulative and includes previous km upto 5 kms
12 The lead & lift charges are exclusive of contractor's profit and overhead charges of 13.615%
13 The loading & unloading charges are exclusive of contractor's profit and overhead charges of 13.615%
14 During the BoCE meeting held on 10.06.2015,the BoCEs has recommended to withdraw lead charges,loading and
unloading charges for Cement as per the minutes of meeting of Sub-Committee held on 29.06.2015.(The
conveyance charges ,loading & unloading charges for cement are displayed for information purpose only).
Earth / Sand
/Gravel /
PCC slab/
Murrum/ Lime/
Cement/Reinforc Shahbad slab
Total distance Surki/ Size
e-ment steel Str / CC block/
Sl No. ( Total lead includes stone / Cut
steel Rs / BS slab/ Late-
initial lead ) stone Rubble /
tonne rite / Wood
Coarse
Rs / cum
aggregate
Rs/Cum
1 2 3 4 5
47
Abstract of leads and lifts - for the year 2020-21
COM-LDLFT-2 B.( Lead) Conveyance charges for machinery per kilometer for transporting materials
by tippers and trucks excluding loading, unloading and idle hire charges of machinery
( No loading and unloading charges allowed for machinery loading and unloading )
(Lead)
charges for (Lead) charges
(Lead) charges (Lead)
(Lead) charges trucks and for trucks and
for trucks and (Lead) charges charges
for trucks and tippers for tippers per
tippers for for trucks and for
tippers for Earth Cement/ cu.meter for
Rubble/Size tippers per trucks
Sl No. Distance / Sand /Gravel / Steel/ RCC PCC slabs/
stones/ Cut cu.meter for per
Murrum/ Lime/ poles/ AC & Shahabad
Stones/ Coarse water/ 1000 1000
Surki/ per GI sheets/ slabs/ CC &
aggregate per litres Nos. of
cu.meter Packed Laterite blocks/
cu.meter Bricks
materials/ton Wood/ cum
ne
1 2 3 4 5 6 7 8
1 Lead upto 1 km 30.40 29.40 18.30 43.20 18.50 48.90
2 Lead upto 2 km 42.60 41.10 25.70 60.40 25.90 68.50
3 Lead upto 3 km 56.80 54.80 34.20 80.60 34.60 91.30
4 Lead upto 4 km 69.00 66.50 41.60 97.80 42.00 110.90
5 Lead upto 5 km 81.10 78.30 48.90 115.10 49.40 130.40
for Every km beyond 5
6 km upto 30 km 12.20 11.70 7.30 17.30 7.40 19.60
for Every km beyond
7 30 km 10.10 9.80 6.10 14.40 6.20 16.30
COM-LDLFT-3 C. LOADING AND UNLOADING CHARGES BY MANUAL MEANS (idle hire charges of trucks are not added)
COM-LDLFT-4 D. LOADING AND UNLOADING CHARGES BY MANUAL MEANS (including idle hire charges of trucks )
COM-LDLFT-5 E. LOADING AND UNLOADING CHARGES BY MECHANICAL MEANS (including idle hire charges of trucks)
48
Abstract of leads and lifts - for the year 2020-21
Earth / Sand
/Gravel PCC slab/
Murrum/ Lime/ Cement/ Shahbad
Total lift Surki/ Reinforce- slab / CC
Sl No. ( Total lift includes Size stone / Cut ment steel block/ BS
initial lift ) stone Str steel slab / Laterite
Rubble / Coarse Rs / tonne / Wood
aggregate Rs / cum
Rs / cum
1 2 3 4 5
49
Dam and Allied Works - Item Unit Rates 2020-21
Chapter - I
3. The Leads for Steel shall be from the nearest market place to the Project area
4. For earth/rockfill embankments wherever initial lead of 1km is considered in the basic rate, the additional lead charges are to be added as
follows: Additional lead charges for Earth, Murrum etc., shall be worked out for total lead involved and 1 km lead charges included in basic rate
shall be deducted from total lead charges. No loading and unloading charges shall be allowed for any item. (same as above)
Example:
Total lead for earth from approved borrow area : 15 Km
Initial lead included in the basic item rate in the data(i.e., item specificaton) : 1 Km
Additional lead charges : Lead charges for 5 km Rs. 81.10
Lead charges for next 10 km Rs. 122
Total lead charges for 15 km /cum Rs. 203.10
Less 1 km initial lead charges /cum Rs. 30.40 (-)
Net additional lead charges / cum Rs. 172.70
5. The initial lead up to 50 m as mentioned in some standard data items is meant for manual lead within the working area. For conveyance of
materials, the lead required from quarry/Borrow area/ Dump Area to worksite shall be added to the data without deducting the 50 m initial
lead charges
DAW - Work Items
IRR-DAW-1-1 Excavation for foundation in all kinds of soil including boulders upto
0.30 m diameter for dam, spillway, intake structure and other appurtenant
works and placing the excavated soil neatly in dump area or disposing off
the same as directed etc., complete with initial lead upto 1 km
and all lifts.
A. MATERIALS: UNIT
880 cum
Sl No Particulars Unit Quantity Rate Amount
in Rs. in Rs
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total cost of Materials Rs: 0.00
50
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
C. LABOUR:
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 78141.60
C. Cost of Labour Rs: 25220.80
Total Rs: 103362.40
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 14072.79
Total cost for 880.00 cum Rs: 117435.19
Rate per cum (A+B+C+D)/880 Rs: 133.40
IRR-DAW-1-2 Excavation for foundation in ordinary rock (including HDR) without blasting including
boulders above 0.3 m upto 0.6 m dia for dam, spillway, intake structure and
other appurtenant works and placing the excavated material neatly in dump
area or disposing off the same as directed etc., complete with initial lead
upto 1 km and all lifts.
A. MATERIALS: UNIT :
520 cum
Sl No Particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total cost of Materials Rs: 0.00
B. MACHINERY:
C. LABOUR:
51
Dam and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 61312.80
C. Cost of Labour Rs: 19298.00
Total Rs: 80610.80
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 10975.16
Total cost for 520.00 cum Rs: 91585.96
Rate per cum (A+B+C+D)/520 Rs: 176.10
IRR-DAW-1-3 Excavation for foundation in hard rock (including F&F rock) requiring blasting including
boulders above 0.6 m upto 1.2 m dia. for dam, spillway, intake structure
and other appurtenant works and placing the excavated material neatly in
dump area or disposing off the same as directed etc., complete with initial
lead upto 1 km and all lifts.
DATA: RATE ANALYSIS
A. MATERIALS: UNIT :
520.00 cum.
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Use rate of 1.5 m drill rod Rm 216.00 19.51 4214.16
Reconditioning charges @ 10% 421.42
2 Use rate of air hose 4 Nos. Hour 26.00 10.56 274.63
3 Explosive small dia kg 104.00 65.00 6760.00
4 Electric detonators Nos 154.00 9.45 1455.30
5 Fuse coil Rm 320.00 7.35 2352.00
6 Sundries LS 5.00 32.00 160.00
Total cost of Materials Rs. 15637.51
B. MACHINERY:
C. LABOUR:
ABSTRACT:
A. Cost of Materials Rs: 15637.51
B. Hire charges of Machinery Rs: 69740.70
C. Cost of Labour Rs: 34085.00
Total Rs: 119463.21
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 16264.92
Total cost for 520.00 cum. Rs: 135728.13
Rate per cum. (A+B+C+D)/520 Rs: 261.00
IRR-DAW-1-3A
New Item 2015-16-1 Excavation for foundation in hard rock (including F&F rock) including
boulders above 0.6 m upto 1.2 m dia. by controlled blasting and controlling fly rock by muffling arrangements
for dam, spillway, intake structure and other appurtenant works and other open foundation works and placing the excavated
material neatly in dump area or disposing off the same as directed etc., complete with initial lead upto 1 km and all leads
52
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
C. LABOUR:
ABSTRACT:
A. Cost of Materials Rs: 67248.56
B. Hire charges of Machinery Rs: 72037.80
C. Cost of Labour Rs: 40554.80
Total Rs: 179841.16
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 24485.37
Total cost for 520.00 cum. Rs: 204326.53
Rate per cum. (A+B+C+D)/520 Rs: 392.90
53
Dam and Allied Works - Item Unit Rates 2020-21
UNIT
A. MATERIALS: 320.00 cum
Sl No Particulars Unit Quantity Rate Amount
in Rs. in Rs
1 Use rate of drill rod 1.5 m long Rm 310.00 26.01 8064.13
Reconditioning charges @ 10% 806.41
2 Use rate of air hose 4 Nos. Hour 48.00 10.56 507.00
3 Explosive small dia kg 95.00 65.00 6175.00
4 Ordinary detonators Nos 10.00 6.00 60.00
5 Electric detonators Nos 333.00 9.45 3146.85
6 Fuse coil Rm 450.00 7.35 3307.50
7 Sundries LS 5.00 32.00 160.00
Total cost of Materials Rs: 22226.89
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Shovel 0.85 cum capacity Hour 8.00 1452.20 11617.60
Fuel / Energy charges Hour 8.00 1205.90 9647.20
2 Dumpers 5 cum capacity 3 Nos. Hour 24.00 499.30 11983.20
Fuel / Energy charges Hour 24.00 552.50 13260.00
3 Tipper 5 cum capacity 1 No Hour 4.00 384.40 1537.60
Fuel / Energy charges Hour 4.00 414.40 1657.60
4 Angle dozer 90 hp Hour 1.00 1453.50 1453.50
Fuel / Energy charges Hour 1.00 843.60 843.60
5 Air compressor 8.5 cmm (ele) 2 Nos. Hour 24.00 136.90 3285.60
Fuel / Energy charges Hour 24.00 478.40 11481.60
6 Jack hammers 4 Nos. Hour 48.00 16.50 792.00
Fuel / Energy charges Hour 48.00 0.00 0.00
Total hire charges of Machinery Rs. 67559.50
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Shovel Hour 8.00 287.30 2298.40
2 Crew for Dumper Hour 24.00 275.80 6619.20
3 Crew for Tipper Hour 4.00 215.50 862.00
4 Crew for Dozer Hour 1.00 287.30 287.30
5 Crew for Air compressor Hour 24.00 202.80 4867.20
6 Crew for Jack hammer Hour 48.00 405.60 19468.80
7 work inspector Day 1.00 600.00 600.00
8 Blaster Day 1.00 605.00 605.00
9 Helper blaster Day 1.00 500.00 500.00
10 Crowbarman Day 1.00 500.00 500.00
11 Stone breaker Day 2.00 500.00 1000.00
12 mazdoor Day 6.00 460.00 2760.00
Total cost of Labour Rs. 40367.90
labour component/unit qty 126.10
Add contractor's profit and overhead charges 13.615% 17.20
labour component/unit qty (including contractor's profit) 143.30
ABSTRACT:
A. Cost of Materials Rs: 22226.89
B. Hire charges of Machinery Rs: 67559.50
C. Cost of Labour Rs: 40367.90
Total Rs: 130154.29
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 17720.51
Total cost for 320.00 cum Rs: 147874.80
Rate per cum (A+B+C+D)/320 Rs: 462.10
IRR-DAW-1-5 Excavation for foundation in hard rock of all toughness including boulders
(b) above 1.2 m dia. by controlled blasting method and controlling fly-rock
by muffling arrangements for dam, spillway, intake structure and other
appurtenant structures etc., including placing and levelling the excavated
rock neatly in dump area or other place as directed etc., complete with
lead upto upto 1 km and all lifts.
54
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Unit Quantity Rate Amount
Particulars in Rs. in Rs
1 Shovel 0.85 cum capacity Hour 12.00 1452.20 17426.40
Fuel / Energy charges Hour 12.00 1205.90 14470.80
2 Angle dozer 90 hp Hour 2.00 1453.50 2907.00
Fuel / Energy charges Hour 2.00 843.60 1687.20
3 Dumpers 5 cum capacity 3 Nos. Hour 36.00 499.30 17974.80
Fuel / Energy charges Hour 36.00 552.50 19890.00
4 Tipper 5 cum capacity 1 No Hour 4.00 384.40 1537.60
Fuel / Energy charges Hour 4.00 414.40 1657.60
5 Air compressor 8.5 cmm ( ele ) 2 Nos Hour 35.00 136.90 4791.50
Fuel / Energy charges Hour 35.00 478.40 16744.00
6 Jack hammers 4 Nos. Hour 70.00 16.50 1155.00
Fuel / Energy charges Hour 70.00 0.00 0.00
Total hire charges of Machinery Rs: 100241.90
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Shovel Hour 12.00 287.30 3447.60
2 Crew for Angle dozer Hour 2.00 287.30 574.60
3 Crew for Dumper Hour 36.00 275.80 9928.80
4 Crew for Tipper Hour 4.00 215.50 862.00
5 Crew for Air compressor Hour 35.00 202.80 7098.00
6 Crew for Jack hammer Hour 70.00 405.60 28392.00
7 work inspector Day 4.50 600.00 2700.00
8 Blaster Day 1.50 605.00 907.50
9 Helper blaster Day 3.00 500.00 1500.00
10 Crowbarman Day 2.50 500.00 1250.00
11 Stone breaker Day 2.50 500.00 1250.00
13 mazdoor Day 20.00 460.00 9200.00
Total cost of Labour Rs. 67110.50
labour component/unit qty 139.80
Add contractor's profit and overhead charges 13.615% 19.00
labour component/unit qty (including contractor's profit) 158.80
ABSTRACT:
A. Cost of Materials Rs: 137199.22
B. Hire charges of Machinery Rs: 100241.90
C. Cost of Labour Rs: 67110.50
Total Rs: 304551.62
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 41464.7
Total cost for 480.00 cum Rs: 346016.32
Rate per cum (A+B+C+D)/480 Rs: 720.90
IRR-DAW-1-6 Excavation for foundation in hard rock of all toughness including boulders
( c) above 1.2 m dia. by line drilling and smooth blasting and controlling
fly-rock by muffling arrangements for dam, spillway, intake structure and
other appurtenant structures etc., including dressing sides and bed to
required level / profile, placing and levelling the excavated rock neatly in
dump area or other place as directed etc., complete with lead upto 1 km and
all lifts.
Note : i ) 1 m width of excavation along the face to be dressed shall be treated as
excavation by line drilling and smooth blasting.
ii) The rate includes controlling fly-rock wherever required.
iii ) The rate under this item shall be paid only on ascertaining that the
surface requiring dressing has come off neatly as per specifications or
atleast 50 percent of smooth blast holes are visible for inspection and are
spaced at specified interval.
iv ) In case, where the above criteria is not fulfilled payment shall be
restricted to the rate provided for excavation by normal or controlled blasting
as the case may be..
55
Dam and Allied Works - Item Unit Rates 2020-21
UNIT :
A. MATERIALS: 40.00 cum
Sl No Particulars Unit Quantity Rate Amount
in Rs. in Rs
1 Use rate of drill rod 1.5 m length Rm 138.00 26.01 3589.84
Reconditioning charges @ 10% 358.98
2 Use rate of 50 m air hose 4 Nos. Hour 22.00 10.56 232.38
3 Explosive small dia. kg 10.50 65.00 682.50
4 Ordinary detonators Nos 2.00 6.00 12.00
5 Electric delay detonators Nos 76.00 18.90 1436.40
6 Fuse coil Rm 140.00 7.35 1029.00
7 Sundries LS 2.00 32.00 64.00
Total cost of Materials Rs. 7405.10
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Shovel 0.85 cum capacity Hour 1.00 1452.20 1452.20
Fuel / Energy charges Hour 1.00 1205.90 1205.90
2 Angle dozer 90 hp Hour 0.25 1453.50 363.38
Fuel / Energy charges Hour 0.25 843.60 210.90
3 Dumpers 5 cum capacity 3 Nos. Hour 3.00 499.30 1497.90
Fuel / Energy charges Hour 3.00 552.50 1657.50
4 Air compressor 8.5 cmm ( ele ) 2 Nos Hour 11.00 136.90 1505.90
Fuel / Energy charges Hour 11.00 478.40 5262.40
5 Jack hammers 4 Nos. Hour 22.00 16.50 363.00
Fuel / Energy charges Hour 22.00 0.00 0.00
Total hire charges of Machinery Rs: 13519.08
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Shovel Hour 1.00 287.30 287.30
2 Crew for Angle dozer Hour 0.25 287.30 71.83
3 Crew for Dumper Hour 3.00 275.80 827.40
4 Crew for Air compressor Hour 11.00 202.80 2230.80
5 Crew for Jack hammer Hour 22.00 405.60 8923.20
6 work inspector Day 0.50 600.00 300.00
7 Blaster Day 0.50 605.00 302.50
8 Helper blaster Day 0.50 500.00 250.00
9 Crowbarman Day 0.50 500.00 250.00
10 Stone breaker Day 0.50 500.00 250.00
11 mazdoor Day 2.00 460.00 920.00
Total cost of Labour Rs. 14613.03
labour component/unit qty 365.30
Add contractor's profit and overhead charges 13.615% 49.70
labour component/unit qty (including contractor's profit) 415.00
ABSTRACT:
A. Cost of Materials Rs: 7405.10
B. Hire charges of Machinery Rs: 13519.08
C. Cost of Labour Rs: 14613.03
Total Rs: 35537.21
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 4838.39
Total cost for 40.00 cum Rs: 40375.60
Rate per cum (A+B+C+D)/40 Rs: 1009.40
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Air compressor 8.5 cmm ( ele ) Hour 1.00 136.90 136.90
Fuel / Energy charges Hour 1.00 478.40 478.40
2 Pump 5 hp ( ele ) Hour 1.00 2.50 2.50
Fuel / Energy charges Hour 1.00 42.50 42.50
Total hire charges of Machinery Rs. 660.30
C. LABOUR:
56
Dam and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 660.30
C. Cost of Labour Rs: 3453.90
Total Rs: 4114.20
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 560.15
Total cost for 100.00 sqm Rs: 4674.35
Rate per sqm (A+B+C+D)/100 Rs: 46.70
IRR-DAW-1-8 Preparing foundation bed for cut-off trench filling in rock portion by
removing all loose materials by wedging / chiselling and disposing off the
same as directed etc., complete with initial lead upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total cost of Machinery Rs. 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crowbar man Day 2.00 500.00 1000.00
2 Stone breaker Day 2.00 500.00 1000.00
3 mazdoor Day 2.00 460.00 920.00
Total cost of Labour Rs: 2920.00
labour component/unit qty 29.20
Add contractor's profit and overhead charges 13.615% 4.00
labour component/unit qty (including contractor's profit) 33.20
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 2920.00
Total Rs: 2920.00
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 397.56
Total cost for 100.00 sqm Rs: 3317.56
Rate per sqm (A+B+C+D)/100 Rs: 33.20
57
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Waggon drill Hour 8.00 161.20 1289.60
Fuel / Energy charges Hour 8.00 0.00 0.00
2 Air compressor 8.5 cmm ( ele ) Hour 8.00 136.90 1095.20
Fuel / Energy charges Hour 8.00 478.40 3827.20
3 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 6276.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Waggon drill Hour 8.00 344.80 2758.40
2 Crew for Air compressor Hour 8.00 202.80 1622.40
3 mazdoor Day 2.00 460.00 920.00
Total cost of Labour Rs: 5300.80
labour component/unit qty 55.20
Add contractor's profit and overhead charges 13.615% 7.50
labour component/unit qty (including contractor's profit) 62.70
ABSTRACT:
A. Cost of Materials Rs: 6865.24
B. Hire charges of Machinery Rs: 6276.00
C. Cost of Labour Rs: 5300.80
Total Rs: 18442.04
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 2510.88
Total cost for 96.00 Rm Rs: 20952.92
Rate per Rm (A+B+C+D)/96 Rs: 218.30
IRR-DAW-1-10 Flushing grout holes of all sizes with water and air jets alternatively for an
average period of 30 minutes including water intake observations after
flushing, cost of all materials, machinery, labour etc., complete.
58
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Air compressor 8.5 cmm ( ele ) Hour 8.00 136.90 1095.20
Fuel / Energy charges Hour 8.00 478.40 3827.20
2 Pump 5 hp ( ele ) Hour 8.00 2.50 20.00
Fuel / Energy charges Hour 8.00 42.50 340.00
3 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 5346.40
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Air compressor Hour 8.00 202.80 1622.40
2 Crew for Pump Hour 8.00 101.10 808.80
3 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 4271.20
labour component/unit qty 22.20
Add contractor's profit and overhead charges 13.615% 3.00
labour component/unit qty (including contractor's profit) 25.20
ABSTRACT:
A. Cost of Materials Rs: 401.92
B. Hire charges of Machinery Rs: 5346.40
C. Cost of Labour Rs: 4271.20
Total Rs: 10019.52
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 1364.16
Total cost for 192.00 Rm. Rs: 11383.68
Rate per Rm. (A+B+C+D)/192 Rs: 59.30
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Grouting equipment Hour 8.00 20.00 160.00
Fuel / Energy charges Hour 8.00 42.50 340.00
2 Pump 5 hp ( ele ) Hour 2.00 2.50 5.00
Fuel / Energy charges Hour 2.00 42.50 85.00
3 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 654.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Grout pump Hour 8.00 324.50 2596.00
2 Crew for Pump Hour 2.00 101.10 202.20
3 mazdoor ( cement handling) Day 2.00 460.00 920.00
Total cost of Labour Rs: 3718.20
labour component/unit qty 3541.10
Add contractor's profit and overhead charges 13.615% 482.10
labour component/unit qty (including contractor's profit) 4023.20
59
Dam and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 4036.08
B. Hire charges of Machinery Rs: 654.00
C. Cost of Labour Rs: 3718.20
Total Rs: 8408.28
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 1144.79
Total cost for 1.05 tonne Rs: 9553.07
Rate per tonne (A+B+C+D)/1.05 Rs: 9098.20
IRR-DAW-1-12 Curtain grouting with neat cement grout mix of suitable consistency
(b) under specified pressure as directed in drilled holes by stage grouting
method including cost of all materials, machinery, labour, redrilling if
necessary etc., complete with initial lead upto 1 km and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Grouting equipment Hour 8.00 20.00 160.00
Fuel / Energy charges Hour 8.00 42.50 340.00
2 Pump 5 hp ( ele ) Hour 2.00 2.50 5.00
Fuel / Energy charges Hour 2.00 42.50 85.00
3 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 654.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Grout pump Hour 8.00 324.50 2596.00
2 Crew for Pump Hour 2.00 101.10 202.20
3 Pipe fitter Day 1.00 615.00 615.00
4 mazdoor ( cement handling ) Day 3.00 460.00 1380.00
Total cost of Labour Rs: 4793.20
labour component/unit qty 4565.00
Add contractor's profit and overhead charges 13.615% 621.50
labour component/unit qty (including contractor's profit) 5186.50
ABSTRACT:
A. Cost of Materials Rs: 4167.04
B. Hire charges of Machinery Rs: 654.00
C. Cost of Labour Rs: 4793.20
Total Rs: 9614.24
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 1308.98
Total cost for 1.05 tonne Rs: 10923.22
Rate per tonne (A+B+C+D)/1.05 Rs: 10403.10
IRR-DAW-1-13 Providing and fixing 25 mm dia 3 m long cold twisted deformed steel
dowel bars with one end driven into 45 to 50 mm diameter 1.50 m deep
hole drilled in bed rock and other end provided with L-bend for embedding in
concrete / masonry of over flow / non-over flow blocks and other appertenant
works including cost of drilling and cleaning hole, filling hole with cement
mortar 1 : 1 proportion, driving anchor rod, cost of all materials, machinery,
labour etc., complete with initial lead upto 1 km and all lifts.
Consider 25 anchor rods for analysis.
60
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Air compressor 8.5 cmm ( ele ) Hour 4.00 136.90 547.60
Fuel / Energy charges Hour 4.00 478.40 1913.60
2 Waggon drill Hour 4.00 161.20 644.80
Fuel / Energy charges Hour 4.00 0.00 0.00
Total hire charges of Machinery Rs: 3106.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Air compressor Hour 4.00 202.80 811.20
2 Crew for Waggon drill Hour 4.00 344.80 1379.20
3 Bar bender Day 0.50 665.00 332.50
4 Mason Cl- II Day 0.50 500.00 250.00
5 mazdoor Day 1.00 460.00 460.00
Total cost of Labour Rs: 3232.90
labour component/unit qty 129.30
Add contractor's profit and overhead charges 13.615% 17.60
labour component/unit qty (including contractor's profit) 146.90
ABSTRACT:
A. Cost of Materials Rs: 15058.96
B. Hire charges of Machinery Rs: 3106.00
C. Cost of Labour Rs: 3232.90
Total Rs: 21397.86
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 2913.32
Lead Charges for 1 Km for FA 0.05 cum @ 30.4 Rs./Cum 1.52
Lead Charges for 1Km for Steel (including Loading
and Unloading Charges) 0.30 tonne @ 190.9 Rs./Tonne 57.884698
Total cost for 25.00 Nos. Rs: 24370.58
Rate per Each (A+B+C+D)/25 Rs: 974.80
IRR-DAW-1-14 Providing and fixing 25 mm dia. 2.75 m long ribbed steel anchor rods
with one end split and driven firmly using steel wedge into 1.25 m deep 45
to 50 mm dia. hole drilled in bed rock and other end provided with L- bend
for embedding in concrete / masonry for spillway and appurtenant works
including drilling and cleaning hole, filling hole with thick cement slurry,
driving anchor rod, cost of all materials, machinery, labour, steel wedge
etc., complete with initial lead upto 1 km and all lifts.
Consider 25 anchor rods for analysis.
61
Dam and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 13889.21
B. Hire charges of Machinery Rs: 2329.50
C. Cost of Labour Rs: 3685.30
Total Rs: 19904.01
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 2709.93
Lead Charges for 1Km for Steel (including Loading
and Unloading Charges) 0.28 tonne @ 190.9 Rs./Tonne 53.054928
Total cost for 25.00 Nos. Rs: 22666.99
Rate per Each (A+B+C+D)/25 Rs: 906.70
IRR-DAW-2-1A Providing, fabricating and placing in position reinforcement steel for RCC,below 36 dia rods
overlaps and wastages wherever required, tying with 1.25 mm diameter soft
annealed steel wire, including cost of all materials, machinery, labour etc.,
complete with initial lead upto 1 km and all lifts.
overlaps and wastage as per NHAI-data
Lap jointing considered for bars upto 36 mm diameter.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Bar bender Day 2.00 665.00 1330.00
2 mazdoor Day 6.84 460.00 3146.40
Total cost of Labour 4476.40
labour component/unit qty 4476.40
Add contractor's profit and overhead charges 13.615% 609.50
labour component/unit qty (including contractor's profit) 5085.90
A.MATERIAL 43029.00
B.MACHINERY 0.00
C. LABOUR 4476.40
Total 47505.40
D.Add for contractor's profit and overheads on A+B+C 13.615% 6467.86
Lead Charges for 1Km for Steel (including Loading
and Unloading Charges) 190.90 Rs/Tonne 200.445
Total cost for 1.00 tonne 54173.71
Rate per/ TON.=(A+B+C+D) / I 54173.71
IRR-DAW-2-1B Providing, fabricating and placing in position reinforcement steel for RCC
above 36 dia with welding and wastage at 2.5%, tying with 1.25 mm diameter soft
annealed steel wire, including cost of all materials, machinery, labour etc.,
complete with initial lead upto 1 km and all lifts.
overlaps and wastage as per NHAI-data
welding joints considered for bars above 36 mm diameter.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 welding machine hour 10.00 14.20 142.00
fuel charges hour 10.00 102.10 1021.00
Total hire charges of Machinery Rs: 1163.00
62
Dam and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 welder day 2.50 540.00 1350.00
2 Bar bender Day 2.00 665.00 1330.00
3 mazdoor Day 6.84 460.00 3146.40
Total cost of Labour 5826.40
labour component/unit qty 5826.40
Add contractor's profit and overhead charges 13.615% 793.30
labour component/unit qty (including contractor's profit) 6619.70
ABSTRACT:
A. Cost of Materials 42422.50
B. Hire charges of Machinery 1163.00
C. Cost of Labour 5826.40
Total 49411.90
D.Add for contractor's profit and overheads on A+B+C 13.615% 6727.43
Lead Charges for 1Km for Steel (including Loading
and Unloading Charges) 190.90 Rs/Tonne 195.6725
Total cost for 1.00 tonne 56335.00
Rate per/ TON.=(A+B+C+D) / I 56335.00
IRR-DAW-2-2 Providing and laying insitu vibrated M-15 ( 28 days cube compressive
strength not less than 15 N / sq mm ) grade cement concrete using 80 mm
down size approved, clean, hard, graded aggregates including cost of all
materials, machinery, labour, formwork, centering, scaffolding, cleaning,
batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc.,complete for plain concrete works with initial lead upto 1 km and
all lifts. ( Cement content : 250 kg /cum with use of super plasticiser
equal to 0.4% of cement content , CA : 0.98 cum,
Blending Ratio of CA -- 40:30:20:10, FA : 0.35 cum )
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Batching plant Hour 8.00 505.90 4047.20
Fuel / Energy charges Hour 8.00 467.70 3741.60
2 Air compressor 7 cmm ( ele ) Hour 8.00 109.60 876.80
Fuel / Energy charges Hour 8.00 382.70 3061.60
3 Tipper Hour 32.00 384.40 12300.80
Fuel / Energy charges Hour 32.00 414.40 13260.80
4 Tower crane 5 t Hour 16.00 711.10 11377.60
Fuel / Energy charges Hour 16.00 221.10 3537.60
5 Concrete bucket Hour 40.00 13.30 532.00
Fuel / Energy charges Hour 40.00 0.00 0.00
6 10 hp pump ( ele ) Hour 8.00 5.60 44.80
Fuel / Energy charges Hour 8.00 85.00 680.00
7 Needle vibrator 60 mm dia ( ele ) Hour 16.00 8.40 134.40
Fuel / Energy charges Hour 16.00 12.80 204.80
8 Sundries LS 10.00 32.00 320.00
Total hire charges of Machinery Rs: 54120.00
63
Dam and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Batching plant Hour 8.00 415.50 3324.00
2 Crew for Air compressor Hour 8.00 202.80 1622.40
3 Crew for Tipper ( 4 ) Hour 32.00 215.50 6896.00
4 Crew for Tower crane ( 2 ) Hour 16.00 229.80 3676.80
5 Crew for Pump Hour 8.00 101.10 808.80
6 Crew for Needle vibrator ( 2 ) Hour 16.00 194.60 3113.60
7 Mason Class-I Day 4.00 550.00 2200.00
8 Foreman Day 2.00 605.00 1210.00
9 mazdoor
for silo ( cement handling ) Day 2.00 460.00 920.00
for batching plant Day 2.00 460.00 920.00
for conveyor system Day 2.00 460.00 920.00
for laying & vibrating Day 6.00 460.00 2760.00
for cleaning / washing / curing Day 2.00 460.00 920.00
10 Labour cost for shuttering sqm 120.00 171.00 20520.00
Total cost of Labour Rs: 49811.60
labour component/unit qty 207.50
Add contractor's profit and overhead charges 13.615% 28.30
labour component/unit qty (including contractor's profit) 235.80
ABSTRACT:
A. Cost of Materials Rs: 542935.20
B. Hire charges of Machinery Rs: 54120.00
C. Cost of Labour Rs: 49811.60
Total Rs: 646866.80
Add for conveyor system @ 3.00% 19406.00
Add for electric sub-station/ Demand charges @ 2.5% 16171.67
Add for trestle bridge for tower crane track @ 4.0% 25874.67
Total Rs: 708319.14
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 96437.65
Lead Charges for 1 Km for FA 84.00 cum @ 30.4 Rs./Cum 2553.6
Lead Charges for 1 Km for CA 235.20 cum @ 29.4 Rs./Cum 6914.88
Total cost for 240.00 cum Rs: 814225.27
Rate per cum (A+B+C+D)/240 Rs: 3392.60
IRR-DAW-2-2A Providing and laying insitu vibrated M-20 ( 28 days cube compressive
New Item1-2010-11 strength not less than 20 N / sq mm ) grade cement concrete using 80 mm
down size approved, clean, hard, graded aggregates including cost of all
materials, machinery, labour, formwork, centering, scaffolding, cleaning,
batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc.,complete for plain concrete works with initial lead upto 1 km and
all lifts. ( Cement content : 300 kg /cum with use of
0.4% of cement content super plasticiser , CA : 0.90 cum,
Blending Ratio of CA -- 40:30:20:10, FA : 0.40 cum )
64
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Batching plant Hour 8.00 505.90 4047.20
Fuel / Energy charges Hour 8.00 467.70 3741.60
2 Air compressor 7 cmm ( ele ) Hour 8.00 109.60 876.80
Fuel / Energy charges Hour 8.00 382.70 3061.60
3 Tipper Hour 32.00 384.40 12300.80
Fuel / Energy charges Hour 32.00 414.40 13260.80
4 Tower crane 5 t Hour 16.00 711.10 11377.60
Fuel / Energy charges Hour 16.00 221.10 3537.60
5 Concrete bucket Hour 40.00 13.30 532.00
Fuel / Energy charges Hour 40.00 0.00 0.00
6 10 hp pump ( ele ) Hour 8.00 5.60 44.80
Fuel / Energy charges Hour 8.00 85.00 680.00
7 Needle vibrator 60 mm dia ( ele ) Hour 16.00 8.40 134.40
Fuel / Energy charges Hour 16.00 12.80 204.80
8 Sundries LS 10.00 32.00 320.00
Total hire charges of Machinery Rs: 54120.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Batching plant Hour 8.00 415.50 3324.00
2 Crew for Air compressor Hour 8.00 202.80 1622.40
3 Crew for Tipper ( 4 ) Hour 32.00 215.50 6896.00
4 Crew for Tower crane ( 2 ) Hour 16.00 229.80 3676.80
5 Crew for Pump Hour 8.00 101.10 808.80
6 Crew for Needle vibrator ( 2 ) Hour 16.00 194.60 3113.60
7 Mason Class-I Day 4.00 550.00 2200.00
8 Foreman Day 2.00 605.00 1210.00
9 mazdoor
for silo ( cement handling ) Day 2.00 460.00 920.00
for batching plant Day 2.00 460.00 920.00
for conveyor system Day 2.00 460.00 920.00
for laying & vibrating Day 6.00 460.00 2760.00
for cleaning / washing / curing Day 2.00 460.00 920.00
10 Labour cost for shuttering sqm 120.00 171.00 20520.00
Total cost of Labour Rs: 49811.60
labour component/unit qty 207.50
Add contractor's profit and overhead charges 13.615% 28.30
labour component/unit qty (including contractor's profit) 235.80
ABSTRACT:
A. Cost of Materials Rs: 577263.84
B. Hire charges of Machinery Rs: 54120.00
C. Cost of Labour Rs: 49811.60
Total Rs: 681195.44
Add for conveyor system @ 3.00% 20435.86
Add for electric sub-station/ Demand charges @ 2.5% 17029.89
Add for trestle bridge for tower crane track @ 4.0% 27247.82
Total Rs: 745909.01
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 101555.51
Lead Charges for 1 Km for FA 96.00 cum @ 30.4 Rs./Cum 2918.4
Lead Charges for 1 Km for CA 216.00 cum @ 29.4 Rs./Cum 6350.40
Total cost for 240.00 cum Rs: 856733.32
Rate per cum (A+B+C+D)/240 Rs: 3569.70
IRR-DAW-2-3 Providing and laying insitu vibrated M-10 ( 28 days cube compressive
strength not less than10 N / sq mm ) grade cement concrete using 80 mm
down size approved, clean, hard, graded aggregates including cost of all
materials, machinery, labour, formwork, centering, scaffolding, cleaning,
batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc.,complete for plain concrete works with initial lead upto 1 km and
all lifts. ( Cement content : 220 kg /cum with use of super plasticiser,
CA: 0.98 cum, Blending Ratio of CA --40:30:20:10, FA: 0.37 cum)
65
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Batching plant 2 x 1.5 cum Hour 8.00 505.90 4047.20
Fuel / Energy charges Hour 8.00 467.70 3741.60
2 Air compressor 7 cmm ( ele ) Hour 8.00 109.60 876.80
Fuel / Energy charges Hour 8.00 382.70 3061.60
3 Tipper Hour 32.00 384.40 12300.80
Fuel / Energy charges Hour 32.00 414.40 13260.80
4 Tower crane 5 t Hour 16.00 711.10 11377.60
Fuel / Energy charges Hour 16.00 221.10 3537.60
5 Concrete bucket Hour 40.00 13.30 532.00
Fuel / Energy charges Hour 40.00 0.00 0.00
6 10 hp pump ( ele ) Hour 8.00 5.60 44.80
Fuel / Energy charges Hour 8.00 85.00 680.00
7 Needle vibrator 60 mm dia ( ele ) Hour 16.00 8.40 134.40
Fuel / Energy charges Hour 16.00 12.80 204.80
8 Sundries LS 10.00 32.00 320.00
Total hire charges of Machinery Rs: 54120.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Batching plant Hour 8.00 415.50 3324.00
2 Crew for Air compressor Hour 8.00 202.80 1622.40
3 Crew for Tipper ( 4 ) Hour 32.00 215.50 6896.00
4 Crew for Tower crane ( 2 ) Hour 16.00 229.80 3676.80
5 Crew for Pump Hour 8.00 101.10 808.80
6 Crew for Needle vibrator ( 2 ) Hour 16.00 194.60 3113.60
7 Mason Class-I Day 4.00 550.00 2200.00
8 Foreman Day 2.00 605.00 1210.00
9 mazdoor
for silo ( cement handling ) Day 2.00 460.00 920.00
for batching plant Day 2.00 460.00 920.00
for conveyor system Day 2.00 460.00 920.00
for laying & vibrating Day 6.00 460.00 2760.00
for cleaning / washing / curing Day 2.00 460.00 920.00
10 Labour cost for shuttering sqm 120.00 171.00 20520.00
Total cost of Labour Rs: 49811.60
labour component/unit qty 207.50
Add contractor's profit and overhead charges 13.615% 28.30
labour component/unit qty (including contractor's profit) 235.80
ABSTRACT:
A. Cost of Materials Rs: 517533.60
B. Hire charges of Machinery Rs: 54120.00
C. Cost of Labour Rs: 49811.60
Total Rs: 621465.20
Add for conveyor system @ 3.00% 18643.96
Add for electric sub-station/ Demand charges @ 2.5% 15536.63
Add for trestle bridge for tower crane track @ 4.0% 24858.61
Total Rs: 680504.40
D.Add for contractor's profit and overheads on (A+B+C+other 13.615% Rs. 92650.67
Lead Charges for 1 Km for FA 88.80 cum @ 30.4 Rs./Cum 2699.52
Lead Charges for 1 Km for CA 235.20 cum @ 29.4 Rs./Cum 6914.88
Total cost for 240.00 cum Rs: 782769.47
Rate per cum (A+B+C+D)/240 Rs: 3261.50
66
Dam and Allied Works - Item Unit Rates 2020-21
IRR-DAW-2-4 Providing and laying insitu vibrated M-20 ( 28 days cube compressive
strength not less than 20 N / sq mm ) grade cement concrete using 40 mm
down size approved, clean, hard, graded aggregates including cost of all
materials, machinery, labour, formwork, centering, scaffolding, cleaning,
batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc.,complete for RCC works of gallery, sluice, spillway crest, spillway d / s
face, energy dissipating structures, training walls, piers, abutments and
such other locations with initial lead upto 1 km and all lifts.
( Cement content : 310 kg / cum with use of super plasticiser,
CA : 0.90 cum, blending ratio of CA--50:30:20, FA : 0.40 cum)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Batching plant 2 x 1.5 cum Hour 8.00 505.90 4047.20
Fuel / Energy charges Hour 8.00 467.70 3741.60
2 Air compressor 7 cmm ( ele ) Hour 8.00 109.60 876.80
Fuel / Energy charges Hour 8.00 382.70 3061.60
3 Tipper Hour 32.00 384.40 12300.80
Fuel / Energy charges Hour 32.00 414.40 13260.80
4 Tower crane 5 t Hour 16.00 711.10 11377.60
Fuel / Energy charges Hour 16.00 221.10 3537.60
5 Concrete bucket Hour 40.00 13.30 532.00
Fuel / Energy charges Hour 40.00 0.00 0.00
6 10 hp pump ( ele ) Hour 8.00 5.60 44.80
Fuel / Energy charges Hour 8.00 85.00 680.00
7 Needle vibrator 60 mm dia ( ele ) Hour 16.00 8.40 134.40
Fuel / Energy charges Hour 16.00 12.80 204.80
8 Sundries LS 10.00 32.00 320.00
Total hire charges of Machinery Rs: 54120.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Batching plant Hour 8.00 415.50 3324.00
2 Crew for Air compressor Hour 8.00 202.80 1622.40
3 Crew for Tipper ( 4 ) Hour 32.00 215.50 6896.00
4 Crew for Tower crane ( 2 ) Hour 16.00 229.80 3676.80
5 Crew for Pump Hour 8.00 101.10 808.80
6 Crew for Needle vibrator ( 2 ) Hour 16.00 194.60 3113.60
7 Mason Class-I Day 4.00 550.00 2200.00
8 Foreman Day 2.00 605.00 1210.00
9 mazdoor 0.00
for silo ( cement handling ) Day 2.00 460.00 920.00
for batching plant Day 2.00 460.00 920.00
for conveyor system Day 2.00 460.00 920.00
for laying & vibrating Day 6.00 460.00 2760.00
for cleaning / washing / curing Day 2.00 460.00 920.00
10 Labour cost for shuttering sqm 360.00 171.00 61560.00
11 Labour cost for scaffolding @ 15% 9234.00
Total cost of Labour Rs: 100085.60
labour component/unit qty 417.00
Add contractor's profit and overhead charges 13.615% 56.80
labour component/unit qty (including contractor's profit) 473.80
67
Dam and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 730931.28
B. Hire charges of Machinery Rs: 54120.00
C. Cost of Labour Rs: 100085.60
Total Rs: 885136.88
Add for aggregate conveyor system @ 3.0% 26554.11
Add for electric sub-station / Demand charges @ 2.50% 22128.42
Add for trestle bridge for tower crane track @ 4.0% 35405.48
Total Rs: 969224.89
D.Add for contractor's profit and overheads on (A+B+C+other 13.615% Rs. 131959.97
Lead Charges for 1 Km for FA 96.00 cum @ 30.4 Rs./Cum 2918.4
Lead Charges for 1 Km for CA 216.00 cum @ 29.4 Rs./Cum 6350.40
Total cost for 240.00 cum Rs: 1110453.66
Rate per cum (A+B+C+D)/240 Rs: 4626.90
IRR-DAW-2-4A Providing and laying insitu vibrated M-25 ( 28 days cube compressive
new Item2-2010-11 strength not less than 25 N / sq mm ) grade cement concrete using 40 mm
down size approved, clean, hard, graded aggregates including cost of all
materials, machinery, labour, formwork, centering, scaffolding, cleaning,
batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc.,complete for RCC works of gallery, sluice, spillway crest, spillway d / s
face, energy dissipating structures, training walls, piers, abutments and
such other locations with initial lead upto 1 km and all lifts.
( Cement content : 360 kg / cum with use of super plasticiser,
CA : 0.90 cum, blending ratio of CA--50:30:20, FA : 0.40 cum)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Batching plant 2 x 1.5 cum Hour 8.00 505.90 4047.20
Fuel / Energy charges Hour 8.00 467.70 3741.60
2 Air compressor 7 cmm ( ele ) Hour 8.00 109.60 876.80
Fuel / Energy charges Hour 8.00 382.70 3061.60
3 Tipper Hour 32.00 384.40 12300.80
Fuel / Energy charges Hour 32.00 414.40 13260.80
4 Tower crane 5 t Hour 16.00 711.10 11377.60
Fuel / Energy charges Hour 16.00 221.10 3537.60
5 Concrete bucket Hour 40.00 13.30 532.00
Fuel / Energy charges Hour 40.00 0.00 0.00
6 10 hp pump ( ele ) Hour 8.00 5.60 44.80
Fuel / Energy charges Hour 8.00 85.00 680.00
7 Needle vibrator 60 mm dia ( ele ) Hour 16.00 8.40 134.40
Fuel / Energy charges Hour 16.00 12.80 204.80
8 Sundries LS 10.00 32.00 320.00
Total hire charges of Machinery Rs: 54120.00
68
Dam and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Batching plant Hour 8.00 415.50 3324.00
2 Crew for Air compressor Hour 8.00 202.80 1622.40
3 Crew for Tipper ( 4 ) Hour 32.00 215.50 6896.00
4 Crew for Tower crane ( 2 ) Hour 16.00 229.80 3676.80
5 Crew for Pump Hour 8.00 101.10 808.80
6 Crew for Needle vibrator ( 2 ) Hour 16.00 194.60 3113.60
7 Mason Class-I Day 4.00 550.00 2200.00
8 Foreman Day 2.00 605.00 1210.00
9 mazdoor 0.00
for silo ( cement handling ) Day 2.00 460.00 920.00
for batching plant Day 2.00 460.00 920.00
for conveyor system Day 2.00 460.00 920.00
for laying & vibrating Day 6.00 460.00 2760.00
for cleaning / washing / curing Day 2.00 460.00 920.00
10 Labour cost for shuttering sqm 360.00 171.00 61560.00
11 Labour cost for scaffolding @ 15% 9234.00
Total cost of Labour Rs: 100085.60
labour component/unit qty 417.00
Add contractor's profit and overhead charges 13.615% 56.80
labour component/unit qty (including contractor's profit) 473.80
ABSTRACT:
A. Cost of Materials Rs: 777347.28
B. Hire charges of Machinery Rs: 54120.00
C. Cost of Labour Rs: 100085.60
Total Rs: 931552.88
Add for aggregate conveyor system @ 3.0% 27946.59
Add for electric sub-station / Demand charges @ 2.50% 23288.82
Add for trestle bridge for tower crane track @ 4.0% 37262.12
Total Rs: 1020050.41
D.Add for contractor's profit and overheads on (A+B+C+other 13.615% Rs. 138879.86
Lead Charges for 1 Km for FA 96.00 cum @ 30.4 Rs./Cum 2918.4
Lead Charges for 1 Km for CA 216.00 cum @ 29.4 Rs./Cum 6350.40
Total cost for 240.00 cum Rs: 1168199.07
Rate per cum (A+B+C+D)/240 Rs: 4867.50
IRR-DAW-2-4B Providing and laying insitu vibrated M-25 ( 28 days cube compressive
new Item3-2010-11 strength not less than 25 N / sq mm ) grade cement concrete using 20 mm
down size approved, clean, hard, graded aggregates including cost of all
materials, machinery, labour, formwork, centering, scaffolding, cleaning,
batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc.,complete for RCC works of gallery, sluice, spillway crest, spillway d / s
face, energy dissipating structures, training walls, piers, abutments and
such other locations with initial lead upto 1 km and all lifts.
( Cement content : 380 kg / cum with use of super plasticiser,
CA : 0.90 cum, blending ratio of CA--65:35, FA : 0.40 cum)
69
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Batching plant 2 x 1.5 cum Hour 8.00 505.90 4047.20
Fuel / Energy charges Hour 8.00 467.70 3741.60
2 Air compressor 7 cmm ( ele ) Hour 8.00 109.60 876.80
Fuel / Energy charges Hour 8.00 382.70 3061.60
3 Tipper Hour 32.00 384.40 12300.80
Fuel / Energy charges Hour 32.00 414.40 13260.80
4 Tower crane 5 t Hour 16.00 711.10 11377.60
Fuel / Energy charges Hour 16.00 221.10 3537.60
5 Concrete bucket Hour 40.00 13.30 532.00
Fuel / Energy charges Hour 40.00 0.00 0.00
6 10 hp pump ( ele ) Hour 8.00 5.60 44.80
Fuel / Energy charges Hour 8.00 85.00 680.00
7 Needle vibrator 60 mm dia ( ele ) Hour 16.00 8.40 134.40
Fuel / Energy charges Hour 16.00 12.80 204.80
8 Sundries LS 10.00 32.00 320.00
Total hire charges of Machinery Rs: 54120.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Batching plant Hour 8.00 415.50 3324.00
2 Crew for Air compressor Hour 8.00 202.80 1622.40
3 Crew for Tipper ( 4 ) Hour 32.00 215.50 6896.00
4 Crew for Tower crane ( 2 ) Hour 16.00 229.80 3676.80
5 Crew for Pump Hour 8.00 101.10 808.80
6 Crew for Needle vibrator ( 2 ) Hour 16.00 194.60 3113.60
7 Mason Class-I Day 4.00 550.00 2200.00
8 Foreman Day 2.00 605.00 1210.00
9 mazdoor 0.00
for silo ( cement handling ) Day 2.00 460.00 920.00
for batching plant Day 2.00 460.00 920.00
for conveyor system Day 2.00 460.00 920.00
for laying & vibrating Day 6.00 460.00 2760.00
for cleaning / washing / curing Day 2.00 460.00 920.00
10 Labour cost for shuttering sqm 360.00 171.00 61560.00
11 Labour cost for scaffolding @ 15% 9234.00
Total cost of Labour Rs: 100085.60
labour component/unit qty 417.00
Add contractor's profit and overhead charges 13.615% 56.80
labour component/unit qty (including contractor's profit) 473.80
ABSTRACT:
A. Cost of Materials Rs: 789962.88
B. Hire charges of Machinery Rs: 54120.00
C. Cost of Labour Rs: 100085.60
Total Rs: 944168.48
Add for aggregate conveyor system @ 3.0% 28325.05
Add for electric sub-station / Demand charges @ 2.50% 23604.21
Add for trestle bridge for tower crane track @ 4.0% 37766.74
Total Rs: 1033864.48
D.Add for contractor's profit and overheads on (A+B+C+other 13.615% Rs. 140760.65
Lead Charges for 1 Km for FA 96.00 cum @ 30.4 Rs./Cum 2918.4
Lead Charges for 1 Km for CA 216.00 cum @ 29.4 Rs./Cum 6350.40
Total cost for 240.00 cum Rs: 1183893.93
Rate per cum (A+B+C+D)/240 Rs: 4932.90
IRR-DAW-2-5 Providing and laying insitu vibrated M-15 ( 28 days cube compressive
strength not less than 15 N / sq mm ) grade cement concrete using 40 mm
down size approved, clean, hard, graded aggregates including cost of all
materials, machinery, labour, formwork, centering, scaffolding, cleaning,
batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc.,complete for plain concrete works with initial lead upto 1 km and
all lifts. ( Cement content : 260 kg / cum with use of super plasticiser,
CA : 0.90 cum, Blending Ratio of CA -- 50:30:20, FA : 0.40 cum)
70
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Concrete mixer 300 / 200 ltr ( ele ) Hour 8.0 43.90 351.20
Fuel / Energy charges Hour 8.0 42.50 340.00
2 10 hp pump ( ele ) Hour 1.0 5.60 5.60
Fuel / Energy charges Hour 1.0 85.00 85.00
3 Needle vibrator 40 mm dia ( ele ) Hour 8.0 6.90 55.20
Fuel / Energy charges Hour 8.0 8.50 68.00
Total hire charges of Machinery Rs: 905.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 1.00 101.10 101.10
3 Crew for Needle vibrator Hour 8.00 194.60 1556.80
4 Mason Class-I Day 1.00 550.00 550.00
5 mazdoor
for batching cement ( cement handling Day 2.00 460.00 920.00
for batching other materials Day 9.00 460.00 4140.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying Day 3.00 460.00 1380.00
for conveying concrete Day 14.00 460.00 6440.00
for cleaning / washing / curing Day 1.00 460.00 460.00
6 Labour cost of shuttering sqm 14.00 114.00 1596.00
7 Labour cost of scaffolding @ 15% 239.40
Total cost of Labour Rs: 21386.50
labour component/unit qty 1527.60
Add contractor's profit and overhead charges 13.615% 208.00
labour component/unit qty (including contractor's profit) 1735.60
ABSTRACT:
A. Cost of Materials Rs: 35197.30
B. Hire charges of Machinery Rs: 905.00
C. Cost of Labour Rs: 21386.50
Total Rs: 57488.80
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 7827.1
Lead Charges for 1 Km for FA 5.60 cum @ 30.4 Rs./Cum 170.24
Lead Charges for 1 Km for CA 12.60 cum @ 29.4 Rs./Cum 370.44
Total cost for 14.00 cum Rs: 65856.58
Rate per cum (A+B+C+D)/14 Rs: 4704.00
IRR-DAW-2-6 Providing and laying insitu vibrated M-15 ( 28 days cube compressive
strength not less than 15 N / sq mm ) grade cement concrete using 40 mm
down size approved, clean, hard, graded aggregates with placing and
sinking plums of size 150 to 80 mm upto 15 percent for gravity type
structures including cost of all materials, machinery, labour, formwork,
scaffolding, cleaning, batching, mixing, placing in position, levelling,
vibrating, finishing, curing etc.,complete with initial lead upto 1 km and
all lifts. ( Cement content : 260 kg / cum of concrete with use of plums
and super plasticiser of 0.4% of cement quantity, CA : 0.77 cum,
Blending Ratio of CA : 50:30:20,FA : 0.34 cum,
plums of size 150 to 80 mm : 0.25 cum)
71
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Concrete mixer 300 / 200 ltr ( ele ) Hour 8.00 43.90 351.20
Fuel / Energy charges Hour 8.00 42.50 340.00
2 10 hp pump ( ele ) Hour 1.00 5.60 5.60
Fuel / Energy charges Hour 1.00 85.00 85.00
3 Needle vibrator 60 mm dia ( ele ) Hour 8.00 8.40 67.20
Fuel / Energy charges Hour 8.00 12.80 102.40
Total hire charges of Machinery Rs: 951.40
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 1.00 101.10 101.10
3 Crew for Needle vibrator Hour 8.00 194.60 1556.80
4 Mason Class-I Day 1.00 550.00 550.00
5 work inspector Day 1.00 600.00 600.00
6 mazdoor
for batching cement ( cement handling Day 2.00 460.00 920.00
for batching other materials Day 9.00 460.00 4140.00
for loading mortar pans Day 4.00 460.00 1840.00
for loading plums Day 1.00 460.00 460.00
for laying concrete and plums Day 4.00 460.00 1840.00
for conveying concrete Day 13.99 460.00 6433.57
for conveying plums Day 3.00 460.00 1380.00
for cleaning / washing / curing Day 1.00 460.00 460.00
7 Labour for shuttering sqm 16.45 114.00 1875.30
8 Labour for scaffolding @ 15% 281.30
Total cost of Labour Rs: 24601.27
labour component/unit qty 1495.50
Add contractor's profit and overhead charges 13.615% 203.60
labour component/unit qty (including contractor's profit) 1699.10
ABSTRACT:
A. Cost of Materials Rs: 39884.24
B. Hire charges of Machinery Rs: 951.40
C. Cost of Labour Rs: 24601.27
Total Rs: 65436.91
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 8909.24
Lead Charges for 1 Km for FA 5.59 cum @ 30.4 Rs./Cum 170.0272
Lead Charges for 1 Km for CA and Plums 16.77 cum @ 29.4 Rs./Cum 493.11
Total cost for 16.45 cum Rs: 75009.29
Rate per cum (A+B+C+D)/16.45 Rs: 4559.80
IRR-DAW-2-7 Providing and laying insitu vibrated M-10 ( 28 days cube compressive
strength not less than 10 N / sq mm ) grade cement concrete using 40 mm
down size approved, clean, hard, graded aggregates including cost of all
materials, machinery, labour, formwork, centering, scaffolding, cleaning,
batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc.,complete for plain concrete works with initial lead upto 1 km and all
lifts. ( Cement content 220 kg / cum with use of super plasticiser,
CA : 0.90 cum, Blending Ratio of CA : 50:30:20, FA : 0.40 cum)
72
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Concrete mixer 300 / 200 ltr ( ele ) Hour 8.00 43.90 351.20
Fuel / Energy charges Hour 8.00 42.50 340.00
2 10 hp pump ( ele ) Hour 1.00 5.60 5.60
Fuel / Energy charges Hour 1.00 85.00 85.00
3 Needle vibrator 40 mm dia ( ele ) Hour 8.00 6.90 55.20
Fuel / Energy charges Hour 8.00 8.50 68.00
Total hire charges of Machinery Rs: 905.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 1.00 101.10 101.10
3 Crew for Needle vibrator Hour 8.00 194.60 1556.80
4 Mason Class-I Day 1.00 550.00 550.00
5 mazdoor
for batching cement ( cement handling Day 2.00 460.00 920.00
for batching other materials Day 9.00 460.00 4140.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying Day 3.00 460.00 1380.00
for conveying concrete Day 16.53 460.00 7603.80
for cleaning / washing / curing Day 1.00 460.00 460.00
6 Labour cost of shuttering sqm 16.53 114.00 1884.42
7 Labour cost of scaffolding @ 15% 282.66
Total cost of Labour Rs: 22881.98
labour component/unit qty 1384.30
Add contractor's profit and overhead charges 13.615% 188.50
labour component/unit qty (including contractor's profit) 1572.80
ABSTRACT:
A. Cost of Materials Rs: 39000.44
B. Hire charges of Machinery Rs: 905.00
C. Cost of Labour Rs: 22881.98
Total Rs: 62787.42
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 8548.51
Lead Charges for 1 Km for FA 6.61 cum @ 30.4 Rs./Cum 201.0048
Lead Charges for 1 Km for CA 14.88 cum @ 29.4 Rs./Cum 437.38
Total cost for 16.53 cum Rs: 71974.32
Rate per cum (A+B+C+D)/16.53 Rs: 4354.20
IRR-DAW-2-8 Providing and laying insitu vibrated M-15 ( 28 days cube compressive
strength not less than 15 N / sq mm ) grade cement concrete using 20 mm
down size approved, clean, hard, graded aggregates including cost of all
materials, machinery, labour, formwork, centering, scaffolding, cleaning,
batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc.,complete for plain concrete works with initial lead upto 1 km and all
lifts. ( Cement content : 280 kg / cum with use of super plasticiser,
CA : 0.80 cum, Blending Ratio of CA -- 65:35, FA : 0.44 cum)
73
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Concrete mixer 300 / 200 ltr ( ele ) Hour 8.00 43.90 351.20
Fuel / Energy charges Hour 8.00 42.50 340.00
2 10 hp pump ( ele ) Hour 1.00 5.60 5.60
Fuel / Energy charges Hour 1.00 85.00 85.00
3 Needle vibrator 40 mm dia ( ele ) Hour 8.00 6.90 55.20
Fuel / Energy charges Hour 8.00 8.50 68.00
Total hire charges of Machinery Rs: 905.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 1.00 101.10 101.10
3 Crew for Needle vibrator Hour 8.00 194.60 1556.80
4 Mason Class-I Day 1.00 550.00 550.00
5 mazdoor
for batching cement ( cement handling Day 2.00 460.00 920.00
for batching other materials Day 9.00 460.00 4140.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying Day 3.00 460.00 1380.00
for conveying concrete Day 15.87 460.00 7300.20
for cleaning / washing / curing Day 1.00 460.00 460.00
6 Labour cost of shuttering sqm 15.87 114.00 1809.18
7 Labour cost of scaffolding @ 15% 271.38
Total cost of Labour Rs: 22491.86
labour component/unit qty 1417.30
Add contractor's profit and overhead charges 13.615% 193.00
labour component/unit qty (including contractor's profit) 1610.30
ABSTRACT:
A. Cost of Materials Rs: 39296.56
B. Hire charges of Machinery Rs: 905.00
C. Cost of Labour Rs: 22491.86
Total Rs: 62693.42
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 8535.71
Lead Charges for 1 Km for FA 6.98 cum @ 30.4 Rs./Cum 212.27712
Lead Charges for 1 Km for CA 12.70 cum @ 29.4 Rs./Cum 373.26
Total cost for 15.87 cum Rs: 71814.67
Rate per cum (A+B+C+D)/15.87 Rs: 4525.20
IRR-DAW-2-9 Providing and laying insitu vibrated M-20 ( 28 days cube compressive
strength not less than 20 N / sq mm ) grade cement concrete using 20 mm
down size approved, clean, hard, graded aggregates including cost of all
materials, machinery, labour, formwork, centering, scaffolding, cleaning,
batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc.,complete for RCC works of spillway bridge, blockouts and such
other similar structures with conjested reinforcement with initial lead
upto 1 km and all lifts. ( Cement content : 330 kg / cum with use of
super plasticiser, CA : 0.80 cum, Blending Ratio of CA -- 65:35,
FA : 0.44 cum)
74
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Concrete mixer 300 / 200 ltr ( ele Hour 8.00 43.90 351.20
Fuel / Energy charges Hour 8.00 42.50 340.00
2 10 hp pump ( ele ) Hour 1.00 5.60 5.60
Fuel / Energy charges Hour 1.00 85.00 85.00
3 Needle vibrator 40 mm dia ( ele ) Hour 8.00 6.90 55.20
Fuel / Energy charges Hour 8.00 8.50 68.00
Total hire charges of Machinery Rs: 905.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 1.00 101.10 101.10
3 Crew for Needle vibrator Hour 8.00 194.60 1556.80
4 Mason Class-I Day 1.00 550.00 550.00
5 mazdoor 0.00
for batching cement ( cement handling ) Day 2.00 460.00 920.00
for batching other materials Day 9.00 460.00 4140.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying Day 3.00 460.00 1380.00
for conveying concrete Day 13.47 460.00 6196.20
for cleaning/ washing/ curing Day 1.00 460.00 460.00
6 Labour cost of shuttering sqm 33.68 114.00 3838.95
7 Labour cost of scaffolding @ 100% 3838.95
Total cost of Labour Rs: 26985.20
labour component/unit qty 2003.40
Add contractor's profit and overhead charges 13.615% 272.80
labour component/unit qty (including contractor's profit) 2276.20
ABSTRACT:
A. Cost of Materials Rs: 48155.21
B. Hire charges of Machinery Rs: 905.00
C. Cost of Labour Rs: 26985.20
Total Rs: 76045.41
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 10353.58
Lead Charges for 1 Km for FA 5.93 cum @ 30.4 Rs./Cum 180.17472
Lead Charges for 1 Km for CA 10.78 cum @ 29.4 Rs./Cum 316.81
Total cost for 13.47 cum Rs: 86895.98
Rate per cum (A+B+C+D)/13.47 Rs: 6451.10
IRR-DAW-2-10 Providing and forming porous concrete body drain of size 68.5 x 68.5 cm
with 23 cm diameter central hole using cement and 20 mm down
approved, clean, hard, graded coarse aggregates in 1 : 3.50 proportion by
volume including cost of all materials, machinery, labour, formwork, curing
etc., complete with initial lead upto 1 km and all lifts.
(M15 Cement content : 400kg/cum, CA : 1cum,
Blending Ratio of CA -- 65:35)
75
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Concrete mixer 300 / 200 ltr ( ele ) Hour 8.00 43.90 351.20
Fuel / Energy charges Hour 8.00 42.50 340.00
2 10 hp pump ( ele ) Hour 0.50 5.60 2.80
Fuel / Energy charges Hour 0.50 85.00 42.50
Total hire charges of Machinery Rs: 736.50
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.50 101.10 50.55
3 Mason Class-I Day 1.00 550.00 550.00
4 mazdoor
for batching cement ( cement handling Day 2.00 460.00 920.00
for batching other materials Day 6.00 460.00 2760.00
for loading mortar pans Day 2.00 460.00 920.00
for laying & packing concrete Day 2.00 460.00 920.00
for conveying concrete Day 8.56 460.00 3937.60
5 Fitter shuttering Day 3.00 500.00 1500.00
Total cost of Labour Rs: 13721.35
labour component/unit qty 686.10
Add contractor's profit and overhead charges 13.615% 93.40
labour component/unit qty (including contractor's profit) 779.50
ABSTRACT:
A. Cost of Materials Rs: 26686.61
B. Hire charges of Machinery Rs: 736.50
C. Cost of Labour Rs: 13721.35
Total Rs: 41144.46
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 5601.82
Lead Charges for 1 Km for CA 8.56 cum @ 29.4 Rs./Cum 251.66
Total cost for 20.00 Rm Rs: 46997.94
Rate per Rm (A+B+C+D)/20 Rs: 2349.90
IRR-DAW-2-11 Providing and laying insitu vibrated M-20 ( 28 days cube compressive
(a) strength not less than 20 N / sq mm ) grade cement concrete using 20 mm
down size approved, clean, hard, graded aggregates including cost of
all materials, machinery, labour, formwork, centering, scaffolding, cleaning,
batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc.,complete for RCC solid parapet consisting of 35 cm x 20 cm kerb,
35 cm x 35 cm x 1 m pillars spaced approximately at 3.35 m c / c, 12.5 cm
thick wall 80 cm height with 12.5 cm thick and 35 cm wide coping slab for
wall and 12 .5 cm thick 40 cm x 40 cm coping for pillars with top edges of
kerb and coping chamferred / rounded as directed etc., complete
( excluding cost of providing and placing reinforcement steel and gate )
with initial lead upto 1 km and all lifts.
( Cement content 350 kg / cum with use of super plasticiser( 0.4% by wt.
of cement), CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.44 cum)
76
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Concrete mixer 300 / 200 ltr ( ele ) Hour 8.00 43.90 351.20
Fuel / Energy charges Hour 8.00 42.50 340.00
2 Needle vibrator 40 mm ( ele ) Hour 8.00 6.90 55.20
Fuel / Energy charges Hour 8.00 8.50 68.00
3 10 hp pump ( ele ) Hour 0.50 5.60 2.80
Fuel / Energy charges Hour 0.50 85.00 42.50
Total hire charges of Machinery Rs: 859.70
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.50 101.10 50.55
3 Crew for Vibrator Hour 8.00 194.60 1556.80
4 Mason Class-I Day 2.00 550.00 1100.00
5 work inspector Day 1.00 600.00 600.00
6 mazdoor
for batching cement ( cement handling ) Day 2.00 460.00 920.00
for batching other materials Day 9.00 460.00 4140.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying & packing concrete Day 2.00 460.00 920.00
for conveying concrete Day 8.67 460.00 3988.20
for curing & miscellaneous Day 2.00 460.00 920.00
7 Labour for shuttering sqm 95.00 114.00 10830.00
8 Labour for scaffolding @ 15% 1624.50
Total cost of Labour Rs: 30653.25
labour component/unit qty 851.50
Add contractor's profit and overhead charges 13.615% 115.90
labour component/unit qty (including contractor's profit) 967.40
ABSTRACT:
A. Cost of Materials Rs: 47293.63
B. Hire charges of Machinery Rs: 859.70
C. Cost of Labour Rs: 30653.25
Total Rs: 78806.58
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 10729.52
Lead Charges for 1 Km for FA 3.81 cum @ 30.4 Rs./Cum 115.824
Lead Charges for 1 Km for CA 6.94 cum @ 29.4 Rs./Cum 204.04
Total cost for 36.00 Rm Rs: 89855.96
Rate per Rm (A+B+C+D)/36 Rs: 2496.00
IRR-DAW-2-12 Providing and laying insitu vibrated M-20 ( 28 days cube compressive
(b) strength not less than 20 N / sq mm ) grade cement concrete using 20 mm
down size approved, clean, hard, graded aggregates including cost of all
materials, machinery, labour, formwork, centering, scaffolding, cleaning,
batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc.,complete for RCC ornamental parapet consisting of 35 cm x 20 cm
kerb, 35 cm x 35 cm x 1 m pillars spaced approximately at 3.5 m apart,
20 cm x 15 cm posts 80 cm height approximately 30 cm c / c with 12.5 cm
thick and 35 cm wide coping slab for posts and pillars with top edges of
kerb and coping chamferred or rounded as directed etc., complete
( excluding cost of providing and placing reinforcement steel and gate ) with
initial lead upto 1 km and all lifts.
( Cement content : 350 kg / cum with use of super plasticiser(0.4% by wt.
of cement, CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.44 cum)
77
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Concrete mixer 300 / 200 ltr ( ele Hour 8.00 43.90 351.20
Fuel / Energy charges Hour 8.00 42.50 340.00
2 Needle vibrator 40 mm ( ele ) Hour 8.00 6.90 55.20
Fuel / Energy charges Hour 8.00 8.50 68.00
3 10 hp pump ( ele ) Hour 0.50 5.60 2.80
Fuel / Energy charges Hour 0.50 85.00 42.50
Total hire charges of Machinery Rs: 859.70
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.50 101.10 50.55
3 Crew for Vibrator Hour 8.00 194.60 1556.80
4 Mason Class-I Day 2.00 550.00 1100.00
5 work inspector Day 1.00 600.00 600.00
6 mazdoor
for batching cement ( cement handling ) Day 2.00 460.00 920.00
for batching other materials Day 9.00 460.00 4140.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying & packing concrete Day 2.00 460.00 920.00
for conveying concrete Day 7.00 460.00 3220.00
for curing & miscellaneous Day 2.00 460.00 920.00
7 Labour for shuttering sqm 115.00 114.00 13110.00
8 Labour for scaffolding @ 15% 1966.50
Total cost of Labour Rs: 32507.05
labour component/unit qty 903.00
Add contractor's profit and overhead charges 13.615% 122.90
labour component/unit qty (including contractor's profit) 1025.90
ABSTRACT:
A. Cost of Materials Rs: 48553.16
B. Hire charges of Machinery Rs: 859.70
C. Cost of Labour Rs: 32507.05
Total Rs: 81919.91
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 11153.4
Lead Charges for 1 Km for FA 3.08 cum @ 30.4 Rs./Cum 93.632
Lead Charges for 1 Km for CA 5.60 cum @ 29.4 Rs./Cum 164.64
Total cost for 36.00 Rm Rs: 93331.58
Rate per Rm (A+B+C+D)/36 Rs: 2592.50
IRR-DAW-2-13 Providing and laying insitu M- 25 ( 28 days cube compressive strength not
less than 25 N / sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates for wearing coat including cost
of all materials, machinery, labour, formwork, cleaning, batching, mixing,
placing in position in alternate panels, levelling, compacting, finishing,
curing, packing joints with asphalt mortar etc., complete
with initial lead upto 1 km and all lifts.
( Cement content : 380 kg / cum with use of super plasticiser(0.4% by
wt. of cement, CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
78
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Concrete mixer 300/200 ltr ( ele ) Hour 8.00 43.90 351.20
Fuel / Energy charges Hour 8.00 42.50 340.00
2 10 hp pump ( ele ) Hour 0.50 5.60 2.80
Fuel / Energy charges Hour 0.50 85.00 42.50
Total hire charges of Machinery Rs: 736.50
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.50 101.10 50.55
3 Mason Class-I Day 3.00 550.00 1650.00
4 work inspector Day 1.00 600.00 600.00
5 mazdoor
for batching cement ( cement handling ) Day 2.00 460.00 920.00
for batching materials Day 9.00 460.00 4140.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying & compacting Day 5.00 460.00 2300.00
for conveying concrete Day 11.70 460.00 5382.00
for cleaning/ washing/ curing Day 1.00 460.00 460.00
6 Labour cost for shuttering sqm 5.85 114.00 666.90
Total cost of Labour Rs: 20172.65
labour component/unit qty 1724.20
Add contractor's profit and overhead charges 13.615% 234.70
labour component/unit qty (including contractor's profit) 1958.90
ABSTRACT:
A. Cost of Materials Rs: 32013.60
B. Hire charges of Machinery Rs: 736.50
C. Cost of Labour Rs: 20172.65
Total Rs: 52922.75
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 7205.43
Lead Charges for 1 Km for FA 5.27 cum @ 30.4 Rs./Cum 160.056
Lead Charges for 1 Km for CA 9.36 cum @ 29.4 Rs./Cum 275.18
Total cost for 11.70 cum Rs: 60563.42
Rate per cum (A+B+C+D)/11.70 Rs: 5176.40
79
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Ice maker unit consisting of: Hour 24.00 155.30 3727.20
Compressor 125 hp - 1 No
Condenser with 30 hp motor - 1 No.
Ice makers 10 t / day each - 3 Nos.
Pump 2 hp for ice cutting - 3 Nos.
Pump 2 hp for pumping water-3 Nos.
Screw conveyor with 15 hp motor -1
Ice elevator with 5 hp motor - 1 No.
Fuel / Energy charges for system Hour 24.00 1211.90 29085.60
Total hire charges of Machinery Rs: 32812.80
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Ice maker unit Hour 24.00 162.20 3892.80
2 mazdoor
for Ice chamber ( 2 x 3 ) Day 6.00 460.00 2760.00
for miscellaneous works ( 1 x 3 ) Day 3.00 460.00 1380.00
Total cost of Labour Rs: 8032.80
labour component/unit qty 16.10
Add contractor's profit and overhead charges 13.615% 2.20
labour component/unit qty (including contractor's profit) 18.30
ABSTRACT:
A. Cost of Materials Rs: 96.00
B. Hire charges of Machinery Rs: 32812.80
C. Cost of Labour Rs: 8032.80
Total Rs: 40941.60
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 5574.2
Total cost for 500.00 cum Rs: 46515.80
Rate per cum (A+B+C+D)/500 Rs: 93.00
IRR-DAW-2-15 Conveying and fixing elastomeric bearing for spillway bridge including
cleaning and preparing surface, mixing and applying adhesive, fixing bearing
in correct position etc., including cost of all materials except bearings,
machinery, labour etc., complete with all leads and lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Nil 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Marker / Erector Day 1.00 655.00 655.00
2 work inspector Day 1.00 600.00 600.00
3 mazdoor Day 2.00 460.00 920.00
Total cost of Labour Rs: 2175.00
labour component/unit qty 362.50
Add contractor's profit and overhead charges 13.615% 49.40
labour component/unit qty (including contractor's profit) 411.90
ABSTRACT:
A. Cost of Materials Rs: 242.80
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 2175.00
Total Rs: 2417.80
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 329.18
Total cost for 6.00 Nos. Rs: 2746.98
Rate per Each (A+B+C+D)/6 Rs: 457.80
80
Dam and Allied Works - Item Unit Rates 2020-21
IRR-DAW-2-16 Providing and constructing 150 mm dia hume pipe weep holes for
concrete / masonry walls including providing 20 x 20 x 20 cm size porous
concrete block made of cement and 20 mm down coarse aggregate in
1 : 4 proportion including 10 cm thick sand backing at the junction of wall
and soil back fill, cost of all materials, machinery, labour etc., complete
with lead upto 1 km and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Nil 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Mason Class-II Day 0.25 500.00 125.00
2 mazdoor Day 0.25 460.00 115.00
Total cost of Labour Rs: 240.00
labour component/unit qty 80.00
Add contractor's profit and overhead charges 13.615% 10.90
labour component/unit qty (including contractor's profit) 90.90
ABSTRACT:
A. Cost of Materials Rs: 788.08
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 240.00
Total Rs: 1028.08
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 139.97
Lead Charges for 1 Km for FA 0.02 cum @ 30.4 Rs./Cum 0.608
Lead Charges for 1 Km for CA 0.01 cum @ 29.4 Rs./Cum 0.24
Total cost for 3.00 Rm Rs: 1168.89
Rate per Rm (A+B+C+D)/3 Rs: 389.60
IRR-DAW-2-17 Providing and forming expansion joint for spillway bridge consisting of
75 x 75 x 6 mm angles 2 numbers provided with 25 cm long 12 mm dia.
anchors fixed to both flanges at 15 cm c /c and 140 x 6 mm plate welded
on top of one of the angle including cost of all materials, machinery, labour,
providing and fixing 38 mm thick joint filler board matching the thickness of
wearing coat, painting etc., complete with lead upto 1 km and all lifts.
81
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Welding set Hour 8.00 14.20 113.60
Fuel / Energy charges Hour 8.00 102.10 816.80
2 Sundries (cutting torch/ welding guns etc) LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 994.40
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Marker / Fabricator / Erector Day 1.50 655.00 982.50
2 Gas cutter / Welder Day 1.50 540.00 810.00
3 mazdoor Day 2.00 460.00 920.00
Total cost of Labour Rs: 2712.50
labour component/unit qty 361.70
Add contractor's profit and overhead charges 13.615% 49.20
labour component/unit qty (including contractor's profit) 410.90
ABSTRACT:
A. Cost of Materials Rs: 9104.55
B. Hire charges of Machinery Rs: 994.40
C. Cost of Labour Rs: 2712.50
Total Rs: 12811.45
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 1744.28
Lead Charges for 1Km for Steel (including Loading
and Unloading Charges) 0.18 tonne @ 190.9 Rs./Tonne 34.85834
Total cost for 7.50 Rm Rs: 14590.59
Rate per Rm (A+B+C+D)/7.50 Rs: 1945.40
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Concrete mixer 300 / 200 ltr ( ele ) Hour 8.00 43.90 351.20
Fuel / Energy charges Hour 8.00 42.50 340.00
2 10 hp pump ( ele ) Hour 1.00 5.60 5.60
Fuel / Energy charges Hour 1.00 85.00 85.00
Total hire charges of Machinery Rs: 781.80
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 1.00 101.10 101.10
3 work inspector Day 1.00 600.00 600.00
4 Mason Class-I Day 2.50 550.00 1375.00
5 Mason Class-II Day 4.00 500.00 2000.00
6 Chavali Day 16.00 500.00 8000.00
7 mazdoor
for batching cement ( cement handling ) Day 2.00 460.00 920.00
for batching sand Day 6.00 460.00 2760.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying & packing mortar Day 10.00 460.00 4600.00
for loading chips Day 1.00 460.00 460.00
for washing rubble / finishing / curing Day 4.00 460.00 1840.00
for conveying mortar / chips Day 12.00 460.00 5520.00
Total cost of Labour Rs: 32179.30
labour component/unit qty 1287.20
82
Dam and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 31737.00
B. Hire charges of Machinery Rs: 781.80
C. Cost of Labour Rs: 32179.30
Total Rs: 64698.10
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 8808.65
Lead Charges for 1 Km for FA 10.00 cum @ 30.4 Rs./Cum 304
Lead Charges for 1 Km for Stones/Stone Chips 25.00 cum @ 29.4 Rs./Cum 735.00
Total cost for 25.00 cum Rs: 74545.75
Rate per cum (A+B+C+D)/25 Rs: 2981.80
IRR-DAW-3-2 Providing and constructing un-coursed rubble stone masonry using approved stones in
cement mortar 1 : 4 proportion including cost of all materials, machinery, labour, scaffolding,
cleaning, packing mortar, wedging stone chips, curing etc., complete with initial lead upto
1 km and all lifts.
( Cement content : 143 kg/cum of masonry, rubble stones : 0.85 cum,
stone chips : 0.15 cum/cum, FA : 0.4 cum)
For 1 cum masonry :-
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Concrete mixer 300 / 200 ltr(ele) Hour 8.00 43.90 351.20
Fuel / Energy charges Hour 8.00 42.50 340.00
2 10 hp pump Hour 1.00 5.60 5.60
Fuel / Energy charges Hour 1.00 85.00 85.00
Total hire charges of Machinery Rs: 781.80
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 1.00 101.10 101.10
3 work inspector Day 1.00 600.00 600.00
4 Mason Class-I Day 2.50 550.00 1375.00
5 Mason Class-II Day 4.00 500.00 2000.00
6 Chavali Day 16.00 500.00 8000.00
7 mazdoor
for batching cement ( cement handling ) Day 2.00 460.00 920.00
for batching sand Day 6.00 460.00 2760.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying & packing mortar Day 10.00 460.00 4600.00
for loading chips Day 1.00 460.00 460.00
for washing rubble / finishing / curing Day 4.00 460.00 1840.00
for conveying mortar / chips Day 12.00 460.00 5520.00
Total cost of Labour Rs: 32179.30
labour component/unit qty 1287.20
Add contractor's profit and overhead charges 13.615% 175.30
labour component/unit qty (including contractor's profit) 1462.50
ABSTRACT:
A. Cost of Materials Rs: 27422.40
B. Hire charges of Machinery Rs: 781.80
C. Cost of Labour Rs: 32179.30
Total Rs: 60383.50
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 8221.21
Lead Charges for 1 Km for FA 10.00 cum @ 30.4 Rs./Cum 304
Lead Charges for 1 Km for Stones/Stone Chips 25.00 cum @ 29.4 Rs./Cum 735.00
Total cost for 25.00 cum Rs: 69643.71
Rate per cum (A+B+C+D)/25 Rs: 2785.70
83
Dam and Allied Works - Item Unit Rates 2020-21
IRR-DAW-3-3 Providing and constructing coursed rubble face stone masonry using
approved rubble stones in cement mortar 1 : 3 proportion including cost
of all materials, machinery, labour, scaffolding, ramps, cleaning, packing
mortar, wedging stone chips, curing etc., with initial lead upto 1 km
and all lifts.
( Thickness of the CR face assumed: 0.75 m,Cement content : 178 kg/cum of masonry,
rubble stones : 0.35 cum, stone chips : 0.15 cum/cum, FA : 0.375 cum,
CR stones 30 x 30 x 45 cm : 9.75 No, CR stones 30 x 30 x 60 cm : 3.25 No)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Concrete mixer 300 / 200 ltr ( ele ) Hour 8.00 43.90 351.20
Fuel / Energy charges Hour 8.00 42.50 340.00
2 10 hp pump ( ele ) Hour 1.00 5.60 5.60
Fuel / Energy charges Hour 1.00 85.00 85.00
Total hire charges of Machinery Rs: 781.80
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 1.00 101.10 101.10
3 work inspector Day 1.00 600.00 600.00
4 Stone chiseller Cl -II Day 7.00 500.00 3500.00
5 Mason Class-I Day 2.50 550.00 1375.00
6 Mason Class-II Day 4.00 500.00 2000.00
7 Chavali Day 16.00 500.00 8000.00
8 mazdoor
for batching cement ( cement handling ) Day 2.00 460.00 920.00
for batching sand Day 6.00 460.00 2760.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying & packing mortar Day 10.00 460.00 4600.00
for loading chips Day 1.00 460.00 460.00
for washing rubble / finishing / curing Day 4.00 460.00 1840.00
for conveying mortar / chips Day 12.00 460.00 5520.00
Total cost of Labour Rs: 35679.30
labour component/unit qty 1427.20
Add contractor's profit and overhead charges 13.615% 194.30
labour component/unit qty (including contractor's profit) 1621.50
ABSTRACT:
A. Cost of Materials Rs: 34668.28
B. Hire charges of Machinery Rs: 781.80
C. Cost of Labour Rs: 35679.30
Total Rs: 71129.38
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 9684.26
Lead Charges for 1 Km for FA 9.38 cum @ 30.4 Rs./Cum 285
Lead Charges for 1 Km for Stones/Stone Chips 26.81 cum @ 29.4 Rs./Cum 788.21
Total cost for 25.00 cum Rs: 81886.85
Rate per cum (A+B+C+D)/25 Rs: 3275.50
IRR-DAW-3-4 Providing and constructing coursed rubble face stone masonry using
approved rubble stones in cement mortar 1 : 4 proportion including cost of
all materials, machinery, labour, scaffolding, ramps, cleaning, packing
mortar, wedging stone chips, curing etc., with initial lead upto 1 km and
all lifts.
( Cement content : 134 kg/cum of masonry, rubble stones : 0.35 cum,
stone chips : 0.15 cum/cum, FA : 0.375 cum,
CR stones 30 x 30 x 45 cm : 9.75 No, CR stones 30 x 30 x 60 cm : 3.25 No)
84
Dam and Allied Works - Item Unit Rates 2020-21
UNIT:
A. MATERIALS: 25.00 cum
Sl No Particulars Unit Quantity Rate Amount
in Rs. in Rs
1 Cement for mortar kg 3350 3.67 12301.20
2 Coursed rubble stone 30 x 30 x 45 cm Nos 244 25.20 6148.80
3 Coursed rubble stone 30 x 30 x 60 cm Nos 82 28.35 2324.70
4 Rubble stones cum 8.75 325.00 2843.75
5 Stone chips cum 3.75 357.00 1338.75
6 Sand (Screened ) cum 9.375 605.00 5671.88
Total cost of Materials Rs: 30629.08
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Concrete mixer 300 / 200 ltr ( ele ) Hour 8.00 43.90 351.20
Fuel / Energy charges Hour 8.00 42.50 340.00
2 10 hp pump ( ele ) Hour 1.00 5.60 5.60
Fuel / Energy charges Hour 1.00 85.00 85.00
Total hire charges of Machinery Rs: 781.80
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 1.00 101.10 101.10
3 work inspector Day 1.00 600.00 600.00
4 Stone chiseller Cl -II Day 7.00 500.00 3500.00
5 Mason Class-I Day 2.50 550.00 1375.00
6 Mason Class-II Day 4.00 500.00 2000.00
7 Chavali Day 16.00 500.00 8000.00
8 mazdoor
for batching cement ( cement handling ) Day 2.00 460.00 920.00
for batching sand Day 6.00 460.00 2760.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying & packing mortar Day 10.00 460.00 4600.00
for loading chips Day 1.00 460.00 460.00
for washing rubble / finishing / curing Day 4.00 460.00 1840.00
for conveying mortar / chips Day 12.00 460.00 5520.00
Total cost of Labour Rs: 35679.30
labour component/unit qty 1427.20
Add contractor's profit and overhead charges 13.615% 194.30
labour component/unit qty (including contractor's profit) 1621.50
ABSTRACT:
A. Cost of Materials Rs: 30629.08
B. Hire charges of Machinery Rs: 781.80
C. Cost of Labour Rs: 35679.30
Total Rs: 67090.18
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 9134.33
Lead Charges for 1 Km for FA 9.38 cum @ 30.4 Rs./Cum 285
Lead Charges for 1 Km for Stones/Stone Chips 26.81 cum @ 29.4 Rs./Cum 788.21
Total cost for 25.00 cum Rs: 77297.72
Rate per cum (A+B+C+D)/25 Rs: 3091.90
IRR-DAW-3-5 Providing and constructing chisel drafted and hammer dressed face
stone masonry with approved stones in cement mortar 1 : 3 proportion
including cost of all materials, machinery, labour, scaffolding, ramps,
cleaning, packing mortar, wedging stone chips, curing etc.,complete with
initial lead upto 1 km and all lifts.
( Cement content : 167 kg/cum of masonry, rubble stones : 0.35 cum,
stone chips : 0.15 cum/cum, FA : 0.35 cum,
Dressed stones 30 x 30 x 45 cm : 10 No, Dressed stones 30 x 30 x 60 cm : 3.40 No)
85
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Concrete mixer 300 / 200 ltr ( ele ) Hour 8.00 43.90 351.20
Fuel / Energy charges Hour 8.00 42.50 340.00
2 10 hp pump ( ele ) Hour 1.00 5.60 5.60
Fuel / Energy charges Hour 1.00 85.00 85.00
Total hire charges of Machinery Rs: 781.80
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 1.00 101.10 101.10
3 work inspector Day 1.00 600.00 600.00
4 Stone chiseller Cl -I Day 14.00 545.00 7630.00
5 Stone chiseller Cl -II Day 7.00 500.00 3500.00
6 Mason Class-I Day 2.50 550.00 1375.00
7 Mason Class-II Day 4.00 500.00 2000.00
8 Chavali Day 16.00 500.00 8000.00
9 mazdoor
for batching cement ( cement handling ) Day 2.00 460.00 920.00
for batching sand Day 6.00 460.00 2760.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying & packing mortar Day 10.00 460.00 4600.00
for loading chips Day 1.00 460.00 460.00
for washing rubble / finishing / curing Day 4.00 460.00 1840.00
for conveying mortar / chips Day 12.00 460.00 5520.00
Total cost of Labour Rs: 43309.30
labour component/unit qty 1732.40
Add contractor's profit and overhead charges 13.615% 235.90
labour component/unit qty (including contractor's profit) 1968.30
ABSTRACT:
A. Cost of Materials Rs: 33516.60
B. Hire charges of Machinery Rs: 781.80
C. Cost of Labour Rs: 43309.30
Total Rs: 77607.70
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 10566.29
Lead Charges for 1 Km for FA 8.75 cum @ 30.4 Rs./Cum 266
Lead Charges for 1 Km for Stones/Stone Chips 27.22 cum @ 29.4 Rs./Cum 800.12
Total cost for 25.00 cum Rs: 89240.11
Rate per cum (A+B+C+D)/25 Rs: 3569.60
IRR-DAW-3-6 Providing and constructing chisel drafted and hammer dressed face
stone masonry with approved stones in cement mortar 1 : 4 proportion
including cost of all materials, machinery, labour, scaffolding, ramps,
cleaning, packing mortar, wedging stone chips, curing etc.,complete with
initial lead upto 1 km and all lifts.
( Cement content : 125 kg/cum of masonry, rubble stones : 0.35 cum,
stone chips : 0.15 cum/cum, FA : 0.35 cum,
Dressed stones 30 x 30 x 45 cm : 10 No, Dressed stones 30 x 30 x 60 cm : 3.40 No)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Concrete mixer 300 / 200 ltr ( ele ) Hour 8.00 43.90 351.20
Fuel / Energy charges Hour 8.00 42.50 340.00
2 10 hp pump ( ele ) Hour 1.00 5.60 5.60
Fuel / Energy charges Hour 1.00 85.00 85.00
Total hire charges of Machinery Rs: 781.80
86
Dam and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 1.00 101.10 101.10
3 work inspector Day 1.00 600.00 600.00
4 Stone chiseller Cl -I Day 14.00 545.00 7630.00
5 Stone chiseller Cl -II Day 7.00 500.00 3500.00
6 Mason Class-I Day 2.50 550.00 1375.00
7 Mason Class-II Day 4.00 500.00 2000.00
8 Chavali Day 16.00 500.00 8000.00
9 mazdoor
for batching cement ( cement handling Day 2.00 460.00 920.00
for batching sand Day 6.00 460.00 2760.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying & packing mortar Day 10.00 460.00 4600.00
for loading chips Day 1.00 460.00 460.00
for washing rubble / finishing / curing Day 4.00 460.00 1840.00
for conveying mortar / chips Day 12.00 460.00 5520.00
Total cost of Labour Rs: 43309.30
labour component/unit qty 1732.40
Add contractor's profit and overhead charges 13.615% 235.90
labour component/unit qty (including contractor's profit) 1968.30
ABSTRACT:
A. Cost of Materials Rs: 29661.00
B. Hire charges of Machinery Rs: 781.80
C. Cost of Labour Rs: 43309.30
Total Rs: 73752.10
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 10041.35
Lead Charges for 1 Km for FA 8.75 cum @ 30.4 Rs./Cum 266
Lead Charges for 1 Km for Stones/Stone Chips 27.22 cum @ 29.4 Rs./Cum 800.12
Total cost for 25.00 cum Rs: 84859.57
Rate per cum (A+B+C+D)/25 Rs: 3394.40
IRR-DAW-3-7 Providing cement mortar pointing to coursed rubble face stone masonry
50 mm deep in CM 1 : 2 proportion by volume including raking and cleaning
joints, pressing mortar into joints, cost of all materials, labour, scaffolding,
finishing, curing etc., complete with initial lead upto 1 km and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 NIL 0.00 0.00 0.00
(Manual mixing ) 0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Mason Class-I Day 10.00 550.00 5500.00
2 mazdoor Day 10.00 460.00 4600.00
Total cost of Labour Rs: 10100.00
labour component/unit qty 101.00
Add contractor's profit and overhead charges 13.615% 13.80
labour component/unit qty (including contractor's profit) 114.80
ABSTRACT:
A. Cost of Materials Rs: 2117.07
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 10100.00
Total Rs: 12217.07
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 1663.35
Lead Charges for 1 Km for FA 0.74 cum @ 30.4 Rs./Cum 22.344
Total cost for 100.00 sqm Rs: 13902.77
Rate per sqm (A+B+C+D)/100 Rs: 139.00
87
Dam and Allied Works - Item Unit Rates 2020-21
IRR-DAW-3-8 Providing cement mortar pointing to coursed rubble face stone masonry
50 mm deep in CM 1 : 3 proportion by volume including raking and cleaning
joints, pressing mortar into joints, cost of all materials, labour, scaffolding,
finishing, curing etc., complete with initial lead upto 1 km and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 NIL 0.00 0.00 0.00
Manual mixing ) 0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Mason Class-I Day 10.00 550.00 5500.00
2 mazdoor Day 10.00 460.00 4600.00
Total cost of Labour Rs: 10100.00
labour component/unit qty 101.00
Add contractor's profit and overhead charges 13.615% 13.80
labour component/unit qty (including contractor's profit) 114.80
ABSTRACT:
A. Cost of Materials Rs: 1626.32
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 10100.00
Total Rs: 11726.32
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 1596.54
Lead Charges for 1 Km for FA 0.74 cum @ 30.4 Rs./Cum 22.344
Total cost for 100.00 sqm Rs: 13345.21
Rate per sqm (A+B+C+D)/100 Rs: 133.50
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Guniting equipment Hour 8.00 102.50 820.00
Fuel / Energy charges Hour 8.00 0.00 0.00
2 Air compressor 8.5 cmm ( ele ) Hour 8.00 136.90 1095.20
Fuel / Energy charges Hour 8.00 478.40 3827.20
3 Pump 10 hp ( ele ) Hour 1.00 5.60 5.60
Fuel / Energy charges Hour 1.00 85.00 85.00
4 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 5897.00
88
Dam and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Guniting equipment Hour 8.00 270.40 2163.20
2 Crew for Air compressor Hour 8.00 202.80 1622.40
3 Crew for pump Hour 1.00 101.10 101.10
4 Mason Cl II Day 1.00 500.00 500.00
5 mazdoor
for cement handling Day 2.00 460.00 920.00
for sand Day 2.00 460.00 920.00
mazdoor for other works Day 2.00 460.00 920.00
Total cost of Labour Rs: 7146.70
labour component/unit qty 198.50
Add contractor's profit and overhead charges 13.615% 27.00
labour component/unit qty (including contractor's profit) 225.50
ABSTRACT:
A. Cost of Materials Rs: 3073.50
B. Hire charges of Machinery Rs: 5897.00
C. Cost of Labour Rs: 7146.70
Total Rs: 16117.20
Add for scaffolding 3% 402.93
Total Rs: 16520.13
D.Add for contractor's profit and overheads on (A+B+C+other 13.615% Rs. 2249.22
Lead Charges for 1 Km for FA 1.09 cum @ 30.4 Rs./Cum 33.136
Total cost for 36.00 sqm Rs: 18802.49
Rate per sqm (A+B+C+D)/36 Rs: 522.30
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Steam circulation arrangement LS 8.00 16.00 128.00
Fuel charges ( gas for heating ) LS 10.00 18.00 180.00
Total hire charges of Machinery Rs: 308.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Welder Day 1.00 540.00 540.00
2 Tinsmith Day 1.00 525.00 525.00
3 Bar bender Day 0.50 665.00 332.50
4 Pipe fitter Day 0.50 615.00 307.50
5 Mason Class-I Day 0.50 550.00 275.00
6 mazdoor Day 1.00 460.00 460.00
Total cost of Labour Rs: 2440.00
labour component/unit qty 203.30
Add contractor's profit and overhead charges 13.615% 27.70
labour component/unit qty (including contractor's profit) 231.00
89
Dam and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 148564.00
B. Hire charges of Machinery Rs: 308.00
C. Cost of Labour Rs: 2440.00
Total Rs: 151312.00
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 20601.13
Total cost for 12.00 Rm Rs: 171913.13
Rate per Rm (A+B+C+D)/12 Rs: 14326.10
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Steam circulation arrangement LS 8.00 16.00 128.00
Fuel charges ( gas for heating ) LS 10.00 18.00 180.00
Total hire charges of Machinery Rs: 308.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Welder Day 0.50 540.00 270.00
2 Bar bender Day 0.50 665.00 332.50
3 Pipe fitter Day 0.50 615.00 307.50
4 Mason Class-I Day 0.50 550.00 275.00
5 mazdoor Day 1.00 460.00 460.00
Total cost of Labour Rs: 1645.00
labour component/unit qty 137.10
Add contractor's profit and overhead charges 13.615% 18.70
labour component/unit qty (including contractor's profit) 155.80
ABSTRACT:
A. Cost of Materials Rs: 22139.00
B. Hire charges of Machinery Rs: 308.00
C. Cost of Labour Rs: 1645.00
Total Rs: 24092.00
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 3280.13
Total cost for 12.00 Rm. Rs: 27372.13
Rate per Rm. (A+B+C+D)/12 Rs: 2281.00
90
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Sundries such as soldering gun etc., LS 3.00 32.00 96.00
Fuel charges ( gas ) LS 5.00 18.00 90.00
Total hire charges of Machinery Rs: 186.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Welder Day 0.5 540.00 270.00
2 Tinsmith Day 0.5 525.00 262.50
3 Bar bender Day 0.5 665.00 332.50
4 Mason Class-I Day 0.5 550.00 275.00
5 mazdoor Day 0.5 460.00 230.00
Total cost of Labour Rs: 1370.00
labour component/unit qty 157.50
Add contractor's profit and overhead charges 13.615% 21.40
labour component/unit qty (including contractor's profit) 178.90
ABSTRACT:
A. Cost of Materials Rs: 49662.50
B. Hire charges of Machinery Rs: 186.00
C. Cost of Labour Rs: 1370.00
Total Rs: 51218.50
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 6973.4
Total cost for 8.70 Rm Rs: 58191.90
Rate per Rm (A+B+C+D)/8.70 Rs: 6688.70
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Sundries such as heater etc., LS 0.50 32.00 16.00
Fuel charges for heating LS 0.50 18.00 9.00
Total hire charges of Machinery 25.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Welder Day 0.50 540.00 270.00
2 Bar bender Day 0.50 665.00 332.50
3 Mason Class-I Day 0.50 550.00 275.00
4 mazdoor Day 0.50 460.00 230.00
Total cost of Labour Rs: 1107.50
labour component/unit qty 127.30
Add contractor's profit and overhead charges 13.615% 17.30
labour component/unit qty (including contractor's profit) 144.60
ABSTRACT:
A. Cost of Materials Rs: 810.00
B. Hire charges of Machinery Rs: 25.00
C. Cost of Labour Rs: 1107.50
Total Rs: 1942.50
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 264.47
Total cost for 8.70 Rm Rs: 2206.97
Rate per Rm (A+B+C+D)/8.70 Rs: 253.70
91
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Angle dozer 90 hp Hour 5.50 1453.50 7994.25
Fuel / Energy charges Hour 5.50 843.60 4639.80
2 Shovel 0.85 cum capacity Hour 8.00 1452.20 11617.60
Fuel / Energy charges Hour 8.00 1205.90 9647.20
3 Tippers 5.00 cum capacity 5 Nos. Hour 40.00 384.40 15376.00
Fuel / Energy charges Hour 40.00 414.40 16576.00
4 Pump 5 hp ( ele ) Hour 4.00 2.50 10.00
Fuel / Energy charges Hour 4.00 42.50 170.00
5 Water tanker 8000 ltr Hour 8.00 358.00 2864.00
Fuel / Energy charges Hour 8.00 414.40 3315.20
6 Vibratory Roller 8 tonne Hour 6.50 1175.20 7638.80
Fuel / Energy charges Hour 6.50 1425.20 9263.80
7 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 89176.65
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Dozer Hour 5.50 287.30 1580.15
2 Crew for Shovel Hour 8.00 287.30 2298.40
3 Crew for Tipper Hour 40.00 215.50 8620.00
4 Crew for Pump Hour 4.00 101.10 404.40
5 Crew for Water tanker Hour 8.00 215.50 1724.00
6 Crew for Roller Hour 6.50 324.50 2109.25
7 work inspector Day 2.00 600.00 1200.00
8 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 19776.20
labour component/unit qty 24.00
Add contractor's profit and overhead charges 13.615% 3.30
labour component/unit qty (including contractor's profit) 27.30
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 89176.65
C. Cost of Labour Rs: 19776.20
Total Rs: 108952.85
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 14833.93
Total cost for 825.00 cum Rs: 123786.78
Rate per cum (A+B+C+D)/825 Rs: 150.00
IRR-DAW-5-2 Providing cut-off trench filling using selected impervious soil from
approved borrow areas in layers of 25 to 30 cm before compaction
including cost of all materials, machinery, labour, all operations such as
excavation, sorting out, transportation, spreading soil to specified thickness,
breaking clods, sectioning, watering, compacting to density control of not
less than 95 percent using Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller as stipulated etc.,
complete with initial lead upto 1 km and all lifts.
92
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Angle dozer 90 hp Hour 5.50 1453.50 7994.25
Fuel / Energy charges Hour 5.50 843.60 4639.80
2 Shovel 0.85 cum capacity Hour 8.00 1452.20 11617.60
Fuel / Energy charges Hour 8.00 1205.90 9647.20
3 Tippers 5.00 cum capacity 6 Nos. Hour 48.00 384.40 18451.20
Fuel / Energy charges Hour 48.00 414.40 19891.20
4 Pump 5 hp ( ele ) Hour 4.00 2.50 10.00
Fuel / Energy charges Hour 4.00 42.50 170.00
5 Water tanker 8000 ltr Hour 8.00 358.00 2864.00
Fuel / Energy charges Hour 8.00 414.40 3315.20
6 Vibratory Roller 8 tonne Hour 6.50 1175.20 7638.80
Fuel / Energy charges Hour 6.50 1425.20 9263.80
7 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 95567.05
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Dozer Hour 5.50 287.30 1580.15
2 Crew for Shovel Hour 8.00 287.30 2298.40
3 Crew for Tipper Hour 48.00 215.50 10344.00
4 Crew for Pump Hour 4.00 101.10 404.40
5 Crew for Water tanker Hour 8.00 215.50 1724.00
6 Crew for Roller Hour 6.50 324.50 2109.25
7 work inspector Day 2.00 600.00 1200.00
8 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 21500.20
labour component/unit qty 26.10
Add contractor's profit and overhead charges 13.615% 3.60
labour component/unit qty (including contractor's profit) 29.70
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 95567.05
C. Cost of Labour Rs: 21500.20
Total Rs: 117067.25
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 15938.71
Total cost for 825.00 cum Rs: 133005.96
Rate per cum (A+B+C+D)/825 Rs: 161.20
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Angle dozer 90 hp Hour 4.00 1453.50 5814.00
Fuel / Energy charges Hour 4.00 843.60 3374.40
2 Shovel 0.85 cum Hour 8.00 1452.20 11617.60
Fuel / Energy charges Hour 8.00 1205.90 9647.20
3 Tipper 5 cum Hour 32.00 384.40 12300.80
Fuel / Energy charges Hour 32.00 414.40 13260.80
4 Pump 5 hp ( ele ) Hour 3.00 2.50 7.50
Fuel / Energy charges Hour 3.00 42.50 127.50
5 Water tanker 8000 ltr Hour 5.00 358.00 1790.00
Fuel / Energy charges Hour 5.00 414.40 2072.00
6 Vibratory Roller 8 tonne Hour 5.00 1175.20 5876.00
Fuel / Energy charges Hour 5.00 1425.20 7126.00
7 Sundries LS 5.00 32.00 160.00
Total hire charges of Machinery Rs: 73173.80
93
Dam and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Dozer Hour 4.00 287.30 1149.20
2 Crew for Shovel Hour 8.00 287.30 2298.40
3 Crew for Tipper Hour 32.00 215.50 6896.00
4 Crew for Pump Hour 3.00 101.10 303.30
5 Crew for Water tanker Hour 5.00 215.50 1077.50
6 Crew for Roller Hour 5.00 324.50 1622.50
7 work inspector Day 2.00 600.00 1200.00
8 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 16386.90
labour component/unit qty 26.00
Add contractor's profit and overhead charges 13.615% 3.50
labour component/unit qty (including contractor's profit) 29.50
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 73173.80
C. Cost of Labour Rs: 16386.90
Total Rs: 89560.70
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 12193.69
Total cost for 630.00 cum Rs: 101754.39
Rate per cum (A+B+C+D)/630 Rs: 161.50
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Angle dozer 90 hp Hour 4.60 1453.50 6686.10
Fuel / Energy charges Hour 4.60 843.60 3880.56
2 Shovel 0.85 cum Hour 8.00 1452.20 11617.60
Fuel / Energy charges Hour 8.00 1205.90 9647.20
3 Tipper 5 cum Hour 48.00 384.40 18451.20
Fuel / Energy charges Hour 48.00 414.40 19891.20
4 Pump 5 hp ( ele ) Hour 4.00 2.50 10.00
Fuel / Energy charges Hour 4.00 42.50 170.00
5 Water tanker 8000 ltr Hour 8.00 358.00 2864.00
Fuel / Energy charges Hour 8.00 414.40 3315.20
6 Vibratory Roller 8 tonne Hour 7.00 1175.20 8226.40
Fuel / Energy charges Hour 7.00 1425.20 9976.40
7 Sundries LS 5.00 32.00 160.00
Total hire charges of Machinery Rs: 94895.86
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Dozer Hour 4.60 287.30 1321.58
2 Crew for Shovel Hour 8.00 287.30 2298.40
3 Crew for Tipper Hour 48.00 215.50 10344.00
4 Crew for Pump Hour 4.00 101.10 404.40
5 Crew for Water tanker Hour 8.00 215.50 1724.00
6 Crew for Roller Hour 7.00 324.50 2271.50
7 work inspector Day 2.00 600.00 1200.00
8 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 21403.88
labour component/unit qty 22.10
Add contractor's profit and overhead charges 13.615% 3.00
labour component/unit qty (including contractor's profit) 25.10
94
Dam and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 94895.86
C. Cost of Labour Rs: 21403.88
Total Rs: 116299.74
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 15834.21
Total cost for 970.00 cum Rs: 132133.95
Rate per cum (A+B+C+D)/970 Rs: 136.20
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Angle dozer 90 hp Hour 4.60 1453.50 6686.10
Fuel / Energy charges Hour 4.60 843.60 3880.56
2 Shovel 0.85 cum Hour 8.00 1452.20 11617.60
Fuel / Energy charges Hour 8.00 1205.90 9647.20
3 Tipper 5 cum Hour 48.00 384.40 18451.20
Fuel / Energy charges Hour 48.00 414.40 19891.20
4 Pump 5 hp ( ele ) Hour 4.00 2.50 10.00
Fuel / Energy charges Hour 4.00 42.50 170.00
5 Water tanker 8000 ltr Hour 8.00 358.00 2864.00
Fuel / Energy charges Hour 8.00 414.40 3315.20
6 Vibratory Roller 8 tonne Hour 7.00 1175.20 8226.40
Fuel / Energy charges Hour 7.00 1425.20 9976.40
7 Sundries LS 5.00 32.00 160.00
Total hire charges of Machinery Rs: 94895.86
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Dozer Hour 4.60 287.30 1321.58
2 Crew for Shovel Hour 8.00 287.30 2298.40
3 Crew for Tipper Hour 48.00 215.50 10344.00
4 Crew for Pump Hour 4.00 101.10 404.40
5 Crew for Water tanker Hour 8.00 215.50 1724.00
6 Crew for Roller Hour 7.00 324.50 2271.50
7 work inspector Day 2.00 600.00 1200.00
8 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 21403.88
labour component/unit qty 22.10
Add contractor's profit and overhead charges 13.615% 3.00
labour component/unit qty (including contractor's profit) 25.10
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 94895.86
C. Cost of Labour Rs: 21403.88
Total Rs: 116299.74
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 15834.21
Total cost for 970.00 cum Rs: 132133.95
Rate per cum (A+B+C+D)/970 Rs: 136.20
Deduct Rate for Proctar's density Control of 95% using 8T roller as per IRR-PMW-3-23 50.40
Add Rate for Proctor's Density control of 90% using 2T Roller as per IRR-PMW-3-24 6.70
Rate per cum Rs. 92.50
95
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Angle dozer 90 hp Hour 5.40 1453.50 7848.90
Fuel / Energy charges Hour 5.40 843.60 4555.44
2 Shovel 0.85 cum capacity Hour 8.00 1452.20 11617.60
Fuel / Energy charges Hour 8.00 1205.90 9647.20
3 Tippers 5.00 cum capacity 5 Nos. Hour 40.00 384.40 15376.00
Fuel / Energy charges Hour 40.00 414.40 16576.00
4 Pump 5 hp ( ele ) Hour 4.00 2.50 10.00
Fuel / Energy charges Hour 4.00 42.50 170.00
5 Water tanker 8000 ltr Hour 8.00 358.00 2864.00
Fuel / Energy charges Hour 8.00 414.40 3315.20
6 Vibratory Roller 8 tonne Hour 6.40 1175.20 7521.28
Fuel / Energy charges Hour 6.40 1425.20 9121.28
7 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 88686.90
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Dozer Hour 5.40 287.30 1551.42
2 Crew for Shovel Hour 8.00 287.30 2298.40
3 Crew for Tipper Hour 40.00 215.50 8620.00
4 Crew for Pump Hour 4.00 101.10 404.40
5 Crew for Water tanker Hour 8.00 215.50 1724.00
6 Crew for Roller Hour 6.40 324.50 2076.80
7 work inspector Day 2.00 600.00 1200.00
8 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 19715.02
labour component/unit qty 24.40
Add contractor's profit and overhead charges 13.615% 3.30
labour component/unit qty (including contractor's profit) 27.70
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 88686.90
C. Cost of Labour Rs: 19715.02
Total Rs: 108401.92
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 14758.92
Total cost for 807.00 cum Rs: 123160.84
Rate per cum (A+B+C+D)/807 Rs: 152.60
IRR-DAW-5-6 Providing embankment adjacent to masonry / concrete structures and filling trial pits
using impervious soil from approved borrow areas in layers of 10 to 15 cm and compacting
each layer to density control of not less than 95 percent using pneumatic tampers or by
vibratory earth rammers including cost of all materials, machinery, labour, picking previous
layer, spreading soil in layer, breaking clods, watering etc., complete with initial lead upto
1 km and all lifts.
B. MACHINERY:
96
Dam and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Dozer Hour 0.15 287.30 43.10
2 Crew for Shovel Hour 0.80 287.30 229.84
3 Crew for Tipper Hour 3.00 215.50 646.50
4 Crew for Air compressor Hour 8.00 202.80 1622.40
5 Crew for Pump Hour 0.40 101.10 40.44
6 Crew for Water tanker Hour 0.80 215.50 172.40
7 Crew for Pneumatic tamper Hour 16.00 324.50 5192.00
8 work inspector Day 1.00 600.00 600.00
9 mazdoor Day 5.00 460.00 2300.00
Total cost of Labour Rs: 10846.68
labour component/unit qty 135.60
Add contractor's profit and overhead charges 13.615% 18.50
labour component/unit qty (including contractor's profit) 154.10
ABSTRACT:
A. Cost of Materials Rs: 169.00
B. Hire charges of Machinery Rs: 10736.17
C. Cost of Labour Rs: 10846.68
Total Rs: 21751.84
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 2961.51
Total cost for 80.00 cum Rs: 24713.35
Rate per cum (A+B+C+D)/80 Rs: 308.90
IRR-DAW-5-7 Providing and constructing rockfill embankment with 300 mm down graded stones and
quarry spalls from approved source including cost of all materials, machinery, labour, spreading
stones and spalls in layers, hand packing, wedging, finishing the surface to required slopes
etc., complete with initial lead upto 1 km and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Air compressor 8.5cmm( diesel )3 Nos Hour 30.00 223.10 6693.00
Fuel / Energy charges Hour 30.00 1233.30 36999.00
2 Jack hammer 6 Nos Hour 60.00 16.50 990.00
Fuel / Energy charges Hour 60.00 0.00 0.00
3 Angle dozer 90 hp Hour 4.00 1453.50 5814.00
Fuel / Energy charges Hour 4.00 843.60 3374.40
4 Shovel 0.85 cum Hour 8.00 1452.20 11617.60
Fuel / Energy charges Hour 8.00 1205.90 9647.20
5 Tipper 5 cum Hour 24.00 384.40 9225.60
Fuel / Energy charges Hour 24.00 414.40 9945.60
Total hire charges of Machinery Rs: 94306.40
C. LABOUR:
97
Dam and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 28218.22
B. Hire charges of Machinery Rs: 94306.40
C. Cost of Labour Rs: 48648.60
Total Rs: 171173.22
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 23305.23
Total cost for 400.00 cum Rs: 194478.45
Rate per cum (A+B+C+D)/400 Rs: 486.20
IRR-DAW-5-8 Providing and constructing dry rubble rock-toe using rubble and stone chips from
approved source including cost of all materials, machinery, labour, hand packing rubble
and stone chips, finishing top and sides to required slopes etc., complete with initial lead upto
1 km and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Air compressor 8.5 cmm ( diesel ) Hour 7.50 223.10 1673.25
Fuel / Energy charges Hour 7.50 1233.30 9249.75
2 Jack hammer Hour 15.00 16.50 247.50
Fuel / Energy charges Hour 15.00 0.00 0.00
3 Shovel 0.85 cum Hour 2.00 1452.20 2904.40
Fuel / Energy charges Hour 2.00 1205.90 2411.80
4 Tipper 5 cum Hour 6.00 384.40 2306.40
Fuel / Energy charges Hour 6.00 414.40 2486.40
Total hire charges of Machinery Rs: 21279.50
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Air compressor Hour 7.50 259.60 1947.00
2 Crew for Jack hammer Hour 15.00 405.60 6084.00
3 Crew for Shovel Hour 2.00 287.30 574.60
4 Crew for Tipper Hour 6.00 215.50 1293.00
5 Blaster Day 0.50 605.00 302.50
6 Helper blaster Day 1.00 500.00 500.00
7 work inspector Day 1.00 600.00 600.00
8 Mason Class-II Day 7.00 500.00 3500.00
9 mazdoor Day 19.00 460.00 8740.00
Total cost of Labour Rs: 23541.10
labour component/unit qty 235.40
Add contractor's profit and overhead charges 13.615% 32.00
labour component/unit qty (including contractor's profit) 267.40
98
Dam and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 7084.12
B. Hire charges of Machinery Rs: 21279.50
C. Cost of Labour Rs: 23541.10
Total Rs: 51904.72
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 7066.83
Total cost for 100.00 cum Rs: 58971.55
Rate per cum (A+B+C+D)/100 Rs: 589.70
IRR-DAW-5-9 Providing and constructing dry rubble rock-toe with rubble and stone chips from dump
yard (Spoil Bank) including cost of all materials, machinery, labour, hand packing rubble and stone chips,
finishing top and sides to required slopes etc., complete with initial lead upto 1 km and all
lifts.
Note: Useful rubble and stone chips will be issued at dump yard at the issue rate for usefull rubble /
stone chips. Sorting out and breaking charges included in rate analysis.
DATA: RATE ANALYSIS
UNIT : 100 cum
A. MATERIALS:
Sl No Particulars Unit Quantity Rate Amount
in Rs. in Rs
1 Useful rubble ( at dump yard ) cum 100.00 166.00 16600.00
2 Useful stone chips ( at dump yard ) cum 15.00 188.00 2820.00
Total cost of Materials Rs: 19420.00
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Shovel 0.85 cum Hour 2.00 1452.20 2904.40
Fuel / Energy charges Hour 2.00 1205.90 2411.80
2 Tipper 5 cum Hour 6.00 384.40 2306.40
Fuel / Energy charges Hour 6.00 414.40 2486.40
Total hire charges of Machinery Rs: 10109.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Shovel Hour 2.00 287.30 574.60
2 Crew for Tipper Hour 6.00 215.50 1293.00
3 Mason Class-II Day 7.00 500.00 3500.00
4 work inspector Day 1.00 600.00 600.00
6 Stone breaker Day 2.00 500.00 1000.00
7 mazdoor Day 21.00 460.00 9660.00
Total cost of Labour Rs: 16627.60
labour component/unit qty 166.30
Add contractor's profit and overhead charges 13.615% 22.60
labour component/unit qty (including contractor's profit) 188.90
ABSTRACT:
A. Cost of Materials Rs: 19420.00
B. Hire charges of Machinery Rs: 10109.00
C. Cost of Labour Rs: 16627.60
Total Rs: 46156.60
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 6284.22
Total cost for 100.00 cum Rs: 52440.82
Rate per cum (A+B+C+D)/100 Rs: 524.40
IRR-DAW-5-9-A Providing and constructing dry rock pitching for groynes/platform using un-coursed rubble stone of size 300 mm thick
(New Item 1 -2020-21) from quarry to site of work including cost of all materials, machinery, labour charge hand picking un-coursed
rubble stone to the designed profile with all leads and all lifts etc for Above Water level
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
Shovel 0.85 cum for loading tipper at the
1 worksite Hour 2.00 1452.20 2904.40
Fuel / Energy charges Hour 2.00 1205.90 2411.80
2 Tipper 5 cum Hour 6.00 384.40 2306.40
Fuel / Energy charges Hour 6.00 414.40 2486.40
Total hire charges of Machinery Rs: 10109.00
99
Dam and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Shovel Hour 2.00 287.30 574.60
2 Crew for Tipper Hour 6.00 215.50 1293.00
3 Mason Class-II Day 7.00 500.00 3500.00
4 work inspector Day 1.00 600.00 600.00
5 Stone breaker Day 2.00 500.00 1000.00
6 mazdoor Day 21.00 460.00 9660.00
Total cost of Labour Rs: 16627.60
labour component/unit qty 166.30
Add contractor's profit and overhead charges 13.615% 22.60
labour component/unit qty (including contractor's profit) 188.90
ABSTRACT:
A. Cost of Materials Rs: 32500.00
B. Hire charges of Machinery Rs: 10109.00
C. Cost of Labour Rs: 16627.60
Total Rs: 59236.60
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 8065.06
Total cost for 100.00 cum Rs: 67301.66
Rate per cum (A+B+C+D)/100 Rs: 673.00
IRR-DAW-5-9-B Providing and constructing dry rock pitching for groynes using un-coursed rubble stone of size 300 mm thick and
(New Item 2 -2020-21) un-coursed rubble stone chips from quarry to site of work including cost of all materials,machinery, labour charge
hand picking un-coursed rubble stone and chips to the designed profile with all leads and all lifts etc for
Below Water level.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Shovel 0.85 cum for loading tipper at the Hour 2.00 1452.20 2904.40
Fuel / Energy charges Hour 2.00 1205.90 2411.80
2 Tipper 5 cum Hour 6.00 384.40 2306.40
Fuel / Energy charges Hour 6.00 414.40 2486.40
Total hire charges of Machinery Rs: 10109.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Shovel Hour 2.00 287.30 574.60
2 Crew for Tipper Hour 6.00 215.50 1293.00
Total cost of Labour Rs: 1867.60
labour component/unit qty 18.70
Add contractor's profit and overhead charges 13.615% 2.50
labour component/unit qty (including contractor's profit) 21.20
ABSTRACT:
A. Cost of Materials Rs: 32500.00
B. Hire charges of Machinery Rs: 10109.00
C. Cost of Labour Rs: 1867.60
Total Rs: 44476.60
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 6055.49
Total cost for 100.00 cum Rs: 50532.09
Rate per cum (A+B+C+D)/100 Rs: 505.30
IRR-DAW-5-10 Providing and laying 30 cm diameter open jointed hume pipes with collars in rock-toe for
drainage including cost of all materials, machinery, labour etc., complete with lead upto 1 km
and all lifts.
100
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Mason Cl- II Day 2 500.00 1000.00
2 mazdoor Day 6 460.00 2760.00
Total cost of Labour Rs: 3760.00
labour component/unit qty 37.60
Add contractor's profit and overhead charges 13.615% 5.10
labour component/unit qty (including contractor's profit) 42.70
ABSTRACT:
A. Cost of Materials Rs: 54000.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 3760.00
Total Rs: 57760.00
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 7864.02
Total cost for 100.00 Rm Rs: 65624.02
Rate per Rm (A+B+C+D)/100 Rs: 656.20
IRR-DAW-6-1 Providing and constructing 1.20 m internal diameter and average 3 m height RCC manhole with
60 cm dia. top cover in M-15 grade cement concrete using 20 mm down graded, clean, hard
coarse aggregate, 20 cm thick for bed / sides / top slab / 1.5 m long cut-off wall and 7.5 cm
thick for cover including providing 12 mm dia reinforcement bars at 30 cm c / c bothways for
bed / sides / cut-off wall / top slab / rungs and 8 mm dia bars at 15 cm c / c bothways for cover,
excavation for foundation, providing 30 cm dia hume pipe outlet, cost of all materials, machinery,
labour, formwork, scaffolding, batching, mixing, laying, vibrating, finishing, curing etc., complete
with lead upto 1 km and all lifts.
( Cement content : 300 kg/cum , CA : 0.80 cum, Blending Ratioof CA -- 65:35,
FA : 0.44 cum, superplasticizer (0.4% by wt. of cement)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Concrete mixer 300 / 200 ( ele ) Hour 4.00 43.90 175.60
Fuel / Energy charges Hour 4.00 42.50 170.00
2 Needle vibrator 40 mm dia ( ele ) Hour 4.00 6.90 27.60
Fuel / Energy charges Hour 4.00 8.50 34.00
3 Pump 5 hp ( ele ) Hour 0.50 2.50 1.25
Fuel / Energy charges Hour 0.50 42.50 21.25
4 Sundries LS 1.00 32.00 32.00
Total hire charges of Machinery Rs: 461.70
101
Dam and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Mason Cl- II Day 1.00 500.00 500.00
2 Bar bender Day 1.00 665.00 665.00
3 work inspector Day 1.00 600.00 600.00
4 mazdoor
for excavation for foundation Day 2.00 460.00 920.00
for bar bending Day 1.00 460.00 460.00
for concreting Day 5.00 460.00 2300.00
for excavation for foundation Day 2.00 460.00 920.00
for concreting Day 4.00 460.00 1840.00
for curing Day 1.00 460.00 460.00
5 Labour for shuttering sqm 36.00 114.00 4104.00
Total cost of Labour Rs: 12769.00
labour component/unit qty 12769.00
Add contractor's profit and overhead charges 13.615% 1738.50
labour component/unit qty (including contractor's profit) 14507.50
ABSTRACT:
A. Cost of Materials Rs: 27379.56
B. Hire charges of Machinery Rs: 461.70
C. Cost of Labour Rs: 12769.00
Total Rs: 40610.26
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 5529.09
Lead Charges for 1 Km for FA 1.95 cum @ 30.4 Rs./Cum 59.376064
Lead Charges for 1 Km for CA 3.55 cum @ 29.4 Rs./Cum 104.41
Lead Charges for 1Km for Steel (including Loading
and Unloading Charges) 0.16 tonne @ 190.9 Rs./Tonne 31.2493755
Total cost for 1.00 Each Rs: 46334.38
Rate per Each (A+B+C+D)/1.0 Rs: 46334.40
IRR-DAW-6-2 Providing and constructing longitudinal and cross graded filter drains using sand and 80-20
mm and 20 mm down graded aggregates satisfying specified filter creteria in layers as per
specifications including cost of all materials, machinery, labour, laying to required slopes,
compaction etc. complete with initial lead upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 work inspector Day 1.00 600.00 600.00
2 mazdoor Day 38.00 460.00 17480.00
Total cost of Labour Rs: 18080.00
labour component/unit qty 180.80
Add contractor's profit and overhead charges 13.615% 24.60
labour component/unit qty (including contractor's profit) 205.40
ABSTRACT:
A. Cost of Materials Rs: 75425.04
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 18080.00
Total Rs: 93505.04
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 12730.71
Total cost for 100.00 cum Rs: 106235.75
Rate per cum (A+B+C+D)/100 Rs: 1062.40
102
Dam and Allied Works - Item Unit Rates 2020-21
IRR-DAW-6-3 Providing and constructing 1.40 m thick vertical or inclined graded filter media consisting of
20 cm thick sand layers, 25 cm thick 20 mm down coarse aggregate layers and 50 cm thick
80-20 mm coarse aggregate layer using approved materials satisfying specified filter creteria as
per specifications including cost of all materials, machinery, labour, laying to required slope,
compaction etc., complete with initial lead upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 work inspector Day 1.00 600.00 600.00
2 mazdoor Day 38.00 460.00 17480.00
Total cost of Labour Rs: 18080.00
labour component/unit qty 180.80
Add contractor's profit and overhead charges 13.615% 24.60
labour component/unit qty (including contractor's profit) 205.40
ABSTRACT:
A. Cost of Materials Rs: 82054.88
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 18080.00
Total Rs: 100134.88
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 13633.36
Total cost for 100.00 cum Rs: 113768.24
Rate per cum (A+B+C+D)/100 Rs: 1137.70
IRR-DAW-6-4 Providing and constructing graded filter media below and behind rock-toe consisting of
20 cm thick sand, 25 cm thick 20 - 4.75 mm and 40 cm thick 80 - 20 mm size graded coarse
aggregates satisfying filter creteria as per specifications including cost of all materials, labour,
machinery, laying to required slope, compaction etc., complete with initial lead upto 50 m and
all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 work inspector Day 1.00 600.00 600.00
2 mazdoor Day 34.00 460.00 15640.00
Total cost of Labour Rs: 16240.00
labour component/unit qty 162.40
Add contractor's profit and overhead charges 13.615% 22.10
labour component/unit qty (including contractor's profit) 184.50
103
Dam and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 78659.85
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 16240.00
Total Rs: 94899.85
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 12920.61
Total cost for 100.00 cum Rs: 107820.46
Rate per cum (A+B+C+D)/100 Rs: 1078.20
IRR-DAW-6-4-A Providing and constructing graded filter media below and behind rock-toe consisting of
(New Item2- 2011-12) 30 cm thick 80 - 20 mm size graded coarse
aggregates satisfying filter creteria as per specifications including cost of all materials, labour,
machinery, laying to required slope, compaction etc., complete with initial lead upto 50 m and
all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 work inspector Day 1.00 600.00 600.00
2 mazdoor Day 12.00 460.00 5520.00
Total cost of Labour Rs: 6120.00
labour component/unit qty 61.20
Add contractor's profit and overhead charges 13.615% 8.30
labour component/unit qty (including contractor's profit) 69.50
ABSTRACT:
A. Cost of Materials Rs: 98265.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 6120.00
Total Rs: 104385.00
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 14212.02
Total cost for 100.00 cum Rs: 118597.02
Rate per cum (A+B+C+D)/100 Rs: 1186.00
IRR-DAW-6-5 Providing and laying filter media consisting of 2 layers of 250 gsm poly-propeline non-woven
filter fabric and 400 mm thick 20 mm down graded coarse aggregate for vertical / inclined
and horizontal filter blanket for embankment including cost of all materials, machinery, labour
etc., complete with lead upto 50 m for aggregate and all leads for fabric and all lifts.
104
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 work inspector Day 1.00 600.00 600.00
2 mazdoor Day 14.00 460.00 6440.00
Total cost of Labour Rs: 7040.00
labour component/unit qty 70.40
Add contractor's profit and overhead charges 13.615% 9.60
labour component/unit qty (including contractor's profit) 80.00
ABSTRACT:
A. Cost of Materials Rs: 72470.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 7040.00
Total Rs: 79510.00
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 10825.29
Total cost for 100.00 sqm Rs: 90335.29
Rate per sqm (A+B+C+D)/100 Rs: 903.40
IRR-DAW-6-6 Providing and constructing 45 cm thick chimney filter using clean approved sand satisfying
filter creteria including cost of all materials, machinery, labour, compacting etc., complete with
initial lead upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 work inspector Day 1.00 600.00 600.00
2 mazdoor Day 30.00 460.00 13800.00
Total cost of Labour Rs: 14400.00
labour component/unit qty 144.00
Add contractor's profit and overhead charges 13.615% 19.60
labour component/unit qty (including contractor's profit) 163.60
ABSTRACT:
A. Cost of Materials Rs: 53550.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 14400.00
Total Rs: 67950.00
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 9251.39
Total cost for 100.00 cum Rs: 77201.39
Rate per cum (A+B+C+D)/100 Rs: 772.00
IRR-DAW-6-7 Providing and constructing 90 cm thick transition cum filter media behind rockfill using
approved sand and 80-20 mm and 20 mm down graded aggregates satisfying the filter creteria
in layers of 30 cm thickness each as per specifications including cost of all materials,
machinery, labour, laying each layer to required slope, compaction etc., complete with initial
lead upto 50 m and all lifts.
105
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 work inspector Day 1.00 600.00 600.00
2 mazdoor Day 40.00 460.00 18400.00
Total cost of Labour Rs: 19000.00
labour component/unit qty 190.00
Add contractor's profit and overhead charges 13.615% 25.90
labour component/unit qty (including contractor's profit) 215.90
ABSTRACT:
A. Cost of Materials Rs: 80027.50
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 19000.00
Total Rs: 99027.50
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 13482.59
Total cost for 100.00 cum. Rs: 112510.09
Rate per cum. (A+B+C+D)/100 Rs: 1125.10
IRR-DAW-6-8 Providing and constructing 60 cm thick hand packed rough stone revetment with 65 to
75 cm long through stones at 1.50 m c / c over a backing of 45 cm thick graded filter media
consisting of sand, 10 mm and 40 mm size approved graded aggregates laid in layers of 15 cm
thick each including cost of all materials, machinery, labour, laying to required slopes, wedging
with chips, finishing etc. complete with initial lead upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 work inspector Day 1.00 600.00 600.00
2 Mason Class-II Day 10.00 500.00 5000.00
3 mazdoor Day 33.00 460.00 15180.00
Total cost of Labour Rs: 20780.00
labour component/unit qty 207.80
Add contractor's profit and overhead charges 13.615% 28.30
labour component/unit qty (including contractor's profit) 236.10
106
Dam and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 64245.90
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 20780.00
Total Rs: 85025.90
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 11576.28
Total cost for 100.00 sqm Rs: 96602.18
Rate per sqm (A+B+C+D)/100 Rs: 966.00
IRR-DAW-6-9 Providing and constructing 60 cm thick hand packed rough stone revetment with 65 to 75
cm long through stones at 1.50 m c / c over a backing of 60 cm thick graded filter media
consisting of sand, 10 mm and 40 mm size approved graded aggregates laid in layers of 20 cm
thick each including cost of all materials, machinery, labour, laying to required slopes, wedging
with chips, finishing etc. complete with initial lead upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 work inspector Day 1.00 600.00 600.00
2 Mason Class-II Day 10.00 500.00 5000.00
3 mazdoor Day 39.00 460.00 17940.00
Total cost of Labour Rs: 23540.00
labour component/unit qty 235.40
Add contractor's profit and overhead charges 13.615% 32.00
labour component/unit qty (including contractor's profit) 267.40
ABSTRACT:
A. Cost of Materials Rs: 77470.20
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 23540.00
Total Rs: 101010.20
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 13752.54
Total cost for 100.00 sqm Rs: 114762.74
Rate per sqm (A+B+C+D)/100 Rs: 1147.60
IRR-DAW-6-10 Providing and constructing 60 cm thick hand packed rough stone riprap over a backing of
45 cm thick graded filter media consisting of sand, 10 mm and 40 mm size graded approved
aggregates laid in layers of 15 cm thick each including cost of all materials, machinery,
labour, laying to required slopes, wedging with stone chips etc., complete with initial lead upto
50 m and all lifts.
107
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 work inspector Day 1.00 600.00 600.00
2 Mason Class-II Day 5.00 500.00 2500.00
3 mazdoor Day 28.00 460.00 12880.00
Total cost of Labour Rs: 15980.00
labour component/unit qty 159.80
Add contractor's profit and overhead charges 13.615% 21.80
labour component/unit qty (including contractor's profit) 181.60
ABSTRACT:
A. Cost of Materials Rs: 62385.90
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 15980.00
Total Rs: 78365.90
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 10669.52
Total cost for 100.00 sqm. Rs: 89035.42
Rate per sqm. (A+B+C+D)/100 Rs: 890.40
IRR-DAW-6-11 Providing and constructing 75 cm thick hand packed rough stone riprap over a backing of
45 cm thick graded filter media consisting of sand, 10 mm and 40 mm size graded approved
aggregates laid in layers of 15 cm thick each including cost of all materials, machinery, labour,
laying to required slopes, wedging with stone chips, etc., complete with initial lead upto 50 m
and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 work inspector Day 1.00 600.00 600.00
2 Mason Class-II Day 6.00 500.00 3000.00
3 mazdoor Day 30.00 460.00 13800.00
Total cost of Labour Rs: 17400.00
labour component/unit qty 174.00
Add contractor's profit and overhead charges 13.615% 23.70
labour component/unit qty (including contractor's profit) 197.70
ABSTRACT:
A. Cost of Materials Rs: 67974.90
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 17400.00
Total Rs: 85374.90
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 11623.79
Total cost for 100.00 sqm Rs: 96998.69
Rate per sqm (A+B+C+D)/100 Rs: 970.00
IRR-DAW-6-12 Providing and constructing 90 cm thick hand packed rough stone riprap over a backing of
45 cm thick graded filter media consisting of sand, 10 mm and 40 mm size graded approved
aggregates laid in layers of 15 cm thick each including cost of all materials, machinery,
labour, laying to required slopes, wedging with stone chips etc., complete with initial lead upto
50 m and all lifts.
108
Dam and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 work inspector Day 1.00 600.00 600.00
2 Mason Class-II Day 8.00 500.00 4000.00
3 mazdoor Day 34.00 460.00 15640.00
Total cost of Labour Rs: 20240.00
labour component/unit qty 202.40
Add contractor's profit and overhead charges 13.615% 27.60
labour component/unit qty (including contractor's profit) 230.00
ABSTRACT:
A. Cost of Materials Rs: 73742.40
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 20240.00
Total Rs: 93982.40
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 12795.7
Total cost for 100.00 sqm Rs: 106778.10
Rate per sqm (A+B+C+D)/100 Rs: 1067.80
IRR-DAW-6-13 Providing and laying Hariyala or other approved quality turfing sods for the slopes of earthen
embankments over 20 mm thick sand backing including cost of all materials, machinery,
labour including preparing surface, spreading sand, watering for 15 days etc., complete with
initial lead upto 1 km and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Cartman with double bullock cart Day 2.00 550.00 1100.00
2 mazdoor Day 15.00 460.00 6900.00
Total cost of Labour Rs: 8000.00
labour component/unit qty 80.00
Add contractor's profit and overhead charges 13.615% 10.90
labour component/unit qty (including contractor's profit) 90.90
ABSTRACT:
A. Cost of Materials Rs: 3350.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 8000.00
Total Rs: 11350.00
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 1545.3
Lead Charges for 1 Km for FA 2.00 cum @ 30.4 Rs./Cum 60.8
Total cost for 100.00 sqm. Rs: 12956.10
Rate per sqm. (A+B+C+D)/100 Rs: 129.60
109
Tunnel and Allied Works - Item Unit Rates 2020-21
Chapter - II
3. The Leads for Steel shall be from the nearest market place to the Project area
4. For earth/rockfill embankments wherever initial lead of 1km is considered in the basic rate, the additional lead charges are to be added
as follows:
Additional lead charges for Earth, Murrum etc., shall be worked out for total lead involved and 1 km lead charges included in basic
rate shall be deducted from total lead charges. No loading and unloading charges shall be allowed for any item. (same as above)
Example:
Total lead for earth from approved borrow area : 15 Km
Initial lead included in the basic rate in the basic item rate in the data (i.e., item specification) : 1 Km
Additional lead charges : Lead charges for 5 km Rs. 81.10
Lead charges for next 10 km Rs. 122
Total lead charges for 15 km /cum Rs. 203.10
Less 1 km initial lead charges /cum Rs. 30.40 (-)
Net additional lead charges / cum Rs. 172.70
5. The initial lead up to 50 m as mentioned in some standard data items is meant for manual lead within the working area. For
conveyance of materials, the lead required from quarry/Borrow area/ Dump Area to worksite shall be added to the data without
deducting the 50 m initial lead charges
TAW -Work Items
IRR-TAW-1 EXCAVATION :
IRR-TAW-1-1 Excavation for adit by tunnelling methods in all types of rock including cost of all materials,
machinery, labour, scaling excavated surface, ventilation, lighting, drainage, removing and
hauling the excavated muck outside adit upto specified dump area and all other ancillary
operations etc., complete with initial lead upto 1km and all lifts.
110
Tunnel and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Drilling jumbo Hour 8.00 318.30 2546.40
Fuel / Energy charges Hour 8.00 59.20 473.60
2 Air compressor 15 cmm ( ele ) Hour 5.00 108.50 542.50
Fuel / Energy charges Hour 5.00 1063.10 5315.50
3 Jack hammer ( 4 x 5 hrs ) Hour 20.00 16.50 330.00
Fuel / Energy charges Hour 20.00 0.00 0.00
4 Pusher leg Hour 20.00 11.30 226.00
Fuel / Energy charges Hour 20.00 0.00 0.00
5 Convey mucker Hour 6.50 686.30 4460.95
Fuel / Energy charges Hour 6.50 296.00 1924.00
6 Dumper ( 1 x 6.5 hrs ) Hour 6.50 499.30 3245.45
Fuel / Energy charges Hour 6.50 552.50 3591.25
7 Pump 10 hp ( ele ) Hour 5.00 5.60 28.00
Fuel / Energy charges Hour 5.00 85.00 425.00
8 Ventilation fans 20 hp Hour 1.00 10.80 10.80
Fuel / Energy charges Hour 1.00 170.10 170.10
9 Sundries(explosive van / magazine ) LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 23353.55
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Drilling jumbo Hour 8.00 216.30 1730.40
2 Crew for Air compressor Hour 5.00 216.30 1081.50
3 Crew for Jack hammer Hour 20.00 405.60 8112.00
4 Crew for Convey mucker Hour 6.50 216.30 1405.95
5 Crew for Dumper Hour 6.50 275.80 1792.70
6 Crew for Pump Hour 5.00 101.10 505.50
7 Crew for ventilation fans Hour 1.00 34.90 34.90
8 Surveyor Day 0.50 850.00 425.00
9 Foreman Day 1.00 605.00 605.00
10 Fitter / Mechanic Day 2.00 560.00 1120.00
11 Blaster ( Licensed ) Day 1.00 605.00 605.00
12 Helper blasting Day 2.00 500.00 1000.00
13 Hammerman Day 2.00 500.00 1000.00
14 work inspector 1 in each shift Day 3.00 600.00 1800.00
15 Khalasi for mucking shift 4 Nos Day 4.00 540.00 2160.00
16 mazdoor
for mucking shift 4 Nos Day 4.00 460.00 1840.00
for other 2 shifts 1 No each shift Day 2.00 460.00 920.00
for cleaning & miscellaneous Day 2.00 460.00 920.00
Total cost of Labour Rs: 27057.95
labour component/unit qty 702.80
Add contractor's profit and overhead charges 13.615% 95.70
labour component/unit qty (including contractor's profit) 798.50
111
Tunnel and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 9406.97
B. Hire charges of Machinery Rs: 23353.55
C. Cost of Labour Rs: 27057.95
Total Rs: 59818.47
Add for Air and Water line @ 1.00% Rs: 598.18
Add for Ventilation @ 4.50% Rs: 2691.83
Add for Lighting @ 1.60% Rs: 957.10
Add for Ele sub-station / Demand charges @ 2.50% Rs: 1495.46
Total Rs: 65561.05
D.Add for contractor's profit and overheads on (A+B+C+other
percentages) 13.615% Rs: 8926.14
Total cost for 38.50 cum Rs: 74487.18
Rate per cum (A+B+C+D)/38.50 Rs: 1934.70
IRR-TAW-1-2 Excavation for vertical / inclined shaft in all types of soft / hard rock including cost of all
materials, machinery, labour, shoring, strutting, scaling excavated surface, ventilation, lighting,
drainage, removing and hauling excavated muck outside shaft upto specified dump area and
all other ancillary operations etc., complete with initial lead upto 1 km and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Air compressor 15 cmm ( ele ) Hour 4.50 108.50 488.25
Fuel / Energy charges Hour 4.50 1063.10 4783.95
2 Jack hammer ( 4 x 4 hrs ) Hour 16.00 16.50 264.00
Fuel / Energy charges Hour 16.00 0.00 0.00
3 Pump 10 hp ( ele ) Hour 4.00 5.60 22.40
Fuel / Energy charges Hour 4.00 85.00 340.00
4 Pump 20 hp electric Hour 2.00 10.30 20.60
Fuel / Energy charges Hour 2.00 170.10 340.20
5 Winch 35 hp electric Hour 28.00 117.60 3292.80
Fuel / Energy charges Hour 28.00 208.40 5835.20
6 Tipping tub 1.5 cum Hour 24.00 55.00 1320.00
Fuel / Energy charges Hour 24.00 0.00 0.00
7 Sundries(explosive van / magazine ) LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 16771.40
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Air compressor Hour 4.50 216.30 973.35
2 Crew for Jack hammer Hour 16.00 405.60 6489.60
3 Crew for Pump 10 hp Hour 4.00 101.10 404.40
4 Crew for Pump 20 hp Hour 2.00 101.10 202.20
5 Crew for Winch Hour 28.00 324.50 9086.00
6 Surveyor Day 0.50 850.00 425.00
7 Foreman Day 4.00 605.00 2420.00
8 Fitter / Mechanic Day 2.00 560.00 1120.00
9 Blaster ( Licensed ) Day 1.00 605.00 605.00
10 Helper blasting Day 2.00 500.00 1000.00
11 Hammerman 1 No. in each shift Day 3.00 500.00 1500.00
12 work inspector 1 in each shift Day 4.00 600.00 2400.00
13 Khalasi for mucking 2 Nos in each shift Day 6.00 540.00 3240.00
14 mazdoor
for mucking 8 Nos in each shift Day 24.00 460.00 11040.00
for other 2 shifts 1 No / shift Day 2.00 460.00 920.00
for cleaning & miscellaneous Day 2.00 460.00 920.00
Total cost of Labour Rs: 42745.55
112
Tunnel and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 7551.66
B. Hire charges of Machinery Rs: 16771.40
C. Cost of Labour Rs: 42745.55
Total Rs: 67068.61
Add for Air and Water line @ 1.00% Rs: 670.69
Add for Ventilation @ 4.50% Rs: 3018.09
Add for Lighting @ 1.60% Rs: 1073.10
Add for Ele sub-station / Demand charges @ 2.50% Rs: 1676.72
Total Rs: 73507.20
D.Add for contractor's profit and overheads on (A+B+C+other
percentages) 13.615% Rs: 10008.00
Total cost for 30.00 cum Rs: 83515.20
Rate per cum (A+B+C+D)/30.0 Rs: 2783.80
IRR-TAW-1-3 Excavation for tunnel by tunnelling methods in rock not requiring supports including cost
of all materials,machinery, labour, scaling excavated surface, removing under-cuts, ventilation,
lighting, drainage, removing and hauling the excavated muck outside tunnel upto specified
dump area and all other ancillary operations etc., complete with initial lead upto 1 km and
all lifts.
113
Tunnel and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Drilling jumbo Hour 10.00 318.30 3183.00
Fuel / Energy charges Hour 10.00 59.20 592.00
2 Air compressor 15 cmm ( ele ) Hour 6.50 108.50 705.25
Fuel / Energy charges Hour 6.50 1063.10 6910.15
3 Jack hammer ( 4 x 6.5 hrs ) Hour 26.00 16.50 429.00
Fuel / Energy charges Hour 26.00 0.00 0.00
4 Pusher leg Hour 26.00 11.30 293.80
Fuel / Energy charges Hour 26.00 0.00 0.00
5 Convey mucker Hour 6.00 686.30 4117.80
Fuel / Energy charges Hour 6.00 296.00 1776.00
6 Dumper ( 2 x 6 hrs ) Hour 12.00 499.30 5991.60
Fuel / Energy charges Hour 12.00 552.50 6630.00
7 Pump 10 hp ( ele ) Hour 6.50 5.60 36.40
Fuel / Energy charges Hour 6.50 85.00 552.50
8 Ventilation fans 20 hp Hour 2.00 10.80 21.60
Fuel / Energy charges Hour 2.00 170.10 340.20
9 Sundries(explosive van / magazine ) LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 31643.30
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Drilling jumbo Hour 10.00 216.30 2163.00
2 Crew for Air compressor Hour 6.50 216.30 1405.95
3 Crew for Jack hammer Hour 26.00 405.60 10545.60
4 Crew for Convey mucker Hour 6.00 216.30 1297.80
5 Crew for Dumper Hour 12.00 275.80 3309.60
6 Crew for Pump Hour 6.50 101.10 657.15
7 Crew for ventilation fans Hour 2.00 34.90 69.80
8 Surveyor Day 0.50 850.00 425.00
9 Foreman Day 1.00 605.00 605.00
10 Fitter / Mechanic Day 2.00 560.00 1120.00
11 Blaster ( Licensed ) Day 1.00 605.00 605.00
12 Helper blasting Day 2.00 500.00 1000.00
13 Hammerman Day 2.00 500.00 1000.00
14 work inspector 1 in each shift Day 3.00 600.00 1800.00
15 Khalasi for mucking shift 4 Nos Day 4.00 540.00 2160.00
16 mazdoor
for mucking shift 8 Nos Day 8.00 460.00 3680.00
for other 2 shifts 1 No each shift Day 2.00 460.00 920.00
for cleaning & miscellaneous Day 2.00 460.00 920.00
Total cost of Labour Rs: 33683.90
labour component/unit qty 693.10
Add contractor's profit and overhead charges 13.615% 94.40
labour component/unit qty (including contractor's profit) 787.50
ABSTRACT:
A. Cost of Materials Rs: 11998.70
B. Hire charges of Machinery Rs: 31643.30
C. Cost of Labour Rs: 33683.90
Total Rs: 77325.90
Add for Air and Water line @ 1.00% Rs: 773.26
Add for Ventilation @ 4.50% Rs: 3479.67
Add for Lighting @ 1.60% Rs: 1237.21
Add for Ele sub-station / Demand charges @ 2.50% Rs: 1933.15
Total Rs: 84749.19
D.Add for contractor's profit and overheads on (A+B+C+other
percentages) 13.615% Rs: 11538.60
Total cost for 48.60 cum Rs: 96287.79
Rate per cum (A+B+C+D)/48.60 Rs: 1981.20
114
Tunnel and Allied Works - Item Unit Rates 2020-21
IRR-TAW-1-4 Excavation for tunnel by tunnelling methods including excavation for supports in all types of
soil / rock strata requiring supports ( excluding cost of providing supports ) including cost of
all other materials, machinery, labour, scaling excavated surface, ventilation, lighting, drainage,
removing and hauling the excavated muck outside tunnel upto specified dump area and all
other ancillary operations etc., complete with initial lead upto 1 km and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Drilling jumbo Hour 11.00 318.30 3501.30
Fuel / Energy charges Hour 11.00 59.20 651.20
2 Air compressor 15 cmm ( ele ) Hour 6.00 108.50 651.00
Fuel / Energy charges Hour 6.00 1063.10 6378.60
3 Jack hammer ( 4 x 6 hrs ) Hour 24.00 16.50 396.00
Fuel / Energy charges Hour 24.00 0.00 0.00
4 Pusher leg Hour 24.00 11.30 271.20
Fuel / Energy charges Hour 24.00 0.00 0.00
5 Convey mucker Hour 6.00 686.30 4117.80
Fuel / Energy charges Hour 6.00 296.00 1776.00
6 Dumper ( 2 x 6 hrs ) Hour 12.00 499.30 5991.60
Fuel / Energy charges Hour 12.00 552.50 6630.00
7 Pump 10 hp ( ele ) Hour 6.00 5.60 33.60
Fuel / Energy charges Hour 6.00 85.00 510.00
8 Ventilation fans 20 hp Hour 2.00 10.80 21.60
Fuel / Energy charges Hour 2.00 170.10 340.20
9 Sundries(explosive van / magazine ) LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 31334.10
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Drilling jumbo Hour 11.00 216.30 2379.30
2 Crew for Air compressor Hour 6.00 216.30 1297.80
3 Crew for Jack hammer Hour 24.00 405.60 9734.40
4 Crew for Convey mucker Hour 6.00 216.30 1297.80
5 Crew for Dumper Hour 12.00 275.80 3309.60
6 Crew for Pump Hour 6.00 101.10 606.60
7 Crew for ventilation fans Hour 2.00 34.90 69.80
8 Surveyor Day 0.50 850.00 425.00
9 Foreman Day 1.00 605.00 605.00
10 Fitter / Mechanic Day 2.00 560.00 1120.00
11 Blaster ( Licensed ) Day 1.00 605.00 605.00
12 Helper blasting Day 2.00 500.00 1000.00
13 Hammerman 2 Nos Day 2.00 500.00 1000.00
14 work inspector 1 in each shift Day 3.00 600.00 1800.00
15 Khalasi for mucking shift 4 Nos Day 4.00 540.00 2160.00
16 mazdoor
for mucking shift 8 Nos Day 8.00 460.00 3680.00
for other 2 shifts 1 No each shift Day 2.00 460.00 920.00
for cleaning & miscellaneous Day 2.00 460.00 920.00
Total cost of Labour Rs: 32930.30
labour component/unit qty 715.90
Add contractor's profit and overhead charges 13.615% 97.50
labour component/unit qty (including contractor's profit) 813.40
115
Tunnel and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 11066.84
B. Hire charges of Machinery Rs: 31334.10
C. Cost of Labour Rs: 32930.30
Total Rs: 75331.24
Add for Air and Water line @ 1.00% Rs: 753.31
Add for Ventilation @ 4.50% Rs: 3389.91
Add for Lighting @ 1.60% Rs: 1205.30
Add for Ele sub-station / Demand charges @ 2.50% Rs: 1883.28
Total Rs: 82563.04
D.Add for contractor's profit and overheads on (A+B+C+other
percentages) 13.615% Rs: 11240.96
Total cost for 46.00 cum Rs: 93804.00
Rate per cum (A+B+C+D)/46.0 Rs: 2039.20
IRR-TAW-1-5 Excavation for tunnel by heading and benching tunnelling methods including excavation
for supports in all types of soil / rock strata requiring supports ( excluding cost of providing
supports ) for roof before benching including cost of all other materials, machinery, labour,
scaling excavated surface, ventilation, lighting, drainage removing and hauling excavated muck
outside tunnel upto specified dump area and all other ancillary operations etc., complete with
initial lead upto 1 km and all lifts.
116
Tunnel and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Drilling jumbo Hour 12.00 318.30 3819.60
Fuel / Energy charges Hour 12.00 59.20 710.40
2 Air compressor 15 cmm ( ele ) Hour 6.50 108.50 705.25
Fuel / Energy charges Hour 6.50 1063.10 6910.15
3 Jack hammer ( 4 x 6.5 hrs ) Hour 26.00 16.50 429.00
Fuel / Energy charges Hour 26.00 0.00 0.00
4 Pusher leg Hour 26.00 11.30 293.80
Fuel / Energy charges Hour 26.00 0.00 0.00
5 Convey mucker Hour 6.50 686.30 4460.95
Fuel / Energy charges Hour 6.50 296.00 1924.00
6 Dumper ( 2 x 6.5 hrs ) Hour 13.00 499.30 6490.90
Fuel / Energy charges Hour 13.00 552.50 7182.50
7 Pump 10 hp ( ele ) Hour 6.50 5.60 36.40
Fuel / Energy charges Hour 6.50 85.00 552.50
8 Ventilation fans 20 hp Hour 3.00 10.80 32.40
Fuel / Energy charges Hour 3.00 170.10 510.30
9 Sundries(explosive van / magazine ) LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 34122.15
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Drilling jumbo Hour 12.00 216.30 2595.60
2 Crew for Air compressor Hour 6.50 216.30 1405.95
3 Crew for Jack hammer Hour 26.00 405.60 10545.60
4 Crew for Convey mucker Hour 6.50 216.30 1405.95
5 Crew for Dumper Hour 13.00 275.80 3585.40
6 Crew for Pump Hour 6.50 101.10 657.15
7 Crew for Ventilation fan Hour 3.00 34.90 104.70
8 Surveyor Day 0.50 850.00 425.00
9 Foreman Day 1.00 605.00 605.00
10 Fitter / Mechanic Day 2.00 560.00 1120.00
11 Blaster ( Licensed ) Day 2.00 605.00 1210.00
12 Helper blasting Day 4.00 500.00 2000.00
13 Hammerman 2 Nos Day 2.00 500.00 1000.00
14 work inspector 1 in each shift Day 3.00 600.00 1800.00
15 Khalasi
for pushing muck in heading portion Day 4.00 540.00 2160.00
for mucking shift 4 Nos Day 4.00 540.00 2160.00
16 mazdoor
for mucking shift 8 Nos Day 8.00 460.00 3680.00
for other 2 shifts 1 No each shift Day 2.00 460.00 920.00
for cleaning &miscellaneous Day 2.00 460.00 920.00
Total cost of Labour Rs: 38300.35
labour component/unit qty 766.00
Add contractor's profit and overhead charges 13.615% 104.30
labour component/unit qty (including contractor's profit) 870.30
ABSTRACT:
A. Cost of Materials Rs: 11972.01
B. Hire charges of Machinery Rs: 34122.15
C. Cost of Labour Rs: 38300.35
Total Rs: 84394.51
Add for Air and Water line @ 1.00% Rs: 843.95
Add for Ventilation @ 4.50% Rs: 3797.75
Add for Lighting @ 1.60% Rs: 1350.31
Add for Ele sub-station / Demand charges @ 2.50% Rs: 2109.86
Total Rs: 92496.38
D.Add for contractor's profit and overheads on (A+B+C+other
percentages) 13.615% Rs: 12593.38
Total cost for 50.00 cum Rs: 105089.77
Rate per cum (A+B+C+D)/50.0 Rs: 2101.80
NOTE: Where mucking is to be carried out through shaft using winch and mucking tub system
increase the basic rates for items IRR-TAW-1-3, IRR-TAW-1-4 & IRR-TAW-1-5 by 8 percent.
117
Tunnel and Allied Works - Item Unit Rates 2020-21
IRR-TAW-1-6 Removing and hauling muck overfallen due to natural causes such as geological faults
etc., out of tunnel including breaking large fragments by blasting if necessary and disposing off
the same in specified dump area or as directed including cost of all materials, machinery,
labour, ventilation, drainage, lighting and all other ancillary operations etc., complete with
initial lead upto 1 km and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Air compressor 15 cmm ( ele ) Hour 1.00 108.50 108.50
Fuel / Energy charges Hour 1.00 1063.10 1063.10
2 Jack hammer Hour 4.00 16.50 66.00
Fuel / Energy charges Hour 4.00 0.00 0.00
3 Pump 10 hp ( ele ) Hour 1.00 5.60 5.60
Fuel / Energy charges Hour 1.00 85.00 85.00
4 Convey mucker Hour 6.00 686.30 4117.80
Fuel / Energy charges Hour 6.00 296.00 1776.00
5 Dumper 4.5 cum Hour 12.00 499.30 5991.60
Fuel / Energy charges Hour 12.00 552.50 6630.00
6 Sundries LS 1.00 32.00 32.00
Total hire charges of Machinery Rs: 19875.60
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Air compressor Hour 1.00 216.30 216.30
2 Crew for Jack hammer Hour 4.00 405.60 1622.40
3 Crew for Pump Hour 1.00 101.10 101.10
4 Crew for Convey mucker Hour 6.00 216.30 1297.80
5 Crew for Dumper Hour 12.00 275.80 3309.60
6 Blaster ( Licensed ) Day 0.50 605.00 302.50
7 Helper blasting Day 0.50 500.00 250.00
8 mazdoor Day 8.00 460.00 3680.00
Total cost of Labour Rs: 10779.70
labour component/unit qty 107.80
Add contractor's profit and overhead charges 13.615% 14.70
labour component/unit qty (including contractor's profit) 122.50
ABSTRACT:
A. Cost of Materials Rs: 1453.97
B. Hire charges of Machinery Rs: 19875.60
C. Cost of Labour Rs: 10779.70
Total Rs: 32109.27
Add for Air and Water line @ 1.00% Rs: 321.09
Add for Ventilation @ 4.50% Rs: 1444.92
Add for Lighting @ 1.60% Rs: 513.75
Add for Ele sub-station / Demand charges @ 2.50% Rs: 802.73
Total Rs: 35191.76
D.Add for contractor's profit and overheads on (A+B+C+other
percentages) 13.615% Rs: 4791.36
Total cost for 100.00 cum Rs: 39983.12
Rate per cum (A+B+C+D)/100.0 Rs: 399.80
118
Tunnel and Allied Works - Item Unit Rates 2020-21
IRR-TAW-2-1 Dewatering tunnel by pumping out water collected by natural drainage inside tunnel including
providing sump wherever necessary, cost of all materials, machinery, labour, drainage, lighting,
ventilation and all other ancillary operations etc., complete.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Electric pump 20 hp Hour 1.00 10.30 10.30
2 Fuel / Energy charges Hour 1.00 170.10 170.10
3 Sundries(Starter/Switches ete) LS 0.10 32.00 3.20
Total hire charges of Machinery Rs: 183.60
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew charges for Pump Hour 1.00 101.10 101.10
2 Laying & dismantling pipe LS 0.05 32.00 1.60
3 mazdoor Day 0.10 460.00 46.00
Total cost of Labour Rs: 148.70
labour component/unit qty 9.90
Add contractor's profit and overhead charges 13.615% 1.30
labour component/unit qty (including contractor's profit) 11.20
ABSTRACT:
A. Cost of Materials Rs: 10.55
B. Hire charges of Machinery Rs: 183.60
C. Cost of Labour Rs: 148.70
Total Rs: 342.85
Add for Air and Water line @ 1.00% Rs: 3.43
Add for Ventilation @ 4.50% Rs: 15.43
Add for Lighting @ 1.60% Rs: 5.49
Add for Ele sub-station / Demand charges @ 2.50% Rs: 8.57
Total Rs: 375.76
D.Add for contractor's profit and overheads on (A+B+C+other
percentages) 13.615% Rs: 51.16
Total cost for 15.00 Kwhr Rs: 426.92
Rate per Kwhr (A+B+C+D)/15.0 Rs: 28.50
IRR-TAW-2-2 Providing 25 mm thick guniting to sides and arch of tunnel in cement mortar 1 : 3 proportion
by weight including cost of all materials, machinery, labour, ventilation, lighting, drainage
and all other ancillary operations etc., complete with lead upto 1 km and all lifts.
119
Tunnel and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Guniting equipment Hour 8.00 102.50 820.00
Fuel / Energy charges Hour 8.00 0.00 0.00
2 Air compressor 8.5 cmm ( ele ) Hour 8.00 136.90 1095.20
Fuel / Energy charges Hour 8.00 478.40 3827.20
3 Pump 10 hp ( ele ) Hour 1.00 5.60 5.60
Fuel / Energy charges Hour 1.00 85.00 85.00
4 Drilling jumbo Hour 4.00 318.30 1273.20
Fuel / Energy charges Hour 4.00 59.20 236.80
5 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 7407.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Guniting equipment Hour 8.00 270.40 2163.20
2 Crew for Air compressor Hour 8.00 202.80 1622.40
3 Crew for pump Hour 1.00 101.10 101.10
4 Crew for Drilling jumbo Hour 4.00 216.30 865.20
5 Mason Cl I Day 1.00 550.00 550.00
6 mazdoor Day 6.00 460.00 2760.00
Total cost of Labour Rs: 8061.90
labour component/unit qty 223.90
Add contractor's profit and overhead charges 13.615% 30.50
labour component/unit qty (including contractor's profit) 254.40
ABSTRACT:
A. Cost of Materials Rs: 3043.20
B. Hire charges of Machinery Rs: 7407.00
C. Cost of Labour Rs: 8061.90
Total Rs: 18512.10
Add for Air and Water line @ 1.00% Rs: 185.12
Add for Ventilation @ 4.50% Rs: 833.04
Add for Lighting @ 1.60% Rs: 296.19
Add for Ele sub-station / Demand charges @ 2.50% Rs: 462.80
Total Rs: 20289.26
D.Add for contractor's profit and overheads on (A+B+C+other
percentages) 13.615% Rs: 2762.38
Lead Charges for 1 Km for FA 1.10 cum @ 30.4 Rs./Cum 33.44
Total cost for 36.00 sqm Rs: 23085.08
Rate per sqm (A+B+C+D)/36.0 Rs: 641.30
IRR-TAW-2-3 Shortcreting in two layers (each layer+38 mm thickness) for slabs duly fixing chain weld wire mesh
(new4 - 2011-
12) 100 x 100x5 mm in between the two layers including cost and conveyance of all materials,
labour charges, all heads, lifts, centering, scaffolding, machine mixing,
laying concrete with shortcrete machine etc. complete as per specification and as
directed by Engineer-in-Charge
120
Tunnel and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Guniting equipment Hour 8.00 102.50 820.00
Fuel / Energy charges Hour 8.00 0.00 0.00
2 Air compressor 8.5 cmm ( ele ) Hour 8.00 136.90 1095.20
Fuel / Energy charges Hour 8.00 478.40 3827.20
3 Pump 10 hp ( ele ) Hour 1.00 5.60 5.60
Fuel / Energy charges Hour 1.00 85.00 85.00
4 Drilling jumbo Hour 4.00 318.30 1273.20
Fuel / Energy charges Hour 4.00 59.20 236.80
5 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 7407.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Guniting equipment Hour 8.00 270.40 2163.20
2 Crew for Air compressor Hour 8.00 202.80 1622.40
3 Crew for pump Hour 1.00 101.10 101.10
4 Crew for Drilling jumbo Hour 4.00 216.30 865.20
5 Mason Cl I Day 1.00 550.00 550.00
6 mazdoor Day 6.00 460.00 2760.00
Total cost of Labour Rs: 8061.90
labour component/unit qty 223.90
Add contractor's profit and overhead charges 13.615% 30.50
labour component/unit qty (including contractor's profit) 254.40
ABSTRACT:
A. Cost of Materials Rs: 27146.90
B. Hire charges of Machinery Rs: 7407.00
C. Cost of Labour Rs: 8061.90
Total Rs: 42615.80
Add for Air and Water line @ 1.00% Rs: 426.16
Add for Ventilation @ 4.50% Rs: 1917.71
Add for Lighting @ 1.60% Rs: 681.85
Add for Ele sub-station / Demand charges @ 2.50% Rs: 1065.39
Total Rs: 46706.91
D.Add for contractor's profit and overheads on (A+B+C+other
percentages) 13.615% Rs: 6359.15
Lead Charges for 1 Km for FA 2.41 cum @ 30.4 Rs./Cum 73.264
Lead Charges for 1 Km for CA 1.03 cum @ 29.4 Rs./Cum 30.282
Total cost for 36.00 sqm Rs: 53169.60
Rate per sqm (A+B+C+D)/36.0 Rs: 1476.90
IRR-TAW-3-1 Providing and fixing 25 mm diameter steel rock bolts with mechanical / wedge type
anchorage including drilling 35 mm dia holes, providing 15 cm long 20 mm thick steel tapered
wedge, 10 mm thick plate washers and nuts, tightening bolt by torque wrench, cost of all
materials, machinery, labour, ventilation, lighting, drainage and all other ancillary operations
etc., complete with lead upto 1 km and all lifts.
121
Tunnel and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Air compressor 15 cmm ( ele ) Hour 1.50 108.50 162.75
Fuel / Energy charges Hour 1.50 1063.10 1594.65
2 Pump 10 hp ( ele ) Hour 1.00 5.60 5.60
Fuel / Energy charges Hour 1.00 85.00 85.00
3 Jack hammer Hour 6.00 16.50 99.00
Fuel / Energy charges Hour 6.00 0.00 0.00
4 Pusher leg Hour 6.00 11.30 67.80
Fuel / Energy charges Hour 6.00 0.00 0.00
5 Drilling jumbo Hour 4.00 318.30 1273.20
Fuel / Energy charges Hour 4.00 59.20 236.80
6 Sundries ( lathe, blower etc ) LS 5.00 32.00 160.00
Total hire charges of Machinery Rs: 3684.80
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Air compressor Hour 1.50 216.30 324.45
2 Crew for pump Hour 1.00 101.10 101.10
3 Crew for Jack hammer Hour 6.00 405.60 2433.60
4 Crew for Drilling jumbo Hour 4.00 216.30 865.20
5 Fitter Day 0.50 560.00 280.00
6 Gas cutter Day 1.00 540.00 540.00
7 Turner Day 1.00 605.00 605.00
8 Blacksmith Day 1.00 525.00 525.00
9 Khalasi ( 2 x 0.5 ) Day 1.00 540.00 540.00
10 Hammerman Day 0.50 500.00 250.00
11 mazdoor Day 2.00 460.00 920.00
Total cost of Labour Rs: 7384.35
labour component/unit qty 369.20
Add contractor's profit and overhead charges 13.615% 50.30
labour component/unit qty (including contractor's profit) 419.50
ABSTRACT:
A. Cost of Materials Rs: 8009.16
B. Hire charges of Machinery Rs: 3684.80
C. Cost of Labour Rs: 7384.35
Total Rs: 19078.31
Add for Air and Water line @ 1.00% Rs: 190.78
Add for Ventilation @ 4.50% Rs: 858.52
Add for Lighting @ 1.60% Rs: 305.25
Add for Ele sub-station / Demand charges @ 2.50% Rs: 476.96
Total Rs: 20909.82
D.Add for contractor's profit and overheads on (A+B+C+other
percentages) 13.615% Rs: 2846.87
Lead Charges for 1Km for Steel (including
Loading and Unloading Charges) 0.16 tonne @ 190.9 Rs./Tonne 30.35990081
Total cost for 20.00 Rm Rs: 23787.06
Rate per Rm (A+B+C+D)/20.0 Rs: 1189.40
IRR-TAW-3-2 Providing and fixing 25 mm diameter steel rock bolts with resin bond cement capsule
anchorage including drilling 35 mm dia holes, inserting grout capsule, driving bolt,fixing 10 mm
thick plate washers and nuts and tightening the same by torque wrench after hardening of
cement grout, cost of all materials, machinery, labour, ventilation, lighting, drainage and other
ancillary operations etc., complete with lead upto 1 km and all lifts.
122
Tunnel and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Air compressor 15 cmm ( ele ) Hour 1.50 108.50 162.75
Fuel / Energy charges Hour 1.50 1063.10 1594.65
2 Pump 10 hp ( ele ) Hour 1.00 5.60 5.60
Fuel / Energy charges Hour 1.00 85.00 85.00
3 Jack hammer Hour 6.00 16.50 99.00
Fuel / Energy charges Hour 6.00 0.00 0.00
4 Pusher leg Hour 6.00 11.30 67.80
Fuel / Energy charges Hour 6.00 0.00 0.00
5 Drilling jumbo Hour 4.00 318.30 1273.20
Fuel / Energy charges Hour 4.00 59.20 236.80
6 Sundries ( lathe, etc ) LS 3.00 32.00 96.00
Total hire charges of Machinery Rs: 3620.80
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Air compressor Hour 1.50 216.30 324.45
2 Crew for pump Hour 1.00 101.10 101.10
3 Crew for Jack hammer Hour 6.00 405.60 2433.60
4 Crew for Drilling jumbo Hour 4.00 216.30 865.20
5 Fitter Day 0.50 500.00 250.00
6 Gas cutter Day 1.00 540.00 540.00
7 Turner Day 1.00 605.00 605.00
8 Khalasi ( 2 x 0.5 ) Day 1.00 540.00 540.00
9 Hammerman Day 0.50 500.00 250.00
10 mazdoor Day 2.00 460.00 920.00
Total cost of Labour Rs: 6829.35
labour component/unit qty 341.50
Add contractor's profit and overhead charges 13.615% 46.50
labour component/unit qty (including contractor's profit) 388.00
ABSTRACT:
A. Cost of Materials Rs: 7765.34
B. Hire charges of Machinery Rs: 3620.80
C. Cost of Labour Rs: 6829.35
Total Rs: 18215.49
Add for Air and Water line @ 1.00% Rs: 182.15
Add for Ventilation @ 4.50% Rs: 819.70
Add for Lighting @ 1.60% Rs: 291.45
Add for Ele sub-station / Demand charges @ 2.50% Rs: 455.39
Total Rs: 19964.17
D.Add for contractor's profit and overheads on (A+B+C+other
percentages) 13.615% Rs: 2718.12
Lead Charges for 1Km for Steel (including
Loading and Unloading Charges) 0.15 tonne @ 190.9 Rs./Tonne 29.17978088
Total cost for 20.00 Rm Rs: 22711.47
Rate per Rm (A+B+C+D)/20.0 Rs: 1135.60
IRR-TAW-3-3 Providing, fabricating and fixing in position permanent structural steel supports as per details
including cost of all materials, machinery, labour, cutting, bending, welding, grinding, lighting,
ventilation, drainage and all other ancillary operations etc., complete with initial lead upto
1 km and all lifts.
123
Tunnel and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Bending machine Hour 8.00 36.20 289.60
Fuel / Energy charges Hour 8.00 127.60 1020.80
2 Welding set Hour 16.00 14.20 227.20
Fuel / Energy charges Hour 16.00 102.10 1633.60
3 Drilling Jumbo Hour 12.00 318.30 3819.60
Fuel / Energy charges Hour 12.00 59.20 710.40
4 Sundries ( lathe / drilling / grinder ) LS 30.00 32.00 960.00
Total hire charges of Machinery Rs: 8661.20
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Drilling Jumbo Hour 12.00 216.30 2595.60
2 Crew fir Bending machine Hour 8.00 162.20 1297.60
3 For cutting & preparing sections:
Structural steel Marker Day 1.00 655.00 655.00
Gas cutter Day 2.00 540.00 1080.00
Fitter Day 2.00 560.00 1120.00
Turner / Driller Day 3.00 605.00 1815.00
Khalasi Day 2.00 540.00 1080.00
Helper fabrication Day 4.00 500.00 2000.00
4 For welding sections:
Welder Day 2.00 540.00 1080.00
Helper fabrication Day 2.00 500.00 1000.00
Khalasi Day 2.00 540.00 1080.00
5 For erection of supports:
Foreman Day 1.00 605.00 605.00
Structural steel Erector Day 2.00 655.00 1310.00
Helper erector Day 2.00 500.00 1000.00
Khalasi Day 4.00 540.00 2160.00
Total cost of Labour Rs: 19878.20
labour component/unit qty 19878.20
Add contractor's profit and overhead charges 13.615% 2706.40
labour component/unit qty (including contractor's profit) 22584.60
ABSTRACT:
A. Cost of Materials Rs: 48562.20
B. Hire charges of Machinery Rs: 8661.20
C. Cost of Labour Rs: 19878.20
Total Rs: 77101.60
Add for Air and Water line @ 1.00% Rs: 771.02
Add for Ventilation @ 4.50% Rs: 3469.57
Add for Lighting @ 1.60% Rs: 1233.63
Add for Ele sub-station / Demand charges @ 2.50% Rs: 1927.54
Total Rs: 84503.35
D.Add for contractor's profit and overheads on (A+B+C+other
percentages) 13.615% Rs: 11505.13
Lead Charges for 1Km for Steel (including
Loading and Unloading Charges) 1.03 tonne @ 190.9 Rs./Tonne 195.6725
124
Tunnel and Allied Works - Item Unit Rates 2020-21
IRR-TAW-3-4 Providing, fabricating and fixing in position temperary structural steel supports as per details
and dismantling the same before concreting including cost of all materials, machinery, labour,
cutting, bending, welding, grinding, ventilation, lighting, drainage and all other ancillary
operations etc.,complete with initial lead upto 1 km and all lifts.
125
Tunnel and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 2452.11
B. Hire charges of Machinery for fabrication Rs: 206.56
C. Hire charges of Machinery for erection and dismantling Rs: 7115.00
D. Cost of Labour for fabrication Rs: 610.38
E. Cost of Labour for erection and dismantling Rs: 9342.90
Total Rs: 19726.95
Add for Air and Water line @ 1.00% Rs: 197.27
Add for Ventilation @ 4.50% Rs: 887.71
Add for Lighting @ 1.60% Rs: 315.63
Add for Ele sub-station / Demand charges @ 2.50% Rs: 493.17
Total Rs: 21620.74
D.Add for contractor's profit and overheads on (A+B+C+other
percentages) 13.615% Rs: 2943.66
Lead Charges for 1Km for Steel (including
Loading and Unloading Charges) 1.03 tonne @ 190.9 Rs./Tonne 195.6725
Total cost for 1.00 tonne Rs: 24760.07
Rate per tonne (A+B+C+D)/1.0 Rs: 24760.10
IRR-TAW-3-5 Providing and fixing hard variety cut jungle wood for lagging / blocking locations in tunnel
wherever required including cost of all materials, machinery, labour, fixing in position, lighting,
ventilation, drainage etc complete with all leads and lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Drilling jumbo Hour 2.00 318.30 636.60
Fuel / Energy charges Hour 2.00 59.20 118.40
Total hire charges of Machinery Rs: 755.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Drilling jumbo Hour 2.00 216.30 432.60
2 Carpenter Cl II Day 1.00 500.00 500.00
3 mazdoor Day 2.00 460.00 920.00
Total cost of Labour Rs: 1852.60
labour component/unit qty 1852.60
Add contractor's profit and overhead charges 13.615% 252.20
labour component/unit qty (including contractor's profit) 2104.80
126
Tunnel and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 19562.50
B. Hire charges of Machinery Rs: 755.00
C. Cost of Labour Rs: 1852.60
Total Rs: 22170.10
Add for Air and Water line @ 1.00% Rs: 221.70
Add for Ventilation @ 4.50% Rs: 997.65
Add for Lighting @ 1.60% Rs: 354.72
Add for Ele sub-station / Demand charges @ 2.50% Rs: 554.25
Total Rs: 24298.43
D.Add for contractor's profit and overheads on (A+B+C+other
percentages) 13.615% Rs: 3308.23
Total cost for 1.00 cum Rs: 27606.66
Rate per cum (A+B+C+D)/1.0 Rs: 27606.70
IRR-TAW-4-1 Providing and constructing un-coursed rubble stone masonry with approved stones from
tunnel excavated muck in cement mortar 1 : 6 proportion for backfilling over cuts / slips on
tunnel sides due to geological faults etc., including cost of all materials, machinery, labour,
cleaning,scaffolding, packing mortar, wedging stone chips, curing, ventilation, lighting, drainage
complete with lead upto 1 km and all lifts.
(cement content : 95 kg/cum of masonry, Rubble stones : 0.83 cum, Stone chips : 0.13 cum,
FA : 0.40 cum)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 10 hp pump ( ele ) Hour 1.00 5.60 5.60
Fuel / energy charges Hour 1.00 85.00 85.00
Total hire charges of Machinery Rs: 90.60
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Pump Hour 1.00 101.10 101.10
2 work inspector Day 1.00 600.00 600.00
3 Mason Class-I Day 1.00 550.00 550.00
4 Mason Class-II Day 2.00 500.00 1000.00
5 mazdoor
for sorting out rubble in dump yard Day 1.00 460.00 460.00
for conveying rubble Day 2.00 460.00 920.00
for preparing mortar Day 2.00 460.00 920.00
for loading mortar pans Day 1.00 460.00 460.00
for laying & packing mortar Day 4.00 460.00 1840.00
for washing rubble / finishing / curing Day 1.00 460.00 460.00
for conveying mortar / chips Day 3.00 460.00 1380.00
TOTAL Rs: 8691.10
Add for labour for scaffolding @ 15.0% Rs: 1303.67
Total cost of Labour Rs: 9994.77
labour component/unit qty 999.48
Add contractor's profit and overhead charges 13.615% 136.10
labour component/unit qty (including contractor's profit) 1135.60
127
Tunnel and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 9278.45
B. Hire charges of Machinery Rs: 90.60
C. Cost of Labour Rs: 9994.77
Total Rs: 19363.82
Add for Air and Water line @ 1.00% Rs: 193.64
Add for Ventilation @ 4.50% Rs: 871.37
Add for Lighting @ 1.60% Rs: 309.82
Add for Ele sub-station / Demand charges @ 2.50% Rs: 484.10
Total Rs: 21222.75
D.Add for contractor's profit and overheads on (A+B+C+other
percentages) 13.615% Rs: 2889.48
Lead Charges for 1 Km for FA 4.00 cum @ 30.4 Rs./Cum 121.6
Lead Charges for 1 Km for Stones and Stone Chips9.55 cum @ 29.4 Rs./Cum 280.77
Total cost for 10.00 cum Rs: 24514.59
Rate per cum (A+B+C+D)/10.0 Rs: 2451.50
IRR-TAW-5-1 Providing, fabricating and placing in position reinforcement steel for tunnel RCC works
including cleaning, straightening, cutting, bending, hooking, lapping / welding joints wherever
required, tying with 1.25 mm dia.soft annealed steel wire, including cost of all materials, labour,
machinery, ventilation, lighting, drainage etc.,complete with initial lead upto 1 km and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Bar bender Day 9.00 665.00 5985.00
2 mazdoor Day 15.00 460.00 6900.00
Total cost of Labour Rs: 12885.00
labour component/unit qty 12885.00
Add contractor's profit and overhead charges 13.615% 1754.30
labour component/unit qty (including contractor's profit) 14639.30
ABSTRACT:
A. Cost of Materials Rs: 43441.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 12885.00
Total Rs: 56326.00
Add for Air and Water line @ 1.00% Rs: 563.26
Add for Ventilation @ 4.50% Rs: 2534.67
Add for Lighting @ 1.60% Rs: 901.22
Add for Ele sub-station / Demand charges @ 2.50% Rs: 1408.15
Total Rs: 61733.30
D.Add for contractor's profit and overheads on (A+B+C+other
percentages) 13.615% Rs: 8404.99
Lead Charges for 1Km for Steel (including
Loading and Unloading Charges) 1.05 tonne @ 190.9 Rs./Tonne 200.445
Total cost for 1.00 tonne Rs: 70338.73
Rate per tonne (A+B+C+D)/1.0 Rs: 70338.70
128
Tunnel and Allied Works - Item Unit Rates 2020-21
IRR-TAW-5-2 Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than
10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard,
graded aggregates crushed from tunnel excavated muck for filling and levelling over-cuts
in bed due to geological faults etc., including cost of all materials, machinery, labour, cleaning
bed, batching, mixing, conveying and laying, levelling, compacting, finishing, curing, lighting,
ventilation, drainage etc., complete with initial lead upto 1 km and all lifts. ( Cement
content : 220 kg / cum, CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum,
Superplasticizer 0.4% by wt. of cement)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Batching plant 2 x 1 cum Hour 8.00 330.40 2643.20
Fuel / Energy charges Hour 8.00 382.70 3061.60
2 Agitator car 2 cum Hour 16.00 635.00 10160.00
Fuel / Energy charges Hour 16.00 1205.90 19294.40
3 10 hp pump ( ele ) Hour 8.00 5.60 44.80
Fuel / Energy charges Hour 8.00 85.00 680.00
4 Needle vibrator 40 mm dia Hour 8.00 6.90 55.20
Fuel / Energy charges Hour 8.00 8.50 68.00
5 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 36071.20
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Batching plant Hour 8.00 415.50 3324.00
2 Crew for Agitator car Hour 16.00 344.80 5516.80
3 Crew for Pump Hour 8.00 101.10 808.80
4 Crew for Needle vibrator Hour 8.00 194.60 1556.80
5 Mason Class-I Day 1.00 550.00 550.00
6 work inspector Day 1.00 600.00 600.00
7 mazdoor
for cleaning bed Day 2.00 460.00 920.00
for loading material bin ( Cement ) Day 3.00 460.00 1380.00
for miscellaneous works at BP Day 2.00 460.00 920.00
for laying concrete Day 7.00 460.00 3220.00
for conveying laying concrete Day 14.00 460.00 6440.00
for cleaning bed Day 2.00 460.00 920.00
for washing CA / curing Day 2.00 460.00 920.00
Total cost of Labour Rs: 27076.40
labour component/unit qty 967.00
Add contractor's profit and overhead charges 13.615% 131.70
labour component/unit qty (including contractor's profit) 1098.70
ABSTRACT:
A. Cost of Materials Rs: 58245.20
B. Hire charges of Machinery Rs: 36071.20
C. Cost of Labour Rs: 27076.40
Total Rs: 121392.80
Add for Air and Water line @ 1.00% Rs: 1213.93
Add for Ventilation @ 4.50% Rs: 5462.68
Add for Lighting @ 1.60% Rs: 1942.28
Add for Ele sub-station / Demand charges @ 2.50% Rs: 3034.82
Total Rs: 133046.51
D.Add for contractor's profit and overheads on (A+B+C+other
percentages) 13.615% Rs: 18114.28
Lead Charges for 1 Km for FA 11.20 cum @ 30.4 Rs./Cum 340.48
Lead Charges for 1 Km for CA 25.20 cum @ 29.4 Rs./Cum 740.88
Total cost for 28.00 cum Rs: 152242.15
Rate per cum (A+B+C+D)/28.0 Rs: 5437.20
129
Tunnel and Allied Works - Item Unit Rates 2020-21
IRR-TAW-5-3 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sqmm ) grade cement concrete using 40 mm and down size approved clean, hard,
graded aggregates crushed from tunnel muck for kerb and bed lining including cost of all
materials, machinery, labour, formwork, batching, mixing, conveying upto placing point in
agitator cars, placing in position, levelling, vibrating, finishing, curing, ventilation, lighting,
drainage and all other ancillary operations etc., complete with lead upto 1 km and all lifts.
( Cement content 330 kg / cum for use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Batching plant 2 x 1.00 cum Hour 8.00 330.40 2643.20
Fuel / Energy charges Hour 8.00 382.70 3061.60
2 Agitator car 2 cum ( 2 Nos ) Hour 16.00 635.00 10160.00
Fuel / Energy charges Hour 16.00 1205.90 19294.40
3 Needle Vibrator Hour 8.00 6.90 55.20
Fuel / Energy charges Hour 8.00 8.50 68.00
4 Pump 10 hp ( Ele ) Hour 8.00 5.60 44.80
Fuel / Energy charges Hour 8.00 85.00 680.00
5 Sundries LS 5.00 32.00 160.00
Total hire charges of Machinery Rs: 36167.20
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Batching plant Hour 8.00 415.50 3324.00
2 Crew for Agitator car Hour 16.00 344.80 5516.80
3 Crew for vibrator Hour 8.00 194.60 1556.80
4 Crew for pump Hour 8.00 101.10 808.80
5 For scaling & cleaning bed
Hammerman Day 2.00 500.00 1000.00
mazdoor Day 6.00 460.00 2760.00
6 For loading cement to BP bin
mazdoor Day 3.00 460.00 1380.00
7 For miscellaneous work at BP
mazdoor Day 2.00 460.00 920.00
8 For wetting C.A & curing
mazdoor Day 2.00 460.00 920.00
9 Laying concrete for kerb/ invert
Mason Cl I Day 2.00 550.00 1100.00
Mason Cl II Day 2.00 500.00 1000.00
mazdoor Day 21.00 460.00 9660.00
work inspector Day 1.00 600.00 600.00
10 Labour charges for shuttering sqm 28.00 114.00 3192.00
Total cost of Labour Rs: 33738.40
labour component/unit qty 1204.90
Add contractor's profit and overhead charges 13.615% 164.00
labour component/unit qty (including contractor's profit) 1368.90
130
Tunnel and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 75078.43
B. Hire charges of Machinery Rs: 36167.20
C. Cost of Labour Rs: 33738.40
Total Rs: 144984.03
Add for Air and Water line @ 1.00% Rs: 1449.84
Add for Ventilation @ 4.50% Rs: 6524.28
Add for Lighting @ 1.60% Rs: 2319.74
Add for Ele sub-station / Demand charges @ 2.50% Rs: 3624.60
Total Rs: 158902.50
D.Add for contractor's profit and overheads on (A+B+C+other
percentages) 13.615% Rs: 21634.58
Lead Charges for 1 Km for FA 11.20 cum @ 30.4 Rs./Cum 340.48
Lead Charges for 1 Km for CA 25.20 cum @ 29.4 Rs./Cum 740.88
Total cost for 28.00 cum Rs: 181618.44
Rate per cum (A+B+C+D)/28.0 Rs: 6486.40
IRR-TAW-5-4 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sqmm ) grade cement concrete using 40 mm and down size approved clean, hard,
graded aggregates crushed from tunnel muck for sides and arch lining including cost of all
materials, machinery, labour, formwork, batching, mixing, conveying upto placing point in
agitator cars, placing in position, levelling, vibrating, finishing, curing, ventilation, lighting,
drainage and all other ancillary operations etc., complete with lead upto 1 km and all lifts.
( Cement content 330 kg / cum for use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Air compressor ( Ele ) 8.5 cmm Hour 16.00 136.90 2190.40
Fuel / Energy charges @ 75 % load Hour 12.00 478.40 5740.80
2 Batching plant 2 x 1.00 cum Hour 12.00 330.40 3964.80
Fuel / Energy charges Hour 12.00 382.70 4592.40
3 Agitator car 2 cum ( 2 Nos ) Hour 32.00 635.00 20320.00
Fuel / Energy charges Hour 32.00 1205.90 38588.80
4 Concrete placer pump Hour 16.00 813.60 13017.60
Fuel / Energy charges Hour 16.00 510.30 8164.80
5 Needle Vibrator / Shutter vibrator Hour 8.00 6.90 55.20
Fuel / Energy charges Hour 8.00 8.50 68.00
6 Pump 10 hp ( Ele ) Hour 8.00 5.60 44.80
Fuel / Energy charges Hour 8.00 85.00 680.00
7 Sundries LS 5.00 32.00 160.00
Total hire charges of Machinery Rs: 97587.60
131
Tunnel and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew charges for Air compressor Hour 16.00 202.80 3244.80
2 Crew charges for Batching plant Hour 16.00 415.50 6648.00
3 Crew charges for Agitator car Hour 32.00 344.80 11033.60
4 Crew charges for placer pump Hour 16.00 202.80 3244.80
5 Crew charges for vibrator Hour 8.00 194.60 1556.80
6 Crew charges for Pump Hour 8.00 101.10 808.80
7 For scaling & cleaning
Stone chiseller Cl II Day 0.50 500.00 250.00
mazdoor Day 1.00 460.00 460.00
8 For dismantling / Laying track
Surveyer Day 0.50 850.00 425.00
Fitter shuttering Day 0.50 500.00 250.00
Helper shuttering 2 x 0.5 Day 1.00 500.00 500.00
Khalasi 6 x 0.5 Day 3.00 540.00 1620.00
mazdoor 2 x 0.5 Day 1.00 460.00 460.00
9 For Moving / Positioning gantry
Surveyer Day 0.50 850.00 425.00
Foreman Day 0.50 605.00 302.50
Fitter shuttering Day 0.50 500.00 250.00
Helper shuttering 2 x 0.5 Day 1.00 500.00 500.00
Khalasi 6 x 0.5 Day 3.00 540.00 1620.00
mazdoor 2 x 0.5 Day 1.00 460.00 460.00
10 For loading cement to BP bin
mazdoor Day 5.00 460.00 2300.00
11 For miscellaneous works of BP
mazdoor Day 2.00 460.00 920.00
12 For Erection/Dismantling bulk head sqm 6.00 114.00 684.00
13 For Laying concrete by placer
Masom Cl I Day 3.00 550.00 1650.00
mazdoor Day 9.00 460.00 4140.00
work inspector Day 3.00 600.00 1800.00
14 For wetting C.A / Curing etc
mazdoor Day 3.00 460.00 1380.00
Total cost of Labour Rs: 46933.30
labour component/unit qty 977.80
Add contractor's profit and overhead charges 13.615% 133.10
labour component/unit qty (including contractor's profit) 1110.90
ABSTRACT:
A. Cost of Materials Rs: 132930.71
B. Hire charges of Machinery Rs: 97587.60
C. Cost of Labour Rs: 46933.30
Total Rs: 277451.61
Add for Air and Water line @ 1.00% Rs: 2774.52
Add for Ventilation @ 4.50% Rs: 12485.32
Add for Lighting @ 1.60% Rs: 4439.23
Add for Ele sub-station / Demand charges @ 2.50% Rs: 6936.29
Total Rs: 304086.96
D.Add for contractor's profit and overheads on (A+B+C+other
percentages) 13.615% Rs: 41401.44
Lead Charges for 1 Km for FA 19.20 cum @ 30.4 Rs./Cum 583.68
Lead Charges for 1 Km for CA 43.20 cum @ 29.4 Rs./Cum 1270.08
Total cost for 48.00 cum Rs: 347342.16
Rate per cum (A+B+C+D)/48.0 Rs: 7236.30
IRR-TAW-6-1 Drilling 32 mm diameter grout holes in concrete / rock by percussion drilling using jack
hammer or stooper drills as directed to specified depth for consolidation / contact grouting
including cost of all materials, machinery, labour, cleaning holes, ventilation, lighting, drainage
and all other ancillary operations etc., complete.
132
Tunnel and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Air compressor 15 cmm ( ele ) Hour 8.00 108.50 868.00
Fuel / Energy charges Hour 8.00 1063.10 8504.80
2 Pump 10 hp ( ele ) Hour 4.00 5.60 22.40
Fuel / Energy charges Hour 4.00 85.00 340.00
3 Jack hammer Hour 32.00 16.50 528.00
Fuel / Energy charges Hour 32.00 0.00 0.00
4 Pusher leg Hour 32.00 11.30 361.60
Fuel / Energy charges Hour 32.00 0.00 0.00
5 Drilling jumbo Hour 8.00 318.30 2546.40
Fuel / Energy charges Hour 8.00 59.20 473.60
6 Sundries LS 5.00 32.00 160.00
Total hire charges of Machinery Rs: 13804.80
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew charges for Air compressor Hour 8.00 216.30 1730.40
2 Crew charges for Pump Hour 4.00 101.10 404.40
3 Crew charges for Jack Hammer Hour 32.00 405.60 12979.20
4 Crew charges for Drilling Jumbo Hour 8.00 216.30 1730.40
5 mazdoor Day 2.00 460.00 920.00
Total cost of Labour Rs: 17764.40
labour component/unit qty 177.60
Add contractor's profit and overhead charges 13.615% 24.20
labour component/unit qty (including contractor's profit) 201.80
ABSTRACT:
A. Cost of Materials Rs: 4716.67
B. Hire charges of Machinery Rs: 13804.80
C. Cost of Labour Rs: 17764.40
Total Rs: 36285.87
Add for Air and Water line @ 1.00% Rs: 362.86
Add for Ventilation @ 4.50% Rs: 1632.86
Add for Lighting @ 1.60% Rs: 580.57
Add for Ele sub-station / Demand charges @ 2.50% Rs: 907.15
Total Rs: 39769.31
D.Add for contractor's profit and overheads on (A+B+C+other
percentages) 13.615% Rs: 5414.59
Total cost for 100.00 Rm Rs: 45183.90
Rate per Rm (A+B+C+D)/100.0 Rs: 451.80
IRR-TAW-6-2 Grouting cement slurry in grout holes under specified pressure for consolidation / contact
grouting including cost of all materials, machinery, labour, redrilling wherever necessary,
ventilation,lighting, drainage and other ancillary operations etc., complete with lead upto 1 km
and all lifts.
DATA:
RATE ANALYSIS UNIT : 1.50 tonne
A. MATERIALS:
Sl No Particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Cement tonne 1.50 3672.00 5508.00
2 Use rate of grouting hose 50 m Hour 8.00 10.56 84.50
3 Use rate of water hose 50 m Hour 8.00 10.56 84.50
4 Sundries LS 2.00 32.00 64.00
Total cost of Materials Rs: 5741.00
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Grouting machine Hour 8.00 20.00 160.00
Fuel / Energy charges Hour 8.00 42.50 340.00
2 Pump 10 hp ( ele ) Hour 2.00 5.60 11.20
Fuel / Energy charges Hour 2.00 85.00 170.00
3 Drilling jumbo Hour 2.00 318.30 636.60
Fuel / Energy charges Hour 2.00 59.20 118.40
4 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 1500.20
133
Tunnel and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Grout pump Hour 8.00 324.50 2596.00
2 Crew for pump Hour 2.00 101.10 202.20
3 Crew for Drilling jumbo Hour 2.00 216.30 432.60
4 mazdoor Day 2.00 460.00 920.00
Total cost of Labour Rs: 4150.80
labour component/unit qty 2767.20
Add contractor's profit and overhead charges 13.615% 376.80
labour component/unit qty (including contractor's profit) 3144.00
ABSTRACT:
A. Cost of Materials Rs: 5741.00
B. Hire charges of Machinery Rs: 1500.20
C. Cost of Labour Rs: 4150.80
Total Rs: 11392.00
Add for Air and Water line @ 1.00% Rs: 113.92
Add for Ventilation @ 4.50% Rs: 512.64
Add for Lighting @ 1.60% Rs: 182.27
Add for Ele sub-station / Demand charges @ 2.50% Rs: 284.80
Total Rs: 12485.63
D.Add for contractor's profit and overheads on (A+B+C+other
percentages) 13.615% Rs: 1699.92
Total cost for 1.50 tonne Rs: 14185.55
Rate per tonne (A+B+C+D)/1.50 Rs: 9457.00
IRR-TAW-6-3 Drilling 75 mm diameter drainage holes vertical or inclined in rock / concrete in tunnel by
percussion drilling using waggon drill or other suitable drilling equipment including cost of all
materials, machinery, labour, ventilation, lighting, drainage etc., complete.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Waggon drill Hour 16.00 161.20 2579.20
Fuel / Energy charges Hour 16.00 0.00 0.00
2 Air compressor 15 cmm ( ele ) Hour 8.00 108.50 868.00
Fuel / Energy charges Hour 8.00 1063.10 8504.80
3 Pump 10 hp ( ele ) Hour 6.00 5.60 33.60
Fuel / Energy charges Hour 6.00 85.00 510.00
4 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 12559.60
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Waggon drill Hour 16.00 344.80 5516.80
2 Crew for Air compressor Hour 8.00 216.30 1730.40
3 Crew for Pump Hour 6.00 101.10 606.60
4 mazdoor Day 2.00 460.00 920.00
Total cost of Labour Rs: 8773.80
labour component/unit qty 73.10
Add contractor's profit and overhead charges 13.615% 10.00
labour component/unit qty (including contractor's profit) 83.10
134
Tunnel and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 16505.60
B. Hire charges of Machinery Rs: 12559.60
C. Cost of Labour Rs: 8773.80
Total Rs: 37839.00
Add for Air and Water line @ 1.00% Rs: 378.39
Add for Ventilation @ 4.50% Rs: 1702.76
Add for Lighting @ 1.60% Rs: 605.42
Add for Ele sub-station / Demand charges @ 2.50% Rs: 945.98
Total Rs: 41471.54
D.Add for contractor's profit and overheads on (A+B+C+other
percentages) 13.615% Rs: 5646.35
Total cost for 120.00 Rm Rs: 47117.89
Rate per Rm (A+B+C+D)/120.0 Rs: 392.60
135
Canal and Allied Works - Item Unit Rates 2020-21
Chapter III
3. The Leads for Steel shall be from the nearest market place to the Project area
4. For earth/rockfill embankments wherever initial lead of 1km is considered in the basic rate, the additional lead
charges are to be added as follows:
Additional lead charges for Earth, Murrum etc., shall be worked out for total lead involved and 1 km lead charges included
in basic rate shall be deducted from total lead charges. No loading and unloading charges shall be allowed for any item.
(same as above)
Example:
Total lead for earth from approved borrow area : 15 Km
Initial lead included in the basic rate in the basic item rate in the data (i.e., item specification) : 1 Km
Additional lead charges : Lead charges for 5 km Rs. 81.10
Lead charges for next 10 km Rs. 122
Total lead charges for 15 km /cum Rs. 203.10
Less 1 km initial lead charges /cum Rs. 30.40 (-)
Net additional lead charges / cum Rs. 172.70
5. The initial lead up to 50 m as mentioned in some standard data items is meant for manual lead within the working area. For
conveyance of materials, the lead required from quarry/Borrow area/ Dump Area to worksite shall be added to the data without
deducting the 50 m initial lead charges
CAW-Work Items
IRR-CAW-1-1 Excavation in all kinds of soil including boulders upto 0.3 m diameter for canal, seating of
embankment, filter drains / catch water drains etc., including dressing bed and sides to
required level and profile, cost of all materials, machinery, labour, placing the excavated soil
neatly in dump area or for the formation of service road / embankment as directed etc.,
complete with initial lead upto 1 km and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Shovel 0.85 cum capacity Hour 8.00 1452.20 11617.60
Fuel / Energy charges Hour 8.00 1205.90 9647.20
2 Tippers 5 cum capacity 6 Nos Hour 48.00 384.40 18451.20
Fuel / Energy charges Hour 48.00 414.40 19891.20
Total hire charges of Machinery Rs: 59607.20
136
Canal and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Shovel Hour 8.00 287.30 2298.40
2 Crew for Tipper Hour 48.00 215.50 10344.00
3 work inspector Day 1.00 600.00 600.00
4 mazdoor Day 30.00 460.00 13800.00
Total cost of Labour Rs: 27042.40
labour component/unit qty 29.20
Add contractor's profit and overhead charges 13.615% 4.00
labour component/unit qty (including contractor's profit) 33.20
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 59607.20
C. Cost of Labour Rs: 27042.40
Total Rs: 86649.60
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 11797.34
Total cost for 925.00 cum Rs: 98446.94
Rate per cum (A+B+C+D)/925 Rs. 106.40
IRR-CAW-1-2 Excavation in all kinds of soil including boulders upto 0.30 m dia for field channels, seating
of embankment for field channels etc., including dressing of bed and sides to required profile,
cost of all materials, machinery, labour, placing the excavated stuff for formation of service
road / embankment as directed etc., complete with lead upto 10 m and lift upto 3 m.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Shovel 0.50 cum capacity Hour 8.00 869.30 6954.40
Fuel / Energy charges Hour 8.00 657.80 5262.40
Total hire charges of Machinery Rs: 12216.80
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Shovel Hour 8.00 287.30 2298.40
2 work inspector Day 1.00 600.00 600.00
3 mazdoor Day 17.00 460.00 7820.00
Total cost of Labour Rs: 10718.40
labour component/unit qty 24.40
Add contractor's profit and overhead charges 13.615% 3.30
labour component/unit qty (including contractor's profit) 27.70
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 12216.80
C. Cost of Labour Rs: 10718.40
Total Rs: 22935.20
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 3122.63
Total cost for 440.00 cum Rs: 26057.83
Rate per cum (A+B+C+D)/440 Rs. 59.20
IRR-CAW-1-3 Excavation in ordinary rock (including HDR) without blasting including boulders above 0.30 m upto 0.6 m dia. for
canals, seating of embankment, filter drain / catch water drains etc., including dressing of
bed and sides to required level and profile, cost of all materials, machinery, labour, placing the
excavated soft rock neatly in dump area or for formation of service road as directed etc.,
complete with lead upto 1 km and all lifts.
137
Canal and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Shovel 0.85 cum capacity Hour 8.00 1452.20 11617.60
Fuel / Energy charges Hour 8.00 1205.90 9647.20
2 Tippers 5 cum capacity 5 Nos Hour 40.00 384.40 15376.00
Fuel / Energy charges Hour 40.00 414.40 16576.00
Total hire charges of Machinery Rs: 53216.80
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Shovel Hour 8.00 287.30 2298.40
2 Crew for Tipper Hour 40.00 215.50 8620.00
3 work inspector Day 1.00 600.00 600.00
4 Crowbarman Day 11.00 500.00 5500.00
5 mazdoor Day 22.00 460.00 10120.00
Total cost of Labour Rs: 27138.40
labour component/unit qty 43.10
Add contractor's profit and overhead charges 13.615% 5.90
labour component/unit qty (including contractor's profit) 49.00
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 53216.80
C. Cost of Labour Rs: 27138.40
Total Rs: 80355.20
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 10940.36
Total cost for 630.00 cum Rs: 91295.56
Rate per cum (A+B+C+D)/630 Rs. 144.90
IRR-CAW-1-4 Excavation in ordinary rock (including HDR) without blasting including boulders above 0.3 m upto 0.60 m dia. for
field channels, seating of embankment for field channels etc., including dressing of bed and
sides to required profile, cost of all materials, machinery, labour, placing the excavated stuff
for formation of service road as directed etc.,complete with lead upto 10 m and lift upto 3 m.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Shovel 0.50 cum capacity Hour 8.00 869.30 6954.40
Fuel / Energy charges Hour 8.00 657.80 5262.40
Total hire charges of Machinery Rs: 12216.80
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Shovel Hour 8.00 287.30 2298.40
2 work inspector Day 1.00 600.00 600.00
3 Crowbarman Day 5.00 500.00 2500.00
4 mazdoor Day 11.00 460.00 5060.00
Total cost of Labour Rs: 10458.40
labour component/unit qty 39.50
Add contractor's profit and overhead charges 13.615% 5.40
labour component/unit qty (including contractor's profit) 44.90
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 12216.80
C. Cost of Labour Rs: 10458.40
Total Rs: 22675.20
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 3087.23
Total cost for 265.00 cum Rs: 25762.43
Rate per cum (A+B+C+D)/265 Rs. 97.20
IRR-CAW-1-5 Excavation in hard rock (including F&F rock) requiring blasting including boulders
above 0.6 m upto 1.2 m dia. for canals, seating of embankment, filter drain / catch water drains
etc., including dressing bed and sides to required level and profile, cost of all materials,
machinery, labour, placing the excavated rock in dump area or for formation of service
road as directed etc., complete with lead upto 1 km and all lifts.
138
Canal and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Shovel 0.85 cum capacity Hour 8.00 1452.20 11617.60
Fuel / Energy charges Hour 8.00 1205.90 9647.20
2 Tippers 5 cum capacity 5 Nos. Hour 40.00 384.40 15376.00
Fuel / Energy charges Hour 40.00 414.40 16576.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Shovel Hour 8.00 287.30 2298.40
2 Crew for Tipper Hour 40.00 215.50 8620.00
3 Crew for Air compressor Hour 12.00 259.60 3115.20
4 Crew for Jack hammer Hour 39.00 405.60 15818.40
5 work inspector Day 1.00 600.00 600.00
6 Blaster Day 1.00 605.00 605.00
7 Helper blaster Day 1.00 500.00 500.00
8 Crowbarman Day 16.00 500.00 8000.00
9 Stone breaker Day 16.00 500.00 8000.00
10 mazdoor Day 32.00 460.00 14720.00
Total cost of Labour Rs: 62277.00
labour component/unit qty 77.40
Add contractor's profit and overhead charges 13.615% 10.50
labour component/unit qty (including contractor's profit) 87.90
ABSTRACT:
A. Cost of Materials Rs: 23585.93
B. Hire charges of Machinery Rs: 71337.10
C. Cost of Labour Rs: 62277.00
Total Rs: 157200.03
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 21402.78
Total cost for 805.00 cum Rs: 178602.81
Rate per cum (A+B+C+D)/805 Rs. 221.90
IRR-CAW-1-6 Excavation in hard rock of all toughness by blasting including boulders above 1.2 m dia. for
(a) canals, seating of embankment, filter drain / catch water drains etc., including levelling the bed
by removing all projections by hammering / chiselling, cost of all materials, machinery, labour,
placing the excavated rock neatly in approved dump area and levelling the same as directed
etc., complete with initial lead upto 1 km and all lifts.
Note: i ) The rate under this item shall be adopted for canals designed for carrying capacity of less
than 15 cumecs or where the average depth of excavation in hard rock is less than 3 m.
ii ) The rate includes levelling canal bed by hammering / chiselling all rock projections wherever
required.
139
Canal and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Shovel 0.85 cum capacity Hour 1.10 1452.20 1597.42
Fuel / energy charges Hour 1.10 1205.90 1326.49
2 Angle dozer 90 hp Hour 0.25 1453.50 363.38
Fuel / Energy charges Hour 0.25 843.60 210.90
3 Tippers 5 cum capacity 4 Nos. Hour 4.40 384.40 1691.36
Fuel / Energy charges Hour 4.40 414.40 1823.36
Air compressor 8.5 cmm ( diesel ) 1
4 Nos Hour 6.50 223.10 1450.15
Fuel / Energy charges Hour 6.50 1233.30 8016.45
5 Jack hammers 2 Nos. Hour 13.00 16.50 214.50
Fuel / Energy charges Hour 13.00 0.00 0.00
Total hire charges of Machinery Rs: 16694.01
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Shovel Hour 1.10 287.30 316.03
2 Crew for Dozer Hour 0.25 287.30 71.83
3 Crew for Tipper Hour 4.40 215.50 948.20
4 Crew for Air compressor Hour 6.50 259.60 1687.40
5 Crew for Jack hammer Hour 13.00 405.60 5272.80
6 work inspector Day 0.50 600.00 300.00
7 Blaster Day 1.00 605.00 605.00
8 Helper blaster Day 1.00 500.00 500.00
9 Crowbarman Day 0.50 500.00 250.00
10 Stone breaker Day 0.50 500.00 250.00
11 mazdoor Day 2.00 460.00 920.00
Total cost of Labour Rs: 11121.26
labour component/unit qty 163.50
Add contractor's profit and overhead charges 13.615% 22.30
labour component/unit qty (including contractor's profit) 185.80
ABSTRACT:
A. Cost of Materials Rs: 5254.61
B. Hire charges of Machinery Rs: 16694.01
C. Cost of Labour Rs: 11121.26
Total Rs: 33069.87
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 4502.46
Total cost for 68.00 cum Rs: 37572.33
Rate per cum (A+B+C+D)/68 Rs. 552.50
140
Canal and Allied Works - Item Unit Rates 2020-21
IRR-CAW-1-7 Excavation in hard rock of all toughness including boulders above 1.2 m dia. by approved
(b) controlled blasting methods for canals, cut-off trench of embankment, filter / catch-water
drains etc., including controlling fly-rock by muffling arrangements such as placing
50 x 50 mm opening chain link mesh or waste tyres and sand bags, monitoring ground
vibrations at specified locations, costof all materials, machinery, labour, placing excavated rock
neatly in approved dump area or other place as directed etc., complete with lead upto 1 km
and all lifts.
Note: i ) The rate under this item shall be adopted for canals designed for carrying capacity of less
than 15 cumecs or where the average depth of excavation in hard rock is less than 3 m.
ii ) The rate under this item shall be adopted where the control of fly-rock and ground vibrations
is required.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Shovel 0.85 cum capacity Hour 1.10 1452.20 1597.42
Fuel / Energy charges Hour 1.10 1205.90 1326.49
2 Angle dozer 90 hp Hour 0.25 1453.50 363.38
Fuel / Energy charges Hour 0.25 843.60 210.90
3 Tippers 5 cum capacity 3 Nos. Hour 4.40 384.40 1691.36
Fuel / Energy charges Hour 4.40 414.40 1823.36
Air compressor 8.5 cmm ( diesel ) 1
4 No Hour 6.50 223.10 1450.15
Fuel / Energy charges Hour 6.50 1233.30 8016.45
5 Jack hammers 2 Nos. Hour 13.00 16.50 214.50
Fuel / Energy charges Hour 13.00 0.00 0.00
Total hire charges of Machinery Rs: 16694.01
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Shovel Hour 1.10 287.30 316.03
2 Crew for Angle dozer Hour 0.25 287.30 71.83
3 Crew for Tipper Hour 4.40 215.50 948.20
4 Crew for Air compressor Hour 6.50 259.60 1687.40
5 Crew for Jack hammer Hour 13.00 405.60 5272.80
6 work inspector Day 0.50 600.00 300.00
7 Blaster Day 0.50 605.00 302.50
8 Helper blaster Day 0.50 500.00 250.00
9 Stone chiseller Cl - II Day 0.50 500.00 250.00
10 Stone breaker Day 0.50 500.00 250.00
11 mazdoor Day 3.00 460.00 1380.00
Total cost of Labour Rs: 11028.76
labour component/unit qty 162.20
Add contractor's profit and overhead charges 13.615% 22.10
labour component/unit qty (including contractor's profit) 184.30
141
Canal and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 12561.89
B. Hire charges of Machinery Rs: 16694.01
C. Cost of Labour Rs: 11028.76
Total Rs: 40284.65
Add for blasting studies & monitoring vibrations etc 0.50% Rs: 201.42
Total Rs: 40486.07
D. Add for contractor's profit and overheads on (A+B+C+blasting study charges) 13.615% Rs: 5512.18
Total cost for 68.00 cum Rs: 45998.25
Rate per cum (A+B+C+D)/68 Rs. 676.40
IRR-CAW-1-8 Excavation in hard rock of all toughness including boulders above 1.2 m dia. for dressing
( c) canal sides neatly on either side to required profile by line drilling and smooth blasting
including removing under-cuts by chiselling / hammering, placing the excavated rock neatly in
dump area or other place as directed, cost of all materials, machinery, labour etc., complete
with lead upto 1 km and all lifts.
Note: i) For excavation of canal below free board level combination of normal / controlled blasting and
line drilling and smooth blasting shall be adopted to obtain neat side slopes. For the purpose
of payment 1 m width of excavation on either side shall be treated as excavation by line drilling
and smooth blasting and remaining portion shall be treated as excavation by normal / controlled
blasting as the case may be.
ii ) The rate under this item shall be adopted for canals designed for carrying capacity of less
than 15 cumecs or where the average depth of excavation in hard rock is less than 3 m.
iii ) The rate includes controlling fly-rock wherever required.
iv ) The rate under this item shall be paid only on ascertaining that the excavated face has
come off neatly as per specifications or atleast 50 percent of smooth blast holes are visible for
inspection and are spaced at specified interval.
v ) In case, where the above criteria is not fulfilled payment shall be restricted to rate provided
for excavation by normal blasting or controlled blasting as the case may be.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Shovel 0.85 cum capacity Hour 0.28 1452.20 406.62
Fuel / Energy charges Hour 0.28 1205.90 337.65
2 Tippers 5 cum capacity 4 Nos. Hour 1.12 384.40 430.53
Fuel / Energy charges Hour 1.12 414.40 464.13
Air compressor 8.5 cmm ( diesel ) 1
3 Nos Hour 5.00 223.10 1115.50
Fuel / Energy charges Hour 5.00 1233.30 6166.50
4 Jack hammers 2 Nos. Hour 10.00 16.50 165.00
Fuel / Energy charges Hour 10.00 0.00 0.00
Total hire charges of Machinery Rs: 9085.92
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Shovel Hour 0.50 287.30 143.65
2 Crew for Tipper Hour 1.12 215.50 241.36
3 Crew for Air compressor Hour 5.00 259.60 1298.00
4 Crew for Jack hammer Hour 10.00 405.60 4056.00
5 work inspector Day 0.50 600.00 300.00
6 Blaster Day 0.50 605.00 302.50
7 Helper blaster Day 0.50 500.00 250.00
8 Stone breaker Day 0.50 500.00 250.00
9 Stone chiseller Cl - II Day 0.50 500.00 250.00
10 mazdoor Day 1.00 460.00 460.00
Total cost of Labour Rs: 7551.51
142
Canal and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 2730.65
B. Hire charges of Machinery Rs: 9085.92
C. Cost of Labour Rs: 7551.51
Total Rs: 19368.08
Add for blasting studies & monitoring vibrations etc 0.50% Rs: 96.84
Total Rs: 19464.92
D. Add for contractor's profit and overheads on (A+B+C+blasting study charges) 13.615% Rs: 2650.15
Total cost for 17.50 cum Rs: 22115.07
Rate per cum (A+B+C+D)/17.50 Rs. 1263.70
IRR-CAW-1-9 Excavation in hard rock by blasting including boulders above 1.2 m dia. for canals, seating
(a) embankment etc., including levelling bed by removing all projections by hammering / chiselling,
cost of all materials, machinery, labour, placing the excavated rock neatly in approved dump
area and levelling the same as directed etc.,complete with initial lead upto 1 km and all lifts.
Note: i ) The rate under this item shall be adopted for canals designed for carrying capacity of more
than 15 cumecs or where the average depth of excavation in hard rock is more than 3 m.
ii ) The rate includes levelling canal bed by hammering / chiselling all rock projections wherever
required.
143
Canal and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Tippers 5 cum capacity Hour 24.84 384.40 9548.50
Fuel / Energy charges Hour 24.84 414.40 10293.70
2 Shovel 0.85 cum capacity Hour 6.21 1452.20 9018.16
Fuel / Energy charges Hour 6.21 1205.90 7488.64
3 Angle dozer Hour 2.00 1453.50 2907.00
Fuel / Energy charges Hour 2.00 843.60 1687.20
4 Air compressor 8.5 cmm ( diesel ) Hour 11.50 223.10 2565.65
Fuel / Energy charges Hour 11.50 1233.30 14182.95
5 Waggon drill Hour 10.50 161.20 1692.60
Fuel / Energy charges Hour 10.50 0.00 0.00
6 Jack hammer Hour 2.00 16.50 33.00
Fuel / Energy charges Hour 2.00 0.00 0.00
Total hire charges of Machinery Rs: 59417.39
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Tipper Hour 24.84 215.50 5353.02
2 Crew for Shovel Hour 6.21 287.30 1784.13
3 Crew for Dozer Hour 2.00 287.30 574.60
4 Crew for Air compressor Hour 11.50 259.60 2985.40
5 Crew for Waggon drill Hour 10.50 344.80 3620.40
6 Crew for Jack hammer Hour 2.00 405.60 811.20
7 work inspector Day 2.00 600.00 1200.00
8 Blaster Day 1.00 605.00 605.00
9 Helper blaster Day 1.00 500.00 500.00
10 Stone chiseller Cl - II Day 1.00 500.00 500.00
11 Stone breaker Day 1.00 500.00 500.00
12 mazdoor Day 3.00 460.00 1380.00
Total cost of Labour Rs: 19813.75
labour component/unit qty 51.30
Add contractor's profit and overhead charges 13.615% 7.00
labour component/unit qty (including contractor's profit) 58.30
ABSTRACT:
A. Cost of Materials Rs: 30195.94
B. Hire charges of Machinery Rs: 59417.39
C. Cost of Labour Rs: 19813.75
Total Rs: 109427.08
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 14898.5
Total cost for 386.00 Cum Rs: 124325.58
Rate per Cum (A+B+C+D)/386 Rs. 322.10
IRR-CAW-1-10 Excavation in hard rock of all toughness including boulders above 1.2 m dia. by approved
(b) controlled blasting methods for canals, cut-off trench of embankment etc., including
controlling fly-rock by muffling arrangements such as placing 50 x 50 mm opening
chain link mesh or waste tyres and sand bags, monitoring ground vibrations at specified
locations, cost of all materials, machinery, labour, placing excavated rock neatly in approved
dump area or other place as directed etc., complete with lead upto 1 km and all lifts.
Note: i ) The rate under this item shall be adopted for canals designed for carrying capacity of more
than 15 cumecs or where the average depth of excavation in hard rock is more than 3 m.
ii ) The rate under this item shall be adopted where the control of fly-rock and ground vibrations
is required.
144
Canal and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Tippers 5 cum capacity Hour 30.00 384.40 11532.00
Fuel / Energy charges Hour 30.00 414.40 12432.00
2 Shovel 0.85 cum capacity Hour 10.00 1452.20 14522.00
Fuel / Energy charges Hour 10.00 1205.90 12059.00
3 Angle dozer Hour 2.00 1453.50 2907.00
Fuel / Energy charges Hour 2.00 843.60 1687.20
4 Air compressor 8.5 cmm ( diesel ) Hour 12.50 223.10 2788.75
Fuel / Energy charges Hour 12.50 1233.30 15416.25
5 Waggon drill Hour 11.50 161.20 1853.80
Fuel / Energy charges Hour 11.50 0.00 0.00
6 Jack hammer Hour 2.00 16.50 33.00
Fuel / Energy charges Hour 2.00 0.00 0.00
Total hire charges of Machinery Rs: 75231.00
145
Canal and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Tipper Hour 30.00 215.50 6465.00
2 Crew for Shovel Hour 10.00 287.30 2873.00
3 Crew for Dozer Hour 2.00 287.30 574.60
4 Crew for Air compressor Hour 12.50 259.60 3245.00
5 Crew for Waggon drill Hour 11.50 344.80 3965.20
6 Crew for Jack hammer Hour 2.00 405.60 811.20
7 work inspector Day 1.50 600.00 900.00
8 Blaster Day 0.50 605.00 302.50
9 Helper blaster Day 0.50 500.00 250.00
10 Stone chiseller Cl - II Day 1.00 500.00 500.00
11 Stone breaker Day 1.00 500.00 500.00
12 mazdoor Day 5.00 460.00 2300.00
Total cost of Labour Rs: 22686.50
labour component/unit qty 58.80
Add contractor's profit and overhead charges 13.615% 8.00
labour component/unit qty (including contractor's profit) 66.80
ABSTRACT:
A. Cost of Materials Rs: 61644.15
B. Hire charges of Machinery Rs: 75231.00
C. Cost of Labour Rs: 22686.50
Total Rs: 159561.65
Add for blasting studies & monitoring vibrations etc 0.50% Rs: 797.81
Total Rs: 160359.46
D. Add for contractor's profit and overheads on (A+B+C+blasting study charges) 13.615% Rs: 21832.94
Total cost for 386.00 cum Rs: 182192.40
Rate per cum (A+B+C+D)/386 Rs. 472.00
IRR-CAW-1-11 Excavation in hard rock of all toughness including boulders above 1.2 m dia. for dressing
( c) canal sides neatly on either side to required profile by line drilling and smooth blasting
including removing under-cuts by chiselling / hammering, placing the excavated rock neatly in
dump area or other place as directed, cost of all materials, machinery, labour etc., complete
with lead upto 1 km and all lifts.
Note: i ) For excavation of canal below free board level combination of normal / controlled blasting and
line drilling and smooth blasting shall be adopted to obtain neat side slopes. For the purpose
of payment 1 m width of excavation on either side shall be treated as excavation by line drilling
and smooth blasting and remaining portion shall be treated as excavation by normal / controlled
blasting as the case may be.
ii ) The rate under this item shall be adopted for canals designed for carrying capacity of more
than 15 cumecs or where the average depth of excavation in hard rock is more than 3 m.
iii ) The rate includes controlling fly-rock wherever required.
iv ) The rate under this item shall be paid only on ascertaining that the excavated face has
come off neatly as per specifications or atleast 50 percent of smooth blast holes are visible for
inspection and are spaced at specified interval.
v ) In case, where the above criteria is not fulfilled payment shall be restricted to rate provided
for excavation by normal blasting or controlled blasting as the case may be.
146
Canal and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Tippers 5 cum capacity Hour 6.24 384.40 2398.66
Fuel / Energy charges Hour 6.24 414.40 2585.86
2 Shovel 0.85 cum capacity Hour 1.56 1452.20 2265.43
Fuel / Energy charges Hour 1.56 1205.90 1881.20
3 Angle dozer Hour 0.50 1453.50 726.75
Fuel / Energy charges Hour 0.50 843.60 421.80
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Tipper Hour 5.24 215.50 1129.22
2 Crew for Shovel Hour 1.56 287.30 448.19
3 Crew for Dozer Hour 0.50 287.30 143.65
4 Crew for Air compressor Hour 13.45 259.60 3491.62
5 Crew for Waggon drill Hour 13.45 344.80 4637.56
6 Crew for Jack hammer Hour 0.50 405.60 202.80
7 work inspector Day 0.50 600.00 300.00
8 Blaster Day 0.50 605.00 302.50
9 Helper blaster Day 0.50 500.00 250.00
10 Stone breaker Day 1.00 500.00 500.00
11 Stone chiseller Cl- II Day 1.00 500.00 500.00
12 mazdoor Day 2.00 460.00 920.00
Total cost of Labour Rs: 12825.54
labour component/unit qty 132.20
Add contractor's profit and overhead charges 13.615% 18.00
labour component/unit qty (including contractor's profit) 150.20
ABSTRACT:
A. Cost of Materials Rs: 23512.80
B. Hire charges of Machinery Rs: 32004.37
C. Cost of Labour Rs: 12825.54
Total Rs: 68342.71
Add for blasting studies & monitoring vibrations etc 0.50% Rs: 341.71
Total Rs: 68684.42
D. Add for contractor's profit and overheads on (A+B+C+blasting study charges) 13.615% Rs: 9351.38
Total cost for 97.00 cum Rs: 78035.80
Rate per cum (A+B+C+D)/97 Rs. 804.50
IRR-CAW-2-1 Providing impervious hearting embankment with selected soil from approved borrow areas in
layers of 25 cm before compaction including cost of all materials, machinery, labour,
all operations such as excavation, sorting out, transporting, spreading in layer of specified
thickness, breaking clods, sectioning, watering, compacting each layer to density control of
not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/
8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Angle dozer Hour 3.40 1453.50 4941.90
Fuel / Energy charges Hour 3.40 843.60 2868.24
2 Shovel 0.50 cum capacity Hour 8.00 869.30 6954.40
Fuel / Energy charges Hour 8.00 657.80 5262.40
3 Tippers 5.00 cum capacity 4 Nos. Hour 32.00 384.40 12300.80
Fuel / Energy charges Hour 32.00 414.40 13260.80
4 Pump 5 hp ( diesel ) Hour 2.00 8.50 17.00
Fuel / Energy charges Hour 2.00 109.60 219.20
5 Water tanker 8000 ltr Hour 4.00 358.00 1432.00
Fuel / Energy charges Hour 4.00 414.40 1657.60
6 Vibratory Roller 8 tonne Hour 5.10 1175.20 5993.52
Fuel / Energy charges Hour 5.10 1425.20 7268.52
7 Sundries LS 5.00 32.00 160.00
Total hire charges of Machinery Rs: 62336.38
147
Canal and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Dozer Hour 3.40 287.30 976.82
2 Crew for Shovel Hour 8.00 287.30 2298.40
3 Crew for Tipper Hour 32.00 215.50 6896.00
4 Crew for Pump Hour 2.00 134.80 269.60
5 Crew for Water tanker Hour 4.00 215.50 862.00
6 Crew for Roller Hour 5.10 324.50 1654.95
7 work inspector Day 2.00 600.00 1200.00
8 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 15997.77
labour component/unit qty 38.80
Add contractor's profit and overhead charges 13.615% 5.30
labour component/unit qty (including contractor's profit) 44.10
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 62336.38
C. Cost of Labour Rs: 15997.77
Total Rs: 78334.15
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 10665.19
Total cost for 412.80 cum Rs: 88999.34
Rate per cum (A+B+C+D)/412.80 Rs. 215.60
IRR-CAW-2-2 Providing impervious hearting embankment with selected soil from approved borrow areas in
layers of 25 cm before compaction including cost of all materials, machinery, labour,
all operations such as excavation, sorting out, transporting, spreading in layer of specified
thickness, breaking clods, sectioning, watering, compacting each layer to density control of
not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/
8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Angle dozer 90 hp Hour 3.40 1453.50 4941.90
Fuel / Energy charges Hour 3.40 843.60 2868.24
2 Shovel 0.5 cum Hour 8.00 869.30 6954.40
Fuel / Energy charges Hour 8.00 657.80 5262.40
3 Tippers 5 cum Hour 32.00 384.40 12300.80
Fuel / Energy charges Hour 32.00 414.40 13260.80
4 Pump 5 hp ( diesel ) Hour 2.00 8.50 17.00
Fuel / Energy charges Hour 2.00 109.60 219.20
5 Water tanker 8000 ltr Hour 4.00 358.00 1432.00
Fuel / Energy charges Hour 4.00 414.40 1657.60
6 Vibratory Roller 8 tonne Hour 4.18 1175.20 4912.34
Fuel / Energy charges Hour 4.18 1425.20 5957.34
7 Sundries LS 5.00 32.00 160.00
Total hire charges of Machinery Rs: 59944.01
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Dozer Hour 3.40 287.30 976.82
2 Crew for Shovel Hour 8.00 287.30 2298.40
3 Crew for Tipper Hour 32.00 215.50 6896.00
4 Crew for Pump Hour 2.00 134.80 269.60
5 Crew for Water tanker Hour 4.00 215.50 862.00
6 Crew for Roller Hour 4.18 324.50 1356.41
7 work inspector Day 2.00 600.00 1200.00
8 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 15699.23
labour component/unit qty 38.00
Add contractor's profit and overhead charges 13.615% 5.20
labour component/unit qty (including contractor's profit) 43.20
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 59944.01
C. Cost of Labour Rs: 15699.23
Total Rs: 75643.24
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 10298.83
Total cost for 412.80 cum Rs: 85942.07
Rate per cum (A+B+C+D)/412.80 Rs. 208.20
148
Canal and Allied Works - Item Unit Rates 2020-21
IRR-CAW-2-3 Providing semi-pervious / pervious casing embankment using soil from approved borrow area
in layers of 25 cm before compaction including cost of all materials, machinery, labour,
all operations such as excavation, sortingout, transporting, spreading in layer of specified
thickness, breaking clods, sectioning, watering, compacting to density control of not less
than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller
etc., complete with initial lead upto 1 km and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Angle dozer 90 hp Hour 3.40 1453.50 4941.90
Fuel / Energy charges Hour 3.40 843.60 2868.24
2 Shovel 0.50 cum capacity Hour 8.00 869.30 6954.40
Fuel / Energy charges Hour 8.00 657.80 5262.40
3 Tippers 5.00 cum capacity 3 Nos. Hour 32.00 384.40 12300.80
Fuel / Energy charges Hour 32.00 414.40 13260.80
4 Pump 5 hp ( diesel ) Hour 2.00 8.50 17.00
Fuel / Energy charges Hour 2.00 109.60 219.20
5 Water tanker 8000 ltr Hour 4.00 358.00 1432.00
Fuel / Energy charges Hour 4.00 414.40 1657.60
6 Vibratory Roller 8 tonne Hour 5.10 1175.20 5993.52
Fuel / Energy charges Hour 5.10 1425.20 7268.52
7 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 62240.38
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Dozer Hour 3.40 287.30 976.82
2 Crew for Shovel Hour 8.00 287.30 2298.40
3 Crew for Tipper Hour 32.00 215.50 6896.00
4 Crew for Pump Hour 2.00 134.80 269.60
5 Crew for Water tanker Hour 4.00 215.50 862.00
6 Crew for Roller Hour 5.10 324.50 1654.95
7 work inspector Day 2.00 600.00 1200.00
8 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 15997.77
labour component/unit qty 38.80
Add contractor's profit and overhead charges 13.615% 5.30
labour component/unit qty (including contractor's profit) 44.10
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 62240.38
C. Cost of Labour Rs: 15997.77
Total Rs: 78238.15
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 10652.12
Total cost for 412.80 cum Rs: 88890.27
Rate per cum (A+B+C+D)/412.80 Rs. 215.30
IRR-CAW-2-4 Providing semi-pervious / pervious casing embankment using soil from approved borrow area
in layers of 25cm before compaction including cost of all materials, machinery, labour,
all operations such as excavation, sortingout, transporting, spreading in layer of specified
thickness, breaking clods, sectioning, watering, compacting to density control of not less
than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller
etc., complete with initial lead upto 1 km and all lifts.
149
Canal and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Angle dozer 90 hp Hour 3.40 1453.50 4941.90
Fuel / Energy charges Hour 3.40 843.60 2868.24
2 Shovel 0.5 cum Hour 8.00 869.30 6954.40
Fuel / Energy charges Hour 8.00 657.80 5262.40
3 Tippers 5 cum Hour 32.00 384.40 12300.80
Fuel / Energy charges Hour 32.00 414.40 13260.80
4 Pump 5 hp ( diesel ) Hour 2.00 8.50 17.00
Fuel / Energy charges Hour 2.00 109.60 219.20
5 Water tanker 8000 ltr Hour 4.00 358.00 1432.00
Fuel / Energy charges Hour 4.00 414.40 1657.60
6 Vibratory Roller 8 tonne Hour 4.17 1175.20 4900.58
Fuel / Energy charges Hour 4.17 1425.20 5943.08
7 Sundries LS 5.00 32.00 160.00
Total hire charges of Machinery Rs: 59918.01
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Dozer Hour 3.40 287.30 976.82
2 Crew for Shovel Hour 8.00 287.30 2298.40
3 Crew for Tipper Hour 32.00 215.50 6896.00
4 Crew for Pump Hour 2.00 134.80 269.60
5 Crew for Water tanker Hour 4.00 215.50 862.00
6 Crew for Roller Hour 4.00 324.50 1298.00
7 work inspector Day 4.17 600.00 2502.00
8 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 16942.82
labour component/unit qty 41.00
Add contractor's profit and overhead charges 13.615% 5.60
labour component/unit qty (including contractor's profit) 46.60
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 59918.01
C. Cost of Labour Rs: 16942.82
Total Rs: 76860.83
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 10464.6
Total cost for 412.80 cum Rs: 87325.43
Rate per cum (A+B+C+D)/412.80 Rs. 211.50
IRR-CAW-2-5 Providing semi-pervious / pervious casing embankment using soil from approved borrow area
in layers of 25cm before compaction including cost of all materials, machinery, labour,
all operations such as excavation, sortingout, transporting, spreading in layer of specified
thickness, breaking clods, sectioning, compacting each layer without watering to density
control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/
8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Angle dozer 90 hp Hour 3.40 1453.50 4941.90
Fuel / Energy charges Hour 3.40 843.60 2868.24
2 Shovel 0.50 cum capacity Hour 8.00 869.30 6954.40
Fuel / Energy charges Hour 8.00 657.80 5262.40
3 Tippers 5.00 cum capacity 3 Nos. Hour 32.00 384.40 12300.80
Fuel / Energy charges Hour 32.00 414.40 13260.80
4 Vibratory Roller 8 tonne Hour 4.17 1175.20 4900.58
Fuel / Energy charges Hour 4.17 1425.20 5943.08
5 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 56496.21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Dozer Hour 3.40 287.30 976.82
2 Crew for Shovel Hour 8.00 287.30 2298.40
3 Crew for Tipper Hour 32.00 215.50 6896.00
4 Crew for Roller Hour 4.17 324.50 1353.17
5 work inspector Day 2.00 600.00 1200.00
6 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 14564.39
labour component/unit qty 35.30
Add contractor's profit and overhead charges 13.615% 4.80
labour component/unit qty (including contractor's profit) 40.10
150
Canal and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 56496.21
C. Cost of Labour Rs: 14564.39
Total Rs: 71060.59
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 9674.9
Total cost for 412.80 cum Rs: 80735.49
Rate per cum (A+B+C+D)/412.80 Rs. 195.60
IRR-CAW-2-6 Providing hearting / casing embankment with homogeneous soil from approved borrow
areas in layers of 25 cm before compaction including cost of all materials, machinery,
labour, all operations such as excavation, sorting out, transporting, spreading in layer of
specified thickness, breaking clods, sectioning, watering, compacting each layer to density
control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/
8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Angle dozer Hour 6.06 1453.50 8808.21
Fuel / Energy charges Hour 6.06 843.60 5112.22
2 Shovel 0.50 cum capacity Hour 8.00 869.30 6954.40
Fuel / Energy charges Hour 8.00 657.80 5262.40
3 Tippers 5.00 cum capacity 6 Nos. Hour 48.00 384.40 18451.20
Fuel / Energy charges Hour 48.00 414.40 19891.20
4 Pump 5 hp ( diesel ) Hour 3.00 8.50 25.50
Fuel / Energy charges Hour 3.00 109.60 328.80
5 Water tanker 8000 ltr Hour 6.00 358.00 2148.00
Fuel / Energy charges Hour 6.00 414.40 2486.40
6 Vibratory Roller 8 tonne Hour 7.53 1175.20 8849.26
Fuel / Energy charges Hour 7.53 1425.20 10731.76
7 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 89113.34
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Dozer Hour 6.06 287.30 1741.04
2 Crew for Shovel Hour 8.00 287.30 2298.40
3 Crew for Tipper Hour 48.00 215.50 10344.00
4 Crew for Pump Hour 3.00 134.80 404.40
5 Crew for Water tanker Hour 6.00 215.50 1293.00
6 Crew for Roller Hour 7.53 324.50 2443.49
7 work inspector Day 2.00 600.00 1200.00
8 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 21564.32
labour component/unit qty 31.80
Add contractor's profit and overhead charges 13.615% 4.30
labour component/unit qty (including contractor's profit) 36.10
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 89113.34
C. Cost of Labour Rs: 21564.32
Total Rs: 110677.66
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 15068.76
Total cost for 677.28 cum Rs: 125746.42
Rate per cum (A+B+C+D)/677.28 Rs. 185.70
IRR-CAW-2-7 Providing hearting / casing embankment with homogeneous soil from approved borrow
areas in layers of 25 cm before compaction including cost of all materials, machinery,
labour, all operations such as excavation, sorting out, transporting, spreading in layer of
specified thickness, breaking clods, sectioning, watering, compacting each layer to density
control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/
8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.
151
Canal and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Angle dozer 90 hp Hour 6.06 1453.50 8808.21
Fuel / Energy charges Hour 6.06 843.60 5112.22
2 Shovel 0.5 cum Hour 8.00 869.30 6954.40
Fuel / Energy charges Hour 8.00 657.80 5262.40
3 Tippers 5 cum 3 Nos Hour 48.00 384.40 18451.20
Fuel / Energy charges Hour 48.00 414.40 19891.20
4 Pump 5 hp ( diesel ) Hour 3.00 8.50 25.50
Fuel / Energy charges Hour 3.00 109.60 328.80
5 Water tanker 8000 ltr Hour 6.00 358.00 2148.00
Fuel / Energy charges Hour 6.00 414.40 2486.40
6 Vibratory Roller 8 tonne Hour 6.16 1175.20 7239.23
Fuel / Energy charges Hour 6.16 1425.20 8779.23
7 Sundries LS 5.00 32.00 160.00
Total hire charges of Machinery Rs: 85646.79
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Dozer Hour 6.06 287.30 1741.04
2 Crew for Shovel Hour 8.00 287.30 2298.40
3 Crew for Tipper Hour 48.00 215.50 10344.00
4 Crew for Pump Hour 3.00 134.80 404.40
5 Crew for Water tanker Hour 6.00 215.50 1293.00
6 Crew for Roller Hour 6.16 324.50 1998.92
7 work inspector Day 2.00 600.00 1200.00
8 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 21119.76
labour component/unit qty 31.20
Add contractor's profit and overhead charges 13.615% 4.20
labour component/unit qty (including contractor's profit) 35.40
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 85646.79
C. Cost of Labour Rs: 21119.76
Total Rs: 106766.55
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 14536.27
Total cost for 677.28 cum Rs: 121302.82
Rate per cum (A+B+C+D)/677.28 Rs. 179.10
IRR-CAW-2-8 Providing casing embankment using homogeneous soil from approved borrow area
in layers of 25 cm before compaction including cost of all materials, machinery, labour,
all operations such as excavation, sortingout, transporting, spreading in layer of specified
thickness, breaking clods, sectioning, compacting each layer without watering to density
control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/
8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Angle dozer 90 hp Hour 6.06 1453.50 8808.21
Fuel / Energy charges Hour 6.06 843.60 5112.22
2 Shovel 0.50 cum capacity Hour 8.00 869.30 6954.40
Fuel / Energy charges Hour 8.00 657.80 5262.40
3 Tippers 5.00 cum capacity 4 Nos. Hour 48.00 384.40 18451.20
Fuel / Energy charges Hour 48.00 414.40 19891.20
4 Vibratory Roller 8 tonne Hour 6.16 1175.20 7239.23
Fuel / Energy charges Hour 6.16 1425.20 8779.23
5 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 80562.09
152
Canal and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Dozer Hour 6.06 287.30 1741.04
2 Crew for Shovel Hour 8.00 287.30 2298.40
3 Crew for Tipper Hour 48.00 215.50 10344.00
4 Crew for Roller Hour 6.16 324.50 1998.92
5 work inspector Day 2.00 600.00 1200.00
6 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 19422.36
labour component/unit qty 28.70
Add contractor's profit and overhead charges 13.615% 3.90
labour component/unit qty (including contractor's profit) 32.60
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 80562.09
C. Cost of Labour Rs: 19422.36
Total Rs: 99984.45
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 13612.88
Total cost for 677.28 cum Rs: 113597.33
Rate per cum (A+B+C+D)/677.28 Rs. 167.70
IRR-CAW-3-1 Providing impervious hearting embankment with soil from approved dump areas in layers
of 25 cm before compaction including cost of all materials, machinery, labour, all
operations such as re-excavation, sorting out, transporting, spreading in layer of specified
thickness, breaking clods, sectioning, watering, compacting each layer to achieve density
control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/
8 to 10 tonne power roller etc.,complete with initial lead upto 1 km and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Angle dozer Hour 4.04 1453.50 5872.14
Fuel / Energy charges Hour 4.04 843.60 3408.14
2 Shovel 0.50 cum capacity Hour 8.00 869.30 6954.40
Fuel / Energy charges Hour 8.00 657.80 5262.40
3 Tippers 5.00 cum capacity 6 Nos. Hour 48.00 384.40 18451.20
Fuel / Energy charges Hour 48.00 414.40 19891.20
4 Pump 5 hp ( diesel ) Hour 3.00 8.50 25.50
Fuel / Energy charges Hour 3.00 109.60 328.80
5 Water tanker 8000 ltr Hour 6.00 358.00 2148.00
Fuel / Energy charges Hour 6.00 414.40 2486.40
6 Vibratory Roller 8 tonne Hour 7.50 1175.20 8814.00
Fuel / Energy charges Hour 7.50 1425.20 10689.00
7 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 84395.18
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Dozer Hour 3.58 287.30 1028.53
2 Crew for Shovel Hour 8.00 287.30 2298.40
3 Crew for Tipper Hour 48.00 215.50 10344.00
4 Crew for Pump Hour 3.00 134.80 404.40
5 Crew for Water tanker Hour 6.00 215.50 1293.00
6 Crew for Roller Hour 7.50 324.50 2433.75
7 work inspector Day 2.00 600.00 1200.00
8 mazdoor Day 6.00 460.00 2760.00
Total cost of Labour Rs: 21762.08
labour component/unit qty 29.60
Add contractor's profit and overhead charges 13.615% 4.00
labour component/unit qty (including contractor's profit) 33.60
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 84395.18
C. Cost of Labour Rs: 21762.08
Total Rs: 106157.27
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 14453.31
Total cost for 735.36 cum Rs: 120610.58
Rate per cum (A+B+C+D)/735.36 Rs. 164.00
153
Canal and Allied Works - Item Unit Rates 2020-21
IRR-CAW-3-2 Providing impervious hearting embankment with soil from approved dump areas in layers
of 25 cm before compaction including cost of all materials, machinery, labour, all
operations such as re-excavation, sorting out, transporting, spreading in layer of specified
thickness, breaking clods, sectioning, watering, compacting each layer to achieve density
control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/
8 to 10 tonne power roller etc.,complete with initial lead upto 1 km and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Angle dozer 90 hp Hour 4.04 1453.50 5872.14
Fuel / Energy charges Hour 4.04 843.60 3408.14
2 Shovel 0.5 cum Hour 8.00 869.30 6954.40
Fuel / Energy charges Hour 8.00 657.80 5262.40
3 Tippers 5 cum Hour 48.00 384.40 18451.20
Fuel / Energy charges Hour 48.00 414.40 19891.20
4 Pump 5 hp ( diesel ) Hour 3.00 8.50 25.50
Fuel / Energy charges Hour 3.00 109.60 328.80
5 Water tanker 8000 ltr Hour 6.00 358.00 2148.00
Fuel / Energy charges Hour 6.00 414.40 2486.40
6 Vibratory Roller 8 tonne Hour 6.13 1175.20 7203.98
Fuel / Energy charges Hour 6.13 1425.20 8736.48
7 Sundries LS 5.00 32.00 160.00
Total hire charges of Machinery Rs: 80928.64
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Dozer Hour 4.04 287.30 1160.69
2 Crew for Shovel Hour 8.00 287.30 2298.40
3 Crew for Tipper Hour 48.00 215.50 10344.00
4 Crew for Pump Hour 3.00 134.80 404.40
5 Crew for Water tanker Hour 6.00 215.50 1293.00
6 Crew for Roller Hour 6.13 324.50 1989.19
7 work inspector Day 2.00 600.00 1200.00
8 mazdoor Day 6.00 460.00 2760.00
Total cost of Labour Rs: 21449.68
labour component/unit qty 29.20
Add contractor's profit and overhead charges 13.615% 4.00
labour component/unit qty (including contractor's profit) 33.20
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 80928.64
C. Cost of Labour Rs: 21449.68
Total Rs: 102378.31
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 13938.81
Total cost for 735.36 cum Rs: 116317.12
Rate per cum (A+B+C+D)/735.36 Rs. 158.20
IRR-CAW-3-3 Providing semi-pervious / pervious casing embankment using soil from approved dump area
in layers of 25 cm before compaction including cost of all materials, machinery, labour,
all operations such as re-excavation, sorting out, transporting, spreading in layer of specified
thickness, breaking clods, sectioning, watering, compacting each layer to density control of
not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/
8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.
154
Canal and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Angle dozer 90 hp Hour 4.22 1453.50 6133.77
Fuel / Energy charges Hour 4.22 843.60 3559.99
2 Shovel 0.50 cum capacity Hour 8.00 869.30 6954.40
Fuel / Energy charges Hour 8.00 657.80 5262.40
3 Tippers 5.00 cum capacity 6 Nos Hour 48.00 384.40 18451.20
Fuel / Energy charges Hour 48.00 414.40 19891.20
4 Pump 5 hp ( diesel ) Hour 3.00 8.50 25.50
Fuel / Energy charges Hour 3.00 109.60 328.80
5 Water tanker 8000 ltr Hour 6.00 358.00 2148.00
Fuel / Energy charges Hour 6.00 414.40 2486.40
6 Vibratory Roller 8 tonne Hour 7.82 1175.20 9190.06
Fuel / Energy charges Hour 7.82 1425.20 11145.06
7 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 85640.79
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Dozer Hour 4.22 287.30 1212.41
2 Crew for Shovel Hour 8.00 287.30 2298.40
3 Crew for Tipper Hour 48.00 215.50 10344.00
4 Crew for Pump Hour 3.00 134.80 404.40
5 Crew for Water tanker Hour 6.00 215.50 1293.00
6 Crew for Roller Hour 7.82 324.50 2537.59
7 work inspector Day 2.00 600.00 1200.00
8 mazdoor Day 6.00 460.00 2760.00
Total cost of Labour Rs: 22049.80
labour component/unit qty 28.70
Add contractor's profit and overhead charges 13.615% 3.90
labour component/unit qty (including contractor's profit) 32.60
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 85640.79
C. Cost of Labour Rs: 22049.80
Total Rs: 107690.59
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 14662.07
Total cost for 768.00 cum Rs: 122352.66
Rate per cum (A+B+C+D)/768 Rs. 159.30
IRR-CAW-3-4 Providing semi-pervious / pervious casing embankment using soil from approved dump area
in layers of 25 cm before compaction including cost of all materials, machinery, labour,
all operations such as re-excavation, sorting out, transporting, spreading in layer of specified
thickness, breaking clods, sectioning, watering, compacting each layer to density control of
not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/
8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Angle dozer 90 hp Hour 4.22 1453.50 6133.77
Fuel / Energy charges Hour 4.22 843.60 3559.99
2 Shovel 0.5 cum Hour 8.00 869.30 6954.40
Fuel / Energy charges Hour 8.00 657.80 5262.40
3 Tippers 5 cum of 6 Nos Hour 48.00 384.40 18451.20
Fuel / Energy charges Hour 48.00 414.40 19891.20
4 Pump 5 hp ( diesel ) Hour 3.00 8.50 25.50
Fuel / Energy charges Hour 3.00 109.60 328.80
5 Water tanker 8000 ltr Hour 6.00 358.00 2148.00
Fuel / Energy charges Hour 6.00 414.40 2486.40
6 Vibratory Roller 8 tonne Hour 6.40 1175.20 7521.28
Fuel / Energy charges Hour 6.40 1425.20 9121.28
7 Sundries LS 5.00 32.00 160.00
Total hire charges of Machinery Rs: 82044.22
155
Canal and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Dozer Hour 4.22 287.30 1212.41
2 Crew for Shovel Hour 8.00 287.30 2298.40
3 Crew for Tipper Hour 48.00 215.50 10344.00
4 Crew for Pump Hour 3.00 134.80 404.40
5 Crew for Water tanker Hour 6.00 215.50 1293.00
6 Crew for Roller Hour 6.40 324.50 2076.80
7 work inspector Day 2.00 600.00 1200.00
8 mazdoor Day 6.00 460.00 2760.00
Total cost of Labour Rs: 21589.01
labour component/unit qty 28.10
Add contractor's profit and overhead charges 13.615% 3.80
labour component/unit qty (including contractor's profit) 31.90
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 82044.22
C. Cost of Labour Rs: 21589.01
Total Rs: 103633.23
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 14109.66
Total cost for 768.00 cum Rs: 117742.89
Rate per cum (A+B+C+D)/768 Rs. 153.30
IRR-CAW-3-5 Providing semi-pervious / pervious casing embankment using soil from approved dump area
in layers of 25 cm before compaction including cost of all materials, machinery, labour,
all operations such as re-excavation, sorting out, transporting, spreading in layer of specified
thickness, breaking clods, sectioning, compacting each layer without watering to density
control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/
8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Angle dozer 90 hp Hour 4.22 1453.50 6133.77
Fuel / Energy charges Hour 4.22 843.60 3559.99
2 Shovel 0.50 cum capacity Hour 8.00 869.30 6954.40
Fuel / Energy charges Hour 8.00 657.80 5262.40
3 Tippers 5.00 cum capacity 6 Nos. Hour 48.00 384.40 18451.20
Fuel / Energy charges Hour 48.00 414.40 19891.20
4 Vibratory Roller 8 tonne Hour 6.40 1175.20 7521.28
Fuel / Energy charges Hour 6.40 1425.20 9121.28
5 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 76959.52
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Dozer Hour 4.22 287.30 1212.41
2 Crew for Shovel Hour 8.00 287.30 2298.40
3 Crew for Tipper Hour 48.00 215.50 10344.00
4 Crew for Roller Hour 6.40 324.50 2076.80
5 work inspector Day 2.00 600.00 1200.00
6 mazdoor Day 6.00 460.00 2760.00
Total cost of Labour Rs: 19891.61
labour component/unit qty 25.90
Add contractor's profit and overhead charges 13.615% 3.50
labour component/unit qty (including contractor's profit) 29.40
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 76959.52
C. Cost of Labour Rs: 19891.61
Total Rs: 96851.13
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 13186.28
Total cost for 768.00 cum Rs: 110037.41
Rate per cum (A+B+C+D)/768 Rs. 143.30
156
Canal and Allied Works - Item Unit Rates 2020-21
IRR-CAW-4-1 Providing impervious hearting embankment with soil collected in embankment area in
heaps as part of disposal of excavated soil from canal including cost of all materials,machinery,
labour, all operations such as sortingout, spreading in layer of 25 cm before compaction,
breaking clods,sectioning, watering and compacting each layer to density control of not less
than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/
8 to 10 tonne power roller etc., complete with lead upto 1 km for water.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Angle dozer 90 hp Hour 3.60 1453.50 5232.60
Fuel / Energy charges Hour 3.60 843.60 3036.96
2 Pump 5 hp ( diesel ) Hour 3.00 8.50 25.50
Fuel / Energy charges Hour 3.00 109.60 328.80
3 Water tanker 8000 ltr Hour 5.00 358.00 1790.00
Fuel / Energy charges Hour 5.00 414.40 2072.00
4 Vibratory Roller 8 tonne Hour 7.30 1175.20 8578.96
Fuel / Energy charges Hour 7.30 1425.20 10403.96
5 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 31532.78
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Dozer Hour 3.60 287.30 1034.28
2 Crew for Pump Hour 3.00 134.80 404.40
3 Crew for Water tanker Hour 5.00 215.50 1077.50
4 Crew for Roller Hour 7.30 324.50 2368.85
5 work inspector Day 1.00 600.00 600.00
6 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 7325.03
labour component/unit qty 12.20
Add contractor's profit and overhead charges 13.615% 1.70
labour component/unit qty (including contractor's profit) 13.90
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 31532.78
C. Cost of Labour Rs: 7325.03
Total Rs: 38857.81
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 5290.49
Total cost for 600.00 cum Rs: 44148.30
Rate per cum (A+B+C+D)/600 Rs. 73.60
IRR-CAW-4-2 Providing impervious hearting embankment with soil collected in embankment area in
heaps as part of disposal of excavated soil from canal including cost of all materials,machinery,
labour, all operations such as sortingout, spreading in layer of 25 cm before compaction,
breaking clods,sectioning, watering and compacting each layer to density control of not less
than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/
8 to 10 tonne power roller etc., complete with lead upto 1 km for water.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Angle dozer 90 hp Hour 3.60 1453.50 5232.60
Fuel / Energy charges Hour 3.60 843.60 3036.96
2 Pump 5 hp ( diesel ) Hour 3.00 8.50 25.50
Fuel / Energy charges Hour 3.00 109.60 328.80
3 Water tanker 8000 ltr Hour 5.00 358.00 1790.00
Fuel / Energy charges Hour 5.00 414.40 2072.00
4 Vibratory Roller 8 tonne Hour 6.06 1175.20 7121.71
Fuel / Energy charges Hour 6.06 1425.20 8636.71
5 Sundries LS 5.00 32.00 160.00
Total hire charges of Machinery Rs: 28404.28
157
Canal and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Dozer Hour 3.60 287.30 1034.28
2 Crew for Pump Hour 3.00 134.80 404.40
3 Crew for Water tanker Hour 5.00 215.50 1077.50
4 Crew for Roller Hour 6.06 324.50 1966.47
5 work inspector Day 2.00 600.00 1200.00
6 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 7522.65
labour component/unit qty 12.50
Add contractor's profit and overhead charges 13.615% 1.70
labour component/unit qty (including contractor's profit) 14.20
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 28404.28
C. Cost of Labour Rs: 7522.65
Total Rs: 35926.93
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 4891.45
Total cost for 600.00 cum Rs: 40818.38
Rate per cum (A+B+C+D)/600 Rs. 68.00
IRR-CAW-4-3 Providing semi-pervious / pervious casing hearting embankment using soil collected in
heaps in embankment area as part of disposal of excavated soil from canal including cost of
all materials, machinery, labour, all operations such as sorting-out, spreading in layers of 25
cm before compaction, breaking clods, sectioning, watering and compacting each layer
to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/
8 to 10 tonne power roller etc., complete with lead upto 1 km for water.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Angle dozer 90 hp Hour 3.60 1453.50 5232.60
Fuel / Energy charges Hour 3.60 843.60 3036.96
2 Pump 5 hp ( diesel ) Hour 3.00 8.50 25.50
Fuel / Energy charges Hour 3.00 109.60 328.80
3 Water tanker 8000 ltr Hour 5.00 358.00 1790.00
Fuel / Energy charges Hour 5.00 414.40 2072.00
4 Vibratory Roller 8 tonne Hour 7.30 1175.20 8578.96
Fuel / Energy charges Hour 7.30 1425.20 10403.96
5 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 31532.78
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Dozer Hour 3.60 287.30 1034.28
2 Crew for Pump Hour 3.00 134.80 404.40
3 Crew for Water tanker Hour 5.00 215.50 1077.50
4 Crew for Roller Hour 7.30 324.50 2368.85
5 work inspector Day 1.00 600.00 600.00
6 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 7325.03
labour component/unit qty 12.20
Add contractor's profit and overhead charges 13.615% 1.70
labour component/unit qty (including contractor's profit) 13.90
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 31532.78
C. Cost of Labour Rs: 7325.03
Total Rs: 38857.81
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 5290.49
Total cost for 600.00 cum Rs: 44148.30
Rate per cum (A+B+C+D)/600 Rs. 73.60
IRR-CAW-4-4 Providing semi-pervious / pervious casing embankment using soil collected in heaps in
embankment area as part of disposal of excavated soil from canal including cost of all
materials, machinery, labour, all operations such as sorting-out, spreading in layers of 25
cm before compaction, breaking clods, sectioning, watering and compacting each layer
to density control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/
8 to 10 tonne power roller etc., complete with lead upto 1 km for water.
158
Canal and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Angle dozer 90 hp Hour 3.60 1453.50 5232.60
Fuel / Energy charges Hour 3.60 843.60 3036.96
2 Pump 5 hp ( diesel ) Hour 3.00 8.50 25.50
Fuel / Energy charges Hour 3.00 109.60 328.80
3 Water tanker 8000 ltr Hour 5.00 358.00 1790.00
Fuel / Energy charges Hour 5.00 414.40 2072.00
4 Vibratory Roller 8 tonne Hour 6.1 1175.20 7121.71
Fuel / Energy charges Hour 6.1 1425.20 8636.71
5 Sundries LS 5.00 32.00 160.00
Total hire charges of Machinery Rs: 28404.28
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Dozer Hour 3.60 287.30 1034.28
2 Crew for Pump Hour 3.00 134.80 404.40
3 Crew for Water tanker Hour 5.00 215.50 1077.50
4 Crew for Roller Hour 6.1 324.50 1966.47
5 work inspector Day 2.00 600.00 1200.00
6 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 7522.65
labour component/unit qty 12.50
Add contractor's profit and overhead charges 13.615% 1.70
labour component/unit qty (including contractor's profit) 14.20
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 28404.28
C. Cost of Labour Rs: 7522.65
Total Rs: 35926.93
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 4891.45
Total cost for 600.00 cum Rs: 40818.38
Rate per cum (A+B+C+D)/600 Rs. 68.00
IRR-CAW-4-5 Providing semi-pervious / pervious casing embankment using soil collected in heaps in
embankment area as part of disposal of excavated soil from canal including cost of all
materials, machinery, labour, all operations such as sorting-out, spreading in layers of 25
cm before compaction, breaking clods, sectioning and compacting each layer without
watering to density control of not less than 95 percent or as stipulated by Sheep foot roller /
Vibratory roller/ 8 to 10 tonne power roller etc., complete.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Angle dozer 90 hp Hour 3.60 1453.50 5232.60
Fuel / Energy charges Hour 3.60 843.60 3036.96
2 Vibratory Roller 8 tonne Hour 6.06 1175.20 7121.71
Fuel / Energy charges Hour 6.06 1425.20 8636.71
3 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 24091.98
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Dozer Hour 3.60 287.30 1034.28
2 Crew for Roller Hour 6.06 324.50 1966.47
3 work inspector Day 1.00 600.00 600.00
4 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 5440.75
labour component/unit qty 9.10
Add contractor's profit and overhead charges 13.615% 1.20
labour component/unit qty (including contractor's profit) 10.30
159
Canal and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 24091.98
C. Cost of Labour Rs: 5440.75
Total Rs: 29532.73
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 4020.88
Total cost for 600.00 cum Rs: 33553.61
Rate per cum (A+B+C+D)/600 Rs. 55.90
IRR-CAW-4-6 Providing compacted embankment for field irrigation channels with gravely soil from
approved borrow area including sorting out, spreading in layers of 15 cm thickness, breaking
clods, watering, compacting, dressing sides to required slopes etc.,complete with lead upto
50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 5 hp pump ( diesel ) Hour 1.00 8.50 8.50
Fuel / Energy charges Hour 1.00 109.60 109.60
Total hire charges of Machinery Rs: 118.10
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for pump Hour 1.00 134.80 134.80
2 work inspector Day 1.00 600.00 600.00
3 Crowbarman for loosening soil Day 2.50 500.00 1250.00
4 mazdoor
For excavation at borrow area Day 5.00 460.00 2300.00
5 Cartman with Bullock cart for water Day 1.00 515.00 515.00
6 Bullock drawn roller for rolling Day 1.00 515.00 515.00
Total cost of Labour Rs: 8764.80
labour component/unit qty 350.60
Add contractor's profit and overhead charges 13.615% 47.70
labour component/unit qty (including contractor's profit) 398.30
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 118.10
C. Cost of Labour Rs: 8764.80
Total Rs: 8882.90
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 1209.41
Total cost for 25.00 cum Rs: 10092.31
Rate per cum (A+B+C+D)/25 Rs. 403.70
IRR-CAW-5-1 Providing rubble and sand filling in layers of 22.5 to 30 cm including cost of all materials,
machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 1840.00
160
Canal and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 4750.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 1840.00
Total Rs: 6590.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 897.23
Total cost for 10.00 cum Rs: 7487.23
Rate per cum (A+B+C+D)/10 Rs. 748.70
IRR-CAW-5-2 Providing rubble and Murum filling in layers of 22.5 to 30 cm including cost of all materials,
machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 1840.00
labour component/unit qty 184.00
Add contractor's profit and overhead charges 13.615% 25.10
labour component/unit qty (including contractor's profit) 209.10
ABSTRACT:
A. Cost of Materials Rs: 4070.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 1840.00
Total Rs: 5910.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 804.65
Total cost for 10.00 cum Rs: 6714.65
Rate per cum (A+B+C+D)/10 Rs. 671.50
IRR-CAW-5-3 Providing and laying 25 cm thick sand blanket below embankment including cost of all
materials, machinery, labour, spreading to specified thickness etc., complete with initial lead
upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 mazdoor Day 5.00 460.00 2300.00
Total cost of Labour Rs: 2300.00
labour component/unit qty 23.00
Add contractor's profit and overhead charges 13.615% 3.10
labour component/unit qty (including contractor's profit) 26.10
161
Canal and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 9375.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 2300.00
Total Rs: 11675.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 1589.55
Total cost for 100.00 sqm Rs: 13264.55
Rate per sqm (A+B+C+D)/100 Rs. 132.60
IRR-CAW-5-3-A Providing and laying sand blanket below embankment including cost of all
(New Item3- 2011--
12) materials, machinery, labour, spreading to specified thickness etc., complete with initial lead
upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 mazdoor Day 20.00 460.00 9200.00
Total cost of Labour Rs: 9200.00
labour component/unit qty 92.00
Add contractor's profit and overhead charges 13.615% 12.50
labour component/unit qty (including contractor's profit) 104.50
ABSTRACT:
A. Cost of Materials Rs: 37500.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 9200.00
Total Rs: 46700.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 6358.21
Total cost for 100.00 cum Rs: 53058.21
Rate per cum (A+B+C+D)/100 Rs. 530.60
IRR-CAW-5-4 Providing and constructing dry rubble rock-toe using rubble and stone chips from
approved source including cost of all materials, machinery, labour, hand packing rubble
and stone chips, finishing top and sides to required slopes etc., complete with initial lead upto
50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00
0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 Mason Class-II Day 7.00 500.00 3500.00
3 mazdoor Day 19.00 460.00 8740.00
Total cost of Labour Rs: 12840.00
labour component/unit qty 128.40
Add contractor's profit and overhead charges 13.615% 17.50
labour component/unit qty (including contractor's profit) 145.90
162
Canal and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 37919.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 12840.00
Total Rs: 50759.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 6910.84
Total cost for 100.00 cum Rs: 57669.84
Rate per cum (A+B+C+D)/100 Rs. 576.70
IRR-CAW-5-5 Providing and constructing longitudinal and cross graded filter drains using sand and
20 mm down graded aggregates satisfying specified filter creteria in layers as per specifications
including cost of all materials, machinery, labour, laying to required slopes, compaction etc.,
complete with initial lead upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00
0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 mazdoor Day 36.00 460.00 16560.00
Total cost of Labour Rs: 17160.00
labour component/unit qty 171.60
Add contractor's profit and overhead charges 13.615% 23.40
labour component/unit qty (including contractor's profit) 195.00
ABSTRACT:
A. Cost of Materials Rs: 65633.40
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 17160.00
Total Rs: 82793.40
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 11272.32
Total cost for 100.00 cum Rs: 94065.72
Rate per cum (A+B+C+D)/100 Rs. 940.70
IRR-CAW-5-6 Laying Longitudinal Drains and Transverse drains of Size 600 x600 x750 mm in Bed and
filling with 12 mm to 40 mm HG machine Crushed metal and sand in bed including
Excavation of drains and Cost of procuring of all materials including 50 m lead and for all lifts.
B. MACHINERY
Sl.No Description Unit Quantity Rate in Rs. Amount in Rs.
C. LABOUR
Sl.No Particulars Unit Qty Rate in Rs Amount in Rs.
1 Labour for Sand laying Cum 5.14 460.00 2364.40
2 Labour for Metal laying Cum 1.93 460.00 887.80
Total cost of Labour Rs. 3252.20
labour component/unit qty 32.50
Add contractor's profit and overhead charges 13.615% 4.40
labour component/unit qty (including contractor's profit) 36.90
163
Canal and Allied Works - Item Unit Rates 2020-21
ABSTRACT
A. Cost of Materials Rs. 34290
B. Hire charges of Machinery Rs. 1755
C. Cost of Labour Rs. 3252.2
Total Rs: 39297.20
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 5350.31
Total cost for 100.00 mt Rs: 44647.51
Rate per mt (A+B+C+D)/100 Rs. 446.50
IRR-CAW-5-7 Laying and fixing of 100 mm Dia 300 mm long precast porus CC plugs in bed and sides
using 0.787 Kgs of cement per each using 20 mm HG metal and placing in local filters of size
600x600x750 mm in size including Excavation of drains and Cost of procuring of all materials
including 50 m lead and for all lifts. (Thickness of lining=100 mm)
A. MATERIALS:
Amount in
Sl.No Particulars Unit Qty Rate in Rs Rs.
1 Coarse aggregate Cum 0.122 1220.00 148.84
2 Sand (Un-Screened ) cum 0.188 510.00 95.79
3 Cement Kg 0.787 3.67 2.89
Total cost of materials Rs. 247.52
B. MACHINERY
Amount in
Sl.No Description Unit Quantity Rate in Rs.
Rs.
C. LABOUR
Amount in
Sl.No Particulars Unit Qty Rate in Rs Rs.
1 Mazdoor Day 0.30 460.00 138.00
Total cost of Labour Rs. 138.00
labour component/unit qty 138.00
Add contractor's profit and overhead charges 13.615% 18.79
labour component/unit qty (including contractor's profit) 156.79
ABSTRACT
A. Cost of Materials Rs. 247.52
B. Hire charges of Machinery Rs. 11.38
C. Cost of Labour Rs. 138.00
Total Rs: 396.90
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 54.04
Total cost for 1.00 Plug Rs: 450.94
Rate per each plug (A+B+C+D)/1.0 Rs. 450.94
IRR-CAW-5-8 Providing and constructing 0.50 m thick vertical or inclined graded filter media consisting of
15 cm thick sand layers and 20 cm thick 20 mm down coarse aggregate layer using approved
materials satisfying specified filter creteria as per specifications including cost of all materials,
machinery, labour, laying to required slope, compaction etc., complete with initial lead upto
50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 mazdoor Day 36.00 460.00 16560.00
Total cost of Labour Rs: 17160.00
labour component/unit qty 171.60
Add contractor's profit and overhead charges 13.615% 23.40
labour component/unit qty (including contractor's profit) 195.00
164
Canal and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 76230.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 17160.00
Total Rs: 93390.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 12715.05
Total cost for 100.00 cum Rs: 106105.05
Rate per cum (A+B+C+D)/100.0 Rs. 1061.10
IRR-CAW-5-9 Providing and constructing graded filter media below and behind rock-toe consisting of
20 cm thick sand, 15 cm thick 20 mm down and 15 cm thick 40 mm down size graded coarse
aggregates satisfying filter creteria behind rock-toe and 15 cm thick sand, 20 cm thick 20 mm
down coarse aggregate and 65 cm thick 40 mm down size coarse aggregate satisfying filter
creiteria below rock-toe as per specifications including cost of all materials, machinery, labour,
laying to required slope, compaction etc., complete with initial lead upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 mazdoors Day 60.00 460.00 27600.00
Total cost of Labour Rs: 28200.00
labour component/unit qty 160.20
Add contractor's profit and overhead charges 13.615% 21.80
labour component/unit qty (including contractor's profit) 182.00
ABSTRACT:
A. Cost of Materials Rs: 166474.10
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 28200.00
Total Rs: 194674.10
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 26504.88
Total cost for 176.00 cum Rs: 221178.98
Rate per cum (A+B+C+D)/176.0 Rs. 1256.70
IRR-CAW-5-10 Providing and laying filter media consisting of 2 layers of poly-propeline nonwoven filter
(a) fabric and 200 mm thick 20 mm down graded coarse aggregate for embankment including
cost of all materials, machinery, labour, forming toe drain etc., complete with lead upto 50 m
a. for aggregate and all leads for fabric and all lifts.
Using 200 gsm filter fabric.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
165
Canal and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 mazdoor Day 7.00 460.00 3220.00
Total cost of Labour Rs: 3820.00
labour component/unit qty 38.20
Add contractor's profit and overhead charges 13.615% 5.20
labour component/unit qty (including contractor's profit) 43.40
ABSTRACT:
A. Cost of Materials Rs: 45495.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 3820.00
Total Rs: 49315.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 6714.24
Total cost for 100.00 sqm Rs: 56029.24
Rate per sqm (A+B+C+D)/100.0 Rs. 560.30
IRR-CAW-5-11 Providing and laying filter media consisting of 2 layers of poly-propeline nonwoven filter
(b) fabric and 200 mm thick 20 mm down graded coarse aggregate for embankment including
cost of all materials, machinery, labour, forming toe drain etc., complete with lead upto 50 m
for aggregate and all leads for fabric and all lifts.
b. Using 250 gsm filter fabric.
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 mazdoor Day 7.00 460.00 3220.00
Total cost of Labour Rs: 3820.00
labour component/unit qty 38.20
Add contractor's profit and overhead charges 13.615% 5.20
labour component/unit qty (including contractor's profit) 43.40
ABSTRACT:
A. Cost of Materials Rs: 48435.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 3820.00
Total Rs: 52255.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 7114.52
Total cost for 100.00 sqm Rs: 59369.52
Rate per sqm (A+B+C+D)/100.0 Rs. 593.70
IRR-CAW-6-1 Providing and constructing rockfill casing to canal embankment with graded stones and
spalls from approved quarry including cost of all materials, machinery, labour, spreading
stones and spalls in layers, hand packing, wedging, finishing surface to required slopes etc.,
complete with initial lead upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
166
Canal and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Mason Cl- II Day 6.00 500.00 3000.00
2 mazdoor Day 8.00 460.00 3680.00
Total cost of Labour Rs: 6680.00
labour component/unit qty 66.80
Add contractor's profit and overhead charges 13.615% 9.10
labour component/unit qty (including contractor's profit) 75.90
ABSTRACT:
A. Cost of Materials Rs: 37855.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 6680.00
Total Rs: 44535.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 6063.44
Total cost for 100.00 cum Rs: 50598.44
Rate per cum (A+B+C+D)/100.0 Rs. 506.00
IRR-CAW-6-2 Providing and constructing rockfill casing to canal embankment with graded stones and
spalls available in dump yard (spoil bank) including cost of all materials, machinery, labour, spreading
stones and spalls in layers, hand packing, wedging, finishing surface to required slopes etc.,
complete with initial lead upto 50 m and all lifts.
Note: Stones and spalls available in dump yard shall be issued at specified issue rate.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Mason Cl- II Day 6.00 500.00 3000.00
2 Crowbarman Day 2.00 500.00 1000.00
3 mazdoor Day 10.00 460.00 4600.00
Total cost of Labour Rs: 8600.00
labour component/unit qty 86.00
Add contractor's profit and overhead charges 13.615% 11.70
labour component/unit qty (including contractor's profit) 97.70
ABSTRACT:
A. Cost of Materials Rs: 19420.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 8600.00
Total Rs: 28020.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 3814.92
Total cost for 100.00 cum Rs: 31834.92
Rate per cum (A+B+C+D)/100.0 Rs. 318.30
IRR-CAW-7-1 Providing cohesive non-swelling ( CNS ) soil lining to canals using soil from approved borrow
area including spreading soil in layers of thickness not more than 15 cm, breaking clods,
watering, compacting to density control of not less than 98 percent or as stipulated,
dressing to required profile etc., complete with initial lead upto 1 km and all lifts.
167
Canal and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Shovel 0.5 cum Hour 8.00 869.30 6954.40
Fuel / Energy charges Hour 8.00 657.80 5262.40
2 Angle dozer 90 hp Hour 3.00 1453.50 4360.50
Fuel / Energy charges Hour 3.00 843.60 2530.80
3 Tipper 5 cum Hour 24.00 384.40 9225.60
Fuel / Energy charges Hour 24.00 414.40 9945.60
4 Pump 5 hp ( diesel ) Hour 4.00 8.50 34.00
Fuel / Energy charges Hour 4.00 109.60 438.40
5 Water tanker 8000 ltr Hour 4.00 358.00 1432.00
Fuel / Energy charges Hour 4.00 414.40 1657.60
6 Diesel road roller 8-10 tonne Hour 11.50 170.20 1957.30
Fuel / Energy charges Hour 11.50 986.70 11347.05
7 Sundries LS 5.00 32.00 160.00
Total hire charges of Machinery Rs: 55305.65
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Shovel Hour 8.00 287.30 2298.40
2 Crew for Dozer Hour 3.00 287.30 861.90
3 Crew for Tipper Hour 24.00 215.50 5172.00
4 Crew for Pump Hour 4.00 134.80 539.20
5 Crew for Water tanker Hour 4.00 215.50 862.00
6 Crew for Road roller Hour 11.50 264.60 3042.90
7 work inspector Day 2.00 600.00 1200.00
8 mazdoor Day 38.00 460.00 17480.00
Total cost of Labour Rs: 31456.40
labour component/unit qty 79.80
Add contractor's profit and overhead charges 13.615% 10.90
labour component/unit qty (including contractor's profit) 90.70
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 55305.65
C. Cost of Labour Rs: 31456.40
Total Rs: 86762.05
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 11812.65
Total cost for 394.00 cum Rs: 98574.70
Rate per cum (A+B+C+D)/394.0 Rs. 250.20
IRR-CAW-7-2 Providing cohesive non-swelling ( CNS ) soil lining to canals using soil from approved borrow
area including spreading soil in layers of thickness not more than 15 cm, breaking clods,
watering, compacting to density control of not less than 95 percent or as stipulated,
dressing to required profile etc., complete with initial lead upto 1 km and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Shovel 0.5 cum Hour 8.00 869.30 6954.40
Fuel / Energy charges Hour 8.00 657.80 5262.40
2 Angle dozer 90 hp Hour 3.00 1453.50 4360.50
Fuel / Energy charges Hour 3.00 843.60 2530.80
3 Tippers 5 cum Hour 24.00 384.40 9225.60
Fuel / Energy charges Hour 24.00 414.40 9945.60
4 Pump 5 hp ( diesel ) Hour 4.00 8.50 34.00
Fuel / Energy charges Hour 4.00 109.60 438.40
5 Water tanker 8000 ltr Hour 4.00 358.00 1432.00
Fuel / Energy charges Hour 4.00 414.40 1657.60
6 Diesel road roller 8-10 tonnes Hour 10.00 170.20 1702.00
Fuel / Energy charges Hour 10.00 986.70 9867.00
7 Sundries LS 5.00 32.00 160.00
Total hire charges of Machinery Rs: 53570.30
168
Canal and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Shovel Hour 8.00 287.30 2298.40
2 Crew for Dozer Hour 3.00 287.30 861.90
3 Crew for Tipper Hour 24.00 215.50 5172.00
4 Crew for Pump Hour 4.00 134.80 539.20
5 Crew for Water tanker Hour 4.00 215.50 862.00
6 Crew for Road roller Hour 10.00 264.60 2646.00
7 work inspector Day 2.00 600.00 1200.00
8 mazdoor Day 38.00 460.00 17480.00
Total cost of Labour Rs: 31059.50
labour component/unit qty 78.80
Add contractor's profit and overhead charges 13.615% 10.70
labour component/unit qty (including contractor's profit) 89.50
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 53570.30
C. Cost of Labour Rs: 31059.50
Total Rs: 84629.80
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 11522.35
Total cost for 394.00 cum Rs: 96152.15
Rate per cum (A+B+C+D)/394.0 Rs. 244.00
IRR-CAW-7-3 Providing cohesive non-swelling ( CNS ) soil lining to canal using soil collected in heaps
along the edge of canal requiring CNS soil lining as part of the disposal of excavated soil from
canal excavation in CNS soil reach including spreading in layers of thickness not more than
15 cm, breaking clods, watering, compacting to density control of not less than 95 percent
or as stipulated, dressing to required profile etc., complete with lead upto upto 50 m and all
lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Angle Dozer 90 hp Hour 1.50 1453.50 2180.25
Fuel / Energy charges Hour 1.50 843.60 1265.40
2 Pump 5 hp ( diesel ) Hour 5.00 8.50 42.50
Fuel / Energy charges Hour 5.00 109.60 548.00
3 Water tanker 8000 ltr Hour 5.00 358.00 1790.00
Fuel / Energy charges Hour 5.00 414.40 2072.00
4 Diesel road roller 8-10 tonne Hour 13.00 170.20 2212.60
Fuel / Energy charges Hour 13.00 986.70 12827.10
5 Sundries LS 5.00 32.00 160.00
Total hire charges of Machinery Rs: 23097.85
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Dozer Hour 1.50 287.30 430.95
2 Crew for Pump Hour 5.00 134.80 674.00
3 Crew for Water tanker Hour 5.00 215.50 1077.50
4 Crew for Road roller Hour 13.00 264.60 3439.80
5 work inspector Day 2.00 600.00 1200.00
6 mazdoor Day 38.00 460.00 17480.00
Total cost of Labour Rs: 24302.25
labour component/unit qty 61.70
Add contractor's profit and overhead charges 13.615% 8.40
labour component/unit qty (including contractor's profit) 70.10
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 23097.85
C. Cost of Labour Rs: 24302.25
Total Rs: 47400.10
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 6453.52
Total cost for 394.00 cum Rs: 53853.62
Rate per cum (A+B+C+D)/394.0 Rs. 136.70
169
Canal and Allied Works - Item Unit Rates 2020-21
IRR-CAW-7-4 Providing and fixing 20 x 20 x 75 cm size top surface neatly dressed canal bed level
stones including cost of all materials, labour, excavation, fixing in position to correct level etc.,
complete with lead upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00
0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 Stone chiseller Cl- I Day 2.00 545.00 1090.00
3 mazdoor Day 2.00 460.00 920.00
Total cost of Labour Rs: 2610.00
labour component/unit qty 81.60
Add contractor's profit and overhead charges 13.615% 11.10
labour component/unit qty (including contractor's profit) 92.70
ABSTRACT:
A. Cost of Materials Rs: 768.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 2610.00
Total Rs: 3378.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 459.91
Total cost for 32.00 Nos. Rs: 3837.91
Rate per each (A+B+C+D)/32.0 Rs. 119.90
IRR-CAW-7-5 Providing, fabricating and placing in position reinforcement steel bars for RCC works
including cleaning, straightening, cutting, bending, hooking, lapping, tying with 1.25 mm dia.
soft annealed steel wire, welding wherever required including cost of all materials, machinery,
labour etc., complete with initial lead upto 50 and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Bar bender Day 6.00 665.00 3990.00
2 mazdoor Day 11.00 460.00 5060.00
Total cost of Labour Rs: 9050.00
labour component/unit qty 9.10
Add contractor's profit and overhead charges 13.615% 1.20
labour component/unit qty (including contractor's profit) 10.30
ABSTRACT:
A. Cost of Materials Rs: 43293.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 9050.00
Total Rs: 52343.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 7126.5
Total cost for 1000.00 kg Rs: 59469.50
Rate per kg (A+B+C+D)/1000.0 Rs. 59.50
170
Canal and Allied Works - Item Unit Rates 2020-21
IRR-CAW-7-6 Providing and laying 75 mm thick in-situ M-15 ( 28 days cube compressive strength not less
than 15 N / sqmm ) grade cement concrete with 20 mm down size approved, clean, hard,
graded aggregates for canal lining using vibrating cylinder type mechanical paver including
cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position,
finishing, forming contraction joints, fixing PVC joint sealing strips, curing, shifting of paver
from one side to other side of canal etc., complete with initial lead upto 1 km and all lifts.
(43 Gr Cement content: 300 kg /cum (22.5 kg/ sqm) for
use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35,
FA : 0.45 cum equivalent concrete volume:79.2 cum including the extra quantity of
concrete for curvatures and bends etc.,)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Batching plant Hour 8.00 330.40 2643.20
Fuel / Energy charges Hour 8.00 382.70 3061.60
2 Transit mixer 3 Nos Hour 24.00 635.00 15240.00
Fuel / Energy charges Hour 24.00 1205.90 28941.60
3 Mechanical paver Hour 8.00 293.30 2346.40
Lubricants etc @ 5 % Hour 8.00 14.67 117.32
4 DG set for batching plant 50 KVA Hour 8.00 68.80 550.40
Fuel / Energy charges Hour 8.00 1315.50 10524.00
5 DG set for paver 30 KVA Hour 8.00 55.10 440.80
Fuel / Energy charges Hour 8.00 877.00 7016.00
6 Shovel 0.5 cum / Loader Hour 2.00 869.30 1738.60
Fuel / Energy charges Hour 2.00 657.80 1315.60
7 Water tanker Hour 8.00 358.00 2864.00
Fuel / Energy charges Hour 8.00 414.40 3315.20
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Batching plant Hour 8.00 415.50 3324.00
2 Crew for Transit mixer Hour 24.00 344.80 8275.20
3 Crew for Concrete paver Hour 8.00 519.20 4153.60
4 Crew for DG set Hour 16.00 162.20 2595.20
5 Crew for Shovel Hour 2.00 287.30 574.60
6 Crew for Water tanker Hour 8.00 215.50 1724.00
7 Crew for Pump Hour 16 134.80 2156.80
8 Mason Class I Day 2 550.00 1100.00
9 Mechanic Day 1 560.00 560.00
10 Fitter Day 1 560.00 560.00
11 Electrician Day 1 610.00 610.00
12 work inspector Day 2 600.00 1200.00
13 mazdoor ( BP site ) Day 5 460.00 2300.00
14 mazdoor ( Paver site ) Day 10 460.00 4600.00
Total cost of Labour Rs: 33733.40
labour component/unit qty 35.10
Add contractor's profit and overhead charges 13.615% 4.80
labour component/unit qty (including contractor's profit) 39.90
ABSTRACT:
A. Cost of Materials Rs: 207607.19
B. Hire charges of Machinery Rs: 81219.52
C. Cost of Labour Rs: 33733.4
Total Rs: 322560.11
Add for shifting & re-erection of BP @ 2% Rs: 6451.2022
Add for LH / RH shifting & erection of Paver @ 0.5% Rs: 1612.8005
Add for ledge cutting / erection of tracks etc @ 1% Rs: 3225.6011
Total Rs: 333849.71
D. Add for contractor's profit and overheads on (A+B+C+other percentages) 13.615% Rs: 45453.64
Lead Charges for 1 Km for FA 35.64 cum @ 30.4 Rs./Cum 1083.456
Lead Charges for 1 Km for CA 63.36 cum @ 29.4 Rs./Cum 1862.78
Total cost for 960.00 sqm Rs: 382249.59
Rate per sqm (A+B+C+D)/960.0 Rs. 398.20
171
Canal and Allied Works - Item Unit Rates 2020-21
IRR-CAW-7-7 Providing and laying 80 mm thick in-situ M-15 ( 28 days cube compressive strength not less
than 15 N / sqmm ) grade cement concrete with 20 mm down size approved, clean, hard,
graded aggregates for canal lining using vibrating cylinder type mechanical paver including
cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position,
finishing, forming contraction joints, fixing PVC joint sealing strips, curing, shifting of paver
from one side to other side of canal etc., complete with initial lead upto 1 km and all lifts.
(43 Gr Cement content: 300 kg /cum (24 kg/ sqm) for
use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35,
FA : 0.45 cum equivalent concrete volume:84.48 cum including the extra quantity of
concrete for curvatures and bends etc.,)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Batching plant Hour 8.00 330.40 2643.20
Fuel / Energy charges Hour 8.00 382.70 3061.60
2 Transit mixer 3 Nos Hour 24.00 635.00 15240.00
Fuel / Energy charges Hour 24.00 1205.90 28941.60
3 Mechanical paver Hour 8.00 293.30 2346.40
Lubricants etc @ 5 % Hour 8.00 14.67 117.32
4 DG set for batching plant 50 KVA Hour 8.00 68.80 550.40
Fuel / Energy charges Hour 8.00 1315.50 10524.00
5 DG set for paver 30 KVA Hour 8.00 55.10 440.80
Fuel / Energy charges Hour 8.00 877.00 7016.00
6 Shovel 0.5 cum / Loader Hour 2.00 869.30 1738.60
Fuel / Energy charges Hour 2.00 657.80 1315.60
7 Water tanker Hour 8.00 358.00 2864.00
Fuel / Energy charges Hour 8.00 414.40 3315.20
8 Pump 5 hp(diesel) 2 Nos. 4 hrs each Hour 8.00 8.50 68.00
Fuel / Energy charges Hour 8.00 109.60 876.80
9 Sundries ( power line etc ) LS 5.00 32.00 160.00
Total hire charges of Machinery Rs: 81219.52
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Batching plant Hour 8.00 415.50 3324.00
2 Crew for Transit mixer Hour 24.00 344.80 8275.20
3 Crew for Concrete paver Hour 8.00 519.20 4153.60
4 Crew for DG set Hour 16.00 162.20 2595.20
5 Crew for Shovel Hour 2.00 287.30 574.60
6 Crew for Water tanker Hour 8.00 215.50 1724.00
7 Crew for Pump Hour 16 134.80 2156.80
8 Mason Class I Day 2 550.00 1100.00
9 Mechanic Day 1 560.00 560.00
10 Fitter Day 1 560.00 560.00
11 Electrician Day 1 610.00 610.00
12 work inspector Day 2 600.00 1200.00
13 mazdoor ( BP site ) Day 5 460.00 2300.00
14 mazdoor ( Paver site ) Day 10 460.00 4600.00
Total cost of Labour Rs: 33733.40
labour component/unit qty 35.10
Add contractor's profit and overhead charges 13.615% 4.80
labour component/unit qty (including contractor's profit) 39.90
172
Canal and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 219630.49
B. Hire charges of Machinery Rs: 81219.52
C. Cost of Labour Rs: 33733.4
Total Rs: 334583.41
Add for shifting & re-erection of BP @ 2% Rs: 6691.6681
Add for LH / RH shifting & erection of Paver @ 0.5% Rs: 1672.917
Add for ledge cutting / erection of tracks etc @ 1% Rs: 3345.8341
Total Rs: 346293.83
D. Add for contractor's profit and overheads on (A+B+C+other percentages) 13.615% Rs: 47147.9
Lead Charges for 1 Km for FA 38.02 cum @ 30.4 Rs./Cum 1155.6864
Lead Charges for 1 Km for CA 67.58 cum @ 29.4 Rs./Cum 1986.97
Total cost for 960.00 sqm Rs: 396584.38
Rate per sqm (A+B+C+D)/960.0 Rs. 413.10
IRR-CAW-7-8 Providing and laying 100 mm thick in situ M-15 (28 days cube compressive strength not less than
15 N /Sqmm ) grade cement concrete with 20 mm down size approved, clean, hard, graded
aggregates for canal lining using, vibrating, cylinder type mechanical paver including cost of all
materials, machinery, labour, cleaning, batching, mixing, placing in position, finishing, forming
contraction joints, fixing PVC joint sealing strips, curing, shifting of paver from one side to othere
side of canal etc., complete with initial lead upto 1 Km and all lifts.
(43 Gr Cement content: 300 kg /cum (30 kg/ sqm) for
use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35,
FA : 0.45 cum equivalent concrete volume:88 cum including the extra quantity of
concrete for curvatures and bends etc.,)
B. MACHINERY:
Sl.No Particulars Unit Qty Rate in Rs. Amount
1 Batching plant Hour 8 330.40 2643.20
Fuel / Energy charges Hour 8 382.70 3061.60
2 Transit mixer 3 Nos Hour 24 635.00 15240.00
Fuel / Energy charges Hour 24 1205.90 28941.60
3 Mechanical paver Hour 8 293.30 2346.40
lubricants etc @ 5% Hour 8 14.67 117.32
4 DG set for batching plant 50 KVA Hour 8 68.80 550.40
Fuel / Energy charges Hour 8 1315.50 10524.00
5 DG set for paver 30 KVA Hour 8 55.10 440.80
Fuel / Energy charges Hour 8 877.00 7016.00
6 Shovel 0.5 cum / Loader Hour 2.00 869.30 1738.60
Fuel / Energy charges Hour 2.00 657.80 1315.60
7 Water tanker Hour 8 358.00 2864.00
Fuel / Energy charges Hour 8 414.40 3315.20
Pump 5 hp (diesel) 2 Nos. 4 hrs
8 each Hour 8 8.50 68.00
Fuel / Energy charges 8 109.60 876.80
Total hire charges of Machinery Rs. 81059.52
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Batching plant Hour 8.00 415.50 3324.00
2 Crew for Transit mixer Hour 24.00 344.80 8275.20
3 Crew for Concrete paver Hour 8.00 519.20 4153.60
4 Crew for DG set Hour 16.00 162.20 2595.20
5 Crew for Shovel Hour 2.00 287.30 574.60
6 Crew for Water tanker Hour 8 215.50 1724.00
7 Crew for Pump Hour 8 134.80 1078.40
8 Mason Class I Day 2 550.00 1100.00
9 Mechanic Day 1 560.00 560.00
10 Fitter Day 1 560.00 560.00
11 Electrician Day 1 610.00 610.00
12 work inspector Day 2 600.00 1200.00
13 mazdoor ( BP site ) Day 5 460.00 2300.00
14 mazdoor ( Paver site ) Day 10 460.00 4600.00
Total cost of Labour Rs: 32655.00
labour component/unit qty 40.80
Add contractor's profit and overhead charges 13.615% 5.60
labour component/unit qty (including contractor's profit) 46.40
173
Canal and Allied Works - Item Unit Rates 2020-21
ABSTRACT
A. Cost of Materials Rs. 222956.07
B. Hire charges of Machinery Rs. 81059.52
C. Cost of Labour Rs. 32655.00
TOTAL Rs. 336670.59
Add for shifting & re-erection of BP @ 2% Rs. 6733.4118
Add for LH / RH shifting & erection of Paver @ 0.5% Rs. 1683.353
Add for ledge cutting / erection of tracks etc @ 1% Rs. 3366.7059
Total Rs: 348454.06
D. Add for contractor's profit and overheads on (A+B+C+other percentages) 13.615% Rs: 47442.02
Lead Charges for 1 Km for FA 39.60 cum @ 30.4 Rs./Cum 1203.84
Lead Charges for 1 Km for CA 70.40 cum @ 29.4 Rs./Cum 2069.76
Total cost for 800.00 Sqm Rs: 399169.68
Rate per Sqm (A+B+C+D)/800.0 Rs. 499.00
IRR-CAW-7-9 Dismantling, shifting and re-erecting mechanical concrete paver and DG set with all
accessories across canal CD work or other locations wherever shifting and re-erecting is
necessary including aligning paver correctly for continuing canal lining work, cost of all
materials, machinery, labour etc., complete with all leads and lifts.
Note: Local shifting and re-erection of paver for LH and RH side lining included in concrete lining rates
under items IRR-CAW-7-7 and IRR-CAW-7-8 and saperate rate for shifting shall not be allowed.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Tipper Hour 4.00 384.40 1537.6
Fuel / Energy charges Hour 1.00 414.40 414.4
2 Sundries (ropes / rails etc) LS 1.00 32.00 32
Total hire charges of Machinery Rs: 1984.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Tipper Hour 4.00 215.50 862
2 Crew for Paver Hour 8.00 519.20 4153.6
3 mazdoor Day 6.00 460.00 2760
Total cost of Labour Rs: 7775.60
labour component/unit qty 7775.60
Add contractor's profit and overhead charges 13.615% 1058.60
labour component/unit qty (including contractor's profit) 8834.20
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 1984.00
C. Cost of Labour Rs: 7775.60
Total Rs: 9759.60
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 1328.77
Total cost for 1.00 Shifting Rs: 11088.37
Rate per Shifting (A+B+C+D)/1.0 Rs. 11088.40
IRR-CAW-7-10 Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than
10 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates for bed and side lining of canal(150mm thick) including finishing the junction of bed and sides
to required curveture, cost of all materials, machinery, labour, formwork including supports,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,
complete with initial lead upto 50 m and all lifts. ( Cement content : 250 kg / cum )
( 43 Gr Cement content: 250 kg / cum for use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
174
Canal and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 16.00 270.40 4326.4
2 Crew for Pump Hour 0.50 134.80 67.4
3 Crew for Water tanker Hour 1.00 215.50 215.5
4 Crew for Needle vibrator Hour 16.00 194.60 3113.6
5 work inspector Day 1.00 600.00 600
6 Mason Class-I Day 2.00 550.00 1100
7 Fitter Day 1.00 560.00 560
8 mazdoor
for batching materials Day 22.00 460.00 10120
for loading mortar pans Day 8.00 460.00 3680
for laying and moving paver Day 6.00 460.00 2760
for conveying concrete Day 28.17 460.00 12958.2
for cleaning/ washing/ curing Day 2.00 460.00 920
Total cost of Labour Rs: 40421.10
labour component/unit qty 1434.90
Add contractor's profit and overhead charges 13.615% 195.40
labour component/unit qty (including contractor's profit) 1630.30
ABSTRACT:
A. Cost of Materials Rs: 71496.69
B. Hire charges of Machinery Rs: 6017.05
C. Cost of Labour Rs: 40421.10
Total Rs: 117934.84
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 16056.83
Total cost for 28.17 cum Rs: 133991.67
Rate per cum (A+B+C+D)/28.17 Rs. 4756.50
IRR-CAW-7-11 Providing and laying insitu vibrated M-10 (28 days cube compressive strength not less than
10 N/sqm) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregade for bed and side lining of canal(100 mm thick) including, finishing the junction of bed and sides
to required curvature, cost of all materials, machinery, labour, formwork including supports
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,
complete with initial lead up to 50 m and all lifts (Cement content: 250 kg/cum)
( 43 Gr Cement content: 250 kg / cum for use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
A. MATERIALS:
Sl.No Particulars Unit Qty Rate in Rs. Amount
1 Cement for mix kg 6750 3.67 24786.00
175
Canal and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl.No Particulars Unit Qty Rate in Rs. Amount
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 16.00 270.40 4326.4
2 Crew for Pump Hour 0.50 134.80 67.4
3 Crew for Water tanker Hour 1.00 215.50 215.5
4 Crew for Needle vibrator Hour 16.00 194.60 3113.6
5 work inspector Day 1.00 600.00 600
6 Mason Class-I Day 2.00 550.00 1100
7 Fitter Day 1.00 560.00 560
8 mazdoor
for batching materials Day 22.00 460.00 10120
for loading mortar pans Day 8.00 460.00 3680
for laying and moving paver Day 6.00 460.00 2760
for conveying concrete Day 27.00 460.00 12420
for cleaning/ washing/ curing Day 2.00 460.00 920
Total cost of Labour Rs: 39882.90
labour component/unit qty 1477.10
Add contractor's profit and overhead charges 13.615% 201.10
labour component/unit qty (including contractor's profit) 1678.20
ABSTRACT:
A. Cost of Materials including royalty charges Rs. 73400.40
B. Hire charges of Machinery Rs. 5676.25
C. Cost of Labour Rs. 39882.90
Total Rs. 118959.55
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 16196.34
Total cost for 27.00 cum Rs: 135155.89
Rate per cum (A+B+C+D)/27.0 Rs. 5005.80
IRR-CAW-7-12 Providing and laying100mm thick insitu vibrated M-10 (28 days cube compressive strength-not less than
10.00 N / sq mm) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates for bed and side lining of canal lining using vibrating cylindertype mechanical paver
including cost of all materials mechinery labour batching mixing placing in position forming
contraction joints fixing pvc joint seiling strips shifting of paver from one side of canal to other
side etc.complete with 1 km lead & all lifts.
(Cement content: 250 kg / cum for use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
176
Canal and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl.No Particulars Unit Qty Rate in Rs. Amount
1 Batching plant Hour 8.00 330.40 2643.2
2 Transit mixer 3 Nos Hour 24.00 635.00 15240
Fuel / Energy charges Hour 24.00 1205.90 28941.6
3 Mechanical paver Hour 5.00 293.30 1466.5
lubricants etc @ 5% Hour 5.00 14.67 73.325
4 DG set for batching plant 50 KVA Hour 8.00 68.80 550.4
Fuel / Energy charges Hour 8.00 1315.50 10524
5 DG set for paver 30 KVA Hour 8.00 55.10 440.8
Fuel / Energy charges Hour 8.00 877.00 7016
6 Shovel 0.5 cum / Loader Hour 2.00 869.30 1738.60
Fuel / Energy charges Hour 2.00 657.80 1315.60
7 Water tanker Hour 8.00 358.00 2864
Fuel / Energy charges Hour 8.00 414.40 3315.2
Pump 5 hp (diesel) 2 Nos. 4 hrs
8 each Hour 8.00 8.50 68
Fuel / Energy charges Hour 8.00 109.60 876.8
Total hire charges of Machinery Rs. 77074.03
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Batching plant Hour 8.00 415.50 3324.00
2 Crew for Transit mixer Hour 24.00 344.80 8275.20
3 Crew for Concrete paver Hour 8.00 519.20 4153.60
4 Crew for DG set Hour 16.00 162.20 2595.20
5 Crew for Shovel Hour 2.00 287.30 574.60
6 Crew for Water tanker Hour 8 215.50 1724.00
7 Crew for Pump Hour 8 134.80 1078.40
8 Mason Class I Day 2 550.00 1100.00
9 Mechanic Day 1 560.00 560.00
10 Fitter Day 1 560.00 560.00
11 Electrician Day 1 610.00 610.00
12 work inspector Day 2 600.00 1200.00
13 mazdoor ( BP site ) Day 5 460.00 2300.00
14 mazdoor ( Paver site ) Day 10 460.00 4600.00
Total cost of Labour Rs: 32655.00
labour component/unit qty 40.80
Add contractor's profit and overhead charges 13.615% 5.60
labour component/unit qty (including contractor's profit) 46.40
ABSTRACT:
A. Cost of Materials Rs. 215634.47
B. Hire charges of Machinery Rs. 77074.03
C. Cost of Labour Rs. 32655.00
TOTAL Rs. 325363.50
Add for shifting & re-erection of BP @ 2% Rs. 6507.27
Add for LH / RH shifting & erection of Paver @ 0.5% Rs. 1626.82
Add for ledge cutting / erection of tracks etc @ 1% Rs. 3253.63
Total Rs: 336751.22
D. Add for contractor's profit and overheads on (A+B+C+other percentages) 13.615% Rs: 45848.68
Lead Charges for 1 Km for FA 35.20 cum @ 30.4 Rs./Cum 1070.08
Lead Charges for 1 Km for CA 79.20 cum @ 29.4 Rs./Cum 2328.48
Total cost for 800.00 Sqm Rs: 385998.46
Rate per Sqm (A+B+C+D)/800.0 Rs. 482.50
IRR-CAW-7-13 Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than
10 N /sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for bed and side lining of canal including finishing the junction of bed and sides
to required curveture, cost of all materials, machinery, labour, formwork including supports,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,
complete with initial lead upto 50 m and all lifts. ( Cement content : 250 kg / cum )
(Cement content: 250 kg / cum for use of super plasticiser(0.4% by wt. of cement),
CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
177
Canal and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 16.00 270.40 4326.4
2 Crew for Pump Hour 0.50 134.80 67.4
3 Crew for Water tanker Hour 1.00 215.50 215.5
4 Crew for Vibrator Hour 16.00 194.60 3113.60
5 Mason Class-I Day 2.00 550.00 1100
6 work inspector Day 1.00 600.00 600
7 Fitter Day 1.00 560.00 560
8 mazdoor
for batching materials Day 22.00 460.00 10120
for loading mortar pans Day 8.00 460.00 3680
for laying and moving paver Day 6.00 460.00 2760
for conveying concrete Day 27.00 460.00 12420
for cleaning/ washing/ curing Day 2.00 460.00 920
Total cost of Labour Rs: 39882.90
labour component/unit qty 1477.10
Add contractor's profit and overhead charges 13.615% 201.10
labour component/unit qty (including contractor's profit) 1678.20
ABSTRACT:
A. Cost of Materials Rs: 70489.00
B. Hire charges of Machinery Rs: 6017.05
C. Cost of Labour Rs: 39882.90
Total Rs: 116388.95
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 15846.36
Total cost for 27.00 cum Rs: 132235.31
Rate per cum (A+B+C+D)/27.0 Rs. 4897.60
IRR-CAW-7-14 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than
15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates for bed and side lining of canal(150 mm thick) including finishing the junction of bed and sides
to required curveture, cost of all materials, machinery, labour, formwork including supports,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,
complete with initial lead upto 50 m and all lifts.
(Cement content: 290 kg / cum for use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
178
Canal and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 16.00 270.40 4326.4
2 Crew for Pump Hour 0.50 134.80 67.40
3 Crew for Water tanker Hour 1.00 215.50 215.5
4 Crew for Vibrator Hour 16.00 194.60 3113.60
5 Mason Class-I Day 2.00 550.00 1100
6 work inspector Day 1.00 600.00 600
7 Fitter Day 1.00 560.00 560
8 mazdoor
for batching materials Day 22.00 460.00 10120
for loading mortar pans Day 8.00 460.00 3680
for laying Day 6.00 460.00 2760
for conveying concrete Day 24.92 460.00 11463.2
for cleaning/ washing/ curing Day 2.00 460.00 920
Total cost of Labour Rs: 38926.10
labour component/unit qty 1562.00
Add contractor's profit and overhead charges 13.615% 212.70
labour component/unit qty (including contractor's profit) 1774.70
ABSTRACT:
A. Cost of Materials Rs: 67460.70
B. Hire charges of Machinery Rs: 6017.05
C. Cost of Labour Rs: 38926.10
Total Rs: 112403.85
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 15303.78
Total cost for 24.92 cum Rs: 127707.63
Rate per cum (A+B+C+D)/24.92 Rs. 5124.70
IRR-CAW-7-15 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than
15 N /sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for bed and side lining of canal(100 mm thick) including finishing the junction of bed and sides
to required curveture, cost of all materials, machinery, labour, formwork including supports,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,
complete with initial lead upto 50 m and all lifts.
(Cement content: 300 kg / cum for use of super plasticiser(0.4% by wt. of cement),
CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
179
Canal and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 16.00 270.40 4326.4
2 Crew for Pump Hour 0.50 134.80 67.4
3 Crew for Water tanker Hour 1.00 215.50 215.5
4 Crew for Vibrator Hour 16.00 194.60 3113.6
5 Mason Class-I Day 2.00 550.00 1100
6 work inspector Day 1.00 600.00 600
7 Fitter Day 1.00 560.00 560
8 mazdoor
for batching materials Day 22.00 460.00 10120
for loading mortar pans Day 8.00 460.00 3680
for laying and moving paver Day 6.00 460.00 2760
for conveying concrete Day 23.10 460.00 10626
for cleaning/ washing/ curing Day 2.00 460.00 920
Total cost of Labour Rs: 38088.90
labour component/unit qty 1648.90
Add contractor's profit and overhead charges 13.615% 224.50
labour component/unit qty (including contractor's profit) 1873.40
ABSTRACT:
A. Cost of Materials Rs: 64784.04
B. Hire charges of Machinery Rs: 6017.05
C. Cost of Labour Rs: 38088.90
Total Rs: 108889.99
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 14825.37
Total cost for 23.10 cum Rs: 123715.36
Rate per cum (A+B+C+D)/23.10 Rs. 5355.60
IRR-CAW-7-16 Providing and laying150mm thick insitu vibrated M-15 (28 days cube compressive strength-not less than
15.00 N / sq mm) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for bed and side lining of canal lining using vibrating cylindertype mechanical paver
including cost of all materials mechinery labour batching mixing placing in position forming
contractiom joints fixing pvc joint seiling strips shifting of paver from one side of canal to other
side etc.complete with 1km lead & all lifts.
(43 Gr Cement content: 300 kg /cum (45 kg/ sqm) for
use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35,
FA : 0.44 cum equivalent concrete volume:132 cum including the extra quantity of
concrete for curvatures and bends etc.,)
B. MACHINERY:
Sl.No Particulars Unit Qty Rate in Rs. Amount
1 Batching plant Hour 8.00 330.40 2643.2
2 Transit mixer 3 Nos Hour 24.00 635.00 15240
Fuel / Energy charges Hour 24.00 1205.90 28941.6
3 Mechanical paver Hour 5.00 293.30 1466.5
lubricants etc @ 5% Hour 5.00 14.67 73.325
4 DG set for batching plant 50 KVA Hour 8.00 68.80 550.4
Fuel / Energy charges Hour 8.00 1315.50 10524
5 DG set for paver 30 KVA Hour 8.00 55.10 440.8
Fuel / Energy charges Hour 8.00 877.00 7016
6 Shovel 0.5 cum / Loader Hour 2.00 869.30 1738.60
Fuel / Energy charges Hour 2.00 657.80 1315.60
7 Water tanker Hour 8.00 358.00 2864
Fuel / Energy charges Hour 8.00 414.40 3315.2
Pump 5 hp (diesel) 2 Nos. 4 hrs
8 each Hour 8.00 8.50 68
Fuel / Energy charges Hour 8.00 109.60 876.8
Total hire charges of Machinery Rs. 77074.03
180
Canal and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Batching plant Hour 8.00 415.50 3324.00
2 Crew for Transit mixer Hour 24.00 344.80 8275.20
3 Crew for Concrete paver Hour 8.00 519.20 4153.60
4 Crew for DG set Hour 16.00 162.20 2595.20
5 Crew for Shovel Hour 2.00 287.30 574.60
6 Crew for Water tanker Hour 8 215.50 1724.00
7 Crew for Pump Hour 8 134.80 1078.40
8 Mason Class I Day 2 550.00 1100.00
9 Mechanic Day 1 560.00 560.00
10 Fitter Day 1 560.00 560.00
11 Electrician Day 1 610.00 610.00
12 work inspector Day 2 600.00 1200.00
13 mazdoor ( BP site ) Day 5 460.00 2300.00
14 mazdoor ( Paver site ) Day 10 460.00 4600.00
Total cost of Labour Rs: 32655.00
labour component/unit qty 40.80
Add contractor's profit and overhead charges 13.615% 5.60
labour component/unit qty (including contractor's profit) 46.40
ABSTRACT
A. Cost of Materials Rs. 322477.03
B. Hire charges of Machinery Rs. 77074.03
C. Cost of Labour Rs. 32655.00
TOTAL Rs. 432206.06
Add for shifting & re-erection of BP @ 2% Rs. 8644.12
Add for LH / RH shifting & erection of Paver @ 0.5% Rs. 2161.03
Add for ledge cutting / erection of tracks etc @ 1% Rs. 4322.06
Total Rs: 447333.27
D. Add for contractor's profit and overheads on (A+B+C+other percentages) 13.615% Rs: 60904.42
Lead Charges for 1 Km for FA 58.08 cum @ 30.4 Rs./Cum 1765.632
Lead Charges for 1 Km for CA 105.60 cum @ 29.4 Rs./Cum 3104.64
Total cost for 800.00 Sqm Rs: 513107.96
Rate per Sqm (A+B+C+D)/800.0 Rs. 641.40
IRR-CAW-7-17 Providing and fixing pre-cast RCC template walls consisting of 0.05 cum M-15 grade
concrete using 20 mm down size coarse aggregates and 10 kg reinforcement steel moulded
as per specifications and drawing in CM 1:4 proportion including cost of all materials,
machinery, labour, formwork, fabricating and placing reinforcement steel, mixing, laying,
conveying and fixing in position including necessary excavation for seating, finishing joints in
CM 1:4, curing etc., complete with initial lead upto 1 km and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Hand mixer Hour 8.00 4.80 38.4
8.00 0.00 0
Total hire charges of Machinery Rs: 38.40
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600
2 Mason Class I for fixing Day 1.00 550.00 550
3 Mason Class II for casting Day 2.00 500.00 1000
4 Bar bender Day 1.00 665.00 665
5 mazdoor ( casting yard ) Day 4.00 460.00 1840
mazdoor ( for fixing ) Day 2.00 460.00 920
mazdoor for conveying Day 2.00 460.00 920
Total cost of Labour Rs: 6495.00
181
Canal and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials including serignorage charges Rs: 11834.97
B. Hire charges of Machinery Rs: 38.40
C. Cost of Labour Rs: 6495.00
Total Rs: 18368.37
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 2500.85
Lead Charges for 1 Km for FA 0.50 cum @ 30.4 Rs./Cum 15.2
Lead Charges for 1 Km for CA 0.80 cum @ 29.4 Rs./Cum 23.52
Lead Charges for 1Km for Steel (including Loading
and Unloading Charges) 0.20 tonne @ 190.9 Rs./Tonne 38.18
Total cost for 20.00 templete Rs: 20946.12
Rate per templete (A+B+C+D)/20.0 Rs. 1047.30
IRR-CAW-7-18 Providing and fixing 50 mm dia perforated GI pressure relief pipes 12.50 cm long with
one end closed with perforated GI plate and other end provided with alluminium lid hinged
to pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with all
leads and lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Drilling 8 mm dia holes LS 0.50 32.00 16
0.00
Total hire charges of Machinery Rs: 16.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Pipe fitter Day 0.50 615.00 307.5
mazdoor Day 0.50 460.00 230
Total cost of Labour Rs: 537.50
labour component/unit qty 53.80
Add contractor's profit and overhead charges 13.615% 7.30
labour component/unit qty (including contractor's profit) 61.10
ABSTRACT:
A. Cost of Materials Rs: 638.75
B. Hire charges of Machinery Rs: 16.00
C. Cost of Labour Rs: 537.50
Total Rs: 1192.25
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 162.32
Total cost for 10.00 Nos. Rs: 1354.57
Rate per each (A+B+C+D)/10.0 Rs. 135.50
IRR-CAW-7-19 Providing and fixing 50 mm dia perforated GI pressure relief pipes 22.50 cm long with
one end closed with perforated GI plate and other end provided with alluminium lid hinged
to pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with all
leads and lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Drilling 8 mm dia holes LS 5.00 32.00 160
0.00
Total hire charges of Machinery Rs: 160.00
182
Canal and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Pipe fitter Day 0.50 615.00 307.5
mazdoor Day 0.50 460.00 230
Total cost of Labour Rs: 537.50
labour component/unit qty 53.80
Add contractor's profit and overhead charges 13.615% 7.30
labour component/unit qty (including contractor's profit) 61.10
ABSTRACT:
A. Cost of Materials Rs: 893.75
B. Hire charges of Machinery Rs: 160.00
C. Cost of Labour Rs: 537.50
Total Rs: 1591.25
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 216.65
Total cost for 10.00 Nos. Rs: 1807.90
Rate per No. (A+B+C+D)/10.0 Rs. 180.80
IRR-CAW-7-20 Providing and fixing 50 mm dia perforated GI pressure relief pipes 30 cm long with
one end closed with perforated GI plate and other end provided with alluminium lid hinged
to pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with all
leads and lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Drilling 8 mm dia holes LS 7.00 32.00 224.00
0.00
Total hire charges of Machinery Rs: 224.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Pipe fitter Day 0.50 615.00 307.50
mazdoor Day 0.50 460.00 230.00
Total cost of Labour Rs: 537.50
labour component/unit qty 53.80
Add contractor's profit and overhead charges 13.615% 7.30
labour component/unit qty (including contractor's profit) 61.10
ABSTRACT:
A. Cost of Materials Rs: 1085.00
B. Hire charges of Machinery Rs: 224.00
C. Cost of Labour Rs: 537.50
Total Rs: 1846.50
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 251.4
Total cost for 10.00 Nos. Rs: 2097.90
Rate per No. (A+B+C+D)/10.0 Rs. 209.80
IRR-CAW-7-21 Providing and fixing 50 mm dia perforated GI pressure relief pipes 45 cm long with
one end closed with perforated GI plate and other end provided with alluminium lid hinged
to pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with all
leads and lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Drilling 8 mm dia holes LS 10.00 32.00 320.00
0.00
Total hire charges of Machinery Rs: 320.00
183
Canal and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Pipe fitter Day 0.50 615.00 307.50
mazdoor Day 0.50 460.00 230.00
Total cost of Labour Rs: 537.50
labour component/unit qty 53.80
Add contractor's profit and overhead charges 13.615% 7.30
labour component/unit qty (including contractor's profit) 61.10
ABSTRACT:
A. Cost of Materials Rs: 1467.50
B. Hire charges of Machinery Rs: 320.00
C. Cost of Labour Rs: 537.50
Total Rs: 2325.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 316.55
Total cost for 10.00 Nos. Rs: 2641.55
Rate per No. (A+B+C+D)/10.0 Rs. 264.20
IRR-CAW-7-22 Providing and fixing 50 mm dia perforated GI pressure relief pipes 75 cm long with
one end closed with perforated GI plate and other end provided with alluminium lid hinged
to pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with all
leads and lifts.
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 GI pipe 50 mm dia Rm 7.50 255.00 1912.50
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Drilling 8 mm dia holes LS 15.00 32.00 480.00
0.00
Total hire charges of Machinery Rs: 480.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Pipe fitter Day 0.50 615.00 307.50
2 mazdoor Day 0.50 460.00 230.00
Total cost of Labour Rs: 537.50
labour component/unit qty 53.80
Add contractor's profit and overhead charges 13.615% 7.30
labour component/unit qty (including contractor's profit) 61.10
ABSTRACT:
A. Cost of Materials Rs: 2232.50
B. Hire charges of Machinery Rs: 480.00
C. Cost of Labour Rs: 537.50
Total Rs: 3250.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 442.49
Total cost for 10.00 Nos. Rs: 3692.49
Rate per No. (A+B+C+D)/10.0 Rs. 369.20
IRR-CAW-7-23 Providing and fixing 100 mm dia perforated PVC pipes 40 cm long for Weep holes
including cost of all materials, labour, drilling 8 mm dia holes etc. complete with all
leads and lifts.
B. MACHINERY
Amount in
Sl.No Description Unit Quantity Rate in Rs.
Rs.
1 Nill 0.00 0.00
0.00 0.00
Total hire chargs of Machinery Rs. 0.00
184
Canal and Allied Works - Item Unit Rates 2020-21
C. LABOUR
Amount in
Sl.No Particulars Unit Qty Rate in Rs Rs.
1 Pipe fitter Day 0.25 615.00 153.75
2 Mazdoor Day 0.25 460.00 115.00
Total cost of Labour Rs. 268.75
labour component/unit qty 26.90
Add contractor's profit and overhead charges 13.615% 3.70
labour component/unit qty (including contractor's profit) 30.60
ABSTRACT
A. Cost of Materials Rs. 1550.00
B. Hire charges of Machinery Rs. 0.00
C. Cost of Labour Rs. 268.75
Total Rs: 1818.75
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 247.62
Total cost for 10.00 Nos. Rs: 2066.37
Rate per No. (A+B+C+D)/10.0 Rs. 206.60
IRR-CAW-7-24 Drilling 32 mm dia pressure relief hole below pressure relief pipe for bed and side lining of
canal laid on rock including cost of all materials, machinery, labour etc., complete with all
leads and lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Air compressor 8.5 cmm diesel Hour 1.00 223.10 223.10
Fuel / Energy charges Hour 1.00 1233.30 1233.30
2 Jack hammer 2 Nos. Hour 2.00 16.50 33.00
Fuel / Energy charges Hour 2.00 0.00 0.00
Total hire charges of Machinery Rs: 1489.40
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Air compressor Hour 1.00 259.60 259.60
2 Crew for Jack hammer Hour 2.00 405.60 811.20
Total cost of Labour Rs: 1070.80
labour component/unit qty 107.10
Add contractor's profit and overhead charges 13.615% 14.60
labour component/unit qty (including contractor's profit) 121.70
ABSTRACT:
A. Cost of Materials Rs: 307.27
B. Hire charges of Machinery Rs: 1489.40
C. Cost of Labour Rs: 1070.80
Total Rs: 2867.47
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 390.41
Total cost for 10.00 Nos. Rs: 3257.88
Rate per No. (A+B+C+D)/10.0 Rs. 325.80
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00
185
Canal and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Mason Cl- II Day 0.10 500.00 50.00
2 mazdoor Day 0.10 460.00 46.00
Total cost of Labour Rs: 96.00
labour component/unit qty 9.60
Add contractor's profit and overhead charges 13.615% 1.30
labour component/unit qty (including contractor's profit) 10.90
ABSTRACT:
A. Cost of Materials Rs: 313.95
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 96.00
Total Rs: 409.95
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 55.81
Total cost for 10.00 Nos. Rs: 465.76
Rate per No. (A+B+C+D)/10.0 Rs. 46.60
IRR-CAW-7-26 Providing and fixing 25 to 40 mm thick Shahabad / Talikota / other similar stone slabs
with pointing and finishing joints neatly in CM 1:3 proportion for canal / field channel lining
including cutting slabs to required size, mixing mortar, finishing joints neatly, curing etc.,
complete with lead upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 5 hp pump ( diesel ) Hour 2.00 8.50 17.00
Fuel / Energy charges Hour 2.00 109.60 219.20
Total hire charges of Machinery Rs: 236.20
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Operator pump Hour 2.00 134.80 269.60
2 work inspector Day 1.00 600.00 600.00
3 Mason Class I Day 4.00 550.00 2200.00
4 Mason Class II Day 2.00 500.00 1000.00
5 mazdoor Day 8.00 460.00 3680.00
Cartman with Double Bullock cart for
6 water Day 1.00 550.00 550.00
Total cost of Labour Rs: 8299.60
labour component/unit qty 83.00
Add contractor's profit and overhead charges 13.615% 11.30
labour component/unit qty (including contractor's profit) 94.30
ABSTRACT:
A. Cost of Materials Rs: 26176.40
B. Hire charges of Machinery Rs: 236.20
C. Cost of Labour Rs: 8299.60
Total Rs: 34712.20
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 4726.07
Total cost for 100.00 sqm Rs: 39438.27
Rate per sqm (A+B+C+D)/100.0 Rs. 394.40
IRR-CAW-7-27 Fixing PCC slabs of various sizes in CM 1 : 3 proportion to the side slopes of canal
including preparing bed, flush pointing joints in CM 1 : 3 propn, cost of all materials ( excluding
PCC slabs ), labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
186
Canal and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 5 hp pump ( diesel ) Hour 2.00 8.50 17.00
Fuel / Energy charges Hour 2.00 109.60 219.20
Total hire charges of Machinery Rs: 236.20
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Operator pump Hour 2.00 134.80 269.60
2 work inspector Day 1.00 600.00 600.00
3 Mason Class I Day 4.00 550.00 2200.00
4 mazdoor Day 9.00 460.00 4140.00
Cartman with Double Bullock cart for
5 water Day 1.00 550.00 550.00
Total cost of Labour Rs: 7759.60
labour component/unit qty 77.60
Add contractor's profit and overhead charges 13.615% 10.60
labour component/unit qty (including contractor's profit) 88.20
ABSTRACT:
A. Cost of Materials Rs: 1183.78
B. Hire charges of Machinery Rs: 236.20
C. Cost of Labour Rs: 7759.60
Total Rs: 9179.58
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 1249.8
Total cost for 100.00 sqm Rs: 10429.38
Rate per sqm (A+B+C+D)/100.0 Rs. 104.30
IRR-CAW-7-28 Fixing PCC lug slabs of various sizes in CM 1 : 3 proportion for supporting PCC slab lining
including necessary excavation, refilling, flush pointing joints in CM 1 : 3 propn, cost of all
materials ( excluding PCC lug slabs ), labour, finishing, curing etc., complete with initial lead
upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 5 hp pump ( diesel ) Hour 1.00 8.50 8.50
Fuel / Energy charges Hour 1.00 109.60 109.60
Total hire charges of Machinery Rs: 118.10
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Operator pump Hour 1.00 134.80 134.80
2 work inspector Day 1.00 600.00 600.00
3 Mason Class I Day 2.00 550.00 1100.00
4 Mason Class II Day 1.00 500.00 500.00
5 mazdoor Day 5.00 460.00 2300.00
Cartman with Double Bullock cart for
6 water Day 1.00 550.00 550.00
Total cost of Labour Rs: 5184.80
labour component/unit qty 51.80
Add contractor's profit and overhead charges 13.615% 7.10
labour component/unit qty (including contractor's profit) 58.90
ABSTRACT:
A. Cost of Materials Rs: 285.58
B. Hire charges of Machinery Rs: 118.10
C. Cost of Labour Rs: 5184.80
Total Rs: 5588.48
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 760.87
Total cost for 100.00 Rm Rs: 6349.35
Rate per Rm (A+B+C+D)/100.0 Rs. 63.50
IRR-CAW-7-29 Fixing 30 cm height pre-cast drops for field channels as directed including excavation, etc.,
complete with all leads and lifts.
187
Canal and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00
0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 Mason Cl- II Day 1.00 500.00 500.00
3 mazdoor Day 1.00 460.00 460.00
Total cost of Labour Rs: 1560.00
labour component/unit qty 222.90
Add contractor's profit and overhead charges 13.615% 30.30
labour component/unit qty (including contractor's profit) 253.20
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 1560.00
Total Rs: 1560.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 212.39
Total cost for 7.00 Nos. Rs: 1772.39
Rate per No. (A+B+C+D)/7.00 Rs. 253.20
IRR-CAW-7-30 Providing and fixing LDPE sheet for bed and sides of canal including cost of all materials,
labour, laying, joining etc., complete with all leads and lifts.
a. Using 500 micron thick LDPE sheet.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
Joining & laying @ 10 % of sheet
1 cost sqm 250.00 8.20 2050.00
2 mazdoor Day 1.00 460.00 460.00
Total cost of Labour Rs: 2510.00
labour component/unit qty 10.00
Add contractor's profit and overhead charges 13.615% 1.40
labour component/unit qty (including contractor's profit) 11.40
188
Canal and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 22718.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 2510.00
Total Rs: 25228.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 3434.79
Total cost for 250.00 sqm Rs: 28662.79
Rate per sqm (A+B+C+D)/250.0 Rs. 114.70
Note : i ) If the surface on which the LDPE sheet is to be laid is too rough and undulating provide
average 75 mm thick sand backing to LDPE sheet.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 mazdoor Day 6.00 460.00 2760.00
Total cost of Labour Rs: 2760.00
labour component/unit qty 11.00
Add contractor's profit and overhead charges 13.615% 1.50
labour component/unit qty (including contractor's profit) 12.50
ABSTRACT:
A. Cost of Materials Rs: 7031.25
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 2760.00
Total Rs: 9791.25
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 1333.08
Total cost for 250.00 sqm Rs: 11124.33
Rate per sqm (A+B+C+D)/250.0 Rs. 44.50
IRR-CAW-7-31 Providing and fixing LDPE sheet for bed and sides of canal including cost of all materials,
labour, laying, joining etc., complete with all leads and lifts.
b. Using 750 micron thick LDPE sheet.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00
0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
Joining & laying @ 10 % of sheet
1 cost sqm 250.00 12.10 3025.00
2 mazdoor Day 1.00 460.00 460.00
Total cost of Labour Rs: 3485.00
labour component/unit qty 13.90
Add contractor's profit and overhead charges 13.615% 1.90
labour component/unit qty (including contractor's profit) 15.80
189
Canal and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 33443.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 3485.00
Total Rs: 36928.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 5027.75
Total cost for 250.00 sqm Rs: 41955.75
Rate per sqm (A+B+C+D)/250.0 Rs. 167.80
Note : i ) If the surface on which the LDPE sheet is to be laid is too rough and undulating provide
average 75 mm thick unscreened sand backing to LDPE sheet.
For providing average 75 mm thick sand backing add per sqm Rs: 44.50
IRR-CAW-7-32 Providing and fixing LDPE sheet for bed and sides of canal including cost of all materials,
labour, laying, joining etc., complete with all leads and lifts.
Using 1000 micron thick LDPE sheet.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
Joining & laying @ 10 % of sheet
1 cost sqm 250.00 16.60 4150.00
2 mazdoor Day 1.00 460.00 460.00
Total cost of Labour Rs: 4610.00
labour component/unit qty 18.40
Add contractor's profit and overhead charges 13.615% 2.50
labour component/unit qty (including contractor's profit) 20.90
ABSTRACT:
A. Cost of Materials Rs: 45818.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 4610.00
Total Rs: 50428.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 6865.77
Total cost for 250.00 sqm Rs: 57293.77
Rate per sqm (A+B+C+D)/250.0 Rs. 229.20
Note : i ) If the surface on which the LDPE sheet is to be laid is too rough and undulating provide
average 75 mm thick unscreened sand backing to LDPE sheet.
For providing average 75 mm thick sand backing add per sqm Rs: 44.50
IRR-CAW-7-33 Providing and fixing 12 mm thick 380 mm depth tarfelt expansion joint filler boards for
stone masonry lining of canal including cost of all materials, labour etc., complete with all
leads and lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00
0.00 0.00
Total hire charges of Machinery Rs: 0.00
190
Canal and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Carpenter Cl- II Day 1.00 500.00 500.00
2 mazdoor Day 1.00 460.00 460.00
Total cost of Labour Rs: 960.00
labour component/unit qty 9.60
Add contractor's profit and overhead charges 13.615% 1.30
labour component/unit qty (including contractor's profit) 10.90
ABSTRACT:
A. Cost of Materials Rs: 13291.25
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 960.00
Total Rs: 14251.25
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 1940.31
Total cost for 100.00 Rm Rs: 16191.56
Rate per Rm (A+B+C+D)/100.00 Rs. 161.90
IRR-CAW-7-34 Providing and fixing 20 mm thick 100 mm depth tarfelt expansion joint filler boards for
cement concrete lining of canal including cost of all materials, labour etc., complete with all
leads and lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Carpenter Cl- II Day 1.00 500.00 500.00
2 mazdoor Day 1.00 460.00 460.00
Total cost of Labour Rs: 960.00
labour component/unit qty 9.60
Add contractor's profit and overhead charges 13.615% 1.30
labour component/unit qty (including contractor's profit) 10.90
ABSTRACT:
A. Cost of Materials Rs: 5200.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 960.00
Total Rs: 6160.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 838.68
Total cost for 100.00 Rm Rs: 6998.68
Rate per Rm (A+B+C+D)/100.00 Rs. 70.00
IRR-CAW-7-35 Providing and fixing 20 mm thick 150 mm depth tarfelt expansion joint filler boards for
cement concrete lining of canal including cost of all materials, labour etc., complete with all
leads and lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00
0.00 0.00
Total hire charges of Machinery Rs: 0.00
191
Canal and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Carpenter Cl- II Day 1.00 500.00 500.00
2 mazdoor Day 1.00 460.00 460.00
Total cost of Labour Rs: 960.00
labour component/unit qty 9.60
Add contractor's profit and overhead charges 13.615% 1.30
labour component/unit qty (including contractor's profit) 10.90
ABSTRACT:
A. Cost of Materials Rs: 7956.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 960.00
Total Rs: 8916.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 1213.91
Total cost for 100.00 Rm Rs: 10129.91
Rate per Rm (A+B+C+D)/100.00 Rs. 101.30
IRR-CAW-7-36 Providing and forming 35 mm wide and 10 mm thick construction / contraction joints
for concrete lining by mastic filler including cost of all materials, labour etc., complete with
all leads and lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Mason Cl- II Day 0.50 500.00 250.00
2 mazdoor Day 1.00 460.00 460.00
Total cost of Labour Rs: 710.00
labour component/unit qty 7.10
Add contractor's profit and overhead charges 13.615% 1.00
labour component/unit qty (including contractor's profit) 8.10
ABSTRACT:
A. Cost of Materials Rs: 1494.20
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 710.00
Total Rs: 2204.20
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 300.1
Total cost for 100.00 Rm Rs: 2504.30
Rate per Rm (A+B+C+D)/100.00 Rs. 25.00
IRR-CAW-7-37 Manufacturing 550 x 550 x 55 mm size PCC lining slabs in M-15 grade ( 28 days cube
compressive strength not less than 15 N /sqmm ) cement concrete using 20 mm down graded
coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying,
compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.
( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement),
CA : 0.80 cum, Blending Ratio of CA : 65:35, FA : 0.45cum
equivalent concrete volume: 3.74 cum)
192
Canal and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
359.20
1 Concrete mixer 300/200 ltr ( diesel) Hour 8.00 44.90
Fuel / Energy charges Hour 8.00 109.60 876.80
2 5 hp pump ( diesel ) Hour 0.10 8.50 0.85
Fuel / Energy charges Hour 0.10 109.60 10.96
3 Water tanker 8000 ltr Hour 0.20 358.00 71.60
Fuel / Energy charges Hour 0.20 414.40 82.88
Total hire charges of Machinery Rs: 1402.29
Aportioned hire charges of
machinery for lining slab 90% Rs: 1262.06
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.10 134.80 13.48
3 Crew for Water tanker Hour 0.20 215.50 43.10
4 Mason Class-I Day 2.00 550.00 1100.00
5 work inspector Day 1.00 600.00 600.00
6 mazdoor
for batching materials / laying CC Day 3.00 460.00 1380.00
for demoulding / oiling / laying Day 2.00 460.00 920.00
for shifting slabs to curing pond Day 1.00 460.00 460.00
for stacking after curing Day 1.00 460.00 460.00
for cleaning & miscellaneous Day 1.00 460.00 460.00
Total cost of Labour Rs: 7599.78
Aportioned cost of labour for lining
slabs 90% Rs: 6839.80
labour component/unit qty 30.40
Add contractor's profit and overhead charges 13.615% 4.10
labour component/unit qty (including contractor's profit) 34.50
ABSTRACT:
A. Cost of Materials Rs: 10593.27
B. Hire charges of Machinery Rs: 1262.06
C. Cost of Labour Rs: 6839.80
Total Rs: 18695.13
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 2545.34
Total cost for 225.00 Nos. Rs: 21240.47
Rate per each (A+B+C+D)/225.0 Rs. 94.40
IRR-CAW-7-38 Manufacturing 550 x 300 x 55 mm size PCC lug slabs in M-15 grade ( 28 days cube
compressive strength not less than 15 N / sqmm ) cement concrete using 20 mm down graded
coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying,
compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.
( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement),
CA : 0.80 cum, Blending Ratio of CA : 65:35, FA : 0.45cum,
equivalent concrete volume: 0.23 cum)
DATA: RATE ANALYSIS UNIT : 25 Nos.
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Cement for mix kg 69.00 3.67 253.37
45.90
Cement for incidentals @ 0.5 kg/slab kg 12.50 3.67
2 Coarse aggregate 20-10 mm cum 0.12 1220.00 145.91
Coarse aggregate 10 mm below cum 0.06 903.00 58.15
3 Fine aggregate (Un-Screened ) cum 0.10 510.00 52.79
4 Super Plasticizer kg 0.28 49.00 13.52
5 Use rate of moulds for 500 uses No. 25.00 3.47 86.64
Total cost of Materials Rs: 656.29
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
359.20
1 Concrete mixer 300/200 ltr ( diesel) Hour 8.00 44.90
Fuel / Energy charges Hour 8.00 109.60 876.80
2 5 hp pump ( diesel ) Hour 0.10 8.50 0.85
Fuel / Energy charges Hour 0.10 109.60 10.96
3 Water tanker 8000 ltr Hour 0.20 358.00 71.60
Fuel / Energy charges Hour 0.20 414.40 82.88
Total hire charges of Machinery Rs: 1402.29
Aportioned hire charges of
machinery for lug slabs 10% Rs: 140.23
193
Canal and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.10 134.80 13.48
3 Crew for Water tanker Hour 0.20 215.50 43.10
4 Mason Class-I Day 2.00 550.00 1100.00
5 work inspector Day 1.00 600.00 600.00
6 mazdoor
for batching materials / laying CC Day 3.00 460.00 1380.00
for demoulding / oiling / laying Day 2.00 460.00 920.00
for shifting slabs to curing pond Day 1.00 460.00 460.00
for stacking after curing Day 1.00 460.00 460.00
for cleaning & miscellaneous Day 1.00 460.00 460.00
Total cost of Labour Rs: 7599.78
Aportioned cost of labourfor lug
slabs 10% Rs: 759.98
labour component/unit qty 30.40
Add contractor's profit and overhead charges 13.615% 4.10
labour component/unit qty (including contractor's profit) 34.50
ABSTRACT:
A. Cost of Materials Rs: 656.29
B. Hire charges of Machinery Rs: 140.23
C. Cost of Labour Rs: 759.98
Total Rs: 1556.49
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 211.92
Total cost for 25.00 Nos. Rs: 1768.41
Rate per each (A+B+C+D)/25.0 Rs. 70.70
IRR-CAW-7-39 Manufacturing 450 x 300 x 30 mm size PCC lining slabs in M-15 grade ( 28 days cube
compressive strength not less than 15 N / sqmm ) cement concrete using 10 mm down graded
coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying,
compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.
( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement),
CA : 0.68 cum, FA : 0.43cum)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Hand mixer 45 / 30 ltr Hour 8.00 4.80 38.40
Fuel / Energy charges Hour 8.00 0.00 0.00
2 5 hp pump ( diesel ) Hour 0.10 8.50 0.85
Fuel / Energy charges Hour 0.10 109.60 10.96
3 Water tanker 8000 ltr Hour 0.20 358.00 71.60
Fuel / Energy charges Hour 0.20 414.40 82.88
Total hire charges of Machinery Rs: 204.69
Aportioned hire charges of
machinery for lining slab 90% Rs: 184.22
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Pump Hour 0.10 134.80 13.48
2 Crew for Water tanker Hour 0.20 215.50 43.10
3 Mason Class-I Day 2.00 550.00 1100.00
4 work inspector Day 1.00 600.00 600.00
5 mazdoor
for batching / mixing / laying Day 2.00 460.00 920.00
for demoulding / cleaning / oiling Day 2.00 460.00 920.00
for shifting slabs to curing pond Day 1.00 460.00 460.00
for stacking after curing Day 1.00 460.00 460.00
for cleaning & miscellaneous Day 1.00 460.00 460.00
Total cost of Labour Rs: 4976.58
Aportioned cost of labour for lining
slabs 90% Rs: 4478.92
labour component/unit qty 19.90
Add contractor's profit and overhead charges 13.615% 2.70
labour component/unit qty (including contractor's profit) 22.60
ABSTRACT:
194
Canal and Allied Works - Item Unit Rates 2020-21
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 1006.07
Total cost for 225.00 Nos. Rs: 8395.51
Rate per each (A+B+C+D)/225.0 Rs. 37.30
IRR-CAW-7-40 Manucturing 450 x 150 x 30 mm size PCC lug slabs in M-15 grade ( 28 days cube
compressive strength not less than 15 N / sqmm ) cement concrete using 10 mm down graded
coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying,
compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.
( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement),
CA : 0.68 cum, FA : 0.43cum)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Hand mixer 45 / 30 ltr Hour 8.00 4.80 38.40
Fuel / Energy charges Hour 8.00 0.00 0.00
2 5 hp pump ( diesel ) Hour 0.10 8.50 0.85
Fuel / Energy charges Hour 0.10 109.60 10.96
3 Water tanker 8000 ltr Hour 0.20 358.00 71.60
Fuel / Energy charges Hour 0.20 414.40 82.88
Total hire charges of Machinery Rs: 204.69
Aportioned hire charges of
machinery for lug slabs 10% Rs: 20.47
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Pump Hour 0.10 134.80 13.48
2 Crew for Water tanker Hour 0.20 215.50 43.10
3 Mason Class-I Day 2.00 550.00 1100.00
4 work inspector Day 1.00 600.00 600.00
5 mazdoor
for batching / mixing / laying Day 2.00 460.00 920.00
for demoulding / cleaning / oiling Day 2.00 460.00 920.00
for shifting slabs to curing pond Day 1.00 460.00 460.00
for stacking after curing Day 1.00 460.00 460.00
for cleaning & miscellaneous Day 1.00 460.00 460.00
Total cost of Labour Rs: 4976.58
Aportioned cost of labour for lug
slabs 10% Rs: 497.66
labour component/unit qty 19.90
Add contractor's profit and overhead charges 13.615% 2.70
labour component/unit qty (including contractor's profit) 22.60
ABSTRACT:
A. Cost of Materials Rs: 158.98
B. Hire charges of Machinery Rs: 20.47
C. Cost of Labour Rs: 497.66
Total Rs: 677.11
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 92.19
Total cost for 25.00 Nos. Rs: 769.30
Rate per each (A+B+C+D)/25.0 Rs. 30.80
IRR-CAW-7-41 Manufacturing 600 x 300 x 100mm size PCC lining slabs in M-15 grade (28 days cube
compressive strength not less than 15 N/Sqmm) cement concrete using 20mm down
grades coarse aggregate including cost of all materials, machinery, labour, batching,
mixing, laying, compacting, formwork, finishing, curing etc., complete with initial lead upto 50 m
and all lifts.
( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement),
CA : 0.80 cum, FA : 0.45cum, Blending Ratio of CA--65:35)
195
Canal and Allied Works - Item Unit Rates 2020-21
A. MATERIALS :
B. MACHINERY :
C.LABOUR :
Sl. No Particulars Unit Quantity Rate Amount in
in Rs. Rs.
1 Crew for Pump Hour 0.1 134.80 13.48
2 Crew for water tanker Hour 0.2 215.50 43.10
3 Mason Class-I Day 2 550.00 1100.00
4 Class II Mason Day 1 500.00 500.00
5 Mazdoor
For batching materials/laying Day 2 460.00 920.00
For demoulding/cleaning/oiling 2 460.00 920.00
For shifting slabs to curing pond 1 460.00 460.00
For stacking after curing 1 460.00 460.00
For cleaning & miscellaneous Day 1 460.00 460.00
Total Cost of Labour Rs. 4876.58
Aportioned cost of labour for lining 90% 4388.92
slabs Rs.
labour component/unit qty 19.50
Add contractor's profit and overhead charges 13.615% 2.70
labour component/unit qty (including contractor's profit) 22.20
ABSTRACT :
A. Cost of Materials Rs. 9912.267
B. Hire Charges of machinery Rs. 1262.06
C. Cost of Labour Rs. 4388.92
Total Rs: 15563.25
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 2118.94
Total cost for 225.00 Nos. Rs: 17682.19
Rate per each (A+B+C+D)/225.0 Rs. 78.60
IRR-CAW-7-42 Manucturing 400 x 400 x 30 mm size PCC lining slabs in M-15 grade ( 28 days cube
compressive strength not less than 15 N / sqmm )cement concrete using 10 mm down graded
coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying,
compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.
( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement),
CA : 0.68 cum, FA : 0.43cum)
196
Canal and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Hand mixer 45 / 30 ltr Hour 8.00 4.80 38.40
Fuel / Energy charges Hour 8.00 0.00 0.00
2 5 hp pump ( diesel ) Hour 0.10 8.50 0.85
Fuel / Energy charges Hour 0.10 109.60 10.96
3 Water tanker 8000 ltr Hour 0.20 358.00 71.60
Fuel / Energy charges Hour 0.20 414.40 82.88
Total hire charges of Machinery Rs: 204.69
Aportioned hire charges of
machinery for lining slab 90% Rs: 184.22
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Pump Hour 0.10 134.80 13.48
2 Crew for Water tanker Hour 0.20 215.50 43.10
3 Mason Class-I Day 2.00 550.00 1100.00
4 work inspector Day 1.00 600.00 600.00
5 mazdoor
for batching / mixing / laying Day 2.00 460.00 920.00
for demoulding / cleaning / oiling Day 2.00 460.00 920.00
for shifting slabs to curing pond Day 1.00 460.00 460.00
for stacking after curing Day 1.00 460.00 460.00
for cleaning & miscellaneous Day 1.00 460.00 460.00
Total cost of Labour Rs: 4976.58
Aportioned cost of labour for lining
slabs 90% Rs: 4478.92
labour component/unit qty 19.90
Add contractor's profit and overhead charges 13.615% 2.70
labour component/unit qty (including contractor's profit) 22.60
ABSTRACT:
A. Cost of Materials Rs: 3091.37
B. Hire charges of Machinery Rs: 184.22
C. Cost of Labour Rs: 4478.92
Total Rs: 7754.52
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 1055.78
Total cost for 225.00 Nos. Rs: 8810.30
Rate per each (A+B+C+D)/225.0 Rs. 39.20
IRR-CAW-7-43 Manufacturing 400 x 150 x 30 mm size PCC lug slabs in M-15 grade ( 28 days cube
compressive strength not less than 15 N /sqmm ) cement concrete using 10 mm down graded
coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying,
compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.
( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement),
CA : 0.68 cum, FA : 0.43cum)
197
Canal and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Hand mixer 45 / 30 ltr Hour 8.00 4.80 38.40
Fuel / Energy charges Hour 8.00 0.00 0.00
2 5 hp pump ( diesel ) Hour 0.10 8.50 0.85
Fuel / Energy charges Hour 0.10 109.60 10.96
3 Water tanker 8000 ltr Hour 0.20 358.00 71.60
Fuel / Energy charges Hour 0.20 414.40 82.88
Total hire charges of Machinery Rs: 204.69
Aportioned hire charges of
machinery for lug slabs 10% Rs: 20.47
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Pump Hour 0.10 134.80 13.48
2 Crew for Water tanker Hour 0.20 215.50 43.10
3 Mason Class-I Day 2.00 550.00 1100.00
4 work inspector Day 1.00 600.00 600.00
5 mazdoor
for batching / mixing / laying Day 2.00 460.00 920.00
for demoulding / cleaning / oiling Day 2.00 460.00 920.00
for shifting slabs to curing pond Day 1.00 460.00 460.00
for stacking after curing Day 1.00 460.00 460.00
for cleaning & miscellaneous Day 1.00 460.00 460.00
Total cost of Labour Rs: 4976.58
Aportioned cost of labour for lug
slabs 10% Rs: 497.66
labour component/unit qty 19.90
Add contractor's profit and overhead charges 13.615% 2.70
labour component/unit qty (including contractor's profit) 22.60
ABSTRACT:
A. Cost of Materials Rs: 148.15
B. Hire charges of Machinery Rs: 20.47
C. Cost of Labour Rs: 497.66
Total Rs: 666.28
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 90.71
Total cost for 25.00 Nos. Rs: 756.99
Rate per each (A+B+C+D)/25.0 Rs. 30.30
IRR-CAW-7-44 Providing and laying uncoursed rubble stone masonry in CM 1 : 5 proportion for canal side
lining using stones and chips from approved quarry including cost of all materials,
machinery, labour, forming weep holes at specified intervals, finishing, curing etc., complete
with initial lead upto 50 m and all lifts.
(Thickness of the masonry assumed: 0.3 m, rubble stones : 0.96 cum, Stone Chips : 0.15cum,
Through Stones 20 x 20 x 30cm : 1/sqm)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 5 hp pump ( diesel ) Hour 4.00 8.50 34.00
Fuel / Energy charges Hour 4.00 109.60 438.40
Total hire charges of Machinery Rs: 472.40
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Operator pump Hour 4.00 134.80 539.20
2 work inspector Day 1.00 600.00 600.00
3 Mason Class I Day 2.00 550.00 1100.00
4 Mason Class II Day 2.00 500.00 1000.00
5 mazdoor Day 8.00 460.00 3680.00
Cartman with Double Bullock cart for 550.00
6 water Day 1.00 550.00
Total cost of Labour Rs: 7469.20
labour component/unit qty 746.90
Add contractor's profit and overhead charges 13.615% 101.70
labour component/unit qty (including contractor's profit) 848.60
198
Canal and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 11041.64
B. Hire charges of Machinery Rs: 472.40
C. Cost of Labour Rs: 7469.20
Total Rs: 18983.24
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 2584.57
Total cost for 10.00 cum Rs: 21567.81
Rate per cum (A+B+C+D)/10.0 Rs. 2156.80
IRR-CAW-7-45 Providing and laying uncoursed rubble stone masonry in CM 1:5 proportion for canal side
lining using stones from approved quarry including cost of all materials, machinery,
labour, forming weep holes at specified intervals, finishing, curing etc., complete
with initial lead upto 50m and all lifts.(without pin headers) : 1.1 cum)
(Thickness of the Masonry assumed: 0.3 m , rubble stones
A. MATERIALS :
B. MACHINERY :
C. LABOUR :
ABSTRACT :
A. Cost of Materials Rs. 9227.6224
B. Hire Charges of Machinery Rs. 620.4
C. Cost of Labour Rs. 24579.20
Total Rs: 34427.22
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 4687.27
Total cost for 10.00 Cum Rs: 39114.49
Rate per Cum (A+B+C+D)/10.0 Rs. 3911.40
IRR-CAW-7-46 Providing and laying uncoursed rubble stone masonry in CM 1 : 5 proportion for canal side
lining using stones and chips from canal excavation including cost of all materials,
machinery, labour, forming weep holes at specified interval, finishing, curing etc., complete
with initial lead upto 50 m and all lifts.
( rubble stones : 0.96 cum, Stone Chips : 0.15cum, Through Stones 20 x 20 x 30cm : 1/sqm)
Note: Stones and chips will be issued from dump yard at specified issue rate.
199
Canal and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 5 hp pump ( diesel ) Hour 4.00 8.50 34.00
Fuel / Energy charges Hour 4.00 109.60 438.40
Total hire charges of Machinery Rs: 472.40
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Operator pump Hour 4.00 134.80 539.20
2 work inspector Day 1.00 600.00 600.00
3 Mason Class I Day 2.00 550.00 1100.00
4 Mason Class II Day 2.00 500.00 1000.00
5 Crowbarman Day 1.00 500.00 500.00
6 mazdoor Day 9.00 460.00 4140.00
Cartman with Double Bullock cart for 550.00
7 water Day 1.00 550.00
Total cost of Labour Rs: 8429.20
labour component/unit qty 842.90
Add contractor's profit and overhead charges 13.615% 114.80
labour component/unit qty (including contractor's profit) 957.70
ABSTRACT:
A. Cost of Materials Rs: 9232.37
B. Hire charges of Machinery Rs: 472.40
C. Cost of Labour Rs: 8429.20
Total Rs: 18133.97
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 2468.94
Total cost for 10.00 cum Rs: 20602.91
Rate per cum (A+B+C+D)/10.0 Rs. 2060.30
IRR-CAW-7-47 Providing and laying uncoursed rubble stone masonry in CM 1:5 proportion for canal side lining
using stones from canal excavation including cost of all materials, machinery, labour, forming weep holes at
specified intervals, finishing, curing etc., complete with initial lead upto 50m and all lifts.
( rubble stones : 1.1cum, cement : 98kg, sand 0.34 cum)
B. MACHINERY :
C. LABOUR :
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 4449.54
Total cost for 10.00 Cum Rs: 37130.70
Rate per Cum (A+B+C+D)/10.0 Rs. 3713.10
IRR-CAW-8-1 Providing and constructing 25 cm thick dry rubble stone pitching with pin headers at 2 per
sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial
lead upto 50 m and all lifts.
( rubble stones : 0.23 cum/sqm, Stone Chips : 0.0375cum/sqm, Pin Headers 30cm : 2/sqm)
200
Canal and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 Mason Class II Day 5.00 500.00 2500.00
3 mazdoor Day 6.00 460.00 2760.00
Total cost of Labour Rs: 5860.00
labour component/unit qty 58.60
Add contractor's profit and overhead charges 13.615% 8.00
labour component/unit qty (including contractor's profit) 66.60
ABSTRACT:
A. Cost of Materials Rs: 13413.75
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 5860.00
Total Rs: 19273.75
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 2624.12
Total cost for 100.00 sqm Rs: 21897.87
Rate per sqm (A+B+C+D)/100.0 Rs. 219.00
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 1840.00
labour component/unit qty 18.40
Add contractor's profit and overhead charges 13.615% 2.50
labour component/unit qty (including contractor's profit) 20.90
ABSTRACT:
A. Cost of Materials Rs: 3690.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 1840.00
Total Rs: 5530.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 752.91
Total cost for 100.00 sqm Rs: 6282.91
Rate per sqm (A+B+C+D)/100.0 Rs. 62.80
IRR-CAW-8-1-A Providing and constructing 22.5 cm thick dry rubble stone pitching with pin headers at 2 per
(New Item4 - 2011-
12) sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial
lead upto 50 m and all lifts.
( rubble stones : 0.207 cum/sqm, Stone Chips : 0.03375cum/sqm, Pin Headers 30cm : 2/sqm)
(For Maintenance works)
201
Canal and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 Mason Class II Day 5.00 500.00 2500.00
3 mazdoor Day 6.00 460.00 2760.00
Total cost of Labour Rs: 5860.00
labour component/unit qty 58.60
Add contractor's profit and overhead charges 13.615% 8.00
labour component/unit qty (including contractor's profit) 66.60
ABSTRACT:
A. Cost of Materials Rs: 12532.38
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 5860.00
Total Rs: 18392.38
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 2504.12
Total cost for 100.00 sqm Rs: 20896.50
Rate per sqm (A+B+C+D)/100.0 Rs. 209.00
IRR-CAW-8-2 Providing and constructing 25 cm thick dry rubble stone pitching including cost of all materials, labour,
hand packing, finishing etc., complete
( rubble stones : 0.275 cum/sqm)
B. MACHINERY :
C. LABOUR :
ABSTRACT :
A. Cost of Materials Rs. 8937.5
B. Hire Charges of Machinery Rs. 0
C. Cost of Labour Rs. 14135.00
Total Rs: 23072.50
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 3141.32
Total cost for 100.00 Sqm. Rs: 26213.82
Rate per Sqm. (A+B+C+D)/100.0 Rs. 262.10
If 15 cm thick murum bed is to be
NOTE: provided below pitching add in Rs. 62.80
( As per rate analysis under item IRR-CAW-8-1- Note )
IRR-CAW-8-2-A Providing and constructing 225 mm thick dry rubble stone pitching including cost of all materials, labour,
(New Item5 - 2011-
12) hand packing, finishing etc., complete
( rubble stones : 0.2475 cum/sqm) (For Maintenance Works)
202
Canal and Allied Works - Item Unit Rates 2020-21
B. MACHINERY :
C. LABOUR :
ABSTRACT :
A. Cost of Materials Rs. 4926.3
B. Hire Charges of Machinery Rs. 0
C. Cost of Labour Rs. 12721.50
Total Rs: 17647.80
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 2402.75
Total cost for 100.00 Sqm. Rs: 20050.55
Rate per Sqm. (A+B+C+D)/100.0 Rs. 200.50
IRR-CAW-8-3 Providing and constructing 30 cm thick dry rubble stone pitching with pin headers at 2 per
sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial
lead upto 50 m and all lifts.
( rubble stones : 0.275 cum/sqm, Stone Chips : 0.045cum/sqm, Pin Headers 30cm : 2/sqm)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00
0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 Mason Class II Day 5.00 500.00 2500.00
3 mazdoor Day 6.00 460.00 2760.00
Total cost of Labour Rs: 5860.00
labour component/unit qty 58.60
Add contractor's profit and overhead charges 13.615% 8.00
labour component/unit qty (including contractor's profit) 66.60
ABSTRACT:
A. Cost of Materials Rs: 15144.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 5860.00
Total Rs: 21004.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 2859.69
Total cost for 100.00 sqm Rs: 23863.69
Rate per sqm (A+B+C+D)/100.0 Rs. 238.60
If 15 cm thick murum bed is to be
NOTE: provided below pitching add 62.80
( As per rate analysis under item IRR-
CAW-8-1- Note )
203
Canal and Allied Works - Item Unit Rates 2020-21
10725.00
1 Uncoursed rubble stones at Quarry Cum 33.00
325.00
B.MACHINERY :
Amount
Sl No Description Unit Quantity Rate in Rs
in Rs
C.LABOUR :
Amount
Sl No Description Unit Quantity Rate in Rs
in Rs
ABSTRACT
A.Cost of Materials including ryolty charges Rs: 10725.00
B. Hire charges of Machinery Rs: 0.00
C.Cost of Labour Rs: 16962.00
Total Rs: 27687.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 3769.59
Total cost for 100.00 sqm Rs: 31456.59
Rate per sqm (A+B+C+D)/100.0 Rs. 314.60
If 15 cm thick murum bed is to be
NOTE: provided below pitching Rs : 62.80
Add ( As per rate analysis under
item IRR-CAW-8-1 - Note)
IRR-CAW-8-5 Providing and constructing 45 cm thick dry rubble stone pitching with pin headers at 2 per
sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial
lead upto 50 m and all lifts.
( rubble stones : 0.40 cum/sqm, Stone Chips : 0.0675cum/sqm, Pin Headers 45cm : 2/sqm)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00
0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 Mason Class II Day 7.00 500.00 3500.00
3 mazdoor Day 9.00 460.00 4140.00
Total cost of Labour Rs: 8240.00
204
Canal and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 23409.75
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 8240.00
Total Rs: 31649.75
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 4309.11
Total cost for 100.00 sqm Rs: 35958.86
Rate per sqm (A+B+C+D)/100.0 Rs. 359.60
If 15 cm thick murum bed is to be
NOTE: provided below pitching add 62.80
( As per rate analysis under item IRR-
CAW-8-1 - Note )
16087.50
1 Uncoursed rubble stones at Quarry Cum 49.50
325.00
( Included in material Rate)
Total Cost of materials Rs : 16087.50
B.MACHINERY :
Amount
Sl No Description Unit Quantity Rate in Rs
in Rs
C.LABOUR :
Amount
Sl No Description Unit Quantity Rate in Rs
in Rs
ABSTRACT
A.Cost of Materials including ryolty charges Rs: 16087.50
B. Hire charges of Machinery Rs: 0.00
C.Cost of Labour Rs: 25443.00
Total Rs: 41530.50
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 5654.38
Total cost for 100.00 sqm Rs: 47184.88
Rate per sqm (A+B+C+D)/100.0 Rs. 471.80
If 15 cm thick murum bed is to be
NOTE: provided below pitching Rs : 62.80
Add ( As per rate analysis under
item IRR-CAW-8-1 - Note)
IRR-CAW-8-7 Providing and constructing 30 cm thick rubble stone pitching set in CM 1: 5 proportion with
pin headers at 2 per sqm in including cost of all materials, labour, packing chips and mortar,
finishing, curing etc., complete with initial lead upto 50 m and all lifts.
( rubble stones : 0.275 cum/sqm, Stone Chips : 0.045cum/sqm, Pin Headers 30cm : 2/sqm)
B. MACHINERY:
205
Canal and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Pump Hour 2.00 134.80 269.60
2 work inspector Day 1.00 600.00 600.00
3 Mason Class II Day 5.00 500.00 2500.00
4 mazdoor Day 12.00 460.00 5520.00
5 Catrman with double bullock cart Day 2.00 550.00 1100.00
Total cost of Labour Rs: 9989.60
labour component/unit qty 99.90
Add contractor's profit and overhead charges 13.615% 13.60
labour component/unit qty (including contractor's profit) 113.50
ABSTRACT:
A. Cost of Materials Rs: 32512.50
B. Hire charges of Machinery Rs: 236.20
C. Cost of Labour Rs: 9989.60
Total Rs: 42738.30
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 5818.82
Total cost for 100.00 sqm Rs: 48557.12
Rate per sqm (A+B+C+D)/100.0 Rs. 485.60
If 15 cm thick murum bed is to be
NOTE: provided below pitching add 62.80
( As per rate analysis under item IRR-
CAW-8-1 - Note )
IRR-CAW-8-8 Providing and Constructing 30 cm thick rubble stone pitching set in CM 1:5 Proportion
including cost of all materials,labour, packing chips and mortar ,finishing etc.,complete
( rubble stones : 0.33 cum/sqm )
10725.00
1 Uncoursed rubble stones at Quarry Cum 33.00
325.00
2 Cement Kg 3232.00 3.67 11867.90
3 Sand (Screened) Cum 11.22 605.00 6788.10
Total Cost of materials Rs : 29381.00
B.MACHINERY :
Amount
Sl No Description Unit Quantity Rate in Rs
in Rs
C.LABOUR :
Amount
Sl No Description Unit Quantity Rate in Rs
in Rs
ABSTRACT
A.Cost of Materials Rs: 29381.00
B. Hire charges of Machinery Rs: 0.00
C.Cost of Labour Rs: 2215.00
Total Rs: 31596.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 4301.8
Total cost for 100.00 Sqm Rs: 35897.80
Rate per Sqm (A+B+C+D)/100.0 Rs. 359.00
If 15 cm thick murum bed is to be
NOTE: provided below pitching Rs : 62.80
Add ( As per rate analysis under
item IRR-CAW-8-1 - Note)
IRR-CAW-8-9 Providing and constructing 30 cm thick dry khandki stone pitching using 20 to 25 cm size
khandki stones with pin headers at 2 per sqm including cost of all materials, labour, hand
206
Canal and Allied Works - Item Unit Rates 2020-21
packing, finishing etc., complete with initial lead upto 50 m and all lifts.
( Khandki stones 20- 25 cm height : 1200 Nos/sqm, Stone Chips : 0.045cum/sqm,
Pin Headers 30cm : 2/sqm)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 Mason Class II Day 5.00 500.00 2500.00
3 mazdoor Day 6.00 460.00 2760.00
Total cost of Labour Rs: 5860.00
labour component/unit qty 58.60
Add contractor's profit and overhead charges 13.615% 8.00
labour component/unit qty (including contractor's profit) 66.60
ABSTRACT:
A. Cost of Materials Rs: 25406.50
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 5860.00
Total Rs: 31266.50
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 4256.93
Total cost for 100.00 sqm Rs: 35523.43
Rate per sqm (A+B+C+D)/100.0 Rs. 355.20
If 15 cm thick murum bed is to be
NOTE: provided below pitching add 62.80
( As per rate analysis under item IRR-
CAW-8-1 - Note )
IRR-CAW-8-10 Providing and constructing 45 cm thick dry khandki stone pitching using 25 to 30 cm size
khandki stones with pin headers at 2 per sqm including cost of all materials, labour, hand
packing, finishing etc., complete with initial lead upto 50 m and all lifts.
( Khandki stones 25- 30 cm height : 1200 Nos/sqm, Stone Chips : 0.0675cum/sqm,
Pin Headers 45cm : 2/sqm)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 Mason Class II Day 7.00 500.00 3500.00
3 mazdoor Day 9.00 460.00 4140.00
Total cost of Labour Rs: 8240.00
labour component/unit qty 82.40
Add contractor's profit and overhead charges 13.615% 11.20
labour component/unit qty (including contractor's profit) 93.60
207
Canal and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 23549.75
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 8240.00
Total Rs: 31789.75
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 4328.17
Total cost for 100.00 sqm Rs: 36117.92
Rate per sqm (A+B+C+D)/100.0 Rs. 361.20
If 15 cm thick murum bed is to be
NOTE: provided below pitching add 62.80
( As per rate analysis under item IRR-
CAW-8-1 - Note )
IRR-CAW-8-11 Providing and constructing 30 cm thick khandki stone pitching using 20 to 25 cm size
khandki stones with pin headers at 2 per sqm set in CM 1 : 5 proportion with pointing joints in
CM 1:3 proportion including cost of all materials, labour, packing chips and mortar, finishing,
curing etc.complete with initial lead upto 50 m and all lifts.
( Khandki stones 20- 25 cm height : 1200 Nos/sqm, Stone Chips : 0.045cum/sqm,
Pin Headers 30cm : 2/sqm)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 5 hp diesel pump Hour 2.00 8.50 17.00
Fuel / Energy charges Hour 2.00 109.60 219.20
Total hire charges of Machinery Rs: 236.20
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Pump Hour 2.00 134.80 269.60
2 work inspector Day 1.00 600.00 600.00
3 Cartman with double bullock cart Day 2.00 550.00 1100.00
4 Mason Class II Day 5.00 500.00 2500.00
5 mazdoor Day 11.00 460.00 5060.00
Total cost of Labour Rs: 9529.60
labour component/unit qty 95.30
Add contractor's profit and overhead charges 13.615% 13.00
labour component/unit qty (including contractor's profit) 108.30
ABSTRACT:
A. Cost of Materials Rs: 41912.99
B. Hire charges of Machinery Rs: 236.20
C. Cost of Labour Rs: 9529.60
Total Rs: 51678.79
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 7036.07
Total cost for 100.00 sqm Rs: 58714.86
Rate per sqm (A+B+C+D)/100.0 Rs. 587.10
If 15 cm thick murum bed is to be
NOTE: provided below pitching add 62.80
( As per rate analysis under item IRR-
CAW-8-1 - Note )
IRR-CAW-8-12 Providing and constructing 45 cm thick khandki stone pitching using 25 to 30 cm stones
with pin headers at 2 per sqm set in CM 1 : 5 proportion with pointing joints in CM 1 : 3
proportion including cost of all materials, labour, packing chips and mortar, finishing, curing
etc., complete with initial lead upto 50 m and all lifts.
( Khandki stones 25- 30 cm height : 730 Nos/sqm, Stone Chips : 0.0675cum/sqm,
Pin Headers 45cm : 2/sqm)
208
Canal and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 5 hp diesel pump Hour 4.00 8.50 34.00
Fuel / Energy charges Hour 4.00 109.60 438.40
Total hire charges of Machinery Rs: 472.40
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Pump Hour 4.00 134.80 539.20
2 work inspector Day 1.00 600.00 600.00
3 Cartman with double bullock cart Day 2.00 550.00 1100.00
4 Mason Class II Day 7.00 500.00 3500.00
5 mazdoor Day 16.00 460.00 7360.00
Total cost of Labour Rs: 13099.20
labour component/unit qty 131.00
Add contractor's profit and overhead charges 13.615% 17.80
labour component/unit qty (including contractor's profit) 148.80
ABSTRACT:
A. Cost of Materials Rs: 46885.30
B. Hire charges of Machinery Rs: 472.40
C. Cost of Labour Rs: 13099.20
Total Rs: 60456.90
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 8231.21
Total cost for 100.00 sqm Rs: 68688.11
Rate per sqm (A+B+C+D)/100.0 Rs. 686.90
If 15 cm thick murum bed is to be
NOTE: provided below pitching add 62.80
( As per rate analysis under item IRR-
CAW-8-1 - Note )
IRR-CAW-8-13 Providing 10 cm thick approved type grass turfing to the side slopes of canal including cost of
all materials, labour, watering for minimum 15 days etc.,complete with lead 50 m and all lifts.
(FA : 2 cum/sqm)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 0.10 600.00 60.00
2 Cartman with double bullock cart Day 2.00 550.00 1100.00
3 mazdoor Day 14.00 460.00 6440.00
Total cost of Labour Rs: 7600.00
labour component/unit qty 76.00
Add contractor's profit and overhead charges 13.615% 10.30
labour component/unit qty (including contractor's profit) 86.30
ABSTRACT:
A. Cost of Materials Rs: 3350.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 7600.00
Total Rs: 10950.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 1490.84
Total cost for 100.00 sqm Rs: 12440.84
Rate per sqm (A+B+C+D)/100.0 Rs. 124.40
209
Canal and Allied Works - Item Unit Rates 2020-21
IRR-CAW-8-14 Providing 10 cm Thick approved type gross turfing to the side slopes of canal including cost of
all materials ,labour,watering for minimum 15 days etc.,,complete.
with initial lead upto 50 m and all lifts ( WITHOUT USING SAND)
B.MACHINERY :
Amount
Sl No Description Unit Quantity Rate in Rs
in Rs
C.LABOUR :
Amount
Sl No Description Unit Quantity Rate in Rs
in Rs
210
Canal Cross Drainage Works - Item Unit Rates 2020-21
CHAPTER-IV
3. The Leads for Steel shall be from the nearest market place to the Project area
4. For earth/rockfill embankments wherever initial lead of 1km is considered in the basic rate, the additional lead charges are to be
added as follows:
Additional lead charges for Earth, Murrum etc., shall be worked out for total lead involved and 1 km lead charges included
in basic rate shall be deducted from total lead charges. No loading and unloading charges shall be allowed for any item.
(same as above)
Example:
Total lead for earth from approved borrow area : 15 Km
Initial lead included in the basic rate in the basic item rate in the data (i.e., item specification) : 1 Km
Additional lead charges : Lead charges forRs. 5 km 81.10
Lead charges for next 10 km Rs. 122
Total lead charges for 15 km Rs./cum 203.10
Less 1 km initial lead chargesRs./cum 30.40 (-)
Net additional lead chargesRs. / cum 172.70
5. The initial lead up to 50 m as mentioned in some standard data items is meant for manual lead within the working area. For
conveyance of materials, the lead required from quarry/Borrow area/ Dump Area to worksite shall be added to the data without
deducting the 50 m initial lead charges
IRR-CCDW-1-1 Excavation in all kinds of soil including boulders upto 0.30 m dia. for foundations of canal
cross drainage and other appurtenant structures and placing the excavated stuff neatly in
specified dump area or disposing off the same as directed etc., complete with initial lead upto
50 m and initial lift upto 3 m.
211
Canal Cross Drainage Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 0.25 600.00 150.00
2 mazdoor Day 6.00 460.00 2760.00
Total cost of Labour Rs: 2910.00
labour component/unit qty 291.00
Add contractor's profit and overhead charges 13.615% 39.60
labour component/unit qty (including contractor's profit) 330.60
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 2910.00
Total Rs: 2910.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 396.2
Total cost for 10.00 cum Rs: 3306.2
Rate per cum (A+B+C+D)/10.0 Rs. 330.60
IRR-CCDW-1-2 Excavation for Structures- Mechanical Means ( Data adopted from MORTH)
Earth work in excavation in all kinds of soils of foundation of structures as per drawing and
technical specification, including setting out, construction of shoring and bracing, removal of stumps
and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Depth upto 3 m
Unit = cum
DATA: Taking output = 240 cum Unit 240.00 cum
A. Materials:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
NIL 0.00 0.00 0.00
B. Machinery:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Hydraulic excavator 1.0 cum bucket hour 6.00 1452.20 8713.20
capacity
Fuel/ Energy charges hour 6.00 1205.90 7235.40
Total in Rs. 15948.60
C. Labour:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector day 0.32 600.00 192.00
2 Mazdoor day 8.00 460.00 3680.00
3 crew for excavator hour 6.00 287.30 1723.80
Total in Rs. 5595.80
labour component/unit qty 23.30
Add contractor's profit and overhead charges 13.615% 3.20
labour component/unit qty (including contractor's profit) 26.50
212
Canal Cross Drainage Works - Item Unit Rates 2020-21
Abstract
a) Material Rs 0.00
b) Machinery Rs 15948.60
c) Labour Rs 5595.80
Total Rs 21544.40
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 2933.27
Total cost for 240.00 cum Rs: 24477.67
Rate per cum (A+B+C+D)/240.0 Rs. 102.00
IRR-CCDW-1-3 Excavation in ordnary rock (including HDR) without blasting including boulders above 0.3 m upto 0.60 m dia.
for foundations of canal cross drainage and other appurtenant structures and placing the
excavated stuff neatly in specified dump area or disposing off the same as directed etc.,
complete with initial lead upto 50 m and initial lift upto 3 m.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crowbarman Day 1.25 500.00 625.00
2 Stone breaker Day 1.25 500.00 625.00
3 work inspector Day 0.25 600.00 150.00
4 mazdoor Day 6.00 460.00 2760.00
Total cost of Labour Rs: 4160.00
labour component/unit qty 416.00
Add contractor's profit and overhead charges 13.615% 56.60
labour component/unit qty (including contractor's profit) 472.60
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 4160.00
Total Rs: 4160.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 566.38
Total cost for 10.00 cum Rs: 4726.38
Rate per cum (A+B+C+D)/10.0 Rs. 472.60
IRR-CCDW-1-4 Excavation in ordnary rock without blasting for foundations of canal cross drainage
and other appurtenant structures and placing the excavated stuff neatly in specified dump
area or disposing off the same as directed etc., complete with initial
lead upto 50 m and initial lift upto 3 m.
( Data adopted from MORTH)
Mechanical Means
Unit = cum
DATA: Taking output = 180 cum Unit: 180.00 cum
A. Materials:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
NIL 0.00 0.00 0.00
B. Machinery:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1.0 Hydraulic excavator 1.0 cum bucket capacity hour 6.00 1452.20 8713.20
C. Labour:
213
Canal Cross Drainage Works - Item Unit Rates 2020-21
Abstract
a) Material Rs 0.00
b) Machinery Rs 15948.60
c) Labour Rs 4627.80
Total Rs 20576.40
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 2801.48
Total cost for 180.00 cum Rs: 23377.88
Rate per cum (A+B+C+D)/180.0 Rs. 129.90
IRR-CCDW-1-5 Excavation in hard rock requiring blasting including boulders above 0.6 m upto 1.2 m dia. for
foundations of canal cross drainage and other appurtenant structures and placing the
excavated stuff neatly in specified dump area or disposing off the same as directed etc.,
complete with initial lead upto 50 m and initial lift upto 3 m.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Air compressor 8.5 cmm ( diesel ) Hour 3.00 223.10 669.30
Fuel / Energy charges Hour 3.00 1233.30 3699.90
2 Jack hammers 2 Nos. Hour 6.00 16.50 99.00
Fuel / Energy charges Hour 6.00 0.00 0.00
Total hire charges of Machinery Rs: 4468.20
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Air compressor Hour 3.00 259.60 778.80
2 Crew for Jack hammer Hour 6.00 405.60 2433.60
3 work inspector Day 1.00 600.00 600.00
4 Blaster Day 0.50 605.00 302.50
5 Helper blaster Day 0.50 500.00 250.00
6 Crowbarman Day 6.00 500.00 3000.00
7 Stone breaker Day 3.00 500.00 1500.00
8 mazdoor Day 51.00 460.00 23460.00
Total cost of Labour Rs: 32324.90
labour component/unit qty 323.20
Add contractor's profit and overhead charges 13.615% 44.00
labour component/unit qty (including contractor's profit) 367.20
214
Canal Cross Drainage Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 3039.37
B. Hire charges of Machinery Rs: 4468.20
C. Cost of Labour Rs: 32324.90
Total Rs: 39832.47
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 5423.19
Total cost for 100.00 cum Rs: 45255.661
Rate per cum (A+B+C+D)/100.0 Rs. 452.60
IRR-CCDW-1-6 Excavation in hard rock of all toughness by blasting including boulders above 1.2 m dia. for
foundations of canal cross drainage and other appurtenant structures and placing the
excavated rock neatly in specified dump area or stack yard as directed etc., complete with
initial lead upto 50 m and initial lift upto 3 m.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Air compressor 8.5 cmm ( diesel ) Hour 8.00 223.10 1784.80
Fuel / Energy charges Hour 8.00 1233.30 9866.40
2 Jack hammer 2 Nos Hour 16.00 16.50 264.00
Fuel / Energy charges Hour 16.00 0.00 0.00
Total hire charges of Machinery Rs: 11915.20
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Air compressor Hour 8.00 259.60 2076.80
2 Crew for Jack hammer Hour 16.00 405.60 6489.60
3 Blaster licensed Day 1.00 605.00 605.00
4 Helper blasting Day 1.00 500.00 500.00
5 work inspector Day 1.00 600.00 600.00
6 Crowbarman Day 6.00 500.00 3000.00
7 Stone breaker Day 6.00 500.00 3000.00
8 mazdoor Day 51.00 460.00 23460.00
Total cost of Labour Rs: 39731.40
labour component/unit qty 397.30
Add contractor's profit and overhead charges 13.615% 54.10
labour component/unit qty (including contractor's profit) 451.40
ABSTRACT:
A. Cost of Materials Rs: 7195.12
B. Hire charges of Machinery Rs: 11915.20
C. Cost of Labour Rs: 39731.40
Total Rs: 58841.72
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 8011.3
Total cost for 100.00 cum Rs: 66853.02
Rate per cum (A+B+C+D)/100.0 Rs. 668.50
IRR-CCDW-1-7 Excavation in hard rock with blasting prohibited for foundations of canal cross drainage
and other appurtenant structures and placing the excavated rock neatly in
or stack yard as directed etc., complete with specified dump area initial lead upto 50 m and
initial lift upto 3 m.
Hard Rock ( blasting prohibited ) ( Data adopted from MORTH)
Unit = cum
215
Canal Cross Drainage Works - Item Unit Rates 2020-21
A.Materials:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
NIL 0.00 0.00 0.00
b) Machinery
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1.0 Air Compressor 250 cft with 2 leads of hour 6.00 195.20 1171.20
pneumatic breaker
Fuel/ Energy charges hour 6.00 986.70 5920.20
Total in Rs. 7091.40
c) Labour
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector day 0.20 600.00 120.00
2 Mazdoor day 5.00 460.00 2300.00
3 crew for compressor hour 6.00 259.60 1557.60
Total in Rs. 3977.60
labour component/unit qty 397.80
Add contractor's profit and overhead charges 13.615% 54.20
labour component/unit qty (including contractor's profit) 452.00
Abstract
a) Material Rs 0.00
b) Machinery Rs 7091.40
c) Labour Rs 3977.60
Total Rs 11069.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 1507.04
Total cost for 10.00 cum Rs: 12576.04
Rate per cum (A+B+C+D)/10.0 Rs. 1257.60
IRR-CCDW-1-8 Providing and fixing 25 mm dia 2.50 m long cold twisted deformed steel anchor rods with
1.25 m length driven into 32 mm dia hole drilled in bed rock and remaining length embedded in
concrete / masonry including cost of all materials, machinery, labour, drilling and cleaning
hole, driving anchor rod, grouting hole with thick cement slurry etc., complete with initial lead
upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Air compressor 8.5 cmm ( diesel ) Hour 1.00 223.10 223.10
Fuel / Energy charges Hour 1.00 1233.30 1233.30
2 Jack hammer 2 Nos Hour 2.00 16.50 33.00
Fuel / Energy charges Hour 2.00 0.00 0.00
Total hire charges of Machinery Rs: 1489.40
216
Canal Cross Drainage Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Air compressor Hour 1.00 259.60 259.60
2 Crew for Jack hammer Hour 2.00 405.60 811.20
3 Mason Class-II Day 0.50 500.00 250.00
4 Bar bender Day 0.50 665.00 332.50
5 work inspector Day 0.50 600.00 300.00
6 mazdoor Day 1.00 460.00 460.00
Total cost of Labour Rs: 2413.30
labour component/unit qty 241.30
Add contractor's profit and overhead charges 13.615% 32.90
labour component/unit qty (including contractor's profit) 274.20
ABSTRACT:
A. Cost of Materials Rs: 4487.67
B. Hire charges of Machinery Rs: 1489.40
C. Cost of Labour Rs: 2413.30
Total Rs: 8390.37
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 1142.35
Total cost for 10.00 Nos. Rs: 9532.72
Rate per each (A+B+C+D)/10.0 Rs. 953.30
IRR-CCDW-2-1 Providing, fabricating and placing in position reinforcement steel bars for RCC works including
cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with
1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc.,
complete with initial lead upto 50 and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 Bar bender Day 6.00 665.00 3990.00
3 mazdoor Day 11.00 460.00 5060.00
Total cost of Labour Rs: 9650.00
labour component/unit qty 9.70
Add contractor's profit and overhead charges 13.615% 1.30
labour component/unit qty (including contractor's profit) 11.00
ABSTRACT:
A. Cost of Materials Rs: 43069.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 9650.00
Total Rs: 52719.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 7177.69
Total cost for 1000.00 kg Rs: 59896.69
Rate per kg (A+B+C+D)/1000.0 Rs. 59.90
217
Canal Cross Drainage Works - Item Unit Rates 2020-21
IRR-CCDW-2-2 Providing, fabricating and fixing in position structural steel cutting edge consisting of 100 x
100 x 10 mm angle and 250 x 12 mm plate for sinking for sinking 4.50 m outer diameter
foundation wells foundation wells including cost of all materials, machinery, labour, bending,
welding, providing anchors etc., complete with initial lead upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Bending machine Hour 8.00 36.20 289.60
Fuel / Energy charges Hour 8.00 127.60 1020.80
2 Welding set Hour 30.00 14.20 426.00
Fuel / Energy charges Hour 30.00 102.10 3063.00
3 Sundries LS 10.00 32.00 320.00
Total hire charges of Machinery Rs: 5119.40
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Str. Steel fabricator Day 2.00 655.00 1310.00
2 Welder / Gas cutter Day 5.00 540.00 2700.00
3 work inspector Day 1.00 600.00 600.00
4 mazdoor Day 5.00 460.00 2300.00
Total cost of Labour Rs: 6910.00
labour component/unit qty 11.20
Add contractor's profit and overhead charges 13.615% 1.50
labour component/unit qty (including contractor's profit) 12.70
ABSTRACT:
A. Cost of Materials Rs: 30268.85
B. Hire charges of Machinery Rs: 5119.40
C. Cost of Labour Rs: 6910.00
Total Rs: 42298.25
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 5758.91
Total cost for 615.00 kg Rs: 48057.16
Rate per kg (A+B+C+D)/615.0 Rs. 78.10
IRR-CCDW-2-3 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than
15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates for foundation filling including cost of all materials, machinery, labour, formwork,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,
complete with initial lead upto 50 m and all lifts.
(Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
218
Canal Cross Drainage Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 44.90 359.20
Fuel / Energy charges Hour 8.00 109.60 876.80
2 5 hp pump ( diesel ) Hour 0.50 8.50 4.25
Fuel / Energy charges Hour 0.50 109.60 54.80
3 Water tanker 8000 ltr Hour 1.00 358.00 358.00
Fuel / Energy charges Hour 1.00 414.40 414.40
4 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 6.50 52.00
Fuel / Energy charges Hour 8.00 21.90 175.20
Total hire charges of Machinery Rs: 2294.65
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.50 134.80 67.40
3 Crew for Water tanker Hour 1.00 215.50 215.50
4 Crew for Needle vibrator Hour 8.00 194.60 1556.80
5 work inspector Day 1.00 600.00 600.00
6 Mason Class-I Day 1.00 550.00 550.00
7 mazdoor
for batching materials Day 11.00 460.00 5060.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying Day 3.00 460.00 1380.00
for conveying concrete Day 15.38 460.00 7074.80
for cleaning/ washing/ curing Day 1.00 460.00 460.00
8 Labour cost for shuttering sqm 15.38 114.00 1753.32
Labour cost for scaffolding @ 10% 175.33
Total cost of Labour Rs: 22896.35
labour component/unit qty 1488.70
Add contractor's profit and overhead charges 13.615% 202.70
labour component/unit qty (including contractor's profit) 1691.40
ABSTRACT:
A. Cost of Materials Rs: 38651.71
B. Hire charges of Machinery Rs: 2294.65
C. Cost of Labour Rs: 22896.35
Total Rs: 63842.71
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 8692.18
Total cost for 15.38 cum Rs: 72534.89
Rate per cum (A+B+C+D)/15.38 Rs. 4716.20
219
Canal Cross Drainage Works - Item Unit Rates 2020-21
IRR-CCDW-2-4 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than
15 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded
aggregates for foundation filling including cost of all materials, machinery, labour, formwork,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,
complete with initial lead upto 50 m and all lifts.
(Cement content: 250 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Concrete mixer 600/400 ltr ( diesel) Hour 8.00 76.40 611.20
Fuel / Energy charges Hour 8.00 219.30 1754.40
2 5 hp pump ( diesel ) Hour 0.50 8.50 4.25
Fuel / Energy charges Hour 0.50 109.60 54.80
3 Water tanker 8000 ltr Hour 1.00 358.00 358.00
Fuel / Energy charges Hour 1.00 414.40 414.40
4 Needle vibrator 60 mm dia ( petrol) Hour 8.00 6.80 54.40
Fuel / Energy charges Hour 8.00 32.80 262.40
Total hire charges of Machinery Rs: 3513.85
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.50 134.80 67.40
3 Crew for Water tanker Hour 1.00 215.50 215.50
4 Crew for Needle vibrator Hour 8.00 194.60 1556.80
5 Mason Class-I Day 1.00 550.00 550.00
6 work inspector Day 1.00 600.00 600.00
7 mazdoor
for batching materials Day 11.00 460.00 5060.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying Day 3.00 460.00 1380.00
for conveying concrete Day 14.40 460.00 6624.00
for cleaning/ washing/ curing Day 1.00 460.00 460.00
8 Labour cost for shuttering sqm 14.40 114.00 1641.60
Labour cost for scaffolding @ 10% 164.16
Total cost of Labour Rs: 22322.66
labour component/unit qty 1550.20
Add contractor's profit and overhead charges 13.615% 211.10
labour component/unit qty (including contractor's profit) 1761.30
220
Canal Cross Drainage Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 34096.27
B. Hire charges of Machinery Rs: 3513.85
C. Cost of Labour Rs: 22322.66
Total Rs: 59932.78
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 8159.85
Total cost for 14.40 cum Rs: 68092.63
Rate per cum (A+B+C+D)/14.40 Rs. 4728.70
IRR-CCDW-2-5 Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than
10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates for foundation filling including cost of all materials, machinery, labour, formwork,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,
complete with initial lead upto 50 m and all lifts.
(Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 44.90 359.20
Fuel / Energy charges Hour 8.00 109.60 876.80
2 5 hp pump ( diesel ) Hour 0.50 8.50 4.25
Fuel / Energy charges Hour 0.50 109.60 54.80
3 Water tanker 8000 ltr Hour 1.00 358.00 358.00
Fuel / Energy charges Hour 1.00 414.40 414.40
4 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 6.50 52.00
Fuel / Energy charges Hour 8.00 21.90 175.20
Total hire charges of Machinery Rs: 2294.65
221
Canal Cross Drainage Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.50 134.80 67.40
3 Crew for Water tanker Hour 1.00 215.50 215.50
4 Crew for Vibrator Hour 8.00 194.60 1556.80
5 Mason Class-I Day 1.00 550.00 550.00
6 work inspector Day 1.00 600.00 600.00
7 mazdoor
for batching materials Day 11.00 460.00 5060.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying Day 3.00 460.00 1380.00
for conveying concrete Day 16.36 460.00 7525.60
8 for cleaning/ washing/ curing Day 1.00 460.00 460.00
9 Labour cost for shuttering sqm 16.36 114.00 1865.04
10 Labour cost for scaffolding @ 10% 186.50
Total cost of Labour Rs: 23470.04
labour component/unit qty 1434.60
Add contractor's profit and overhead charges 13.615% 195.30
labour component/unit qty (including contractor's profit) 1629.90
ABSTRACT:
A. Cost of Materials Rs: 38582.32
B. Hire charges of Machinery Rs: 2294.65
C. Cost of Labour Rs: 23470.04
Total Rs: 64347.01
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 8760.85
Total cost for 16.36 cum Rs: 73107.86
Rate per cum (A+B+C+D)/16.36 Rs. 4468.70
IRR-CCDW-2-6 Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than
10 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded
aggregates for foundation filling including cost of all materials, machinery, labour, formwork,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,
complete with initial lead upto 50 m and all lifts.
(Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum)
222
Canal Cross Drainage Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Concrete mixer 600/400 ltr ( diesel ) Hour 8.00 76.40 611.20
Fuel / Energy charges Hour 8.00 219.30 1754.40
2 5 hp pump ( diesel ) Hour 0.50 8.50 4.25
Fuel / Energy charges Hour 0.50 109.60 54.80
3 Water tanker 8000 ltr Hour 1.00 358.00 358.00
Fuel / Energy charges Hour 1.00 414.40 414.40
4 Needle vibrator 60 mm dia ( petrol ) Hour 8.00 6.80 54.40
Fuel / Energy charges Hour 8.00 32.80 262.40
Total hire charges of Machinery Rs: 3513.85
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.50 134.80 67.40
3 Crew for Water tanker Hour 1.00 215.50 215.50
4 Crew for Vibrator Hour 8.00 194.60 1556.80
5 Mason Class-I Day 1.00 550.00 550.00
6 work inspector Day 1.00 600.00 600.00
7 mazdoor
for batching materials Day 11.00 460.00 5060.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying Day 3.00 460.00 1380.00
for conveying concrete Day 14.55 460.00 6693.00
for cleaning/ washing/ curing Day 1.00 460.00 460.00
8 Labour cost for shuttering sqm 14.55 114.00 1658.70
Labour cost for scaffolding @ 10% 165.87
Total cost of Labour Rs: 22410.47
labour component/unit qty 1540.20
Add contractor's profit and overhead charges 13.615% 209.70
labour component/unit qty (including contractor's profit) 1749.90
ABSTRACT:
A. Cost of Materials Rs: 32762.89
B. Hire charges of Machinery Rs: 3513.85
C. Cost of Labour Rs: 22410.47
Total Rs: 58687.21
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 7990.26
Total cost for 14.55 cum Rs: 66677.47
Rate per cum (A+B+C+D)/14.55 Rs. 4582.60
IRR-CCDW-2-7 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates for foundation filling including cost of all materials, machinery, labour, formwork,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,
complete with initial lead upto 50 m and all lifts. ( Cement content : 220 kg / cum )
(Cement content: 310 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
223
Canal Cross Drainage Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 44.90 359.20
Fuel / Energy charges Hour 8.00 109.60 876.80
2 5 hp pump ( diesel ) Hour 0.50 8.50 4.25
Fuel / Energy charges Hour 0.50 109.60 54.80
3 Water tanker 8000 ltr Hour 1.00 358.00 358.00
Fuel / Energy charges Hour 1.00 414.40 414.40
4 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 6.50 52.00
Fuel / Energy charges Hour 8.00 21.90 175.20
Total hire charges of Machinery Rs: 2294.65
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.50 134.80 67.40
3 Crew for Water tanker Hour 1.00 215.50 215.50
4 Crew for Vibrator Hour 8.00 194.60 1556.80
5 Mason Class-I Day 1.00 550.00 550.00
6 work inspector Day 1.00 600.00 600.00
7 mazdoor
for batching materials Day 11.00 460.00 5060.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying Day 3.00 460.00 1380.00
for conveying concrete Day 14.19 460.00 6527.40
for cleaning/ washing/ curing Day 1.00 460.00 460.00
8 Labour cost for shuttering sqm 14.19 114.00 1617.66
Labour cost for scaffolding @ 10% 161.77
Total cost of Labour Rs: 22199.73
labour component/unit qty 1564.50
Add contractor's profit and overhead charges 13.615% 213.00
labour component/unit qty (including contractor's profit) 1777.50
ABSTRACT:
A. Cost of Materials Rs: 38406.68
B. Hire charges of Machinery Rs: 2294.65
C. Cost of Labour Rs: 22199.73
Total Rs: 62901.06
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 8563.98
Total cost for 14.19 cum Rs: 71465.04
Rate per cum (A+B+C+D)/14.19 Rs. 5036.30
224
Canal Cross Drainage Works - Item Unit Rates 2020-21
IRR-CCDW-2-8 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates for sub-structure / super- structure works including cost of all materials,
machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,
levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
(Cement content: 320 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 44.90 359.20
Fuel / Energy charges Hour 8.00 109.60 876.80
2 5 hp pump ( diesel ) Hour 0.50 8.50 4.25
Fuel / Energy charges Hour 0.50 109.60 54.80
3 Water tanker 8000 ltr Hour 1.00 358.00 358.00
Fuel / Energy charges Hour 1.00 414.40 414.40
4 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 6.50 52.00
Fuel / Energy charges Hour 8.00 21.90 175.20
Total hire charges of Machinery Rs: 2294.65
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.50 134.80 67.40
3 Crew for Water tanker Hour 1.00 215.50 215.50
4 Crew for Vibrator Hour 8.00 194.60 1556.80
5 Mason Class-I Day 1.00 550.00 550.00
6 work inspector Day 1.00 600.00 600.00
7 mazdoor
for batching materials Day 11.00 460.00 5060.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying including lifting Day 4.00 460.00 1840.00
for conveying concrete Day 15.00 460.00 6900.00
for cleaning/ washing/ curing Day 1.00 460.00 460.00
8 Labour cost for shuttering sqm 15.00 114.00 1710.00
Labour cost for scaffolding @ 25% 427.50
Total cost of Labour Rs: 23390.40
labour component/unit qty 1559.40
Add contractor's profit and overhead charges 13.615% 212.30
labour component/unit qty (including contractor's profit) 1771.70
225
Canal Cross Drainage Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 46413.21
B. Hire charges of Machinery Rs: 2294.65
C. Cost of Labour Rs: 23390.40
Total Rs: 72098.26
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 9816.18
Total cost for 15.00 cum Rs: 81914.44
Rate per cum (A+B+C+D)/15.0 Rs. 5461.00
IRR-CCDW-2-9 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for sub-structure / super- structure works including cost of all materials,
machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,
levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
226
Canal Cross Drainage Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 47636.85
B. Hire charges of Machinery Rs: 2294.65
C. Cost of Labour Rs: 26094.10
Total Rs: 76025.60
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 10350.89
Total cost for 15.76 cum Rs: 86376.488
Rate per cum (A+B+C+D)/15.76 Rs. 5480.70
IRR-CCDW-2-10 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than
15 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for sub-structure / super- structure works including cost of all materials,
machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,
levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
DATA: RATE ANALYSIS UNIT : 15.71 cum
A. MATERIALS:
Sl No Particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Cement for mix kg 4398.80 3.67 16152.39
Cement for incidentals @ 5 kg / cum kg 78.55 3.67 288.44
2 Coarse aggregate 20-10 mm cum 8.17 1220.00 9966.42
Coarse aggregate 10 mm below cum 4.40 903.00 3972.12
3 Fine aggregate (Un-Screened) cum 7.07 510.00 3605.45
4 Super Plasticizer kg 17.60 49.00 862.16
5 Use rate of shuttering for 40 uses sqm 31.42 244.03 7667.58
Scaffolding @ of shuttering 25% 1916.89
6 Sundries LS 0.50 32.00 16.00
Total cost of Materials Rs: 44447.45
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 44.90 359.20
Fuel / Energy charges Hour 8.00 109.60 876.80
2 5 hp pump ( diesel ) Hour 0.50 8.50 4.25
Fuel / Energy charges Hour 0.50 109.60 54.80
3 Water tanker 8000 ltr Hour 1.00 358.00 358.00
Fuel / Energy charges Hour 1.00 414.40 414.40
4 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 6.50 52.00
Fuel / Energy charges Hour 8.00 21.90 175.20
Total hire charges of Machinery Rs: 2294.65
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.50 134.80 67.40
3 Crew for Water tanker Hour 1.00 215.50 215.50
4 Crew for Vibrator Hour 8.00 194.60 1556.80
5 Mason Class-I Day 1.00 550.00 550.00
6 work inspector Day 1.00 600.00 600.00
7 mazdoor
for batching materials Day 11.00 460.00 5060.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying Day 4.00 460.00 1840.00
for conveying concrete Day 15.71 460.00 7226.60
for cleaning/ washing/ curing Day 1.00 460.00 460.00
8 Labour cost for shuttering sqm 31.42 114.00 3581.88
Labour cost for scaffolding @ 25% 895.47
Total cost of Labour Rs: 26056.85
labour component/unit qty 1658.60
Add contractor's profit and overhead charges 13.615% 225.80
labour component/unit qty (including contractor's profit) 1884.40
ABSTRACT:
A. Cost of Materials Rs: 44447.45
B. Hire charges of Machinery Rs: 2294.65
C. Cost of Labour Rs: 26056.85
Total Rs: 72798.95
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 9911.58
Total cost for 15.71 cum Rs: 82710.532
Rate per cum (A+B+C+D)/15.71 Rs. 5264.80
227
Canal Cross Drainage Works - Item Unit Rates 2020-21
IRR-CCDW-2-11 Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than
10 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for sub-structure / super- structure works including cost of all materials,
machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,
levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
(Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 44.90 359.20
Fuel / Energy charges Hour 8.00 109.60 876.80
2 5 hp pump ( diesel ) Hour 0.50 8.50 4.25
Fuel / Energy charges Hour 0.50 109.60 54.80
3 Water tanker 8000 ltr Hour 1.00 358.00 358.00
Fuel / Energy charges Hour 1.00 414.40 414.40
4 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 6.50 52.00
Fuel / Energy charges Hour 8.00 21.90 175.20
Total hire charges of Machinery Rs: 2294.65
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.50 134.80 67.40
3 Crew for Water tanker Hour 1.00 215.50 215.50
4 Crew for Vibrator Hour 8.00 194.60 1556.80
5 Mason Class-I Day 1.00 550.00 550.00
6 work inspector Day 1.00 600.00 600.00
7 mazdoor
for batching materials Day 11.00 460.00 5060.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying Day 4.00 460.00 1840.00
for conveying concrete Day 18.00 460.00 8280.00
for cleaning/ washing/ curing Day 1.00 460.00 460.00
8 Labour cost for shuttering sqm 36.00 114.00 4104.00
Labour cost for scaffolding @ 25% 1026.00
Total cost of Labour Rs: 27762.90
labour component/unit qty 1542.40
Add contractor's profit and overhead charges 13.615% 210.00
labour component/unit qty (including contractor's profit) 1752.40
ABSTRACT:
A. Cost of Materials Rs: 46746.65
B. Hire charges of Machinery Rs: 2294.65
C. Cost of Labour Rs: 27762.90
Total Rs: 76804.20
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 10456.89
Total cost for 18.00 cum Rs: 87261.093
Rate per cum (A+B+C+D)/18.0 Rs. 4847.80
228
Canal Cross Drainage Works - Item Unit Rates 2020-21
IRR-CCDW-2-12 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for well kerb including cost of all materials, machinery, labour, formwork,
scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc., complete with initial lead upto 50 m and all lifts.
Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum.
(Cement content: 350 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
ABSTRACT:
A. Cost of Materials Rs: 59220.27
B. Hire charges of Machinery Rs: 1522.25
C. Cost of Labour Rs: 29982.40
Total Rs: 90724.92
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 12352.2
Total cost for 15.00 cum Rs: 103077.12
Rate per cum (A+B+C+D)/15.0 Rs. 6871.80
IRR-CCDW-2-13 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates for well steining including cost of all materials, machinery, labour, formwork,
scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc., complete with initial lead upto 50 m and all lifts.
Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum.
(Cement content: 320 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
229
Canal Cross Drainage Works - Item Unit Rates 2020-21
A. MATERIALS:
Sl No Particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Cement for mix kg 4800.00 3.67 17625.60
Cement for incidentals @ 2 kg / cum kg 30.00 3.67 110.16
2 Coarse aggregate 40-20 mm cum 6.75 1180.00 7965.00
Coarse aggregate 20-10 mm cum 4.05 1220.00 4941.00
Coarse aggregate 10 mm below cum 2.70 903.00 2438.10
3 Fine aggregate (Un-Screened) cum 6.00 510.00 3060.00
4 Super Plasticizer kg 19.20 49.00 940.80
5 Use rate of curved shutter (40 uses) sqm 60.00 268.44 16106.31
6 Sundries LS 0.50 32.00 16.00
Total cost of Materials Rs: 53202.97
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 44.90 359.20
Fuel / Energy charges Hour 8.00 109.60 876.80
2 5 hp pump ( diesel ) Hour 0.50 8.50 4.25
Fuel / Energy charges Hour 0.50 109.60 54.80
3 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 6.50 52.00
Fuel / Energy charges Hour 8.00 21.90 175.20
Total hire charges of Machinery Rs: 1522.25
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.50 134.80 67.40
3 Crew for Vibrator Hour 8.00 194.60 1556.80
4 Mason Class-I Day 1.00 550.00 550.00
5 work inspector Day 1.00 600.00 600.00
6 mazdoor
for batching materials Day 11.00 460.00 5060.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying Day 3.00 460.00 1380.00
for conveying concrete Day 15.00 460.00 6900.00
for cleaning/ washing/ curing Day 1.00 460.00 460.00
7 Labour cost for shuttering sqm 60.00 114.00 6840.00
Total cost of Labour Rs: 27417.40
labour component/unit qty 1827.80
Add contractor's profit and overhead charges 13.615% 248.90
labour component/unit qty (including contractor's profit) 2076.70
ABSTRACT:
A. Cost of Materials Rs: 53202.97
B. Hire charges of Machinery Rs: 1522.25
C. Cost of Labour Rs: 27417.40
Total Rs: 82142.62
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 11183.72
Total cost for 15.00 cum Rs: 93326.34
Rate per cum (A+B+C+D)/15.0 Rs. 6221.80
IRR-CCDW-2-14 Providing and laying insitu M-15 ( 28 days cube compressive strength not less than 15 N / sq
mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for well bottom plug by tremie or skip box method including cost of all materials,
machinery, labour, batching, mixing, placing in position as per detailed specifications etc.,
complete with initial lead upto 50 m and all lifts. ( Cement content : 350 kg / cum )
(Cement content: 350 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
230
Canal Cross Drainage Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 44.90 359.20
Fuel / Energy charges Hour 8.00 109.60 876.80
2 5 hp pump ( diesel ) Hour 0.50 8.50 4.25
Fuel / Energy charges Hour 0.50 109.60 54.80
3 Sundries( Hopper etc. ) LS 5.00 32.00 160.00
Total hire charges of Machinery Rs: 1455.05
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.50 134.80 67.40
3 Fitter shuttering Day 1.00 500.00 500.00
4 work inspector Day 1.00 600.00 600.00
5 mazdoor
for erecting/ dismantling tremie Day 4.00 460.00 1840.00
for batching materials Day 11.00 460.00 5060.00
for loading mortar pans Day 4.00 460.00 1840.00
for feeding tremie hopper Day 2.00 460.00 920.00
for conveying concrete Day 16.00 460.00 7360.00
Total cost of Labour Rs: 20350.60
labour component/unit qty 1453.60
Add contractor's profit and overhead charges 13.615% 197.90
labour component/unit qty (including contractor's profit) 1651.50
ABSTRACT:
A. Cost of Materials Rs: 34933.44
B. Hire charges of Machinery Rs: 1455.05
C. Cost of Labour Rs: 20350.60
Total Rs: 56739.09
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 7725.03
Total cost for 14.00 cum Rs: 64464.12
Rate per cum (A+B+C+D)/14.0 Rs. 4604.60
IRR-CCDW-2-15 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than
15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates for well top plug including cost of all materials, machinery, labour, cleaning,
batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with
initial lead upto 50 m and all lifts.
Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum.
(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
231
Canal Cross Drainage Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 44.90 359.20
Fuel / Energy charges Hour 8.00 109.60 876.80
2 5 hp pump ( diesel ) Hour 0.50 8.50 4.25
Fuel / Energy charges Hour 0.50 109.60 54.80
3 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 6.50 52.00
Fuel / Energy charges Hour 8.00 21.90 175.20
Total hire charges of Machinery Rs: 1522.25
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.50 134.80 67.40
3 Crew for Needle vibrator Hour 8.00 194.60 1556.80
4 Mason Class-I Day 1.00 550.00 550.00
5 work inspector Day 1.00 600.00 600.00
6 mazdoor
for batching materials Day 11.00 460.00 5060.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying Day 3.00 460.00 1380.00
for conveying concrete Day 14.29 460.00 6573.40
for cleaning/ washing/ curing Day 1.00 460.00 460.00
Total cost of Labour Rs: 20250.80
labour component/unit qty 1417.10
Add contractor's profit and overhead charges 13.615% 192.90
labour component/unit qty (including contractor's profit) 1610.00
ABSTRACT:
A. Cost of Materials Rs: 33009.61
B. Hire charges of Machinery Rs: 1522.25
C. Cost of Labour Rs: 20250.80
Total Rs: 54782.66
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 7458.66
Total cost for 14.29 cum Rs: 62241.32
Rate per cum (A+B+C+D)/14.29 Rs. 4355.60
IRR-CCDW-2-16 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for well cap including cost of all materials, machinery, labour, formwork,
scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc., complete with initial lead upto 50 m and all lifts.
Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum.
(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
232
Canal Cross Drainage Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 44.90 359.20
Fuel / Energy charges Hour 8.00 109.60 876.80
2 5 hp pump ( diesel ) Hour 0.50 8.50 4.25
Fuel / Energy charges Hour 0.50 109.60 54.80
3 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 6.50 52.00
Fuel / Energy charges Hour 8.00 21.90 175.20
Total hire charges of Machinery Rs: 1522.25
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.50 134.80 67.40
3 Crew for Needle vibrator Hour 8.00 194.60 1556.80
4 Mason Class-I Day 1.00 550.00 550.00
5 work inspector Day 1.00 600.00 600.00
6 mazdoor
for batching materials Day 11.00 460.00 5060.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying Day 3.00 460.00 1380.00
for conveying concrete Day 15.76 460.00 7249.60
for cleaning/ washing/ curing Day 1.00 460.00 460.00
7 Labour cost for shuttering sqm 15.76 114.00 1796.64
Total cost of Labour Rs: 22723.64
labour component/unit qty 1441.90
Add contractor's profit and overhead charges 13.615% 196.30
labour component/unit qty (including contractor's profit) 1638.20
ABSTRACT:
A. Cost of Materials Rs: 41867.86
B. Hire charges of Machinery Rs: 1522.25
C. Cost of Labour Rs: 22723.64
Total Rs: 66113.75
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 9001.39
Total cost for 15.76 cum Rs: 75115.14
Rate per cum (A+B+C+D)/15.76 Rs. 4766.20
IRR-CCDW-2-17 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than
15 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded
aggregates for piers and abutments including cost of all materials, labour, machinery,
formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc., complete with initial lead upto 50 m and all lifts.
Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum.
(Cement content: 250 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum)
DATA: RATE ANALYSIS UNIT : 14.40 cum
A. MATERIALS:
Sl No Particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Cement for mix kg 3600.00 3.67 13219.20
Cement for incidentals @ 5 kg / cum kg 72.00 3.67 264.38
2 Coarse aggregate 80-40 mm cum 4.94 650.00 3210.48
Coarse aggregate 40-20 mm cum 4.23 1180.00 4995.65
Coarse aggregate 20-10 mm cum 2.82 1220.00 3443.33
Coarse aggregate 10 mm below cum 2.12 903.00 1911.47
3 Fine aggregate (Un-Screened) cum 5.04 510.00 2570.40
4 Super Plasticizer kg 14.40 49.00 705.60
5 Use rate of shuttering for 40 uses sqm 39.60 256.24 10146.97
6 Scaffolding @ of shuttering 30% 3044.09
Total cost of Materials Rs: 43511.58
233
Canal Cross Drainage Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Concrete mixer 600/400 ltr ( diesel ) Hour 8.00 76.40 611.20
Fuel / Energy charges Hour 8.00 219.30 1754.40
2 5 hp pump ( diesel ) Hour 0.50 8.50 4.25
Fuel / Energy charges Hour 0.50 109.60 54.80
3 Needle vibrator 60 mm dia ( petrol ) Hour 8.00 6.80 54.40
Fuel / Energy charges Hour 8.00 32.80 262.40
Total hire charges of Machinery Rs: 2741.45
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.50 134.80 67.40
3 Crew for Needle vibrator Hour 8.00 194.60 1556.80
4 Mason Class-I Day 1.00 550.00 550.00
5 work inspector Day 1.00 600.00 600.00
6 mazdoor
for batching materials Day 11.00 460.00 5060.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying Day 6.00 460.00 2760.00
for conveying concrete Day 14.40 460.00 6624.00
for cleaning/ washing/ curing Day 1.00 460.00 460.00
7 Labour cost for shuttering sqm 39.60 114.00 4514.40
Labour cost for scaffolding @ 30% 1354.32
Total cost of Labour Rs: 27550.12
labour component/unit qty 1913.20
Add contractor's profit and overhead charges 13.615% 260.50
labour component/unit qty (including contractor's profit) 2173.70
ABSTRACT:
A. Cost of Materials Rs: 43511.58
B. Hire charges of Machinery Rs: 2741.45
C. Cost of Labour Rs: 27550.12
Total Rs: 73803.15
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 10048.3
Total cost for 14.40 cum Rs: 83851.446
Rate per cum (A+B+C+D)/14.40 Rs. 5823.00
IRR-CCDW-2-18 Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than
10 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded
aggregates for piers and abutments including cost of all materials, labour, machinery,
formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc., complete with initial lead upto 50 m and all lifts.
Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum.
(Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum)
234
Canal Cross Drainage Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Concrete mixer 600/400 ltr ( diesel ) Hour 8.00 76.40 611.20
Fuel / Energy charges Hour 8.00 219.30 1754.40
2 5 hp pump ( diesel ) Hour 0.50 8.50 4.25
Fuel / Energy charges Hour 0.50 109.60 54.80
3 Needle vibrator 60 mm dia ( petrol ) Hour 8.00 6.80 54.40
Fuel / Energy charges Hour 8.00 32.80 262.40
Total hire charges of Machinery Rs: 2741.45
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.50 134.80 67.40
3 Crew for Needle vibrator Hour 8.00 194.60 1556.80
4 Mason Class-I Day 1.00 550.00 550.00
5 work inspector Day 1.00 600.00 600.00
6 mazdoor
for batching materials Day 11.00 460.00 5060.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying Day 6.00 460.00 2760.00
for conveying concrete Day 14.55 460.00 6693.00
for cleaning/ washing/ curing Day 1.00 460.00 460.00
7 Labour cost for shuttering sqm 40.01 114.00 4561.43
Labour cost for scaffolding @ 30% 1368.43
Total cost of Labour Rs: 27680.25
labour component/unit qty 1902.40
Add contractor's profit and overhead charges 13.615% 259.00
labour component/unit qty (including contractor's profit) 2161.40
ABSTRACT:
A. Cost of Materials Rs: 42276.44
B. Hire charges of Machinery Rs: 2741.45
C. Cost of Labour Rs: 27680.25
Total Rs: 72698.14
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 9897.85
Total cost for 14.55 cum Rs: 82595.99
Rate per cum (A+B+C+D)/14.55 Rs. 5676.70
IRR-CCDW-2-19 Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than
10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates for piers and abutments including cost of all materials, labour, machinery,
formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc., complete with initial lead upto 50 m and all lifts.
Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum.
(Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
235
Canal Cross Drainage Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 44.90 359.20
Fuel / Energy charges Hour 8.00 109.60 876.80
2 5 hp pump ( diesel ) Hour 0.50 8.50 4.25
Fuel / Energy charges Hour 0.50 109.60 54.80
3 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 6.50 52.00
Fuel / Energy charges Hour 8.00 21.90 175.20
Total hire charges of Machinery Rs: 1522.25
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.50 134.80 67.40
3 Crew for Needle vibrator Hour 8.00 194.60 1556.80
4 Mason Class-I Day 1.00 550.00 550.00
5 work inspector Day 1.00 600.00 600.00
6 mazdoor
for batching materials Day 11.00 460.00 5060.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying Day 5.00 460.00 2300.00
for conveying concrete Day 16.36 460.00 7525.60
for cleaning/ washing/ curing Day 1.00 460.00 460.00
7 Labour cost for shuttering sqm 44.99 114.00 5128.86
Labour cost for scaffolding @ 30% 1538.66
Total cost of Labour Rs: 28790.52
labour component/unit qty 1759.80
Add contractor's profit and overhead charges 13.615% 239.60
labour component/unit qty (including contractor's profit) 1999.40
ABSTRACT:
A. Cost of Materials Rs: 49281.33
B. Hire charges of Machinery Rs: 1522.25
C. Cost of Labour Rs: 28790.52
Total Rs: 79594.10
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 10836.74
Total cost for 16.36 cum Rs: 90430.84
Rate per cum (A+B+C+D)/16.36 Rs. 5527.60
IRR-CCDW-2-20 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates for cantiliver / counterfort retaining walls including cost of all materials,
machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,
levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
(Cement content: 320 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum.
236
Canal Cross Drainage Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 44.90 359.20
Fuel / Energy charges Hour 8.00 109.60 876.80
2 5 hp pump ( diesel ) Hour 0.50 8.50 4.25
Fuel / Energy charges Hour 0.50 109.60 54.80
3 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 6.50 52.00
Fuel / Energy charges Hour 8.00 21.90 175.20
Total hire charges of Machinery Rs: 1522.25
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.50 134.80 67.40
3 Crew for Needle vibrator Hour 8.00 194.60 1556.80
4 Mason Class-I Day 1.00 550.00 550.00
5 work inspector Day 1.00 600.00 600.00
6 mazdoor
for batching materials Day 11.00 460.00 5060.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying Day 5.00 460.00 2300.00
for conveying concrete Day 16.25 460.00 7475.00
for cleaning/ washing/ curing Day 1.00 460.00 460.00
7 Labour cost for shuttering sqm 52.81 114.00 6020.63
Labour cost for scaffolding @ 25% 1505.16
Total cost of Labour Rs: 29598.18
labour component/unit qty 1821.40
Add contractor's profit and overhead charges 13.615% 248.00
labour component/unit qty (including contractor's profit) 2069.40
ABSTRACT:
A. Cost of Materials Rs: 56475.85
B. Hire charges of Machinery Rs: 1522.25
C. Cost of Labour Rs: 29598.18
Total Rs: 87596.28
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 11926.23
Total cost for 16.25 cum Rs: 99522.51
Rate per cum (A+B+C+D)/16.25 Rs. 6124.50
IRR-CCDW-2-21 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than
15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates with placing and sinking plums of size 150 to 80 mm upto 15 percent for gravity
type retaining walls / piers / abutments etc., including cost of all materials, machinery,
labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating,
finishing, curing etc.,complete with initial lead upto 50 m and all lifts.
Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum.
(Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.765cum, Blending Ratio of CA--50:30:20, FA : 0.34 cum,
plums of size 150 to 80 mm : 0.25cum )
237
Canal Cross Drainage Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 44.90 359.20
Fuel / Energy charges Hour 8.00 109.60 876.80
2 5 hp pump ( diesel ) Hour 0.50 8.50 4.25
Fuel / Energy charges Hour 0.50 109.60 54.80
3 Needle vibrator 60 mm dia ( petrol ) Hour 8.00 6.80 54.40
Fuel / Energy charges Hour 8.00 32.80 262.40
Total hire charges of Machinery Rs: 1611.85
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.50 134.80 67.40
3 Crew for Needle vibrator Hour 8.00 194.60 1556.80
4 Mason Class-I Day 1.00 550.00 550.00
5 work inspector Day 1.00 600.00 600.00
6 mazdoor
for batching materials Day 11.00 460.00 5060.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying Day 5.00 460.00 2300.00
for placing plums Day 2.00 460.00 920.00
for conveying concrete Day 15.38 460.00 7074.80
for conveying plums Day 2.00 460.00 920.00
for cleaning/ washing/ curing Day 1.00 460.00 460.00
7 Labour for shuttering sqm 49.75 114.00 5671.22
Labour for scaffolding @ 30% 1701.36
Total cost of Labour Rs: 30884.78
labour component/unit qty 1707.30
Add contractor's profit and overhead charges 13.615% 232.40
labour component/unit qty (including contractor's profit) 1939.70
ABSTRACT:
A. Cost of Materials Rs: 54721.20
B. Hire charges of Machinery Rs: 1611.85
C. Cost of Labour Rs: 30884.78
Total Rs: 87217.83
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 11874.71
Total cost for 18.09 cum Rs: 99092.54
Rate per cum (A+B+C+D)/18.09 Rs. 5477.80
238
Canal Cross Drainage Works - Item Unit Rates 2020-21
IRR-CCDW-2-22 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than
15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard,graded
aggregates for cast in-situ pipes including cost of all materials, machinery, labour, cleaning,
batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with
initial lead upto 50 m and all lifts.
Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum.
(Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
ABSTRACT:
A. Cost of Materials Rs: 43700.19
B. Hire charges of Machinery Rs: 1522.25
C. Cost of Labour Rs: 24784.84
Total Rs: 70007.28
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 9531.49
Total cost for 15.38 cum Rs: 79538.77
Rate per cum (A+B+C+D)/15.38 Rs. 5171.60
IRR-CCDW-2-23 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than
15 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded
aggregates for cast in-situ pipes including cost of all materials, labour, machinery, formwork,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,
complete with initial lead upto 50 m and all lifts.
Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum.
(Cement content: 250 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum)
239
Canal Cross Drainage Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Concrete mixer 600/400 ltr ( diesel ) Hour 8.00 76.40 611.20
Fuel / Energy charges Hour 8.00 219.30 1754.40
2 5 hp pump ( diesel ) Hour 0.50 8.50 4.25
Fuel / Energy charges Hour 0.50 109.60 54.80
3 Needle vibrator 60 mm dia ( petrol ) Hour 8.00 6.80 54.40
Fuel / Energy charges Hour 8.00 32.80 262.40
Total hire charges of Machinery Rs: 2741.45
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.50 134.80 67.40
3 Crew for Needle vibrator Hour 8.00 194.60 1556.80
4 Mason Class-I Day 1.00 550.00 550.00
5 work inspector Day 1.00 600.00 600.00
6 mazdoor
for batching materials Day 11.00 460.00 5060.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying Day 3.00 460.00 1380.00
for conveying concrete Day 14.40 460.00 6624.00
for cleaning/ washing/ curing Day 1.00 460.00 460.00
7 Labour cost for shuttering sqm 28.80 114.00 3283.20
Labour cost for scaffolding @ 15% 492.48
Total cost of Labour Rs: 24077.08
labour component/unit qty 1672.00
Add contractor's profit and overhead charges 13.615% 227.60
labour component/unit qty (including contractor's profit) 1899.60
ABSTRACT:
A. Cost of Materials Rs: 38807.07
B. Hire charges of Machinery Rs: 2741.45
C. Cost of Labour Rs: 24077.08
Total Rs: 65625.60
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 8934.93
Total cost for 14.40 cum Rs: 74560.53
Rate per cum (A+B+C+D)/14.40 Rs. 5177.80
IRR-CCDW-2-24 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for deck slab & kerb including cost of all materials,machinery, labour, formwork,
scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc., complete with initial lead upto 50 m and all lifts.
Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum.
(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
240
Canal Cross Drainage Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 44.90 359.20
Fuel / Energy charges Hour 8.00 109.60 876.80
2 5 hp pump ( diesel ) Hour 0.50 8.50 4.25
Fuel / Energy charges Hour 0.50 109.60 54.80
3 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 6.50 52.00
Fuel / Energy charges Hour 8.00 21.90 175.20
Total hire charges of Machinery Rs: 1522.25
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.50 134.80 67.40
3 Crew for Needle vibrator Hour 8.00 194.60 1556.80
4 Mason Class-I Day 2.00 550.00 1100.00
5 work inspector Day 1.00 600.00 600.00
6 mazdoor
for batching materials Day 11.00 460.00 5060.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying Day 4.00 460.00 1840.00
for conveying concrete Day 15.76 460.00 7249.60
for cleaning/ washing/ curing Day 1.00 460.00 460.00
7 Labour cost for shuttering sqm 39.40 114.00 4491.60
Labour cost for scaffolding @ 250% 11229.00
Total cost of Labour Rs: 37657.60
labour component/unit qty 2389.40
Add contractor's profit and overhead charges 13.615% 325.30
labour component/unit qty (including contractor's profit) 2714.70
ABSTRACT:
A. Cost of Materials Rs: 79156.88
B. Hire charges of Machinery Rs: 1522.25
C. Cost of Labour Rs: 37657.60
Total Rs: 118336.73
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 16111.55
Total cost for 15.76 cum Rs: 134448.28
Rate per cum (A+B+C+D)/15.76 Rs. 8531.00
IRR-CCDW-2-25 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for columns and beams including cost of all materials, labour, machinery,
formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating,
finishing, curing etc.,complete with initial lead upto 50 m and all lifts.
Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum.
(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
241
Canal Cross Drainage Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 66882.80
B. Hire charges of Machinery Rs: 1522.25
C. Cost of Labour Rs: 34401.80
Total Rs: 102806.85
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 13997.15
Total cost for 15.76 cum Rs: 116804.00
Rate per cum (A+B+C+D)/15.76 Rs. 7411.40
IRR-CCDW-2-26 Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N /
sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for wearing coat including cost of all materials, machinery, labour, formwork,
cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting,
finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 50 m
and all lifts.
Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum. to the data
(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
242
Canal Cross Drainage Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 44.90 359.20
Fuel / Energy charges Hour 8.00 109.60 876.80
2 5 hp pump ( diesel ) Hour 0.50 8.50 4.25
Fuel / Energy charges Hour 0.50 109.60 54.80
3 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 6.50 52.00
Fuel / Energy charges Hour 8.00 21.90 175.20
Total hire charges of Machinery Rs: 1522.25
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.50 134.80 67.40
3 Crew for Needle vibrator Hour 8.00 194.60 1556.80
4 Mason Class-I Day 2.00 550.00 1100.00
5 work inspector Day 1.00 600.00 600.00
6 mazdoor
for batching materials Day 11.00 460.00 5060.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying Day 4.00 460.00 1840.00
for conveying concrete Day 15.76 460.00 7249.60
for cleaning/ washing/ curing Day 2.00 460.00 920.00
7 Labour cost for shuttering sqm 7.88 114.00 898.32
Total cost of Labour Rs: 23295.32
labour component/unit qty 1478.10
Add contractor's profit and overhead charges 13.615% 201.20
labour component/unit qty (including contractor's profit) 1679.30
ABSTRACT:
A. Cost of Materials Rs: 40088.87
B. Hire charges of Machinery Rs: 1522.25
C. Cost of Labour Rs: 23295.32
Total Rs: 64906.44
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 8837.01
Total cost for 15.76 cum Rs: 73743.45
Rate per cum (A+B+C+D)/15.76 Rs. 4679.20
IRR-CCDW-2-27 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for troughs including cost of all materials, machinery, labour, formwork,
scaffolding, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing
etc., complete with initial lead upto 50 m and all lifts.
Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum. to the data
(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
243
Canal Cross Drainage Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 44.90 359.20
Fuel / Energy charges Hour 8.00 109.60 876.80
2 5 hp pump ( diesel ) Hour 0.50 8.50 4.25
Fuel / Energy charges Hour 0.50 109.60 54.80
3 Needle vibrator 40 mm dia ( diesel ) Hour 8.00 6.50 52.00
Fuel / Energy charges Hour 8.00 21.90 175.20
Total hire charges of Machinery Rs: 1522.25
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.50 134.80 67.40
3 Crew for Needle vibrator Hour 8.00 194.60 1556.80
4 Mason Class-I Day 1.00 550.00 550.00
5 work inspector Day 1.00 600.00 600.00
6 mazdoor
for batching materials Day 11.00 460.00 5060.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying Day 5.00 460.00 2300.00
for conveying concrete Day 15.76 460.00 7249.60
for cleaning/ washing/ curing Day 1.00 460.00 460.00
7 Labour cost for shuttering sqm 70.92 114.00 8084.88
Labour cost for scaffolding @ 25% 2021.22
Total cost of Labour Rs: 31953.10
labour component/unit qty 2027.50
Add contractor's profit and overhead charges 13.615% 276.00
labour component/unit qty (including contractor's profit) 2303.50
ABSTRACT:
A. Cost of Materials Rs: 59655.57
B. Hire charges of Machinery Rs: 1522.25
C. Cost of Labour Rs: 31953.10
Total Rs: 93130.92
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 12679.77
Total cost for 15.76 cum Rs: 105810.69
Rate per cum (A+B+C+D)/15.76 Rs. 6713.90
244
Canal Cross Drainage Works - Item Unit Rates 2020-21
IRR-CCDW-3-1 Sinking RCC wells vertically for foundation of piers and abutments in all kinds of soil,
DATA: Unit = Running meter
Taking output = 1m
diameter of well = 6.00m
(i) Depth below bed level upto 3.0m
Rate of sinking = 0.50 m /hour
a) Labour
0.12 Mate (Mason Cl- ll ) 500.00 day 60.00
1.00 Sinker ( skilled) 550.00 day 550.00
2.00 Sinking helper ( Semi skilled) 460.00 day 920.00
sub total (a) 1530.00
b) Machinery
2.00 Hire & running charges of crane with grab 448.00 hour 896.00
bucket of 0.75 cum capacity and accessories.
Fuel Charges 414.40 hour 828.80
Crew Charges 215.50 hour 431.00
Consumables in sinking @ 10% of machinery charges 215.58
sub total (b) 2371.38
sub total (a+b) 3901.38
c) Add for Contractor's profit and overhead
charges on (A+B) 13.615% 531.17
IRR-CCDW-3-2 Filling foundation wells with sand in layers of 25 to 30 cm and compacting by watering,
ramming as directed including cost of all materials, machinery, labour etc., complete with
initial lead upto 50 m and all lifts.
245
Canal Cross Drainage Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 0.25 600.00 150.00
2 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 1990.00
labour component/unit qty 132.70
Add contractor's profit and overhead charges 13.615% 18.10
labour component/unit qty (including contractor's profit) 150.80
ABSTRACT:
A. Cost of Materials Rs: 5906.25
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 1990.00
Total Rs: 7896.25
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 1075.07
Total cost for 15.00 cum Rs: 8971.32
Rate per cum (A+B+C+D)/15.0 Rs. 598.10
IRR-CCDW-4-1 Providing and constructing un-coursed rubble stone masonry with approved stones in
CM 1 : 4 proportion for sub-structure portions of return walls / abutments etc., including
cost of all materials, machinery, labour, scaffolding, cleaning, packing cement mortar, wedging
stone chips, curing etc., complete with initial lead upto 50 m and all lifts.
(Cement content: 143 kg / cum of masonry, rubble stones : 0.85cum, FA : 0.40 cum,
Stone Chips : 0.15 cum)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Water tanker 8000 ltr Hour 1.00 358.00 358.00
Fuel / Energy charges Hour 1.00 414.40 414.40
2 5 hp pump ( diesel ) Hour 0.50 8.50 4.25
Fuel / Energy charges Hour 0.50 109.60 54.80
Total hire charges of Machinery Rs: 831.45
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Water tanker Hour 1.00 215.50 215.50
2 Crew for Pump Hour 0.50 134.80 67.40
3 work inspector Day 1.00 600.00 600.00
4 Mason Class-I Day 1.00 550.00 550.00
5 Mason Class-II Day 2.00 500.00 1000.00
6 mazdoor
for conveying rubble stones Day 4.00 460.00 1840.00
for preparing mortar Day 2.00 460.00 920.00
for loading mortar pans Day 1.00 460.00 460.00
for laying & packing mortar Day 3.00 460.00 1380.00
for washing rubble / finishing / curing Day 1.00 460.00 460.00
for conveying mortar / chips Day 4.00 460.00 1840.00
Total cost of Labour Rs: 9332.90
246
Canal Cross Drainage Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 10968.96
B. Hire charges of Machinery Rs: 831.45
C. Cost of Labour Rs: 9332.90
Total Rs: 21133.31
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 2877.3
Total cost for 10.00 cum Rs: 24010.61
Rate per cum (A+B+C+D)/10.0 Rs. 2401.10
IRR-CCDW-4-2 Providing and constructing un-coursed rubble stone masonry with approved stones in
CM 1 : 4 proportion for super-structure portions of return walls / abutments etc., including
cost of all materials, machinery, labour, scaffolding, cleaning, packing cement mortar, wedging
stone chips, curing etc., complete with initial lead upto 50 m and all lifts.
(Cement content: 143 kg / cum of masonry, rubble stones : 0.85cum, FA : 0.40 cum,
Stone Chips : 0.15 cum)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Water tanker 8000 ltr Hour 1.00 358.00 358.00
Fuel / Energy charges Hour 1.00 414.40 414.40
2 5 hp pump ( diesel ) Hour 0.50 8.50 4.25
Fuel / Energy charges Hour 0.50 109.60 54.80
Total hire charges of Machinery Rs: 831.45
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Water tanker Hour 1.00 215.50 215.50
2 Crew for Pump Hour 0.50 134.80 67.40
3 work inspector Day 1.00 600.00 600.00
4 Mason Class-I Day 1.00 550.00 550.00
5 Mason Class-II Day 2.00 500.00 1000.00
6 mazdoor
for conveying rubble stones Day 4.00 460.00 1840.00
for preparing mortar Day 2.00 460.00 920.00
for loading mortar pans Day 1.00 460.00 460.00
for laying & packing mortar Day 3.00 460.00 1380.00
for washing rubble / finishing / curing Day 1.00 460.00 460.00
for conveying mortar / chips Day 4.00 460.00 1840.00
TOTAL Rs: 9332.90
Add for labour for scaffolding @ 2.5% Rs: 233.32
Total cost of Labour Rs: 9566.22
labour component/unit qty 956.60
Add contractor's profit and overhead charges 13.615% 130.20
labour component/unit qty (including contractor's profit) 1086.80
247
Canal Cross Drainage Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 11243.18
B. Hire charges of Machinery Rs: 831.45
C. Cost of Labour Rs: 9566.22
Total Rs: 21640.86
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 2946.4
Total cost for 10.00 cum Rs: 24587.26
Rate per cum (A+B+C+D)/10.0 Rs. 2458.70
IRR-CCDW-4-3 Providing and constructing coursed rubble masonry second sort in CM 1:4 proportion with
stones from approved source including cost of all materials, machinery, labour, scaffolding,
ramps, cleaning, packing mortar, wedging stone chips, finishing, curing etc., complete with
initial lead upto 50 m and initial lift upto 3m.
(Cement content: 133 kg / cum of masonry, rubble stones : 0.45cum, FA : 0.35 cum,
Stone Chips : 0.15 cum, Khandki stones 25 x 25 x 30 cm : 180 Nos, Header stones
25 x 25x 45 cm : 60 Nos)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Water tanker 8000 ltr Hour 1.00 358.00 358.00
Fuel / Energy charges Hour 1.00 414.40 414.40
2 5 hp pump ( diesel ) Hour 0.50 8.50 4.25
Fuel / Energy charges Hour 0.50 109.60 54.80
Total hire charges of Machinery Rs: 831.45
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Water tanker Hour 1.00 215.50 215.50
2 Crew for Pump Hour 0.50 134.80 67.40
3 work inspector Day 1.00 600.00 600.00
4 Stone chiseller Cl -II Day 3.00 500.00 1500.00
5 Mason Class-I Day 1.00 550.00 550.00
6 Mason Class-II Day 2.00 500.00 1000.00
7 mazdoor
for conveying stones / rubble Day 4.00 460.00 1840.00
for preparation of mortar Day 3.00 460.00 1380.00
for loading mortar pans Day 1.00 460.00 460.00
for laying & packing mortar Day 3.00 460.00 1380.00
for washing rubble / finishing / curing Day 1.00 460.00 460.00
for conveying mortar / chips Day 2.00 460.00 920.00
TOTAL Rs: 10372.90
Add for labour for scaffolding @ 2.5% Rs: 259.32
Total cost of Labour Rs: 10632.22
labour component/unit qty 1063.20
Add contractor's profit and overhead charges 13.615% 144.80
labour component/unit qty (including contractor's profit) 1208.00
248
Canal Cross Drainage Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 15005.24
B. Hire charges of Machinery Rs: 831.45
C. Cost of Labour Rs: 10632.22
Total Rs: 26468.91
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 3603.74
Total cost for 10.00 cum Rs: 30072.65
Rate per cum (A+B+C+D)/10.0 Rs. 3007.30
IRR-CCDW-4-4 Providing and constructing coursed rubble masonry first sort in CM 1:4 proportion with
stones from approved source including cost of all materials, machinery, labour, scaffolding,
ramps, cleaning, packing mortar, wedging stone chips, finishing, curing etc., complete with
initial lead upto 50 m and initial lift upto 3 m.
(Cement content: 133 kg / cum of masonry, rubble stones : 0.45cum, FA : 0.35 cum,
Stone Chips : 0.15 cum, Khandki stones 25 x 25 x 30 cm : 180 Nos, Header stones
25 x 25x 45 cm : 60 Nos)
ABSTRACT:
A. Cost of Materials Rs: 15005.24
B. Hire charges of Machinery Rs: 831.45
C. Cost of Labour Rs: 12169.72
Total Rs: 28006.41
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 3813.07
Total cost for 10.00 cum Rs: 31819.48
Rate per cum (A+B+C+D)/10.0 Rs. 3181.90
249
Canal Cross Drainage Works - Item Unit Rates 2020-21
IRR-CCDW-4-5 Providing cement mortar pointing to coursed rubble face stone masonry in CM 1 : 2
proportion by volume including raking and cleaning joints for 50 mm depth, pressing cement
mortar into joints, cost of all materials, labour, scaffolding, finishing, curing etc., complete with
initial lead upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00 0.00
( Manual mixing) 0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Mason Cl- I Day 10.00 550.00 5500.00
2 work inspector Day 1.00 600.00 600.00
3 mazdoor Day 10.00 460.00 4600.00
Total cost of Labour Rs: 10700.00
labour component/unit qty 107.00
Add contractor's profit and overhead charges 13.615% 14.60
labour component/unit qty (including contractor's profit) 121.60
ABSTRACT:
A. Cost of Materials Rs: 2181.39
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 10700.00
Total Rs: 12881.39
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 1753.8
Total cost for 100.00 sqm Rs: 14635.19
Rate per sqm (A+B+C+D)/100.0 Rs. 146.40
IRR-CCDW-4-6 Providing cement mortar pointing to coursed rubble face stone masonry in CM 1 : 3
proportion by volume including raking and cleaning joints for 50 mm depth, pressing cement
mortar into joints, cost of all materials, labour, scaffolding, finishing, curing etc., complete with
initial lead upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00 0.00
( Manual mixing) 0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
250
Canal Cross Drainage Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Mason Cl- I Day 10.00 550.00 5500.00
2 work inspector Day 1.00 600.00 600.00
3 mazdoor Day 10.00 460.00 4600.00
Total cost of Labour Rs: 10700.00
labour component/unit qty 107.00
Add contractor's profit and overhead charges 13.615% 14.60
labour component/unit qty (including contractor's profit) 121.60
ABSTRACT:
A. Cost of Materials Rs: 1677.04
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 10700.00
Total Rs: 12377.04
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 1685.13
Total cost for 100.00 sqm Rs: 14062.17
Rate per sqm (A+B+C+D)/100.0 Rs. 140.60
IRR-CCDW-4-7 Providing 12 mm thick plastering in cement mortar 1:3 proportion by volume including cost
of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc.,
complete with initial lead upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00 0.00
( Manual mixing) 0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Mason Cl- I Day 10.00 550.00 5500.00
2 work inspector Day 1.00 600.00 600.00
3 mazdoor Day 20.00 460.00 9200.00
Total cost of Labour Rs: 15300.00
labour component/unit qty 153.00
Add contractor's profit and overhead charges 13.615% 20.80
labour component/unit qty (including contractor's profit) 173.80
ABSTRACT:
A. Cost of Materials Rs: 3186.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 15300.00
Total Rs: 18486.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 2516.87
Total cost for 100.00 sqm Rs: 21002.87
Rate per sqm (A+B+C+D)/100.0 Rs. 210.00
IRR-CCDW-4-8 Providing 12 mm thick plastering in cement mortar 1:4 proportion by volume including cost
of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc.,
complete with initial lead upto 50 m and all lifts.
251
Canal Cross Drainage Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00 0.00
( Manual mixing) 0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Mason Cl- I Day 10.00 550.00 5500.00
2 work inspector Day 1.00 600.00 600.00
3 mazdoor Day 20.00 460.00 9200.00
Total cost of Labour Rs: 15300.00
labour component/unit qty 153.00
Add contractor's profit and overhead charges 13.615% 20.80
labour component/unit qty (including contractor's profit) 173.80
ABSTRACT:
A. Cost of Materials Rs: 2595.08
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 15300.00
Total Rs: 17895.08
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 2436.41
Total cost for 100.00 sqm Rs: 20331.489
Rate per sqm (A+B+C+D)/100.0 Rs. 203.30
IRR-CCDW-4-9 Providing 20 mm thick plastering in cement mortar 1:3 proportion by volume including cost
of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc.,
complete with initial lead upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00 0.00
( Manual mixing) 0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Mason Cl- I Day 15.00 550.00 8250.00
2 work inspector Day 1.00 600.00 600.00
3 mazdoor Day 25.00 460.00 11500.00
Total cost of Labour Rs: 20350.00
labour component/unit qty 203.50
Add contractor's profit and overhead charges 13.615% 27.70
labour component/unit qty (including contractor's profit) 231.20
252
Canal Cross Drainage Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 5316.27
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 20350.00
Total Rs: 25666.27
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 3494.46
Total cost for 100.00 sqm Rs: 29160.73
Rate per sqm (A+B+C+D)/100.0 Rs. 291.60
IRR-CCDW-4-10 Providing 20 mm thick plastering in cement mortar 1:4 proportion by volume including cost
of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc.,
complete with initial lead upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00 0.00
( Manual mixing) 0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Mason Cl- I Day 15.00 550.00 8250.00
2 work inspector Day 1.00 600.00 600.00
3 mazdoor Day 25.00 460.00 11500.00
Total cost of Labour Rs: 20350.00
labour component/unit qty 203.50
Add contractor's profit and overhead charges 13.615% 27.70
labour component/unit qty (including contractor's profit) 231.20
ABSTRACT:
A. Cost of Materials Rs: 4330.15
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 20350.00
Total Rs: 24680.15
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 3360.2
Total cost for 100.00 sqm Rs: 28040.349
Rate per sqm (A+B+C+D)/100.0 Rs. 280.40
IRR-CCDW-5-1 Providing and fixing 10 cm thick roughly dressed burnt stone slabs for coping set in
CM 1: 6 proportion by volume with pointing to joints in CM 1 : 3 proportion by volume including
cost of all materials, machinery, labour, finishing, curing etc., complete with initial lead upto
50 m and all lifts.
(Cement content: 7.5 kg / sqm, FA : 0.030 cum/sqm,
Burnt stone slab 10 cm thick 1.05 sqm/ sqm)
253
Canal Cross Drainage Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00 0.00
( Manual mixing) 0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Mason Cl- II Day 1.00 500.00 500.00
2 Stone chiseller Cl- II Day 1.00 500.00 500.00
3 work inspector Day 0.50 600.00 300.00
4 mazdoor Day 2.00 460.00 920.00
Total cost of Labour Rs: 2220.00
labour component/unit qty 222.00
Add contractor's profit and overhead charges 13.615% 30.20
labour component/unit qty (including contractor's profit) 252.20
ABSTRACT:
A. Cost of Materials Rs: 3576.98
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 2220.00
Total Rs: 5796.98
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 789.26
Total cost for 10.00 sqm Rs: 6586.235
Rate per sqm (A+B+C+D)/10.0 Rs. 658.60
IRR-CCDW-5-2 Providing and fixing 10 cm thick one line dressed burnt stone slabs for coping set in
CM 1: 6 proportion by volume with pointing to joints in CM 1 : 3 proportion by volume including
cost of all materials, machinery, labour, finishing, curing etc., complete with initial lead upto
50 m and all lifts.
(Cement content: 7.5 kg / sqm, FA : 0.030 cum/sqm, Burnt stone slab 10 cm
thick 1.05 sqm/ sqm)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00 0.00
( Manual mixing) 0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Mason Cl- II Day 1.00 500.00 500.00
2 Stone chiseller Cl- I Day 4.00 545.00 2180.00
3 work inspector Day 0.50 600.00 300.00
4 mazdoor Day 2.00 460.00 920.00
Total cost of Labour Rs: 3900.00
labour component/unit qty 390.00
Add contractor's profit and overhead charges 13.615% 53.10
labour component/unit qty (including contractor's profit) 443.10
ABSTRACT:
A. Cost of Materials Rs: 3576.98
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 3900.00
Total Rs: 7476.98
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 1017.99
Total cost for 10.00 sqm Rs: 8494.965
Rate per sqm (A+B+C+D)/10.0 Rs. 849.50
254
Canal Cross Drainage Works - Item Unit Rates 2020-21
IRR-CCDW-5-3 Providing and fixing 10 cm thick two line dressed burnt stone slabs for coping set in
CM 1: 6 proportion by volume with pointing to joints in CM 1 : 3 proportion by volume including
cost of all materials, machinery, labour, finishing, curing etc., complete with initial lead upto
50 m and all lifts.
(Cement content: 7.5 kg / sqm, FA : 0.030 cum/sqm, Burnt stone slab 10 cm
thick 1.05 sqm/ sqm)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nil 0.00 0.00 0.00
( Manual mixing) 0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Mason Cl- II Day 1.00 500.00 500.00
2 Stone chiseller Cl-I Day 8.00 545.00 4360.00
3 work inspector Day 0.50 600.00 300.00
4 mazdoor Day 2.00 460.00 920.00
Total cost of Labour Rs: 6080.00
labour component/unit qty 608.00
Add contractor's profit and overhead charges 13.615% 82.80
labour component/unit qty (including contractor's profit) 690.80
ABSTRACT:
A. Cost of Materials Rs: 3576.98
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 6080.00
Total Rs: 9656.98
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 1314.8
Total cost for 10.00 sqm Rs: 10971.775
Rate per sqm (A+B+C+D)/10.0 Rs. 1097.20
IRR-CCDW-5-4 Providing and laying insitu M-15 ( 28 days cube compressive strength not less than 15 N /
sqmm ) grade cement concrete using 20 mm down size approved clean, hard, graded
aggregates for coping slab including cost of all materials, machinery, labour, formwork,
cleaning surface, batching, mixing, placing in position, levelling, compacting, finishing, curing
etc., complete with initial lead upto 50 m and initial lift upto 3 m.
(Cement content: 300 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
255
Canal Cross Drainage Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 44.90 359.20
Fuel / Energy charges Hour 8.00 109.60 876.80
2 5 hp pump ( diesel ) Hour 0.50 8.50 4.25
Fuel / Energy charges Hour 0.50 109.60 54.80
3 Water tanker 8000 ltr Hour 1.00 358.00 358.00
Fuel / Energy charges Hour 1.00 414.40 414.40
Total hire charges of Machinery Rs: 2067.45
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Concrete mixer Hour 8.00 270.40 2163.20
2 Crew for Pump Hour 0.50 134.80 67.40
3 Crew for Water tanker Hour 1.00 215.50 215.50
4 Mason Class-I Day 1.00 550.00 550.00
5 work inspector Day 1.00 600.00 600.00
6 mazdoor
for batching materials Day 11.00 460.00 5060.00
for loading mortar pans Day 4.00 460.00 1840.00
for laying and tamping Day 3.00 460.00 1380.00
for conveying concrete Day 14.67 460.00 6748.20
for cleaning/ washing/ curing Day 1.00 460.00 460.00
7 Labour cost for shuttering/scaffolding sqm 80.69 114.00 9198.09
Total cost of Labour Rs: 28282.39
labour component/unit qty 1927.90
Add contractor's profit and overhead charges 13.615% 262.50
labour component/unit qty (including contractor's profit) 2190.40
ABSTRACT:
A. Cost of Materials Rs: 53396.95
B. Hire charges of Machinery Rs: 2067.45
C. Cost of Labour Rs: 28282.39
Total Rs: 83746.79
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 11402.12
Total cost for 14.67 cum Rs: 95148.91
Rate per cum (A+B+C+D)/14.67 Rs. 6486.00
IRR-CCDW-5-5 Providing and constructing protective railing consisting of in-situ railing posts of size 15 x
15 cm at bottom, 10 x 10 cm at top and 75 cm height at 2 m centre to centre in M-20 grade
concrete using 20 mm down size graded aggregates and with each post reinforced by 4 Nos.
of 8 mm dia main bars embedded in kerb concrete for a depth of 40 cm and 5 Nos. of 6 mm
dia. stirrups including fixing 3 rows of 40 mm dia. GI pipes with one coat of red oxide primer
and two coats of synthetic enamel paint, cost of all materials, machinery, labour, formwork,
finishing, curing etc., complete with lead upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
256
Canal Cross Drainage Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Mason Class I Day 0.50 550.00 275.00
2 Bar bender Day 0.50 665.00 332.50
3 work inspector Day 0.50 600.00 300.00
4 mazdoor Day 1.50 460.00 690.00
5 Painter Cl- II Day 0.50 500.00 250.00
6 Fitter shuttering Day 0.50 500.00 250.00
Total cost of Labour Rs: 2097.50
labour component/unit qty 209.80
Add contractor's profit and overhead charges 13.615% 28.60
labour component/unit qty (including contractor's profit) 238.40
ABSTRACT:
A. Cost of Materials Rs: 8381.32
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 2097.50
Total Rs: 10478.82
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 1426.69
Total cost for 10.00 Rm Rs: 11905.51
Rate per Rm (A+B+C+D)/10.0 Rs. 1190.60
IRR-CCDW-6-1 Laying and jointing 300 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2
proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,
labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto
50 m and all lifts.
(Cement content: 9.9 kg / joint, FA : 0.01cum/joint, Hemp Yarn : 0.091kg/joint)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00 0.00
( Manual mixing ) 0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Mason Cl- II Day 2.00 500.00 1000.00
2 work inspector Day 1.00 600.00 600.00
3 mazdoor Day 3.00 460.00 1380.00
Total cost of Labour Rs: 2980.00
labour component/unit qty 298.00
Add contractor's profit and overhead charges 13.615% 40.60
labour component/unit qty (including contractor's profit) 338.60
ABSTRACT:
A. Cost of Materials Rs: 486.82
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 2980.00
Total Rs: 3466.82
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 472.01
Total cost for 10.00 Joints Rs: 3938.828
Rate per joint (A+B+C+D)/10.0 Rs. 393.90
Note: (1) For NP3 Class - 10% extra over the rates of NP2 Class
(2) For NP4 Class - 20% extra over the rates of NP2 Class
IRR-CCDW-6-2 Laying and jointing 450 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2
257
Canal Cross Drainage Works - Item Unit Rates 2020-21
proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,
labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto
50 m and all lifts.
(Cement content: 17.4 kg / joint, FA : 0.022cum/joint, Hemp Yarn : 0.127kg/joint)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00 0.00
( Manual mixing ) 0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Mason Cl- II Day 2.00 500.00 1000.00
2 work inspector Day 1.00 600.00 600.00
3 mazdoor Day 3.00 460.00 1380.00
Total cost of Labour Rs: 2980.00
labour component/unit qty 298.00
Add contractor's profit and overhead charges 13.615% 40.60
labour component/unit qty (including contractor's profit) 338.60
ABSTRACT:
A. Cost of Materials Rs: 859.66
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 2980.00
Total Rs: 3839.66
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 522.77
Total cost for 10.00 Joints Rs: 4362.428
Rate per joint (A+B+C+D)/10.0 Rs. 436.20
Note: (1) For NP3 Class - 10% extra over the rates of NP2 Class
(2) For NP4 Class - 20% extra over the rates of NP2 Class
IRR-CCDW-6-3 Laying and jointing 600 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2
proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,
labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto
50 m and all lifts.
(Cement content: 24.8 kg / joint, FA : 0.025cum/joint, Hemp Yarn : 0.22kg/joint)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00 0.00
( Manual mixing ) 0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
258
Canal Cross Drainage Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Mason Cl- II Day 2.50 500.00 1250.00
2 work inspector Day 1.00 600.00 600.00
3 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 3690.00
labour component/unit qty 369.00
Add contractor's profit and overhead charges 13.615% 50.20
labour component/unit qty (including contractor's profit) 419.20
ABSTRACT:
A. Cost of Materials Rs: 1213.71
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 3690.00
Total Rs: 4903.71
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 667.64
Total cost for 10.00 Joints Rs: 5571.346
Rate per joint (A+B+C+D)/10.0 Rs. 557.10
Note: (1) For NP3 Class - 10% extra over the rates of NP2 Class
(2) For NP4 Class - 20% extra over the rates of NP2 Class
IRR-CCDW-6-4 Laying and jointing 700 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2
proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,
labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto
50 m and all lifts.
(Cement content: 32.1 kg / joint, FA : 0.031cum/joint, Hemp Yarn : 0.25kg/joint)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00 0.00
( Manual mixing ) 0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Mason Cl- II Day 2.50 500.00 1250.00
2 work inspector Day 1.00 600.00 600.00
3 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 3690.00
labour component/unit qty 369.00
Add contractor's profit and overhead charges 13.615% 50.20
labour component/unit qty (including contractor's profit) 419.20
ABSTRACT:
A. Cost of Materials Rs: 1538.76
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 3690.00
Total Rs: 5228.76
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 711.9
Total cost for 10.00 Joints Rs: 5940.662
Rate per joint (A+B+C+D)/10.0 Rs. 594.10
Note: (1) For NP3 Class - 10% extra over the rates of NP2 Class
(2) For NP4 Class - 20% extra over the rates of NP2 Class
259
Canal Cross Drainage Works - Item Unit Rates 2020-21
IRR-CCDW-6-5 Laying and jointing 800 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2
proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,
labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto
50 m and all lifts.
(Cement content: 39.6 kg / joint, FA : 0.039cum/joint, Hemp Yarn : 0.31kg/joint)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00 0.00
( Manual mixing ) 0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Mason Cl- II Day 3.00 500.00 1500.00
2 work inspector Day 1.00 600.00 600.00
3 mazdoor Day 5.00 460.00 2300.00
Total cost of Labour Rs: 4400.00
labour component/unit qty 440.00
Add contractor's profit and overhead charges 13.615% 59.90
labour component/unit qty (including contractor's profit) 499.90
ABSTRACT:
A. Cost of Materials Rs: 1903.96
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 4400.00
Total Rs: 6303.96
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 858.28
Total cost for 10.00 Joints Rs: 7162.242
Rate per joint (A+B+C+D)/10.0 Rs. 716.20
Note: (1) For NP3 Class - 10% extra over the rates of NP2 Class
(2) For NP4 Class - 20% extra over the rates of NP2 Class
IRR-CCDW-6-6 Laying and jointing 900 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2
proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,
labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto
50 m and all lifts.
(Cement content: 44.6 kg / joint, FA : 0.045cum/joint, Hemp Yarn : 0.34kg/joint)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00 0.00
( Manual mixing ) 0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
260
Canal Cross Drainage Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Mason Cl- II Day 3.00 500.00 1500.00
2 work inspector Day 1.00 600.00 600.00
3 mazdoor Day 5.00 460.00 2300.00
Total cost of Labour Rs: 4400.00
labour component/unit qty 440.00
Add contractor's profit and overhead charges 13.615% 59.90
labour component/unit qty (including contractor's profit) 499.90
ABSTRACT:
A. Cost of Materials Rs: 2144.56
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 4400.00
Total Rs: 6544.56
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 891.04
Total cost for 10.00 Joints Rs: 7435.602
Rate per joint (A+B+C+D)/10.0 Rs. 743.60
Note: (1) For NP3 Class - 10% extra over the rates of NP2 Class
(2) For NP4 Class - 20% extra over the rates of NP2 Class
IRR-CCDW-6-7 Laying and jointing 1000 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2
proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,
labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto
50 m and all lifts.
(Cement content: 49.5 kg / joint, FA : 0.05cum/joint, Hemp Yarn : 0.377kg/joint)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00 0.00
( Manual mixing ) 0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Mason Cl- II Day 3.00 500.00 1500.00
2 work inspector Day 1.00 600.00 600.00
3 mazdoor Day 6.00 460.00 2760.00
Total cost of Labour Rs: 4860.00
labour component/unit qty 486.00
Add contractor's profit and overhead charges 13.615% 66.20
labour component/unit qty (including contractor's profit) 552.20
ABSTRACT:
A. Cost of Materials Rs: 2380.27
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 4860.00
Total Rs: 7240.27
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 985.76
Total cost for 10.00 Joints Rs: 8226.03
Rate per joint (A+B+C+D)/10.0 Rs. 822.60
Note: (1) For NP3 Class - 10% extra over the rates of NP2 Class
(2) For NP4 Class - 20% extra over the rates of NP2 Class
261
Canal Cross Drainage Works - Item Unit Rates 2020-21
IRR-CCDW-6-8 Laying and jointing 1100 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2
proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,
labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto
50 m and all lifts.
(Cement content: 56.9 kg / joint, FA : 0.058cum/joint, Hemp Yarn : 0.415kg/joint)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00 0.00
( Manual mixing ) 0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Mason Cl- II Day 3.00 500.00 1500.00
2 work inspector Day 1.00 600.00 600.00
3 mazdoor Day 6.00 460.00 2760.00
Total cost of Labour Rs: 4860.00
labour component/unit qty 486.00
Add contractor's profit and overhead charges 13.615% 66.20
labour component/unit qty (including contractor's profit) 552.20
ABSTRACT:
A. Cost of Materials Rs: 2726.62
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 4860.00
Total Rs: 7586.62
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 1032.92
Total cost for 10.00 Joints Rs: 8619.538
Rate per joint (A+B+C+D)/10.0 Rs. 862.00
Note: (1) For NP3 Class - 10% extra over the rates of NP2 Class
(2) For NP4 Class - 20% extra over the rates of NP2 Class
IRR-CCDW-6-9 Laying and jointing 1200 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2
proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,
labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto
50 m and all lifts.
(Cement content: 66.8 kg / joint, FA : 0.069cum/joint, Hemp Yarn : 0.453kg/joint)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00 0.00
( Manual mixing ) 0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
262
Canal Cross Drainage Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Mason Cl- II Day 4.00 500.00 2000.00
2 work inspector Day 1.00 600.00 600.00
3 mazdoor Day 7.00 460.00 3220.00
Total cost of Labour Rs: 5820.00
labour component/unit qty 582.00
Add contractor's profit and overhead charges 13.615% 79.20
labour component/unit qty (including contractor's profit) 661.20
ABSTRACT:
A. Cost of Materials Rs: 3182.92
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 5820.00
Total Rs: 9002.92
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 1225.75
Total cost for 10.00 Joints Rs: 10228.666
Rate per joint (A+B+C+D)/10.0 Rs. 1022.90
Note: (1) For NP3 Class - 10% extra over the rates of NP2 Class
(2) For NP4 Class - 20% extra over the rates of NP2 Class
IRR-CCDW-7-1 Providing rubble / boulder and sand filling behind abutment and return walls in layers
including cost of all materials, machinery, labour, watering, ramming etc., complete with initial
lead upto 50 m and initial lift upto 3 m.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00 0.00
( Manual mixing ) 0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 0.50 600.00 300.00
2 Mason Cl II Day 1.00 500.00 500.00
3 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 2640.00
labour component/unit qty 264.00
Add contractor's profit and overhead charges 13.615% 35.90
labour component/unit qty (including contractor's profit) 299.90
ABSTRACT:
A. Cost of Materials Rs: 4750.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 2640.00
Total Rs: 7390.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 1006.15
Total cost for 10.00 cum Rs: 8396.15
Rate per cum (A+B+C+D)/10.0 Rs. 839.60
IRR-CCDW-7-2 Providing and filling murrum / gravely soil ( CNS soil ) for foundation or around pipes
including breaking clods, spreading in layers of 10 to 15 cm, watering, compaction by earth
masters to achieve density control of not less than 95 percent etc., complete with lead
upto 50 m and all lifts.
263
Canal Cross Drainage Works - Item Unit Rates 2020-21
A. MATERIALS:
Sl No Particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Murum cum 12.00 205.00 2460.00
0.00 0.00 0.00
Total cost of Materials Rs: 2460.00
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Nill 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Cartman with double bullock cart Day 0.50 550.00 275.00
2 work inspector Day 0.50 600.00 300.00
3 mazdoor Day 6.00 460.00 2760.00
Total cost of Labour Rs: 3335.00
labour component/unit qty 333.50
Add contractor's profit and overhead charges 13.615% 45.40
labour component/unit qty (including contractor's profit) 378.90
ABSTRACT:
A. Cost of Materials Rs: 2460.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 3335.00
Total Rs: 5795.00
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 788.99
Total cost for 10.00 cum Rs: 6583.99
Rate per cum (A+B+C+D)/10.0 Rs. 658.40
IRR-CCDW-7-3 Providing and filling murum / gravely soil ( CNS soil ) for foundation or above pipes
including breaking clods, spreading in layers of 10 to 15 cm, watering, compaction by power
roller to achieve density control of not less than 98 percent etc., complete with lead upto
50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Diesel road roller 8-10 tonne Hour 0.17 170.20 29.04
Fuel / Energy charges Hour 0.17 986.70 168.38
Total hire charges of Machinery Rs: 197.42
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Operator road roller Hour 0.17 264.60 45.15
2 Cartman with double bullock cart Day 0.50 550.00 275.00
3 work inspector Day 0.50 600.00 300.00
4 mazdoor Day 1.50 460.00 690.00
Total cost of Labour Rs: 1310.15
labour component/unit qty 131.00
Add contractor's profit and overhead charges 13.615% 17.80
labour component/unit qty (including contractor's profit) 148.80
264
Canal Cross Drainage Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 2460.00
B. Hire charges of Machinery Rs: 197.42
C. Cost of Labour Rs: 1310.15
Total Rs: 3967.58
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 540.19
Total cost for 10.00 cum Rs: 4507.77
Rate per cum (A+B+C+D)/10.0 Rs. 450.80
IRR-CCDW-7-4 Providing and fixing one line dressed 111x35x25 cm thick IRC standard kilometre stone in
cement concrete M-10 grade with 40 mm down size aggregates including excavating pit of
size 70x45x40 cm, embedding the stone by 30 cm in concrete, providing 2 coats synthetic
enamel paint of approved quality and colour to exposed surfaces and lettering as directed, cost
of all materials, labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
( Manual mixing ) 0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Mason Cl- II Day 1.00 500.00 500.00
2 work inspector Day 1.00 600.00 600.00
3 mazdoor Day 1.00 460.00 460.00
4 Painter Cl- I Day 1.00 615.00 615.00
Total cost of Labour Rs: 2175.00
labour component/unit qty 543.80
Add contractor's profit and overhead charges 13.615% 74.00
labour component/unit qty (including contractor's profit) 617.80
ABSTRACT:
A. Cost of Materials Rs: 3274.50
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 2175.00
Total Rs: 5449.50
D. Add for contractor's profit and overheads on (A+B+C) 13.615% Rs: 741.95
Total cost for 4.00 Nos. Rs: 6191.45
Rate per No. (A+B+C+D)/4.0 Rs. 1547.90
IRR-CCDW-7-5 Providing and fixing one line dressed 65x15x10 cm thick IRC standard hectometre stone in
cement concrete M-10 grade with 40 mm down size aggregates including excavating pit of
size 50x45x40 cm, embedding the stone by 30 cm in concrete, providing 2 coats synthetic
enamel paint of approved quality and colour to exposed surfaces and lettering as directed, cost
of all materials, labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
265
Canal Cross Drainage Works - Item Unit Rates 2020-21
266
Gates and Allied Works - Item Unit Rates 2020-21
CHAPTER-V
HYDRAULIC GATES AND ALLIED EQUIPMENT - Standard Data
1 All materials / bought out components for embedded parts, gates, hoists and allied works
shall conform to relevant Indian standards / technical specifications and approved drawings.
2 The basic rates are EXCLUSIVEof preparation of designs / drawings / material schedules etc.,
as per specifications and other technical data including revisions.
If designs &drawings are to be done by private agency 2% of estimated cost be added
3 The basic rates are inclusive of cost of all materials, machinery, labour, fabrication, erection,
commissioning and testing of gates, hoists and other related components as per technical
specifications.
4 The basic rates are inclusive of finishing, wastage of materials , incidental works, temperary
supports, all enabling works, profit, overheads, small tools / plants, hidden cost
on labour etc.
5 The basic rates are inclusive of duties (excise ), levies and all other incidental charges
but exclusive of GST. Separate provision shall be made in the estimate towards such
tax on works contract at the rate prevailing at the time of preparation of estimate.
6 The basic rates are inclusive of all leads and lifts including rehandling.
8 The basic rates are inclusive of preparatory works such as rectification of damages, repairing
shop painting, cleaning, positioning and anchoring first stage embedments,
9 The basic rates are not inclusive of painting with or without sand blasting,and are to be added to the rate as
perschedule rates formulated in the same chapter as per applicability and specifications
10 The basic rates are exclusive of cost of river diversion arrangements, dewatering, desilting ,secondary concreting
of EM parts etc., which form part of civil works.
12 Add AREA ALLOWANCES AS APPLICABLE ON LABOUR COMPONENT ONLY ( SHOWN UNDER EACH ITEM)
14 Painting Charges added extra to the data items as per applicability wherver necessary
15 HOIST EQUIPMENT1.-where sand blasting is not possible, hand and power tool cleaning be
adopted - Guidance may be taken from Mechanical workshop in this regard
2. Machined surfaces should not be painted
3. for maintenance unless sand blasting is essential hand and power tool cleaning be adopted
16 Painting of Hoast Gates is to be done as per IS 14177:1994
267
Gates and Allied Works - Item Unit Rates 2020-21
GAW - Work Items
Index- code
IRR-GAW TYPES OF GATES:
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 1945.00 14.20 27619.00
Fuel / Energy charges Hour 1945.00 102.10 198584.50
Tower crane/heavy duty tyre
2 mounted crane Hour 16.00 711.10 11377.60
Fuel / Energy charges Hour 16.00 221.10 3537.60
3 Plate shearing machine Hour 16.00 37.80 604.80
Fuel / Energy charges Hour 16.00 170.10 2721.60
4 Pug cutting machine Hour 76.00 6.10 463.60
Fuel / Energy charges Hour 76.00 4.30 326.80
5 Mobile crane 16 Tonnes Hour 22.00 1935.40 42578.80
Fuel / Energy charges Hour 22.00 1438.90 31655.80
6 Stationery derric crane Hour 64.00 71.20 4556.80
Fuel / Energy charges Hour 64.00 0.00 0.00
7 Grinding machine Hour 30.00 19.20 576.00
Fuel / Energy charges Hour 30.00 42.50 1275.00
8 Drilling machines Hour 30.00 19.20 576.00
Fuel / Energy charges Hour 30.00 42.50 1275.00
9 Planing machine Hour 100.00 105.80 10580.00
Fuel / Energy charges Hour 100.00 127.60 12760.00
10 Bending Machine Hour 30.00 36.20 1086.00
Fuel / Energy charges Hour 30.00 127.60 3828.00
11 Sundries LS 100.00 32.00 3200.00
Total hire charges of Machinery Rs: 359182.90
268
Gates and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Tower crane Hour 16.00 229.80 3676.80
2 Crew for Mobile crane 16 T Hour 22.00 650.20 14304.40
3 Crew for Shearing machine Hour 16.00 172.40 2758.40
4 Crew for Planing machine Hour 100.00 259.60 25960.00
5 Crew for Drilling machine Hour 30.00 236.00 7080.00
6 Crew for Grinding machine Hour 30.00 236.00 7080.00
7 Crew for Bending machine 30.00 162.20 4866.00
8 Foreman Day 15.00 605.00 9075.00
9 Marker / Fabricator / Erector Day 75.00 655.00 49125.00
10 Gas cutter Day 20.00 540.00 10800.00
11 Welder ( General ) Day 212.00 540.00 114480.00
12 Welder ( X - ray ) Day 48.00 605.00 29040.00
13 Khalasi Day 345.00 540.00 186300.00
14 Helper fabrication / erection Day 255.00 500.00 127500.00
15 Electrician Day 5.00 610.00 3050.00
Total cost of Labour Rs: 595095.60
Add towards highly skilled labour charges @ 30% on total cost of labour 178528.68
Total Cost of Labour 773624.28
ABSTRACT:
A. Cost of Materials Rs: 1040202.31
B. Hire charges of Machinery Rs: 359182.90
C. Cost of Labour Rs: 773624.28
Total Rs: 2173009.49
D.Add for excise duty 0.00% Rs: 0.00
(on 75 percent cost excluding cost of materials) Total Rs: 2173009.49
E. Add for transportation upto work site @ 3% Rs: 65190.28
Total Rs: 2238199.77
F. Add for contractor's profit and overheads on
(A+B+C+D+E) 13.615% Rs: 304730.90
Add 2 leads
Add 1 km lead charges for fabricated parts Rs. 18.30 per tonne 559.98
Unloading charges of fabricated parts Rs 86.30 per tonne 2640.78
Total cost for 15.300 tonne Rs: 2546131.43
Rate per tonne Rs: 166413.80
RADIAL GATES
A-2 Gates
IRR-GAW-1-2 fabrication, supply, erection, testing and commissioning of radial gate consisting
of skin plate, stiffeners, horizontal girders, radial arms, trunnion assemblies, tie beam, pulley
supports, bracings, rubber seals, clamps etc., with all accessories for spillway/canals including cost
of all materials, machinery, labour, seal fixing etc., complete as per specifications and approved drawings
(without painting on sand-blasted or mechanical cleaning surfaces which are added extra
as perscedule of rates under itemsinthis chapter and add as applicable separately)
269
Gates and Allied Works - Item Unit Rates 2020-21
Vent Size: 12 X 6.6 Mtr
DATA: RATE ANALYSIS UNIT : 29.000 tonne
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel :
Angles / beams / channels / bars kg 9700.00 41.50 402550.00
Plates / flats kg 16850.00 43.00 724550.00
2 Cast steel components :
Trunnion hubs / Guide rollers kg 2100.00 182.00 382200.00
Alluminium / Bronze alloy
3 components :
Bush for Trunnion / Guide roller kg 350.00 905.00 316750.00
4 Bolt / Nut / Washer :
GI bolts / nuts / washers kg 250.00 135.00 33750.00
5 Zinc/Babbit Metal kg 50.00 181.00 9050.00
6 Rubber seals :
Bottom seal Rm 12.00 644.00 7728.00
Side seals ( Z - type ) Rm 14.00 1300.00 18200.00
7 Oxygen gas cum 228.00 41.00 9348.00
8 Acetyline gas cum 76.00 336.00 25536.00
9 Welding electrodes ( std ) Nos 1000.00 13.00 13000.00
10 Welding electrodes ( LH ) Nos 250.00 16.00 4000.00
11 Use rate welding holder set Hour 156.00 7.44 1159.86
12 Use rate gas cutting torch set Hour 228.00 21.97 5008.40
13 Sundries LS 500.00 32.00 16000.00
Total cost of Materials Rs: 1968830.26
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 156.00 14.20 2215.20
Fuel / Energy charges Hour 156.00 102.10 15927.60
2 Plate shearing machine Hour 29.00 37.80 1096.20
Fuel / Energy charges Hour 29.00 170.10 4932.90
3 Pug cutting machine Hour 114.00 6.10 695.40
Fuel / Energy charges Hour 114.00 4.30 490.20
4 Bending machine Hour 116.00 36.20 4199.20
Fuel / Energy charges Hour 116.00 127.60 14801.60
5 Tower crane 5 t cpacity Hour 29.00 711.10 20621.90
Fuel / Energy charges Hour 29.00 221.10 6411.90
6 Mobile derric crane Hour 58.00 448.00 25984.00
Fuel / Energy charges Hour 58.00 414.40 24035.20
7 Stationery derric crane Hour 58.00 71.20 4129.60
Fuel / Energy charges Hour 58.00 0.00 0.00
8 Grinding machine Hour 58.00 19.20 1113.60
Fuel / Energy charges Hour 58.00 42.50 2465.00
9 Drilling machines Hour 58.00 19.20 1113.60
Fuel / Energy charges Hour 58.00 42.50 2465.00
10 Mobile Crane 30 T Hour 100.00 2763.70 276370.00
Fuel / Energy charges Hour 100.00 1627.00 162700.00
11 Sundries LS 500.00 32.00 16000.00
Total hire charges of Machinery Rs: 587768.10
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane 30T Hour 100.00 650.20 65020.00
2 Crew for Tower crane Hour 29.00 229.80 6664.20
3 Crew for Bending machine Hour 116.00 162.20 18815.20
4 Crew for Drilling machine Hour 58.00 236.00 13688.00
5 Crew for Grinding machine Hour 58.00 236.00 13688.00
6 Foreman Day 29.00 605.00 17545.00
7 Marker / Fabricator / Erector Day 145.00 655.00 94975.00
8 Gas cutter Day 29.00 540.00 15660.00
9 Welder ( General ) Day 17.00 540.00 9180.00
10 Welder ( X - ray ) Day 5.00 605.00 3025.00
11 Khalasi Day 493.00 540.00 266220.00
12 Helper fabrication / erection Day 667.00 500.00 333500.00
13 Electrician Day 15.00 610.00 9150.00
Total cost of Labour Rs: 867130.40
270
Gates and Allied Works - Item Unit Rates 2020-21
Add towards highly skilled labour charges @ 30% on total cost of labour 260139.12
Total Cost of Labour 1127269.52
labour component/unit qty 38871.40
Add contractor's profit and overhead charges 13.615% 5292.30
labour component/unit qty (including contractor's profit) 44163.70
ABSTRACT:
A. Cost of Materials Rs: 1968830.26
B. Hire charges of Machinery Rs: 587768.10
C. Cost of Labour Rs: 1127269.52
Total Rs: 3683867.88
D. Add for excise duty 0.00% Rs: 0.00
(on 75 percent cost excluding cost of materials) Total Rs: 3683867.88
E. Add for transportation upto work site @ 3% Rs: 110516.04
Total Rs: 3794383.92
F. Add for contractor's profit and overheads on
(A+B+C+D+E) 13.615% Rs: 516605.37
Add 2 leads
Add 1 km lead charges for fabricated parts Rs. 18.30 per tonne 1061.4
Unloading charges of fabricated parts Rs 86.30 per tonne 5005.4
Total cost for 29.000 tonne Rs: 4317056.09
Rate per tonne Rs. 148864.00
IRR-GAW-1-3 RADIAL GATES-ROPE DRUM HOISTS WITH HOIST BRIDGES
fabrication, supply, erection, testing and commissioning of electrically operated rope
drum hoist of adequate capacity consisting of base frames, rope drums,connecting shaft, gear
system, brake system, electric motor, wire ropes, gate position indicator, manual operation
arrangement etc., with all accessories for spillway radial gate including cost of all materials,
machinery, labour,, greasing, providing hand railing and approach staircase with gate to hoist platform,
, complete as per specifications and approved drawings
(without painting on sand-blasted or mechanical cleaning surfaces which are added extra
as perscedule of rates under itemsinthis chapter and add as applicable separately)
DATA: RATE ANALYSIS UNIT : 15.440 tonne wt
A. MATERIALS: 90.00 t capacity
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel
Angles / beams / channels / bars kg 2571.00 41.50 106696.50
Plates / flats kg 3632.00 43.00 156176.00
2 Cast steel components :
Rope drums 2 Nos / Gears 4 Nos kg 3680.00 219.00 805920.00
Pinions kg 218.00 214.00 46652.00
Pulleys 720 PCD 6 Nos kg 1080.00 182.00 196560.00
Plummer blocks / Hubs kg 322.00 182.00 58604.00
3 Alloy steel components
Shafts kg 557.00 225.00 125325.00
Pins kg 546.00 415.00 226590.00
4 Bronze alloy components :
Bronze bearings / bush kg 144.00 905.00 130320.00
Wire rope 36 mm dia 6/37
5 construction kg 448.00 187.00 83776.00
6 MS Bolt / Nut / Washer kg 85.00 77.00 6545.00
7 Worm reducers No. 1.00 178900.00 178900.00
8 Electric motor 20 hp No. 1.00 103690.00 103690.00
9 Floating shaft 300 mm dia kg 1000.00 165.00 165000.00
10 Manual operating system No. 1.00 27100.00 27100.00
11 Gate position indicator No. 1.00 174851.00 174851.00
12 Ele-magnetic brake No. 1.00 28200.00 28200.00
Electric cable / switch / control panel
13 etc LS 1.00 46500.00 46500.00
14 Oxygen gas cum 213.00 41.00 8733.00
15 Acetyline gas cum 71.00 336.00 23856.00
16 Welding electrodes Nos 530.00 13.00 6890.00
17 Welding electrodes ( LH ) Nos 4776.00 16.00 76416.00
18 Grease kg 50.00 250.00 12500.00
19 Use rate welding holder set Hour 566.00 7.44 4208.21
20 Use rate gas cutting torch set Hour 90.00 21.97 1977.00
21 Sundries ( hand rail /staircase / gate etc ) LS 200.00 32.00 6400.00
Total cost of Materials Rs: 2808385.71
271
Gates and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 566.00 14.20 8037.20
Fuel / Energy charges Hour 353.00 102.10 36041.30
2 Tower crane 5 t capacity Hour 4.00 711.10 2844.40
Fuel / Energy charges Hour 4.00 221.10 884.40
3 Pug cutting machine Hour 53.00 6.10 323.30
Fuel / Energy charges Hour 53.00 4.30 227.90
4 Mobile derric crane Hour 50.00 448.00 22400.00
Fuel / Energy charges Hour 50.00 414.40 20720.00
5 Grinding machine Hour 8.00 19.20 153.60
Fuel / Energy charges Hour 8.00 42.50 340.00
6 Drilling machines Hour 16.00 19.20 307.20
Fuel / Energy charges Hour 16.00 42.50 680.00
7 Sundries LS 100.00 32.00 3200.00
Total hire charges of Machinery Rs: 96159.30
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 50.00 215.50 10775.00
2 Crew for Tower crane Hour 4.00 229.80 919.20
3 Crew for Drilling machine Hour 16.00 236.00 3776.00
4 Crew for Grinding machine Hour 8.00 236.00 1888.00
5 Foreman Day 35.00 605.00 21175.00
Marker / Fabricator / Erector /
6 Mechanic Day 58.00 655.00 37990.00
7 Gas cutter Day 18.00 540.00 9720.00
8 Welder ( General ) Day 53.00 540.00 28620.00
9 Khalasi Day 20.00 540.00 10800.00
10 Helper fabrication / erection Day 175.00 500.00 87500.00
11 Electrician Day 3.00 610.00 1830.00
Total cost of Labour Rs: 214993.20
Add towards highly skilled labour charges @ 30% on total cost of labour 64497.96
Total Cost of Labour 279491.16
ABSTRACT:
A. Cost of Materials Rs: 2808385.71
B. Hire charges of Machinery Rs: 96159.30
C. Cost of Labour Rs: 279491.16
Total Rs: 3184036.17
D. Add for excise duty 0.00% Rs: 0.00
(on 75 percent cost excluding cost of materials) Total Rs: 3184036.17
E. Add for transportation upto work site @ 3% Rs: 95521.09
Total Rs: 3279557.26
272
Gates and Allied Works - Item Unit Rates 2020-21
DATA: RATE ANALYSIS UNIT : 5.22 MT
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel
Angles / beams / channels / bars kg 4258.00 41.50 176707.00
Plates / flats kg 98.00 43.00 4214.00
Chequered plates kg 856.00 59.00 50504.00
2 MS bolts / nuts / washers kg 8.00 77.00 616.00
3 Oxygen gas cum 51.00 41.00 2091.00
4 Acetyline gas cum 17.00 336.00 5712.00
5 Welding electrodes Nos 1195.00 13.00 15535.00
6 Use rate welding holder set Hour 150.00 7.44 1115.25
7 Use rate gas cutting torch set Hour 30.00 21.97 659.00
8 Sundries LS 10.00 32.00 320.00
Total cost of Materials Rs: 257473.25
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 150.00 14.20 2130.00
Fuel / Energy charges Hour 150.00 102.10 15315.00
2 Tower crane Hour 6.00 711.10 4266.60
Fuel / Energy charges Hour 6.00 221.10 1326.60
3 Pug cutting machine Hour 12.00 6.10 73.20
Fuel / Energy charges Hour 12.00 4.30 51.60
4 Mobile CRANE 16T Hour 8.00 1935.40 15483.20
Fuel / Energy charges Hour 8.00 1438.90 11511.20
5 Grinding machine Hour 12.00 19.20 230.40
Fuel / Energy charges Hour 12.00 42.50 510.00
6 Drilling machines Hour 12.00 19.20 230.40
Fuel / Energy charges Hour 12.00 42.50 510.00
7 Bending Machine Hour 10.00 36.20 362.00
Fuel / Energy charges Hour 10.00 127.60 1276.00
8 Sundries LS 10.00 32.00 320.00
Total hire charges of Machinery Rs: 53596.20
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane 16T Hour 10.00 650.20 6502.00
2 Crew for Tower crane Hour 6.00 229.80 1378.80
3 Crew for Drilling machine Hour 12.00 236.00 2832.00
4 Crew for Grinding machine Hour 12.00 236.00 2832.00
5 Crew for Bending machine Hour 10.00 162.20 1622.00
6 Foreman Day 6.00 605.00 3630.00
7 Marker / Fabricator / Erector Day 25.00 655.00 16375.00
8 Gas cutter Day 5.00 540.00 2700.00
9 Welder ( General ) Day 20.00 540.00 10800.00
10 Helper fabrication / erection Day 200.00 500.00 100000.00
11 Electrician Day 2.00 610.00 1220.00
Total cost of Labour Rs: 149891.80
Add towards highly skilled labour charges @ 30% on total cost of labour 44967.54
Total Cost of Labour 194859.34
273
Gates and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 257473.25
B. Hire charges of Machinery Rs: 53596.20
C. Cost of Labour Rs: 194859.34
Total Rs: 505928.79
D. Add for excise duty 0.00% Rs: 0.00
(on 75 percent cost excluding cost of materials) Total Rs: 505928.79
E. Add for transportation upto work site @ 3% Rs: 15177.86
Total Rs: 521106.65
F. Add for contractor's profit and overheads on
(A+B+C+D+E) 13.615% Rs: 70948.67
Add 2 leads
Add 1 km lead charges for fabricated parts Rs. 18.30 per tonne 191.052
Unloading charges of fabricated parts Rs 86.30 per tonne 900.972
Total cost for 5.22 MT Rs: 593147.35
Rate per MT Rs: 113629.80
274
Gates and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 385.00 14.20 5467.00
Fuel / Energy charges Hour 385.00 102.10 39308.50
2 Plate shearing machine Hour 8.00 37.80 302.40
Fuel / Energy charges Hour 8.00 170.10 1360.80
3 Pug cutting machine Hour 110.00 6.10 671.00
Fuel / Energy charges Hour 110.00 4.30 473.00
4 Planing machine Hour 270.00 105.80 28566.00
Fuel / Energy charges Hour 270.00 127.60 34452.00
5 Mobile Crane 16 T Hour 24.00 1935.40 46449.60
Fuel / Energy charges Hour 24.00 1438.90 34533.60
6 Stationery derric crane Hour 14.00 71.20 996.80
Fuel / Energy charges Hour 14.00 0.00 0.00
7 Grinding machine Hour 14.00 19.20 268.80
Fuel / Energy charges Hour 14.00 42.50 595.00
8 Drilling machines Hour 21.00 19.20 403.20
Fuel / Energy charges Hour 21.00 42.50 892.50
9 Bending Machine Hour 14.00 36.20 506.80
Fuel / Energy charges Hour 14.00 127.60 1786.40
10 Sundries LS 40.00 32.00 1280.00
Total hire charges of Machinery Rs: 198313.40
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane 16 T Hour 24.00 650.20 15604.80
2 Crew for Planing machine Hour 270.00 259.60 70092.00
3 Crew for Drilling machine Hour 21.00 236.00 4956.00
4 Crew for Grinding machine Hour 14.00 236.00 3304.00
5 Crew for Bending machine Hour 14.00 162.20 2270.80
6 Foreman Day 32.00 605.00 19360.00
7 Marker / Fabricator / Erector Day 35.00 655.00 22925.00
8 Gas cutter Day 9.00 540.00 4860.00
9 Welder ( General ) Day 46.00 540.00 24840.00
10 Welder ( X - ray ) Day 6.00 605.00 3630.00
11 Helper fabrication / erection Day 240.00 500.00 120000.00
12 Electrician Day 4.00 610.00 2440.00
Total cost of Labour Rs: 294282.60
Add towards highly skilled labour charges @ 30% on total cost of labour 88284.78
Total Cost of Labour 382567.38
275
Gates and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 420352.48
B. Hire charges of Machinery Rs: 198313.40
C. Cost of Labour Rs: 382567.38
Total Rs: 1001233.26
D. Add for excise duty 0.00% Rs: 0.00
(on 75 percent cost excluding cost of materials) Total Rs: 1001233.26
E. Add for transportation upto work site @ 3% Rs: 30037.00
Total Rs: 1031270.25
F. Add for contractor's profit and overheads on
(A+B+C+D+E) 13.615% Rs: 140407.44
Add 2 leads
Add 1 km lead charges for fabricated parts Rs. 18.30 per tonne 230.58
Unloading charges of fabricated parts Rs 86.30 per tonne 1087.38
Total cost for 6.30 tonne Rs: 1172995.66
Rate per tonne Rs: 186189.80
vertical lift gates and stop log gate elements ( SLIDING GATES)
IRR-GAW-2-2 Design, fabrication, supply, erection, testing and commissioning of vertical lift gates and
stoplog gate elements, consisting of skin plate,
horizontal and vertical girders, stiffeners, lifting pins, bronze padded slide blocks/bearings, guide shoes,
rubber seals, clamps etc., with all accessories including cost of all materials,
machinery, labour, seal fixing etc.,complete as per specifications and approved drawings
(without painting on sand-blasted or mechanical cleaning surfaces which are added extra
as perscedule of rates under items in this chapter and add as applicable separately)
Drawing NO. CE/CDO/CL3/MRP/783/2002 (Spillway Stop log gate Elements of Madduvalasa Project)
Vent Size: 12.624 X 0.50 M 16 Elements
276
Gates and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 12880.00 14.20 182896.00
Fuel / Energy charges Hour 12880.00 102.10 1315048.00
2 Pug cutting machine Hour 6440.00 6.10 39284.00
Fuel / Energy charges Hour 6440.00 4.30 27692.00
3 Mobile crane 16 T Hour 360.00 1935.40 696744.00
Fuel / Energy charges Hour 360.00 1438.90 518004.00
4 Stationery derric crane Hour 238.00 71.20 16945.60
Fuel / Energy charges Hour 238.00 0.00 0.00
5 Grinding machine Hour 238.00 19.20 4569.60
Fuel / Energy charges Hour 238.00 42.50 10115.00
6 Drilling machines Hour 357.00 19.20 6854.40
Fuel / Energy charges Hour 357.00 42.50 15172.50
7 Bending Machine Hour 240.00 36.20 8688.00
Fuel / Energy charges Hour 240.00 127.60 30624.00
8 Sundries LS 180.00 32.00 5760.00
Total hire charges of Machinery Rs: 2878397.10
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane 16T Hour 360.00 650.20 234072.00
2 Crew for Drilling machine Hour 357.00 236.00 84252.00
3 Crew for Grinding machine Hour 238.00 236.00 56168.00
4 Crew for Bending machine Hour 240.00 162.20 38928.00
5 Foreman Day 120.00 605.00 72600.00
6 Marker / Fabricator / Erector Day 195.00 655.00 127725.00
7 Gas cutter Day 100.00 540.00 54000.00
8 Welder ( General ) Day 1442.00 540.00 778680.00
9 Welder ( X - ray ) Day 275.00 605.00 166375.00
10 Khalasi Day 2023.00 540.00 1092420.00
11 Helper fabrication / erection Day 2727.00 500.00 1363500.00
12 Electrician Day 10.00 610.00 6100.00
Total cost of Labour Rs: 4074820.00
Add towards highly skilled labour charges @ 30% on total cost of labour 1222446.00
Total Cost of Labour 5297266.00
ABSTRACT:
A. Cost of Materials Rs: 7495422.33
B. Hire charges of Machinery Rs: 2878397.10
C. Cost of Labour Rs: 5297266.00
Total Rs: 15671085.43
D. Add for excise duty 0.00% Rs: 0.00
(on 75 percent cost excluding cost of materials) Total Rs: 15671085.43
E. Add for transportation upto work site @ 3% Rs: 470132.56
Total Rs: 16141218.00
F. Add for contractor's profit and overheads on
(A+B+C+D+E) 13.615% Rs: 2197626.83
Add 2 leads
Add 1 km lead charges for fabricated parts Rs. 20.80 per tonne 4950.400
Unloading charges of fabricated parts Rs 86.30 per tonne 20539.4
Total cost for 119.00 tonne Rs: 18364334.63
Rate per tonne Rs: 154322.10
277
Gates and Allied Works - Item Unit Rates 2020-21
DATA: RATE ANALYSIS UNIT : 3.528 tonne
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel
Angles / beams / channels / bars kg 13.00 41.50 539.50
Plates / flats kg 3389.00 43.00 145727.00
2 Alloy steel components
Lifting pins kg 101.00 415.00 41915.00
3 Bronze alloy components :
Bronze bush kg 5.00 905.00 4525.00
4 Forged steel components :
Lifting hooks kg 103.00 259.00 26677.00
5 MS pipe 100 mm dia kg 11.00 166.00 1826.00
6 Bolt / Nut / Washer
MS bolts / nuts / washers kg 3.00 77.00 231.00
7 Oxygen gas cum 126.00 41.00 5166.00
8 Acetyline gas cum 42.00 336.00 14112.00
9 Welding electrodes Nos 175.00 13.00 2275.00
10 Welding electrodes ( LH ) Nos 1575.00 16.00 25200.00
11 Use rate welding holder set Hour 187.00 7.44 1390.35
12 Use rate gas cutting torch set Hour 24.00 21.97 527.20
13 Sundries LS 25.00 32.00 800.00
Total cost of Materials Rs: 270911.05
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 187.00 14.20 2655.40
Fuel / Energy charges Hour 117.00 102.10 11945.70
2 Pug cutting machine Hour 60.00 6.10 366.00
Fuel / Energy charges Hour 60.00 4.30 258.00
3 Mobile derric crane Hour 4.00 448.00 1792.00
Fuel / Energy charges Hour 4.00 414.40 1657.60
4 Stationery derric crane Hour 8.00 71.20 569.60
Fuel / Energy charges Hour 8.00 0.00 0.00
5 Grinding machine Hour 2.00 19.20 38.40
Fuel / Energy charges Hour 2.00 42.50 85.00
6 Drilling machines Hour 2.00 19.20 38.40
Fuel / Energy charges Hour 2.00 42.50 85.00
7 Sundries LS 10.00 32.00 320.00
Total hire charges of Machinery Rs: 19811.10
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 4.00 215.50 862.00
2 Crew for Drilling machine Hour 2.00 236.00 472.00
3 Crew for Grinding machine Hour 2.00 236.00 472.00
4 Foreman Day 10.00 605.00 6050.00
5 Marker / Fabricator / Erector Day 18.00 655.00 11790.00
6 Gas cutter Day 10.00 540.00 5400.00
7 Welder ( General ) Day 18.00 540.00 9720.00
8 Helper fabrication / erection Day 52.00 500.00 26000.00
9 Electrician Day 1.00 610.00 610.00
Total cost of Labour Rs: 61376.00
Add towards highly skilled labour charges @ 30% on total cost of labour 18412.80
Total Cost of Labour 79788.80
278
Gates and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 270911.05
B. Hire charges of Machinery Rs: 19811.10
C. Cost of Labour Rs: 79788.80
Total Rs: 370510.95
D. Add for excise duty 0.00% Rs: 0.00
(on 75 percent cost excluding cost of materials) Total Rs: 370510.95
E. Add for transportation upto work site @ 3% Rs: 11115.33
Total Rs: 381626.27
F. Add for contractor's profit and overheads on
(A+B+C+D+E) 13.615% Rs: 51958.42
Add 2 leads
Add 1 km lead charges for fabricated parts Rs. 20.80 per tonne 146.764
Unloading charges of fabricated parts Rs 86.30 per tonne 608.932
Total cost for 3.528 tonne Rs: 434340.39
Rate per tonne Rs: 123112.40
279
Gates and Allied Works - Item Unit Rates 2020-21
DATA: RATE ANALYSIS UNIT : 30.856 tonne
A. MATERIALS: 25 t capacity
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel
Angles / beams / channels / bars kg 1743.00 41.50 72334.50
Plates / flats kg 19700.00 43.00 847100.00
Chequered plates kg 820.00 59.00 48380.00
2 Cast steel components :
Rope drums 2 Nos/Gears kg 1320.00 219.00 289080.00
pinions kg 1165.00 214.00 249310.00
Wheels / Pulleys kg 2255.00 182.00 410410.00
Plummer blocks / Couplings kg 817.00 182.00 148694.00
3 Forged steel components
Hook / Shackle kg 127.00 259.00 32893.00
4 Alloy steel components
Shafts kg 556.00 225.00 125100.00
Pins kg 524.00 415.00 217460.00
5 Bronze alloy components :
Bronze bearings / bush kg 181.00 905.00 163805.00
6 Wire rope 28 mm dia 6/37 construction kg 406.00 187.00 75922.00
7 MS Bolt / Nut / Washer kg 63.00 77.00 4851.00
8 MS pipe 32 mm dia for railing Rm 50.00 177.00 8850.00
9 Worm reducers Nos. 4.00 178900.00 715600.00
10 Electric motor 17.5 hp No. 1.00 68500.00 68500.00
Electric motor 5 hp Nos. 2.00 26500.00 53000.00
Electric motor 3 hp No. 1.00 18500.00 18500.00
11 Ele-magnetic / Thruster brakes Nos. 4.00 28200.00 112800.00
Electric cable / switch / control panel
12 etc LS 3.00 46500.00 139500.00
13 Oxygen gas cum 579.00 41.00 23739.00
14 Acetyline gas cum 193.00 336.00 64848.00
15 Welding electrodes Nos 1123.00 13.00 14599.00
16 Welding electrodes ( LH ) Nos 10110.00 16.00 161760.00
17 Grease kg 50.00 250.00 12500.00
18 Use rate welding holder set Hour 1197.00 7.44 8899.70
19 Use rate gas cutting torch set Hour 150.00 21.97 3295.00
20 Sundries LS 200.00 32.00 6400.00
Total cost of Materials Rs: 4098130.20
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 1197.00 14.20 16997.40
Fuel / Energy charges Hour 748.00 102.10 76370.80
2 Tower crane 5 t capacity Hour 6.00 711.10 4266.60
Fuel / Energy charges Hour 6.00 221.10 1326.60
3 Pug cutting machine Hour 235.00 6.10 1433.50
Fuel / Energy charges Hour 235.00 4.30 1010.50
4 Mobile derric crane Hour 100.00 448.00 44800.00
Fuel / Energy charges Hour 100.00 414.40 41440.00
5 Grinding machine Hour 32.00 19.20 614.40
Fuel / Energy charges Hour 32.00 42.50 1360.00
6 Drilling machines Hour 16.00 19.20 307.20
Fuel / Energy charges Hour 16.00 42.50 680.00
7 Sundries LS 500.00 32.00 16000.00
Total hire charges of Machinery Rs: 206607.00
280
Gates and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 100.00 215.50 21550.00
2 Crew for Tower crane Hour 6.00 229.80 1378.80
3 Crew for Drilling machine Hour 16.00 236.00 3776.00
4 Crew for Grinding machine Hour 32.00 236.00 7552.00
5 Foreman Day 74.00 605.00 44770.00
6 Marker / Fabricator / Erector Day 124.00 655.00 81220.00
7 Gas cutter Day 48.00 540.00 25920.00
8 Welder ( General ) Day 112.00 540.00 60480.00
9 Khalasi Day 20.00 540.00 10800.00
10 Helper fabrication / erection Day 350.00 500.00 175000.00
11 Electrician Day 10.00 610.00 6100.00
Total cost of Labour Rs: 438546.80
Add towards highly skilled labour charges @ 30% on total cost of labour 131564.04
Total Cost of Labour 570110.84
ABSTRACT:
A. Cost of Materials Rs: 4098130.20
B. Hire charges of Machinery Rs: 206607.00
C. Cost of Labour Rs: 570110.84
Total Rs: 4874848.04
D. Add for excise duty 0.00% Rs: 0.00
(on 75 percent cost excluding cost of materials) Total Rs: 4874848.04
E. Add for transportation upto work site @ 3% Rs: 146245.44
Total Rs: 5021093.48
F. Add for contractor's profit and overheads on
(A+B+C+D+E) 13.615% Rs: 683621.88
Add 2 leads
Add 1 km lead charges for fabricated parts Rs. 18.30 per tonne 1129.33
Unloading charges of fabricated parts Rs 86.30 per tonne 5325.746
Total cost for 30.856 tonne Rs: 5711170.43
25.000 t capacity Rs:
Rate per tonne Rs: 185091.10
Rate per tonne capacity Rs: 228446.80
281
Gates and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 193.00 14.20 2740.60
Fuel / Energy charges Hour 121.00 102.10 12354.10
2 Mobile derric crane Hour 4.00 448.00 1792.00
Fuel / Energy charges Hour 4.00 414.40 1657.60
3 Grinding machine Hour 8.00 19.20 153.60
Fuel / Energy charges Hour 8.00 42.50 340.00
4 Drilling machines Hour 50.00 19.20 960.00
Fuel / Energy charges Hour 50.00 42.50 2125.00
5 Sundries LS 10.00 32.00 320.00
Total hire charges of Machinery Rs: 22442.90
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 4.00 215.50 862.00
2 Crew for Drilling machine Hour 50.00 236.00 11800.00
3 Crew for Grinding machine Hour 8.00 236.00 1888.00
4 Foreman Day 8.00 605.00 4840.00
5 Marker / Fabricator / Erector Day 32.00 655.00 20960.00
6 Gas cutter Day 17.00 540.00 9180.00
7 Welder ( General ) Day 18.00 540.00 9720.00
8 Helper fabrication / erection Day 52.00 500.00 26000.00
9 Electrician Day 1.00 610.00 610.00
Total cost of Labour Rs: 85860.00
Add towards highly skilled labour charges @ 30% on total cost of labour 25758.00
Total Cost of Labour 111618.00
ABSTRACT:
A. Cost of Materials Rs: 1161751.77
B. Hire charges of Machinery Rs: 22442.90
C. Cost of Labour Rs: 111618.00
Total Rs: 1295812.67
D. Add for excise duty 0.00% Rs: 0.00
(on 75 percent cost excluding cost of materials) Total Rs: 1295812.67
E. Add for transportation upto work site @ 3% Rs: 38874.38
Total Rs: 1334687.05
F. Add for contractor's profit and overheads on
(A+B+C+D+E) 13.615% Rs: 181717.64
Add 2 leads
Add 1 km lead charges for fabricated parts Rs. 18.30 per tonne 758.426
Unloading charges of fabricated parts Rs 86.30 per tonne 3576.618
Total cost for 200.000 Rm Rs: 1520739.74
Rate per Rm Rs: 7603.70
282
Gates and Allied Works - Item Unit Rates 2020-21
DATA: RATE ANALYSIS UNIT : 10.000 tonne
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel
Plates / flats kg 7103.00 43.00 305429.00
Beams/Channels kg 2727.00 41.50 113170.50
2 Alloy steel components
Wheel axles / Pins kg 108.00 415.00 44820.00
3 Cast steel components
Wheels / Guide rollers kg 504.00 182.00 91728.00
Alluminium / Bronze alloy
4 components
Bearings kg 12.00 905.00 10860.00
5 Bolt / Nut / Washer
GI bolts / nuts / washers kg 36.00 98.00 3528.00
MS bolts / nuts / washers kg 6.00 77.00 462.00
6 Rubber seals
Bottom seal ( flat uncladed ) Rm 3.72 644.00 2395.68
Side seals ( bulb teflon claded ) Rm 12.30 1375.00 16912.50
Top seal ( bulb teflon claded ) Rm 3.72 1375.00 5115.00
Corner seals ( bulb teflon claded ) Nos 2.00 1365.00 2730.00
7 Oxygen gas cum 170.00 41.00 6970.00
8 Acetyline gas cum 56.00 336.00 18816.00
9 Welding electrodes Nos 3200.00 13.00 41600.00
10 Welding electrodes ( LH ) Nos 800.00 16.00 12800.00
11 Use rate welding holder set Hour 500.00 7.44 3717.50
12 Use rate gas cutting torch set Hour 40.00 21.97 878.67
13 Sundries LS 60.00 32.00 1920.00
Total cost of Materials Rs: 683852.85
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 500.00 14.20 7100.00
Fuel / Energy charges Hour 500.00 102.10 51050.00
2 Pug cutting machine Hour 85.00 6.10 518.50
Fuel / Energy charges Hour 85.00 4.30 365.50
3 Tower crane Hour 10.00 711.10 7111.00
Fuel / Energy charges Hour 10.00 221.10 2211.00
4 Mobile crane 16 T Hour 30.00 1935.40 58062.00
Fuel / Energy charges Hour 30.00 1438.90 43167.00
5 Stationery derric crane Hour 20.00 71.20 1424.00
Fuel / Energy charges Hour 20.00 0.00 0.00
6 Grinding machine Hour 10.00 19.20 192.00
Fuel / Energy charges Hour 10.00 42.50 425.00
7 Drilling machines Hour 30.00 19.20 576.00
Fuel / Energy charges Hour 30.00 42.50 1275.00
8 Bending machine Hour 10.00 36.20 362.00
Fuel / Energy charges Hour 10.00 127.60 1276.00
9 Sundries LS 50.00 32.00 1600.00
Total hire charges of Machinery Rs: 176715.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane 16 T Hour 30.00 650.20 19506.00
2 Crew for Tower crane Hour 10.00 229.80 2298.00
3 Crew for Drilling machine Hour 30.00 236.00 7080.00
4 Crew for Grinding machine Hour 10.00 236.00 2360.00
5 Crew for Bending machine Hour 10.00 162.20 1622.00
6 Foreman Day 16.00 605.00 9680.00
7 Marker / Fabricator / Erector Day 50.00 655.00 32750.00
8 Gas cutter Day 8.00 540.00 4320.00
9 Welder ( General ) Day 52.00 540.00 28080.00
10 Welder ( X - ray grade ) Day 14.00 605.00 8470.00
11 Khalasi Day 170.00 540.00 91800.00
12 Helper fabrication / erection Day 230.00 500.00 115000.00
13 Electrician Day 4.00 610.00 2440.00
Total cost of Labour Rs: 325406.00
283
Gates and Allied Works - Item Unit Rates 2020-21
Add towards highly skilled labour charges @ 30% on total cost of labour 97621.80
Total Cost of Labour 423027.80
labour component/unit qty 42302.80
Add contractor's profit and overhead charges 13.615% 5759.50
labour component/unit qty (including contractor's profit) 48062.30
ABSTRACT:
A. Cost of Materials Rs: 683852.85
B. Hire charges of Machinery Rs: 176715.00
C. Cost of Labour Rs: 423027.80
Total Rs: 1283595.65
D. Add for excise duty 0.00% Rs: 0.00
(on 75 percent cost excluding cost of materials) Total Rs: 1283595.65
E. Add for transportation upto work site @ 3% Rs: 38507.87
Total Rs: 1322103.52
F. Add for contractor's profit and overheads on
(A+B+C+D+E) 13.615% Rs: 180004.39
Add 2 leads
Add 1 km lead charges for fabricated parts Rs. 18.30 per tonne 366
Unloading charges of fabricated parts Rs 86.30 per tonne 1726
Total cost for 10.000 tonne Rs: 1504199.91
Rate per tonne Rs: 150420.00
VERTICAL LIFT GATES-ROPE DRUM HOIST UPTO 30 TON CAP. POWER OPERATED
IRR-GAW-2-7 Design, fabrication, supply, erection, testing and commissioning of adequate capacity rope
drum hoist consisting of hoist platform, rope drum, gear system, electric motor, electro-
magnetic brake system, hand operation assembly, control panel, wire rope, pulleys, ladder etc.,
with all accessories for operating river sluice / canal sluice service gate including cost of
all materials, machinery, labour, , complete as per specifications and drawings with all leads and lifts
(without painting on sand-blasted or mechanical cleaning surfaces which are added extra
as perscedule of rates under items in this chapter and add as applicable separately)
DATA:
RATE ANALYSIS UNIT : 6.243 tonne wt
A. MATERIALS: 25 t capacity
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel
Angles / beams / channels / bars kg 1487.00 41.50 61710.50
Plates / flats kg 402.00 43.00 17286.00
Chequered plate kg 290.00 59.00 17110.00
2 Cast steel components :
Rope drums 2 Nos / Gears kg 1926.00 219.00 421794.00
Pinions kg 79.00 214.00 16906.00
Pulleys 3 Nos / Couplings 2 Nos kg 306.00 182.00 55692.00
Plummer blocks / Hubs kg 72.00 182.00 13104.00
3 Alloy steel components
Shafts kg 346.00 225.00 77850.00
Pins kg 73.00 415.00 30295.00
4 Bronze alloy components :
Bronze bearings / bush kg 57.00 905.00 51585.00
Wire rope 28 mm dia 6/37
5 construction kg 325.00 187.00 60775.00
6 MS Bolt / Nut / Washer kg 32.00 77.00 2464.00
7 Worm reducers No. 1.00 178900.00 178900.00
8 Electric motor 5 hp No. 1.00 26500.00 26500.00
9 Manual operating system No. 1.00 27100.00 27100.00
10 Gate position indicator No. 1.00 174851.00 174851.00
11 Ele-magnetic brake No. 1.00 28200.00 28200.00
Electric cable / switch / control panel
12 etc LS 1.00 46500.00 46500.00
13 Oxygen gas cum 45.00 41.00 1845.00
14 Acetyline gas cum 15.00 336.00 5040.00
15 Welding electrodes Nos 80.00 13.00 1040.00
16 Welding electrodes ( LH ) Nos 720.00 16.00 11520.00
17 Grease kg 50.00 250.00 12500.00
18 Use rate welding holder set Hour 85.00 7.44 631.98
19 Use rate gas cutting torch set Hour 16.00 21.97 351.47
20 Sundries LS 25.00 32.00 800.00
Total cost of Materials Rs: 1342350.94
284
Gates and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 85.00 14.20 1207.00
Fuel / Energy charges Hour 53.00 102.10 5411.30
2 Tower crane 5 t capacity Hour 2.00 711.10 1422.20
Fuel / Energy charges Hour 2.00 221.10 442.20
3 Pug cutting machine Hour 15.00 6.10 91.50
Fuel / Energy charges Hour 15.00 4.30 64.50
4 Mobile derric crane Hour 10.00 448.00 4480.00
Fuel / Energy charges Hour 10.00 414.40 4144.00
5 Grinding machine Hour 2.00 19.20 38.40
Fuel / Energy charges Hour 2.00 42.50 85.00
6 Drilling machines Hour 2.00 19.20 38.40
Fuel / Energy charges Hour 2.00 42.50 85.00
7 Sundries LS 25.00 32.00 800.00
Total hire charges of Machinery Rs: 18309.50
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 10.00 215.50 2155.00
2 Crew for Tower crane Hour 2.00 229.80 459.60
3 Crew for Drilling machine Hour 2.00 236.00 472.00
4 Crew for Grinding machine Hour 2.00 236.00 472.00
5 Foreman Day 15.00 605.00 9075.00
6 Marker / Fabricator / Erector Day 19.00 655.00 12445.00
7 Gas cutter Day 4.00 540.00 2160.00
8 Welder ( General ) Day 8.00 540.00 4320.00
9 Khalasi Day 4.00 540.00 2160.00
10 Helper fabrication / erection Day 44.00 500.00 22000.00
11 Electrician Day 2.00 610.00 1220.00
Total cost of Labour Rs: 56938.60
Add towards highly skilled labour charges @ 30% on total cost of labour 17081.58
Total Cost of Labour 74020.18
labour component/unit qty 2960.80
Add contractor's profit and overhead charges 13.615% 403.10
labour component/unit qty (including contractor's profit) 3363.90
ABSTRACT:
A. Cost of Materials Rs: 1342350.94
B. Hire charges of Machinery Rs: 18309.50
C. Cost of Labour Rs: 74020.18
Total Rs: 1434680.62
D. Add for excise duty 0.00% Rs: 0.00
(on 75 percent cost excluding cost of materials) Total Rs: 1434680.62
E. Add for transportation upto work site @ 3% Rs: 43040.42
Total Rs: 1477721.04
285
Gates and Allied Works - Item Unit Rates 2020-21
Vent Size: 12 X 6.6 Mtr
DATA: RATE ANALYSIS UNIT : 10.500 tonne
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
Structural steel angles/ beams /
1 channels kg 1494.00 41.50 62001.00
Structural steel plates / flats kg 6564.00 43.00 282252.00
Chequered plate kg 2442.00 59.00 144078.00
2 MS pipe 25 mm dia Rm 60.00 144.00 8640.00
3 Bolt / Nut / Washers kg 18.00 77.00 1386.00
4 Oxygen gas cum 105.00 41.00 4305.00
5 Acetyline gas cum 35.00 336.00 11760.00
6 Welding electrodes Nos 3150.00 13.00 40950.00
7 Use rate welding holder set Hour 394.00 7.44 2929.39
8 Use rate gas cutting torch set Hour 105.00 21.97 2306.50
9 Sundries LS 50.00 32.00 1600.00
Total cost of Materials Rs: 562207.89
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 394.00 14.20 5594.80
Fuel / Energy charges Hour 394.00 102.10 40227.40
2 Pug cutting machine Hour 52.00 6.10 317.20
Fuel / Energy charges Hour 52.00 4.30 223.60
3 Mobile crane 30 T Hour 30.00 2763.70 82911.00
Fuel / Energy charges Hour 30.00 1627.00 48810.00
4 Stationery derric crane Hour 20.00 71.20 1424.00
Fuel / Energy charges Hour 20.00 0.00 0.00
5 Drilling machine Hour 20.00 19.20 384.00
Fuel / Energy charges Hour 20.00 42.50 850.00
6 Grinding machine Hour 20.00 19.20 384.00
Fuel / Energy charges Hour 20.00 42.50 850.00
7 Tower Crane Hour 20.00 711.10 14222.00
Fuel / Energy charges Hour 20.00 221.10 4422.00
8 Sundries LS 50.00 32.00 1600.00
Total hire charges of Machinery Rs: 202220.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane 30 T Hour 30.00 650.20 19506.00
2 Crew for Drilling machine Hour 20.00 236.00 4720.00
3 Crew for Grinding machine Hour 20.00 236.00 4720.00
4 Crew for Tower Crane Hour 20.00 229.80 4596.00
5 Foreman Day 10.00 605.00 6050.00
6 Marker / Fabricator / Erector Day 50.00 655.00 32750.00
7 Gas cutter Day 14.00 540.00 7560.00
8 Welder ( General ) Day 53.00 540.00 28620.00
9 Helper fabrication / erection Day 400.00 500.00 200000.00
10 Electrician Day 6.00 610.00 3660.00
Total cost of Labour Rs: 312182.00
Add towards highly skilled labour charges @ 30% on total cost of labour 93654.60
Total Cost of Labour 405836.60
labour component/unit qty 38651.10
Add contractor's profit and overhead charges 13.615% 5262.30
labour component/unit qty (including contractor's profit) 43913.40
286
Gates and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 562207.89
B. Hire charges of Machinery Rs: 202220.00
C. Cost of Labour Rs: 405836.60
Total Rs: 1170264.49
D. Add for excise duty 0.00% Rs: 0.00
(on 75 percent cost excluding cost of materials) Total Rs: 1170264.49
E. Add for transportation upto work site @ 3% Rs: 35107.93
Total Rs: 1205372.42
F. Add for contractor's profit and overheads on
(A+B+C+D+E) 13.615% Rs: 164111.46
Add 2 leads
Add 1 km lead charges for fabricated parts Rs. 18.30 per tonne 384.3
Unloading charges of fabricated parts Rs 86.30 per tonne 1812.3
Total cost for 10.500 tonne Rs: 1371680.48
Rate per tonne Rs: 130636.20
287
Gates and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 47.00 14.20 667.40
Fuel / Energy charges Hour 47.00 102.10 4798.70
2 Tower crane 5 t capacity Hour 2.00 711.10 1422.20
Fuel / Energy charges Hour 2.00 221.10 442.20
3 Pug cutting machine Hour 9.00 6.10 54.90
Fuel / Energy charges Hour 9.00 4.30 38.70
4 Mobile derric crane Hour 10.00 448.00 4480.00
Fuel / Energy charges Hour 10.00 414.40 4144.00
5 Grinding machine Hour 2.00 19.20 38.40
Fuel / Energy charges Hour 2.00 42.50 85.00
6 Drilling machines Hour 2.00 19.20 38.40
Fuel / Energy charges Hour 2.00 42.50 85.00
7 Sundries LS 25.00 32.00 800.00
Total hire charges of Machinery Rs: 17094.90
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 10.00 215.50 2155.00
2 Crew for Tower crane Hour 2.00 229.80 459.60
3 Crew for Drilling machine Hour 2.00 236.00 472.00
4 Crew for Grinding machine Hour 2.00 236.00 472.00
5 Foreman Day 13.00 605.00 7865.00
6 Marker / Fabricator / Erector Day 17.00 655.00 11135.00
7 Gas cutter Day 3.00 540.00 1620.00
8 Welder ( General ) Day 5.00 540.00 2700.00
9 Khalasi Day 4.00 540.00 2160.00
10 Helper fabrication / erection Day 36.00 500.00 18000.00
11 Electrician Day 2.00 610.00 1220.00
Total cost of Labour Rs: 48258.60
Add towards highly skilled labour charges @ 30% on total cost of labour 14477.58
Total Cost of Labour 62736.18
ABSTRACT:
A. Cost of Materials Rs: 1325522.05
B. Hire charges of Machinery Rs: 17094.90
C. Cost of Labour Rs: 62736.18
Total Rs: 1405353.13
D. Add for excise duty 0.00% Rs: 0.00
(on 75 percent cost excluding cost of materials) Total Rs: 1405353.13
E. Add for transportation upto work site @ 3% Rs: 42160.59
Total Rs: 1447513.72
288
Gates and Allied Works - Item Unit Rates 2020-21
DATA: RATE ANALYSIS UNIT : 0.871 tonne
A. MATERIALS: 3.00 t capacity
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel
Angles / beams / channels / bars kg 402.00 41.50 16683.00
Plates / flats kg 145.00 43.00 6235.00
Chequered plate kg 176.00 59.00 10384.00
2 Cast iron components :
Hoist body / Lock nut / Main nut kg 55.00 219.00 12045.00
3 Alloy steel components
Hoist stem kg 75.00 225.00 16875.00
4 Bronze alloy components :
Thrust bearings kg 4.00 905.00 3620.00
5 MS Bolt / Nut / Washer kg 8.00 77.00 616.00
6 Oxygen gas cum 18.00 41.00 738.00
7 Acetyline gas cum 6.00 336.00 2016.00
8 Welding electrodes Nos 7.00 13.00 91.00
9 Welding electrodes ( LH ) Nos 66.00 16.00 1056.00
10 Grease kg 2.00 250.00 500.00
11 Use rate welding holder set Hour 8.00 7.44 59.48
12 Use rate gas cutting torch set Hour 11.00 21.97 241.63
13 Sundries LS 2.00 32.00 64.00
Total cost of Materials Rs: 71224.11
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 8.00 14.20 113.60
Fuel / Energy charges Hour 5.00 102.10 510.50
2 Grinding machine Hour 2.00 19.20 38.40
Fuel / Energy charges Hour 2.00 42.50 85.00
3 Drilling machines Hour 2.00 19.20 38.40
Fuel / Energy charges Hour 2.00 42.50 85.00
4 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 934.90
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Drilling machine Hour 2.00 236.00 472.00
2 Crew for Grinding machine Hour 2.00 236.00 472.00
3 Foreman Day 4.00 605.00 2420.00
4 Marker / Fabricator / Erector Day 5.00 655.00 3275.00
5 Gas cutter Day 2.00 540.00 1080.00
6 Welder ( General ) Day 1.00 540.00 540.00
7 Helper fabrication / erection Day 9.00 500.00 4500.00
8 Electrician Day 0.50 610.00 305.00
Total cost of Labour Rs: 13064.00
Add towards highly skilled labour charges @ 30% on total cost of labour 3919.20
Total Cost of Labour 16983.20
289
Gates and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 71224.11
B. Hire charges of Machinery Rs: 934.90
C. Cost of Labour Rs: 16983.20
Total Rs: 89142.21
D. Add for excise duty 0.00% Rs: 0.00
(on 75 percent cost excluding cost of materials) Total Rs: 89142.21
E. Add for transportation upto work site @ 3% Rs: 2674.27
Total Rs: 91816.48
F. Add for contractor's profit and overheads on
(A+B+C+D+E) 13.615% Rs: 12500.81
Add 2 leads
Add 1 km lead charges for fabricated parts Rs. 18.30 per tonne 31.878
Unloading charges of fabricated parts Rs 86.30 per tonne 150.334
Total cost for 0.871 tonne Rs: 104499.51
3.000 t capacity Rs:
Rate per tonne Rs: 119976.50
Rate per tonne capacity Rs: 34833.20
MANUAL OPERATED ROPE DRUM HOISTS
IRR-GAW-2-11 Design, fabrication, supply, erection, testing and commissioning of adequate capacity
manually operated rope drum hoist consisting of hoist platform, rope drum, gear system,
brake system, wire rope, ladder etc., with all accessories for operating canal regulator
radial gate including cost of all materials, machinery, labour, welding, finishing, cleaning,
., complete with all leads and lifts
(without painting on sand-blasted or mechanical cleaning surfaces which are added extra
as perscedule of rates under items in this chapter and add as applicable separately)
290
Gates and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 73.00 14.20 1036.60
Fuel / Energy charges Hour 46.00 102.10 4696.60
2 Pug cutting machine Hour 8.00 6.10 48.80
Fuel / Energy charges Hour 8.00 4.30 34.40
3 Mobile derric crane Hour 4.00 448.00 1792.00
Fuel / Energy charges Hour 4.00 414.40 1657.60
4 Stationery derric crane Hour 8.00 71.20 569.60
Fuel / Energy charges Hour 8.00 0.00 0.00
5 Grinding machine Hour 8.00 19.20 153.60
Fuel / Energy charges Hour 8.00 42.50 340.00
6 Drilling machines Hour 16.00 19.20 307.20
Fuel / Energy charges Hour 16.00 42.50 680.00
7 Sundries LS 25.00 32.00 800.00
Total hire charges of Machinery Rs: 12116.40
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 4.00 215.50 862.00
2 Crew for Drilling machine Hour 16.00 236.00 3776.00
3 Crew for Grinding machine Hour 8.00 236.00 1888.00
4 Foreman Day 14.00 605.00 8470.00
5 Marker / Fabricator / Erector Day 20.00 655.00 13100.00
6 Gas cutter Day 6.00 540.00 3240.00
7 Welder ( General ) Day 7.00 540.00 3780.00
8 Helper fabrication / erection Day 44.00 500.00 22000.00
9 Electrician Day 2.00 610.00 1220.00
Total cost of Labour Rs: 58336.00
Add towards highly skilled labour charges @ 30% on total cost of labour 17500.80
Total Cost of Labour 75836.80
ABSTRACT:
A. Cost of Materials Rs: 517150.86
B. Hire charges of Machinery Rs: 12116.40
C. Cost of Labour Rs: 75836.80
Total Rs: 605104.06
D. Add for excise duty 0.00% Rs: 0.00
(on 75 percent cost excluding cost of materials) Total Rs: 605104.06
E. Add for transportation upto work site @ 3% Rs: 18153.12
Total Rs: 623257.18
F. Add for contractor's profit and overheads on
(A+B+C+D+E) 13.615% Rs: 84856.46
Add 2 leads
Add 1 km lead charges for fabricated parts Rs. 18.30 per tonne 102.626
Unloading charges of fabricated parts Rs 86.30 per tonne 483.97
Total cost for 2.804 tonne Rs: 708700.24
10.000 t capacity
Rate per tonne Rs:252746.20
Rate per tonne Rs: 70870.00
capacity of hoist
291
Gates and Allied Works - Item Unit Rates 2020-21
IRR-GAW-2-
12
New Item
2015-16-2 OT SLUICE SHUTTERS Screw Gear Hoist Including Platform for below 5 Tons Capacity (Small Gates)
As per Guidelines of Chief Engineer, Central Designs Organization, Hyderabad Specification drawing for
Krishna Delta System
Fabrication, supply, erection, testing and commissioning of Embedded parts consisting of supporting structure,
platform etc. with all accessories for operating canal escape/ regulator gate with all accessories including cost of all
materials, machinery, labour, cutting, bending, aligning, anchoring, welding, finishing etc. complete
as per Specification and approved drawings
(without painting on mechanical cleaning surfaces which are added extra as per schedule of rates
under items in this chapter and add as applicable separately)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 30.00 14.20 426.00
Fuel / Energy charges Hour 30.00 102.10 3063.00
2 Pug cutting machine Hour 12.00 6.10 73.20
Fuel / Energy charges Hour 12.00 4.30 51.60
3 Drilling machine Hour 8.00 19.20 153.60
Fuel / Energy charges Hour 8.00 42.50 340.00
4 Grinding machine Hour 36.00 19.20 691.20
Fuel / Energy charges Hour 36.00 42.50 1530.00
5 Lathe machine (Screw Rod M/C) Hour 16.00 300.00 4800.00
6 Sundries LS 10.00 32.00 320.00
Total hire charges of Machinery Rs: 11448.60
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Drilling machine Hour 8.00 236.00 1888.00
2 Crew for Grinding machine Hour 36.00 236.00 8496.00
3 Foreman Day 2.00 605.00 1210.00
4 Marker / Fabricator / Erector Day 10.00 655.00 6550.00
5 Gas cutter Day 4.00 540.00 2160.00
6 Welder ( General ) Day 4.00 540.00 2160.00
7 Mazdoors Day 6.00 460.00 2760.00
8 Helper fabrication / erection Day 6.00 500.00 3000.00
Total cost of Labour Rs: 28224.00
labour component/unit qty 28224.00
Add contractor's profit and overhead charges 13.615% 3842.70
labour component/unit qty (including contractor's profit) 32066.70
292
Gates and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 58790.19
B. Hire charges of Machinery Rs: 11448.60
C. Cost of Labour Rs: 28224.00
Total Rs: 98462.79
D. Add for excise duty 0.00% Rs: 0.00
(on 75 percent cost excluding cost of materials) Total Rs: 98462.79
E. Add for transportation upto work site @ 3% Rs: 2953.88
Total Rs: 101416.67
F. Add for contractor's profit and overheads on
(A+B+C+D+E) 13.615% Rs: 13807.88
Add 2 leads
Add 1 km lead charges for fabricated parts Rs. 20.80 per tonne 36.15
Unloading charges of fabricated parts Rs 86.30 per tonne 149.99
Total cost for 0.869 tonne Rs: 115410.69
Rate per tonne Rs: 132808.60
IRR-GAW-2-
13
New Item
2015-16-3 OT SLUICE SHUTTERS EM parts for Below 5 Tons capacity (small gates)
As per Guidelines of Chief Engineer, Central Designs Organization, Hyderabad Specification drawing for
Krishna Delta System
Fabrication, supply, erection, testing and commissioning of Embedded parts consisting of sil beam, slide tracks,
seal seats, Guide plates etc. with all accessories including cost of all materials, machinery, labour, etc.
complete as per specifications and approved drawings.
(without painting on mechanical cleaning surfaces which are added extra as per schedule of rates
under items in this chapter and add as applicable separately)
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 30.00 14.20 426.00
Fuel / Energy charges Hour 30.00 102.10 3063.00
2 Pug cutting machine Hour 20.00 6.10 122.00
Fuel / Energy charges Hour 20.00 4.30 86.00
3 Drilling machine Hour 4.00 19.20 76.80
Fuel / Energy charges Hour 4.00 42.50 170.00
4 Grinding machine Hour 20.00 19.20 384.00
Fuel / Energy charges Hour 20.00 42.50 850.00
5 Sundries LS 3.00 32.00 96.00
Total hire charges of Machinery Rs: 5273.80
293
Gates and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Drilling machine Hour 4.00 236.00 944.00
2 Crew for Grinding machine Hour 20.00 236.00 4720.00
3 Foreman Day 8.00 605.00 4840.00
4 Marker / Fabricator / Erector Day 6.00 655.00 3930.00
5 Gas cutter Day 2.00 540.00 1080.00
6 Welder ( General ) Day 4.00 540.00 2160.00
7 Mazdoors Day 4.00 460.00 1840.00
8 Helper fabrication / erection Day 8.00 500.00 4000.00
Total cost of Labour Rs: 23514.00
labour component/unit qty 23514.00
Add contractor's profit and overhead charges 13.615% 3201.40
labour component/unit qty (including contractor's profit) 26715.40
ABSTRACT:
A. Cost of Materials Rs: 69044.56
B. Hire charges of Machinery Rs: 5273.80
C. Cost of Labour Rs: 23514.00
Total Rs: 97832.36
D. Add for excise duty 0.00% Rs: 0.00
(on 75 percent cost excluding cost of materials) Total Rs: 97832.36
E. Add for transportation upto work site @ 3% Rs: 2934.97
Total Rs: 100767.33
F. Add for contractor's profit and overheads on
(A+B+C+D+E) 13.615% Rs: 13719.47
Add 2 leads
Add 1 km lead charges for fabricated parts Rs. 20.80 per tonne 55.494
Unloading charges of fabricated parts Rs 86.30 per tonne 230.248
Total cost for 1.334 tonne Rs: 114772.54
Rate per tonne Rs: 86036.40
IRR-GAW-2-
14
New Item
2015-16 -4 OT SLUICE SHUTTERS for Below 5 Tons capacity (small gates)
As per Guidelines of Chief Engineer, Central Designs Organization, Hyderabad Specification drawing
for Krishna Delta System
Fabrication, supply, erection, testing and commissioning of Sluice Shutters consisting of skin plate, horizontal
and vertical angles, stiffeners, rubber seals, clamps with all accessories for sluice shutters including cost
of all materials, machinery, labour, seal fixing etc., complete as per specifications and approved drawings
(without painting on mechanical cleaning surfaces which are added extra as per schedule of rates
under items in this chapter and add as applicable separately)
294
Gates and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 14.00 14.20 198.80
Fuel / Energy charges Hour 14.00 102.10 1429.40
2 Pug cutting machine Hour 4.00 6.10 24.40
Fuel / Energy charges Hour 4.00 4.30 17.20
3 Drilling machine Hour 2.00 19.20 38.40
Fuel / Energy charges Hour 2.00 42.50 85.00
4 Grinding machine Hour 4.00 19.20 76.80
Fuel / Energy charges Hour 4.00 42.50 170.00
5 Sundries LS 3.00 32.00 96.00
Total hire charges of Machinery Rs: 2136.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Drilling machine Hour 2.00 236.00 472.00
2 Crew for Grinding machine Hour 4.00 236.00 944.00
3 Foreman Day 2.00 605.00 1210.00
4 Marker / Fabricator / Erector Day 3.00 655.00 1965.00
5 Gas cutter Day 1.00 540.00 540.00
6 Welder ( General ) Day 4.00 540.00 2160.00
7 Mazdoors Day 4.00 460.00 1840.00
8 Helper fabrication / erection Day 6.00 500.00 3000.00
Total cost of Labour Rs: 12131.00
labour component/unit qty 12131.00
Add contractor's profit and overhead charges 13.615% 1651.60
labour component/unit qty (including contractor's profit) 13782.60
ABSTRACT:
A. Cost of Materials Rs: 16070.86
B. Hire charges of Machinery Rs: 2136.00
C. Cost of Labour Rs: 12131.00
Total Rs: 30337.86
D. Add for excise duty 0.00% Rs: 0.00
(on 75 percent cost excluding cost of materials) Total Rs: 30337.86
E. Add for transportation upto work site @ 3% Rs: 910.14
Total Rs: 31248.00
F. Add for contractor's profit and overheads on
(A+B+C+D+E) 13.615% Rs: 4254.41
Add 2 leads
Add 1 km lead charges for fabricated parts Rs. 20.80 per tonne 6.698
Unloading charges of fabricated parts Rs 86.30 per tonne 27.788
Total cost for 0.161 tonne Rs: 35536.90
Rate per tonne Rs: 220726.10
IRR-GAW-3-1 Cleaning gates / hoists / embedded parts/lifting beams etc, to expose fresh metal surface
for painting by sand blasting method as per specifications including cost of all materials, l
abour, machinery, scaffolding, etc., complete with initial lead for sand upto 1 km and all lifts.
295
Gates and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Air compressor 7 cmm diesel Hour 8.00 195.20 1561.60
Fuel / Energy charges Hour 8.00 986.70 7893.60
2 Sand blasting equipment Hour 8.00 102.50 820.00
Fuel / Energy charges Hour 8.00 0.00 0.00
Total hire charges of Machinery 10275.20
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Air compressor Hour 8.00 259.60 2076.80
2 Crew for Sand blasting equipment Hour 8.00 270.40 2163.20
3 mazdoor Day 15.00 460.00 6900.00
Total cost of Labour 11140.00
labour component/unit qty 111.40
Add contractor's profit and overhead charges 13.615% 15.20
labour component/unit qty (including contractor's profit) 126.60
ABSTRACT:
A. Cost of Materials Rs: 20309.30
B. Hire charges of Machinery Rs: 10275.20
C. Cost of Labour Rs: 11140.00
Total Rs: 41724.50
D. Add for excise duty 0.00% Rs: 0.00
(on 75 percent cost excluding cost of materials) Total Rs: 41724.50
E. Add for transportation upto work site @ 3% Rs: 1251.74
Total Rs: 42976.24
F. Add for contractor's profit and overheads on
(A+B+C+D+E) 13.615% Rs: 5851.21
Total cost for 100.00 sqm Rs: 48827.45
Rate per sqm Rs: 488.30
IRR-GAW-3-2 painting of embedded metal parts and all types of gates, stoplogs,etc, on sand blasted
surfaces with one coat of inorganic zinc silicate (airless spray preferred)70+/- 5
and two super coats with a total thickness of 300 microns
(each 150+/- 5) of solventless coaltar epoxy paint each coat 150 microns ( total 300 microns)
cost of all materials, labour, scaffolding etc., complete with all leads and
all lifts
(Upstream surface of gates portion may be painted with solventless coaltar epoxy brown paint
instead of solventless coaltar black. The rate for coaltar epoxy brown shall be adopted in data
for Upstream side painting)
296
Gates and Allied Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew Charges of Air Compressor Day 6.00 259.60 1557.60
2 Painter Class-I Day 20.00 615.00 12300.00
3 Helper Day 20.00 460.00 9200.00
Total cost of Labour Rs: 23057.60
labour component/unit qty 230.60
Add contractor's profit and overhead charges 13.615% 31.40
labour component/unit qty (including contractor's profit) 262.00
ABSTRACT:
A. Cost of Materials Rs: 17458.00
B. Hire charges of Machinery Rs: 7719.00
C. Cost of Labour Rs: 23057.60
Total Rs: 48234.60
D. Add for excise duty 0 Rs: 0.00
(on 75 percent cost excluding cost of materials) Total Rs: 48234.60
E. Add for transportation upto work site @ 0.03 Rs: 1447.04
Total Rs: 49681.64
F. Add for contractor's profit and overheads on
(A+B+C+D+E) 13.615% Rs: 6764.16 6764.16
Total cost for 100.00 sqm Rs: 56445.79
Rate per sqm Rs: 564.50
IRR-GAW-3-3 painting of Lifting beams,cat walks and other similar structures-painting hoist machinery,
on sand blasted surfaces with two coats of zinc phosphate primer (airless spray preferred)
40microns/coat and twocoats of alkyd based micaccous iron oxide paint , 65 microns/coat
cost of all materials, labour, scaffolding etc., complete with all leads and
all lifts
297
Gates and Allied Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 9108.00
B. Hire charges of Machinery Rs: 7719.00
C. Cost of Labour Rs: 17682.60
Total Rs: 34509.60
D. Add for excise duty 0 Rs: 0.00
(on 75 percent cost excluding cost of materials) Total Rs: 34509.60
E. Add for transportation upto work site @ 0.03 Rs: 1035.29
Total Rs: 35544.89
F. Add for contractor's profit and overheads on
(A+B+C+D+E) 13.615% Rs: 4839.44 4839.44
Total cost for 100.00 sqm Rs: 40384.32
Rate per sqm Rs: 403.80
ABSTRACT:
A. Cost of Materials Rs: 12321.00
B. Hire charges of Machinery Rs: 7719.00
C. Cost of Labour Rs: 23057.60
Total Rs: 43097.60
D. Add for excise duty 0 Rs: 0.00
(on 75 percent cost excluding cost of materials) Total Rs: 43097.60
E. Add for transportation upto work site @ 0.03 Rs: 1292.93
Total Rs: 44390.53
F. Add for contractor's profit and overheads on
(A+B+C+D+E) 13.615% Rs: 6043.77 6043.77
Total cost for 100.00 sqm Rs: 50434.30
Rate per sqm Rs: 504.30
298
Gates and Allied Works - Item Unit Rates 2020-21
IRR-GAW-3-5 HOISTS:machineryCOMPONENTS--painting hoist machinery, on sand blasted surfaces with
one coats of zinc phosphate primer (airless spray preferred) 50microns/coat
and three coats of aluminium paint or synthetic enamel , 25 microns/coat
cost of all materials, labour, scaffolding etc., complete with all leads and
all lifts
ABSTRACT:
A. Cost of Materials Rs: 9136.00
B. Hire charges of Machinery Rs: 7719.00
C. Cost of Labour Rs: 23057.60
Total Rs: 39912.60
D. Add for excise duty 0 Rs: 0.00
(on 75 percent cost excluding cost of materials) Total Rs: 39912.60
E. Add for transportation upto work site @ 0.03 Rs: 1197.38
Total Rs: 41109.98
F. Add for contractor's profit and overheads on
(A+B+C+D+E) 13.615% Rs: 5597.12 5597.12
Total cost for 100.00 sqm Rs: 46707.10
Rate per sqm Rs: 467.10
299
Gates and Allied Works - Item Unit Rates 2020-21
DATA: RATE ANALYSIS UNIT : 100.000 Sq.m
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Rust cleaner / inhibitor ltr 13 124 1612.00
2 Protective Mastic ltr 25 424 10600.00
3 Thinner@10% ltr 2.5 85.00 212.50
4 Solventless Coal tar epoxy paint ltr 40.00 261.00 10440.00
5 Thinner@10% ltr 4 85.00 340.00
6 Wire brush Nos 2 39.00 78.00
7 Sundries LS 3.00 32.00 96.00
Total cost of Materials Rs: 23378.50
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Hire Charges of Airless Spray Gun Hr 6.00 104.60 627.60
Hire Charges of Air Compressor-7
2 Cmm (diesel) Hr 6.00 195.20 1171.20
3 Fuel Charges of Air Compressor Hr 6.00 986.70 5920.20
Total cost of Machinery 7719.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew Charges of Air Compressor Day 6.00 259.60 1557.60
2 Painter Class-I Day 20.00 615.00 12300.00
3 Helper Day 20.00 460.00 9200.00
Total cost of Labour Rs: 23057.60
labour component/unit qty 230.60
Add contractor's profit and overhead charges 13.615% 31.40
labour component/unit qty (including contractor's profit) 262.00
ABSTRACT:
A. Cost of Materials Rs: 23378.50
B. Hire charges of Machinery Rs: 7719.00
C. Cost of Labour Rs: 23057.60
Total Rs: 54155.10
D. Add for excise duty 0.00% Rs: 0.00
(on 75 percent cost excluding cost of materials) Total Rs: 54155.10
E. Add for transportation upto work site @ 3% Rs: 1624.65
Total Rs: 55779.75
F. Add for contractor's profit and overheads on
(A+B+C+D+E) 13.615% Rs: 7594.41
Total cost for 100.00 sqm Rs: 63374.17
Rate per sq.meter Rs: 633.70
Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners
and removing dust. After cleaning,applying primary coat with two coats of Zinc chromite red oxide primer ,
followed by finishing coats 3 coats with synthetic enamel paint with material, labour,and all accessories
with all leads and lifts where surface cleaning by sand blasting is not feasible and based on specific
recommendations of designers, it is to adopt surface preperation done manually by hand and power tool
after cleaning by chemical treatment to remove grease, rust, scaling etc., and to form phasphate coating
to prevent further rusting, before applying primer painting.
300
Gates and Allied Works - Item Unit Rates 2020-21
DATA: RATE ANALYSIS UNIT : 100.000 Sq.m
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Rust cleaner / inhibitor ltr 13 124 1612.00
2 Zinc Chromite Red Oxide Primer ltr 28 162 4536.00
3 Thinner@10% ltr 2.8 85.00 238.00
4 Synthetic enamel Paint ltr 17.00 228.00 3876.00
5 Thinner@10% ltr 1.7 85.00 144.50
6 Wire brush Nos 2 39.00 78.00
7 Sundries LS 3.00 32.00 96.00
Total cost of Materials 10580.50
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Hire Charges of Airless Spray Gun Hr 6.00 104.60 627.60
Hire Charges of Air Compressor-7
2 Cmm (diesel) Hr 6.00 195.20 1171.20
3 Fuel Charges of Air Compressor Hr 6.00 986.70 5920.20
Total cost of Machinery 7719.00
C. LABOUR
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew Charges of Air Compressor Day 6.00 259.60 1557.60
2 Painter Class-I Day 20.00 615.00 12300.00
3 Helper Day 20.00 460.00 9200.00
Total cost of Labour 23057.60
labour component/unit qty 230.60
Add contractor's profit and overhead charges 13.615% 31.40
labour component/unit qty (including contractor's profit) 262.00
ABSTRACT:
A. Cost of Materials Rs. 10580.50
B. Hire charges of Machinery Rs. 7719.00
C. Cost of Labour Rs. 23057.60
Total Rs: 41357.10
D. Add for excise duty 0.00% Rs: 0.00
(on 75 percent cost excluding cost of materials) Total Rs: 41357.10
E. Add for transportation upto work site @ 3% Rs: 1240.71
Total Rs: 42597.81
F. Add for contractor's profit and overheads on
(A+B+C+D+E) 13.615% Rs: 5799.69
Total cost for 100.00 sqm Rs: 48397.51
Rate per sq.meter 484.00
301
Gates and Allied Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Hire Charges of Airless Spray Gun Hr 6.00 104.60 627.60
Hire Charges of Air Compressor-7
2 Cmm (diesel) Hr 6.00 195.20 1171.20
3 Fuel Charges of Air Compressor Hr 6.00 986.70 5920.20
Total cost of Machinery Rs: 7719.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew Charges of Air Compressor Day 6.00 259.60 1557.60
2 Painter Class-I Day 13.00 615.00 7995.00
3 Helper Day 13.00 460.00 5980.00
Total cost of Labour Rs: 15532.60
labour component/unit qty 155.30
Add contractor's profit and overhead charges 13.615% 21.10
labour component/unit qty (including contractor's profit) 176.40
ABSTRACT:
A. Cost of Materials Rs: 20917.00
B. Hire charges of Machinery Rs: 7719.00
C. Cost of Labour Rs: 15532.60
Total Rs: 44168.60
D. Add for excise duty 0.00% Rs: 0.00
(on 75 percent cost excluding cost of materials) Total Rs: 44168.60
E. Add for transportation upto work site @ 3% Rs: 1325.06
Total Rs: 45493.66
F. Add for contractor's profit and overheads on
(A+B+C+D+E) 13.615% Rs: 6193.96
Total cost for 100.00 sqm Rs: 51687.62
Rate per sq.meter Rs: 516.90
302
Preliminary and Maintenance Works - Item Unit Rates 2020-21
CHAPTER-VI
3. The Leads for Steel shall be from the nearest market place to the Project area
4. For earth/rockfill embankments wherever initial lead of 1km is considered in the basic rate, the additional lead
charges are to be added as follows:
Additional lead charges for Earth, Murrum etc., shall be worked out for total lead involved and 1 km lead charges included
in basic rate shall be deducted from total lead charges. No loading and unloading charges shall be allowed for any item.
(same as above)
Example:
Total lead for earth from approved borrow area : 15 Km
Initial lead included in the basic rate in the basic item rate in the data (i.e., item specification) : 1 Km
Additional lead charges : Lead charges for 5 km Rs. 81.10
Lead charges for next 10 km Rs. 122
Total lead charges for 15 km /cum Rs. 203.10
Less 1 km initial lead charges /cum Rs. 30.40 (-)
Net additional lead charges / cum Rs. 172.70
5. The initial lead up to 50 m as mentioned in some standard data items is meant for manual lead within the working area.
For conveyance of materials, the lead required from quarry/Borrow area/ Dump Area to worksite shall be added to the
data without deducting the 50 m initial lead charges
IRR-PMW-1-1 Clearing thin jungle growth ( more than 50 percent open space ) including bushes
upto 30 cm / parthenium and other weeds including burning or disposing off the same
as directed etc., complete.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 0.50 600.00 300.00
2 mazdoor Day 3.00 460.00 1380.00
Total cost of Labour Rs: 1680.00
labour component/unit qty 1.70
Add contractor's profit and overhead charges 13.615% 0.20
labour component/unit qty (including contractor's profit) 1.90
303
Preliminary and Maintenance Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 1680.00
Total Rs: 1680.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 228.732
Total cost for 1000.00 sqm Rs: 1908.73
Rate per sqm (A+B+C+D)/1000.0 Rs. 1.90
IRR-PMW-1-2 Clearing thick jungle growth ( less than 50 percent open space ) including bushes
upto 30 cm / parthenium and other weeds including burning or disposing off the same as
directed etc., complete.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 0.50 600.00 300.00
2 mazdoor Day 5.00 460.00 2300.00
Total cost of Labour Rs: 2600.00
labour component/unit qty 2.60
Add contractor's profit and overhead charges 13.615% 0.40
labour component/unit qty (including contractor's profit) 3.00
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 2600.00
Total Rs: 2600.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 353.99
Total cost for 1000.00 sqm Rs: 2953.99
Rate per sqm (A+B+C+D)/1000.0 Rs. 3.00
IRR-PMW-1-3 Removing stumps, tree roots, roots of bamboo clusters etc., upto 1.50 m girth
including excavation, stacking the materials neatly and levelling the surface etc., complete with
initial lead upto 50 m and all lifts.
DATA:
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total cost of Materials Rs: 0.00
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 0.25 600.00 150.00
2 mazdoor Day 2.00 460.00 920.00
Total cost of Labour Rs: 1070.00
labour component/unit qty 59.40
Add contractor's profit and overhead charges 13.615% 8.10
labour component/unit qty (including contractor's profit) 67.50
304
Preliminary and Maintenance Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 1070.00
Total Rs: 1070.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 145.6805
Total cost for 18.00 Nos. Rs: 1215.68
Rate per each (A+B+C+D)/18.0 Rs. 67.50
IRR-PMW-1-4 Removing stumps, tree roots, roots of bamboo cluster etc., with girth above 1.50 m
and upto 3.0 m including excavation, stacking the materials neatly and levelling the area etc.,
complete with initial lead upto 50 m and all lifts.
DATA:
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total cost of Materials Rs: 0.00
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 0.25 600.00 150.00
2 mazdoor Day 2.00 460.00 920.00
Total cost of Labour Rs: 1070.00
labour component/unit qty 133.75
Add contractor's profit and overhead charges 13.615% 18.21
labour component/unit qty (including contractor's profit) 152.00
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 1070.00
Total Rs: 1070.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 145.6805
Total cost for 8.00 Nos. Rs: 1215.70
Rate per each (A+B+C+D)/8.0 Rs. 152.00
IRR-PMW-1-5 Removing stumps, tree roots, roots of bamboo cluster etc., with girth
above 3.0 m and upto 5.0 m including excavation, stacking the materials neatly and levelling
the area etc., complete with initial lead upto 50 m and all lifts.
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total cost of Materials Rs: 0.00
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 0.50 600.00 300.00
2 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 2140.00
labour component/unit qty 428.00
Add contractor's profit and overhead charges 13.615% 58.30
labour component/unit qty (including contractor's profit) 486.30
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 2140.00
Total Rs: 2140.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 291.361
Total cost for 5.00 Nos. Rs: 2431.36
Rate per each (A+B+C+D)/5.0 Rs. 486.30
305
Preliminary and Maintenance Works - Item Unit Rates 2020-21
IRR-PMW-1-6 Additional rate for every 0.5 m increase in girth of tree stump / stumps of bamboo cluster
beyond 5 m.
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total cost of Materials Rs: 0.00
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 0.22 600.00 132.00
2 mazdoor Day 0.88 460.00 402.50
Total cost of Labour Rs: 534.50
labour component/unit qty 76.40
Add contractor's profit and overhead charges 13.615% 10.40
labour component/unit qty (including contractor's profit) 86.80
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 534.50
Total Rs: 534.50
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 72.772175
Total cost for 7.00 Nos. Rs: 607.27
Rate per each (A+B+C+D)/7.0 Rs. 86.80
IRR-PMW-1-7 Cutting and stacking bamboos excluding removing stumps and roots etc., complete with
initial lead upto 50 m and all lifts.
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total cost of Materials Rs: 0.00
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 0.50 600.00 300.00
2 mazdoor Day 5.00 460.00 2300.00
Total cost of Labour Rs: 2600.00
labour component/unit qty 17.33
Add contractor's profit and overhead charges 13.615% 2.36
labour component/unit qty (including contractor's profit) 19.70
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 2600.00
Total Rs: 2600.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 353.99
Total cost for 150.00 Nos. Rs: 2953.99
Rate per each (A+B+C+D)/150.0 Rs. 19.70
IRR-PMW-1-8 Cutting and removing jauliflora bushes upto 1.5 m girth excluding removal of stumps and
including burning or disposing off the materials as directed with initial lead upto 50 m and all
lifts.
306
Preliminary and Maintenance Works - Item Unit Rates 2020-21
DATA: RATE ANALYSIS UNIT : 100 Nos.
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total cost of Materials Rs: 0.00
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 0.50 600.00 300.00
2 mazdoor Day 3.00 460.00 1380.00
Total cost of Labour Rs: 1680.00
labour component/unit qty 16.80
Add contractor's profit and overhead charges 13.615% 2.30
labour component/unit qty (including contractor's profit) 19.10
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 1680.00
Total Rs: 1680.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 228.732
Total cost for 100.00 Nos Rs: 1908.73
Rate per each (A+B+C+D)/100.0 Rs. 19.10
IRR-PMW-1-9 Cutting and removing jauliflora bushes above 1.5 m upto 3.0 m girth excluding
removal of stumps and including burning or disposing off the materials as directed
with initial lead upto 50 m and all lifts.
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total cost of Materials Rs: 0.00
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 0.50 600.00 300.00
2 mazdoor Day 3.00 460.00 1380.00
Total cost of Labour Rs: 1680.00
labour component/unit qty 33.60
Add contractor's profit and overhead charges 13.615% 4.60
labour component/unit qty (including contractor's profit) 38.20
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 1680.00
Total Rs: 1680.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 228.732
Total cost for 50.00 Nos Rs: 1908.73
Rate per each (A+B+C+D)/50.0 Rs. 38.20
IRR-PMW-1-10 Cutting trees above 0.3 m and upto 0.6 m girth excluding removal of stumps and including
stacking the materials neatly as directed with initial lead upto 50 m and all lifts.
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Use rate of ropes etc LS 0.25 160.00 40.00
0.00 0.00 0.00
Total cost of Materials Rs: 40.00
307
Preliminary and Maintenance Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 0.25 600.00 150.00
2 mazdoor Day 3.00 460.00 1380.00
Total cost of Labour Rs: 1530.00
labour component/unit qty 109.30
Add contractor's profit and overhead charges 13.615% 14.90
labour component/unit qty (including contractor's profit) 124.20
ABSTRACT:
A. Cost of Materials Rs: 40.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 1530.00
Total Rs: 1570.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 213.7555
Total cost for 14.00 Nos. Rs: 1783.76
Rate per each (A+B+C+D)/14.0 Rs. 127.40
IRR-PMW-1-11 Cutting trees above 0.6 m and upto 1.2 m girth excluding removal of stumps and including
stacking the materials neatly as directed with initial lead upto 50 m and all lifts.
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Use rate of ropes etc LS 0.25 160.00 40.00
0.00 0.00 0.00
Total cost of Materials Rs: 40.00
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 0.25 600.00 150.00
2 mazdoor Day 3.00 460.00 1380.00
Total cost of Labour Rs: 1530.00
labour component/unit qty 382.50
Add contractor's profit and overhead charges 13.615% 52.10
labour component/unit qty (including contractor's profit) 434.60
ABSTRACT:
A. Cost of Materials Rs: 40.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 1530.00
Total Rs: 1570.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 213.7555
Total cost for 4.00 Nos. Rs: 1783.76
Rate per each (A+B+C+D)/4.0 Rs. 445.90
IRR-PMW-1-12 Cutting trees above 1.2 m and upto 1.8 m girth excluding removal of stumps and including
stacking the materials neatly as directed with initial lead upto 50 m and all lifts.
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Use rate of ropes etc LS 0.25 160.00 40.00
0.00 0.00 0.00
Total cost of Materials Rs: 40.00
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
308
Preliminary and Maintenance Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 0.25 600.00 150.00
2 mazdoor Day 3.00 460.00 1380.00
Total cost of Labour Rs: 1530.00
labour component/unit qty 765.00
Add contractor's profit and overhead charges 13.615% 104.20
labour component/unit qty (including contractor's profit) 869.20
ABSTRACT:
A. Cost of Materials Rs: 40.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 1530.00
Total Rs: 1570.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 213.7555
Total cost for 2.00 Nos. Rs: 1783.76
Rate per each (A+B+C+D)/2.0 Rs. 891.90
IRR-PMW-1-13 Cutting trees above 1.8 m and upto 2.4 m girth excluding removal of stumps and including
stacking the materials neatly as directed with initial lead upto 50 m and all lifts.
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Use rate of ropes etc LS 0.25 160.00 40.00
0.00 0.00 0.00
Total cost of Materials Rs: 40.00
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 0.25 600.00 150.00
2 mazdoor Day 3.00 460.00 1380.00
Total cost of Labour Rs: 1530.00
labour component/unit qty 1530.00
Add contractor's profit and overhead charges 13.615% 208.30
labour component/unit qty (including contractor's profit) 1738.30
ABSTRACT:
A. Cost of Materials Rs: 40.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 1530.00
Total Rs: 1570.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 213.7555
Total cost for 1.00 No. Rs: 1783.76
Rate per each (A+B+C+D)/1.0 Rs. 1783.80
IRR-PMW-1-14 Cutting trees above 2.4 m and upto 3.0 m girth excluding removal of stumps and including
stacking the materials neatly as directed with initial lead upto 50 m and all lifts.
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Use rate of ropes etc LS 0.50 160.00 80.00
0.00 0.00 0.00
Total cost of Materials Rs: 80.00
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 0.25 600.00 150.00
2 mazdoor Day 5.00 460.00 2300.00
Total cost of Labour Rs: 2450.00
309
Preliminary and Maintenance Works - Item Unit Rates 2020-21
labour component/unit qty 2450.00
Add contractor's profit and overhead charges 13.615% 333.60
labour component/unit qty (including contractor's profit) 2783.60
ABSTRACT:
A. Cost of Materials Rs: 80.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 2450.00
Total Rs: 2530.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 344.4595
Total cost for 1.00 Nos. Rs: 2874.46
Rate per each (A+B+C+D)/1.0 Rs. 2874.50
IRR-PMW-1-15 Additional rate for cutting tree for every 0.5 m increase in girth of tree beyond 3 m.
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Use rate of ropes etc LS 0.15 160.00 24.00
0.00 0.00 0.00
Total cost of Materials Rs: 24.00
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 0.10 600.00 60.00
2 mazdoor Day 1.75 460.00 805.00
Total cost of Labour Rs: 865.00
labour component/unit qty 865.00
Add contractor's profit and overhead charges 13.615% 117.80
labour component/unit qty (including contractor's profit) 982.80
ABSTRACT:
A. Cost of Materials Rs: 24.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 865.00
Total Rs: 889.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 121.03735
Total cost for 1.00 No Rs: 1010.04
Rate per each (A+B+C+D)/1.0 Rs. 1010.00
IRR-PMW-1-16 Cutting and burning or disposing off Apu / Jondu from marshy areas as directed with
initial lead upto 50 m and all lifts.
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total cost of Materials Rs: 0.00
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 mazdoor Day 12.00 460.00 5520.00
Total cost of Labour Rs: 6120.00
labour component/unit qty 6.10
Add contractor's profit and overhead charges 13.615% 0.80
labour component/unit qty (including contractor's profit) 6.90
310
Preliminary and Maintenance Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 6120.00
Total Rs: 6120.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 833.238
Total cost for 1000.00 sqm Rs: 6953.24
Rate per sqm (A+B+C+D)/1000.0 Rs. 7.00
IRR-PMW-2-1 Earthwork excavation for trial pits / borrow pits and other investigation works in all kinds of
soil including boulders upto 30 cm dia and disposing off excavated soil as directed with lead
upto 10 m and lift upto 3 m.
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total cost of Materials Rs: 0.00
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 0.50 600.00 300.00
2 mazdoor Day 6.00 460.00 2760.00
Total cost of Labour Rs: 3060.00
labour component/unit qty 306.00
Add contractor's profit and overhead charges 13.615% 41.66
labour component/unit qty (including contractor's profit) 347.70
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 3060.00
Total Rs: 3060.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 416.619
Total cost for 10.00 cum Rs: 3476.62
Rate per cum (A+B+C+D)/100.0 Rs. 347.70
IRR-PMW-2-2 Earthwork excavation for trial pits / borrow pits and other investigation works in soft
rock including disposing off the excavated rock as directed with lead upto 10 m and lift
upto 3 m.
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total cost of Materials Rs: 0.00
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 0.50 600.00 300.00
2 Crowbarman Day 1.00 500.00 500.00
3 mazdoor Day 7.50 460.00 3450.00
Total cost of Labour Rs: 4250.00
labour component/unit qty 425.00
Add contractor's profit and overhead charges 13.615% 57.90
labour component/unit qty (including contractor's profit) 482.90
311
Preliminary and Maintenance Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 4250.00
Total Rs: 4250.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 578.6375
Total cost for 10.00 cum Rs: 4828.64
Rate per cum (A+B+C+D)/10.0 Rs. 482.90
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Electric resistivity meter Hour 8.00 90.80 726.40
Battery / charging cost etc @ 20% 145.28
Total hire charges of Machinery Rs: 871.68
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Geophysist / Geologist Day 2.00 1100.00 2200.00
2 Graduate Engineer Day 1.00 1100.00 1100.00
3 Lab Assistant Day 1.00 625.00 625.00
4 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 5765.00
labour component/unit qty 288.30
Add contractor's profit and overhead charges 13.615% 39.30
labour component/unit qty (including contractor's profit) 327.60
ABSTRACT:
A. Cost of Materials Rs: 160.00
B. Hire charges of Machinery Rs: 871.68
C. Cost of Labour Rs: 5765.00
Total Rs: 6796.68
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 925.367982
Total cost for 20.00 Stages Rs: 7722.05
Rate per stage (A+B+C+D)/20.0 Rs. 386.10
IRR-PMW-2-4 Drilling 80 mm dia hole through over-burden using casing shoe bit vertical or inclined
upto 10 degrees to vertical as directed including cost of all materials, machinery, labour, water
charges, reaming, collection of wash samples at suitable intervals, logging and lebelling,
supplying honne wood core box, fixing casing pipes ( excluding cost of casing pipes ) etc.,
complete for depth upto 30 m from surface.
Note: 1. For drilling through over-burden beyond 30 m from surface increase the basic rate per
Rm by 10 percent.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Core drilling machine Hour 1.00 267.60 267.60
Fuel / Energy charges Hour 1.00 328.90 328.90
2 5 hp pump ( diesel ) 2 Nos. Hour 2.00 8.50 17.00
Fuel / Energy charges Hour 2.00 109.60 219.20
3 Sundries ( samplers etc ) LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 896.70
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Core drilling machine Hour 1.00 344.80 344.80
2 Crew for Pump Hour 2.00 134.80 269.60
3 mazdoor Day 2.00 460.00 920.00
Total cost of Labour Rs: 1534.40
labour component/unit qty 511.50
Add contractor's profit and overhead charges 13.615% 69.60
labour component/unit qty (including contractor's profit) 581.10
ABSTRACT:
312
Preliminary and Maintenance Works - Item Unit Rates 2020-21
A. Cost of Materials Rs: 1046.36
B. Hire charges of Machinery Rs: 896.70
C. Cost of Labour Rs: 1534.40
Total Rs: 3477.46
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 473.4560202
Total cost for 3.00 Rm Rs: 3950.91
Rate per Rm (A+B+C+D)/3.0 Rs. 1317.00
IRR-PMW-2-5 Drilling 76 mm dia ( NX ) core hole in hard rock using diamond core bit vertical / inclined
upto 10 degree to vertical as directed including cost of all materials, machinery, labour, water
charges, collection of core samples, logging and lebelling, supplying honne wood core box
and redrilling in case of collapse of sides etc., complete for depth upto 30 m from surface.
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Use rate of diamond core bit Rm 3.00 872.00 2616.00
2 Use rate of reamer shell Rm 3.00 87.33 262.00
3 Use rate of double tube core barrel Rm 3.00 232.42 697.25
4 Use rate of extension rod set 16.5 m Rm 3.00 21.78 65.34
5 Use rate of honne core box Rm 3.00 448.59 1345.78
Total cost of Materials Rs: 4986.37
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Core drilling machine Hour 8.00 267.60 2140.80
Fuel / Energy charges Hour 8.00 328.90 2631.20
2 5 hp pump ( diesel ) 2 Nos. Hour 16.00 8.50 136.00
Fuel / Energy charges Hour 16.00 109.60 1753.60
3 Sundries LS 5.00 32.00 160.00
Total hire charges of Machinery Rs: 6821.60
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Core drilling machine Hour 8.00 344.80 2758.40
2 Crew for Pump Hour 16.00 134.80 2156.80
3 mazdoor Day 2.00 460.00 920.00
Total cost of Labour Rs: 5835.20
labour component/unit qty 1945.10
Add contractor's profit and overhead charges 13.615% 264.80
labour component/unit qty (including contractor's profit) 2209.90
ABSTRACT:
A. Cost of Materials Rs: 4986.37
B. Hire charges of Machinery Rs: 6821.60
C. Cost of Labour Rs: 5835.20
Total Rs: 17643.17
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 2402.117766
Total cost for 3.00 Rm Rs: 20045.29
Rate per Rm (A+B+C+D)/3.0 Rs. 6681.80
NOTE: 1. For drilling in hard rock beyond 30 m upto 60 m from surface increase the basic
rate per Rm by 25 percent.
2. For drilling in hard rock beyond 60 m upto 90 m from surface increase the basic
rate per Rm by 40 percent.
IRR-PMW-2-5-A
New Item 2015-16-
5 Drilling 76 mm dia ( NX ) core hole in all types of rocks (other than Hard Rock) including
Masonry/CC (where drilling is not possible by casing shoe) using diamond core bit vertical /
inclined upto 10 degree to vertical as directed including cost of all materials, machinery, labour,
water charges, and redrilling in case of collapse of sides etc., complete for depth upto 30 m from
surface for Primary and Secondary Holes
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Use rate of diamond core bit Rm 3.00 1237.46 3712.39
2 Use rate of reamer shell Rm 3.00 52.40 157.20
4 Use rate of extension rod set 16.5 m Rm 3.00 13.07 39.20
Total cost of Materials Rs: 3908.80
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Core drilling machine Hour 4.78 267.60 1278.06
Fuel / Energy charges Hour 4.78 328.90 1570.83
2 5 hp pump ( diesel ) 2 Nos. Hour 9.55 8.50 81.19
Fuel / Energy charges Hour 9.55 109.60 1046.90
3 Sundries LS 2.99 32.00 95.68
Total hire charges of Machinery Rs: 4072.66
313
Preliminary and Maintenance Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Core drilling machine Hour 4.78 344.80 1646.76
2 Crew for Pump Hour 9.55 134.80 1287.34
3 mazdoor Day 1.19 460.00 547.40
Total cost of Labour Rs: 3481.50
labour component/unit qty 1160.50
Add contractor's profit and overhead charges 13.615% 158.00
labour component/unit qty (including contractor's profit) 1318.50
ABSTRACT:
A. Cost of Materials Rs: 3908.80
B. Hire charges of Machinery Rs: 4072.66
C. Cost of Labour Rs: 3481.50
Total Rs: 11462.96
D. Add for contractor's profit and overheads 13.615% Rs: 1560.681673
Total cost for 3.00 Rm Rs: 13023.64
Rate per Rm (A+B+C+D)/3.0 Rs. 4341.20
NOTE: 1. For drilling in all types of rocks (other than hard rock) including masonry/CC beyond 30 m
upto 60 m from surface increase the basic rate per Rm by 25 percent.
2. For drilling in all types of rocks (other than hard rock) including masonry/CC m from
surface increase the basic beyond 60 m upto 90 rate per Rm by 40 percent.
IRR-PMW-2-5-B
New Item 2015-16-
6 Drilling 76 mm dia ( NX ) core hole in all types of rocks (other than Hard Rock) including
Masonry/CC (where drilling is not possible by casing shoe) using diamond core bit vertical /
inclined upto 10 degree to vertical as directed including cost of all materials, machinery, labour,
water charges, collection of core samples, logging and lebelling, supplying honne wood core box
and redrilling in case of collapse of sides etc., complete for depth upto 30 m from surface
for Test Holes
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Use rate of diamond core bit Rm 3.00 1237.46 3712.39
2 Use rate of reamer shell Rm 3.00 52.40 157.20
3 Use rate of double tube core barrel Rm 3.00 139.45 418.35
4 Use rate of extension rod set 16.5 m Rm 3.00 13.07 39.20
5 Use rate of honne core box Rm 3.00 448.59 1345.78
Total cost of Materials Rs: 5672.93
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Core drilling machine Hour 4.78 267.60 1278.06
Fuel / Energy charges Hour 4.78 328.90 1570.83
2 5 hp pump ( diesel ) 2 Nos. Hour 9.55 8.50 81.19
Fuel / Energy charges Hour 9.55 109.60 1046.90
3 Sundries LS 2.99 32.00 95.68
Total hire charges of Machinery Rs: 4072.66
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Core drilling machine Hour 4.78 344.80 1646.76
2 Crew for Pump Hour 9.55 134.80 1287.61
3 mazdoor Day 1.19 460.00 549.24
Total cost of Labour Rs: 3483.61
labour component/unit qty 1161.20
Add contractor's profit and overhead charges 13.615% 158.10
labour component/unit qty (including contractor's profit) 1319.30
ABSTRACT:
A. Cost of Materials Rs: 5672.93
B. Hire charges of Machinery Rs: 4072.66
C. Cost of Labour Rs: 3483.61
Total Rs: 13229.20
D. Add for contractor's profit and overheads 13.615% Rs: 1801.155364
Total cost for 3.00 Rm Rs: 15030.35
Rate per Rm (A+B+C+D)/3.0 Rs. 5010.10
NOTE: 1. For drilling in all types of rocks (other than hard rock) including masonry/CC beyond 30 m
upto 60 m from surface increase the basic rate per Rm by 25 percent.
2. For drilling in all types of rocks (other than hard rock) including masonry/CC m from
surface increase the basic beyond 60 m upto 90 rate per Rm by 40 percent.
IRR-PMW-2-6 Drilling 47 mm (BX )dia core hole in hard rock using diamond core bit vertical / inclined
upto 10 degree to vertical as directed including cost of all materials, machinery, labour, water
charges,collection of core samples,logging, lebelling, supplying honne wood core box
and redrilling in case of collapse of sides etc., complete for depth upto 30 m from surface.
314
Preliminary and Maintenance Works - Item Unit Rates 2020-21
Data: RATE ANALYSIS UNIT : 3.00 Rm
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Use rate of diamond core bit Rm 3.00 726.33 2179.00
2 Use rate of reamer shell Rm 3.00 87.33 262.00
3 Use rate of double tube core barrel Rm 3.00 232.42 697.25
4 Use rate of extension rod set 16.5 m Rm 3.00 21.78 65.34
5 Use rate of honne core box Rm 3.00 448.59 1345.78
Total cost of Materials Rs: 4549.37
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Core drilling machine Hour 8.00 267.60 2140.80
Fuel / Energy charges Hour 8.00 328.90 2631.20
2 5 hp pump ( diesel ) 2 Nos. Hour 16.00 8.50 136.00
Fuel / Energy charges Hour 16.00 109.60 1753.60
3 Sundries LS 5.00 32.00 160.00
Total hire charges of Machinery Rs: 6821.60
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Core drilling machine Hour 8.00 344.80 2758.40
2 Crew for Pump Hour 16.00 134.80 2156.80
3 mazdoor Day 2.00 460.00 920.00
Total cost of Labour Rs: 5835.20
labour component/unit qty 1945.10
Add contractor's profit and overhead charges 13.615% 264.80
labour component/unit qty (including contractor's profit) 2209.90
ABSTRACT:
A. Cost of Materials Rs: 4549.37
B. Hire charges of Machinery Rs: 6821.60
C. Cost of Labour Rs: 5835.20
Total Rs: 17206.17
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 2342.620216
Total cost for 3.00 Rm Rs: 19548.79
Rate per Rm (A+B+C+D)/3.0 Rs. 6516.30
NOTE: 1. For drilling in hard rock beyond 30 m upto 60 m from surface increase the
basic rate for drilling upto 30 m from surface by 25 percent per Rm.
2. For drilling in hard rock beyond 60 m upto 90 m from surface increase the basic
rate for drilling upto 30 m from surface by 40 percent per Rm.
IRR-PMW-2-6-A
New Item 2015-16-
7 Drilling 47 mm (BX )dia core hole in all types of rocks (other than Hard Rock) including
Masonry/CC (where drilling is not possible by casing shoe) using diamond core bit vertical /
inclined upto 10 degree to vertical as directed including cost of all materials, machinery, labour,
water charges, and redrilling in case of collapse of sides etc., complete for depth upto 30 m
A. MATERIALS:
Sl No particulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Use rate of diamond core bit Rm 3.00 1030.75 3092.24
2 Use rate of reamer shell Rm 3.00 52.40 157.20
4 Use rate of extension rod set 16.5 m Rm 3.00 13.07 39.20
Total cost of Materials Rs: 3288.65
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Core drilling machine Hour 4.78 267.60 1278.06
Fuel / Energy charges Hour 4.78 328.90 1570.83
2 5 hp pump ( diesel ) 2 Nos. Hour 9.55 8.50 81.19
Fuel / Energy charges Hour 9.55 109.60 1046.90
3 Sundries LS 2.99 32.00 95.68
Total hire charges of Machinery Rs: 4072.66
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Core drilling machine Hour 4.78 344.80 1646.76
2 Crew for Pump Hour 9.55 134.80 1287.34
3 mazdoor Day 1.19 460.00 547.40
Total cost of Labour Rs: 3481.50
labour component/unit qty 1160.50
Add contractor's profit and overhead charges 13.615% 158.00
labour component/unit qty (including contractor's profit) 1318.50
315
Preliminary and Maintenance Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 3288.65
B. Hire charges of Machinery Rs: 4072.66
C. Cost of Labour Rs: 3481.50
Total Rs: 10842.81
D. Add for contractor's profit and overheads 13.615% Rs: 1476.248063
Total cost for 3.00 Rm Rs: 12319.05
Rate per Rm (A+B+C+D)/3.0 Rs. 4106.40
NOTE: 1. For drilling in all types of rocks (other than hard rock) including masonry/CC beyond 30 m
upto 60 m from surface increase the basic rate per Rm by 25 percent.
2. For drilling in all types of rocks (other than hard rock) including masonry/CC m from
surface increase the basic beyond 60 m upto 90 rate per Rm by 40 percent.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 Stone chiseller Cl- I Day 1.00 545.00 545.00
3 mazdoor Day 3.00 460.00 1380.00
Total cost of Labour Rs: 2525.00
labour component/unit qty 140.30
Add contractor's profit and overhead charges 13.615% 19.10
labour component/unit qty (including contractor's profit) 159.40
ABSTRACT:
A. Cost of Materials Rs: 637.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 2525.00
Total Rs: 3162.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 430.5063
Total cost for 18.00 Nos. Rs: 3592.51
Rate per each (A+B+C+D)/18.0 Rs. 199.60
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 Stone chiseller Cl- I Day 3.00 545.00 1635.00
3 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 4075.00
labour component/unit qty 407.50
Add contractor's profit and overhead charges 13.615% 55.50
labour component/unit qty (including contractor's profit) 463.00
316
Preliminary and Maintenance Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 1269.95
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 4075.00
Total Rs: 5344.95
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 727.7152148
Total cost for 10.00 Nos. Rs: 6072.67
Rate per each (A+B+C+D)/10.0 Rs. 607.30
NOTE: For providing 30 cm thick compacted murum bed in B.C soil area including
additional excavation for thickness of murum bedding add per
Each Rs: 4.00
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 Stone chiseller Cl- I Day 0.50 545.00 272.50
3 Mason Cl- II Day 1.00 500.00 500.00
4 mazdoor Day 5.00 460.00 2300.00
Total cost of Labour Rs: 3672.50
labour component/unit qty 3672.50
Add contractor's profit and overhead charges 13.615% 500.00
labour component/unit qty (including contractor's profit) 4172.50
ABSTRACT:
A. Cost of Materials Rs: 2524.19
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 3672.50
Total Rs: 6196.69
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 843.6798881
Total cost for 1.00 No. Rs: 7040.37
Rate per each (A+B+C+D)/1.0 Rs. 7040.40
IRR-PMW-3-1 Removing dry stone rock-toe / rivetment and filter layers below rock-toe/ rivetment
including stacking all materials separately as directed with initial lead upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 Mason Cl- II Day 6.00 500.00 3000.00
3 mazdoor Day 48.00 460.00 22080.00
Total cost of Labour Rs: 25680.00
labour component/unit qty 244.60
Add contractor's profit and overhead charges 13.615% 33.30
labour component/unit qty (including contractor's profit) 277.90
ABSTRACT:
317
Preliminary and Maintenance Works - Item Unit Rates 2020-21
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 25680.00
Total Rs: 25680.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 3496.332
Total cost for 105.00 cum Rs: 29176.33
Rate per cum (A+B+C+D)/105.0 Rs. 277.90
IRR-PMW-3-2 Re-constructing 60 cm thick hand packed rough stone revetment with through
stones at 1.5 m c / c over a backing of 45 cm thick graded filter media consisting of sand,
10 mm and 40 mm size graded aggregates satisfying filter criteria laid in layers of 15 cm thick
each using sand from approved quarry and stones and filter aggregates obtained from
revetment removed for re-construction including cost of all machinery, labour, laying filter and
stones to specified slopes, wedging with chips, finishing etc. complete with initial
lead upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 Mason Cl- II Day 5.00 500.00 2500.00
3 mazdoor Day 33.00 460.00 15180.00
Total cost of Labour Rs: 18280.00
labour component/unit qty 182.80
Add contractor's profit and overhead charges 13.615% 24.90
labour component/unit qty (including contractor's profit) 207.70
ABSTRACT:
A. Cost of Materials Rs: 7803.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 18280.00
Total Rs: 26083.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 3551.20045
Total cost for 100.00 sqm Rs: 29634.20
Rate per sqm (A+B+C+D)/100.0 Rs. 296.30
IRR-PMW-3-3 Re-constructing dry rubble rock-toe and filter media for rock-toe consisting of
sand 20 mm and 80 mm size graded aggregates satisfying filter criteria laid in layers of 15 cm
thick each using sand from approved quarry and stones and filter aggregates obtained from
rock-toe removed for re-construction including cost of all machinery, labour, laying filter and
stones to specified slopes, wedging with chips, finishing etc. complete with initial lead upto
50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
318
Preliminary and Maintenance Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 Mason Cl- II Day 7.00 500.00 3500.00
3 mazdoor Day 48.00 460.00 22080.00
Total cost of Labour Rs: 26180.00
labour component/unit qty 261.80
Add contractor's profit and overhead charges 13.615% 35.60
labour component/unit qty (including contractor's profit) 297.40
ABSTRACT:
A. Cost of Materials Rs: 4998.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 26180.00
Total Rs: 31178.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 4244.8847
Total cost for 100.00 cum Rs: 35422.88
Rate per cum (A+B+C+D)/100.0 Rs. 354.20
IRR-PMW-3-4 Removing and resetting disturbed Yarguntla / Shahabad / Talikot / PCC / Other types
of slab lining set in CM 1 : 3 including flush cement mortar pointing in CM 1 : 3 with
lead upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 Mason Class I Day 4.00 550.00 2200.00
3 mazdoor Day 6.00 460.00 2760.00
4 Cartman with Double Bullock cart for water Day 1.00 550.00 550.00
Total cost of Labour Rs: 6110.00
labour component/unit qty 61.10
Add contractor's profit and overhead charges 13.615% 8.30
labour component/unit qty (including contractor's profit) 69.40
ABSTRACT:
A. Cost of Materials Rs: 497.92
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 6110.00
Total Rs: 6607.92
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 899.6685803
Total cost for 100.00 sqm Rs: 7507.59
Rate per sqm (A+B+C+D)/100.0 Rs. 75.10
IRR-PMW-3-5 Removing and resetting disturbed dry rubble / khandki stone pitching 25 to 45 cm
thick including packing, wedging, finishing etc., complete with all leads and lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 Mason Class II Day 6.00 500.00 3000.00
3 mazdoor Day 6.00 460.00 2760.00
Total cost of Labour Rs: 6360.00
319
Preliminary and Maintenance Works - Item Unit Rates 2020-21
labour component/unit qty 63.60
Add contractor's profit and overhead charges 13.615% 8.70
labour component/unit qty (including contractor's profit) 72.30
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 6360.00
Total Rs: 6360.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 865.914
Total cost for 100.00 sqm Rs: 7225.91
Rate per sqm (A+B+C+D)/100.0 Rs. 72.30
IRR-PMW-3-6 Removing and refixing disturbed chainage / demarcation / hectometre / guard stones
including excavation, back filling etc., complete with all leads and lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 mazdoor Day 2.00 460.00 920.00
Total cost of Labour Rs: 1520.00
labour component/unit qty 84.44
Add contractor's profit and overhead charges 13.615% 11.50
labour component/unit qty (including contractor's profit) 95.90
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 1520.00
Total Rs: 1520.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 206.948
Total cost for 18.00 Nos. Rs: 1726.95
Rate per each (A+B+C+D)/18.0 Rs. 95.90
IRR-PMW-3-7 Removing and refixing disturbed km stone / sign board / hecto-metre stone etc., including
excavation, back filling with available stuff after refixing, forming base platform of size 90 x 90 x
7.5 cm including watering, ramming etc complete with all leads and lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 mazdoor Day 2.00 460.00 920.00
Total cost of Labour Rs: 1520.00
labour component/unit qty 190.00
Add contractor's profit and overhead charges 13.615% 25.87
labour component/unit qty (including contractor's profit) 215.90
320
Preliminary and Maintenance Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 1520.00
Total Rs: 1520.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 206.948
Total cost for 8.00 Nos. Rs: 1726.95
Rate per each (A+B+C+D)/18.0 Rs. 215.90
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Angle dozer Hour 5.00 1453.50 7267.50
Fuel / Energy charges Hour 5.00 843.60 4218.00
2 Shovel 0.50 cum capacity Hour 8.00 869.30 6954.40
Fuel / Energy charges Hour 8.00 657.80 5262.40
3 Tippers 5.00 cum capacity 4 Nos. Hour 32.00 384.40 12300.80
Fuel / Energy charges Hour 32.00 414.40 13260.80
4 Pump 5 hp ( diesel ) Hour 2.00 8.50 17.00
Fuel / Energy charges Hour 2.00 109.60 219.20
5 Water tanker 8000 ltr Hour 4.00 358.00 1432.00
Fuel / Energy charges Hour 4.00 414.40 1657.60
6 Vibratory pad foot roller 8 tonne Hour 6.00 1175.20 7051.20
Fuel / Energy charges Hour 6.00 1425.20 8551.20
7 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 68256.10
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Dozer Hour 4.00 287.30 1149.20
2 Crew for Shovel Hour 8.00 287.30 2298.40
3 Crew for Tipper Hour 32.00 215.50 6896.00
4 Crew for Pump Hour 3.00 134.80 404.40
5 Crew for Water tanker Hour 5.00 215.50 1077.50
6 Crew for Roller Hour 6.00 324.50 1947.00
7 work inspector Day 2.00 600.00 1200.00
8 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 16812.50
labour component/unit qty 35.00
Add contractor's profit and overhead charges 13.615% 4.80
labour component/unit qty (including contractor's profit) 39.80
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 68256.10
C. Cost of Labour Rs: 16812.50
Total Rs: 85068.60
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 11582.08989
Total cost for 480.00 cum Rs: 96650.69
Rate per cum (A+B+C+D)/480.0 Rs. 201.40
321
Preliminary and Maintenance Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Angle dozer 90 hp Hour 3.50 1453.50 5087.25
Fuel / Energy charges Hour 3.50 843.60 2952.60
2 Shovel 0.50 cum capacity Hour 8.00 869.30 6954.40
Fuel / Energy charges Hour 8.00 657.80 5262.40
3 Tippers 5.00 cum capacity 3 Nos. Hour 24.00 384.40 9225.60
Fuel / Energy charges Hour 24.00 414.40 9945.60
4 Pump 5 hp ( diesel ) Hour 1.50 8.50 12.75
Fuel / Energy charges Hour 1.50 109.60 164.40
5 Water tanker 8000 ltr Hour 3.00 358.00 1074.00
Fuel / Energy charges Hour 3.00 414.40 1243.20
6 Vibratory pad foot roller 8 tonne Hour 4.00 1175.20 4700.80
Fuel / Energy charges Hour 4.00 1425.20 5700.80
7 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 52387.80
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Dozer Hour 3.50 287.30 1005.55
2 Crew for Shovel Hour 8.00 287.30 2298.40
3 Crew for Tipper Hour 24.00 215.50 5172.00
4 Crew for Pump Hour 1.50 134.80 202.20
5 Crew for Water tanker Hour 3.00 215.50 646.50
6 Crew for Roller Hour 4.00 324.50 1298.00
7 work inspector Day 2.00 600.00 1200.00
8 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 13662.65
labour component/unit qty 42.00
Add contractor's profit and overhead charges 13.615% 5.70
labour component/unit qty (including contractor's profit) 47.70
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 52387.80
C. Cost of Labour Rs: 13662.65
Total Rs: 66050.45
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 8992.768768
Total cost for 325.00 cum Rs: 75043.22
Rate per cum (A+B+C+D)/325.0 Rs. 230.90
IRR-PMW-3-10 Providing impervious hearting for breached / damaged portion of embankment with
soil from approved dump areas in layers of 10 to 15 cm before compaction including cost
of all materials, machinery, labour, all operations such as collection of soil,sorting out,
spreading soil to specified thickness, breaking clods, sectioning, watering, compacting each
layer to density control of not less than 98 percent or as stipulated by rolling or by using
mechanical tampers etc., complete with initial lead upto 1 km and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Angle dozer Hour 4.00 1453.50 5814.00
Fuel / Energy charges Hour 4.00 843.60 3374.40
2 Shovel 0.50 cum capacity Hour 8.00 869.30 6954.40
Fuel / Energy charges Hour 8.00 657.80 5262.40
3 Tippers 5.00 cum capacity 5 Nos. Hour 40.00 384.40 15376.00
Fuel / Energy charges Hour 40.00 414.40 16576.00
4 Pump 5 hp ( diesel ) Hour 4.00 8.50 34.00
Fuel / Energy charges Hour 4.00 109.60 438.40
5 Water tanker 8000 ltr Hour 7.00 358.00 2506.00
Fuel / Energy charges Hour 7.00 414.40 2900.80
6 Vibratory pad foot roller 8 tonne Hour 7.50 1175.20 8814.00
Fuel / Energy charges Hour 7.50 1425.20 10689.00
7 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 78803.40
322
Preliminary and Maintenance Works - Item Unit Rates 2020-21
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Dozer Hour 4.00 287.30 1149.20
2 Crew for Shovel Hour 8.00 287.30 2298.40
3 Crew for Tipper Hour 40.00 215.50 8620.00
4 Crew for Pump Hour 4.00 134.80 539.20
5 Crew for Water tanker Hour 7.00 215.50 1508.50
6 Crew for Roller Hour 7.50 324.50 2433.75
7 work inspector Day 2.00 600.00 1200.00
8 mazdoor Day 6.00 460.00 2760.00
Total cost of Labour Rs: 20509.05
labour component/unit qty 33.50
Add contractor's profit and overhead charges 13.615% 4.60
labour component/unit qty (including contractor's profit) 38.10
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 78803.40
C. Cost of Labour Rs: 20509.05
Total Rs: 99312.45
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 13521.39007
Total cost for 612.00 cum Rs: 112833.84
Rate per cum (A+B+C+D)/612.0 Rs. 184.40
IRR-PMW-3-11 Providing pervious /semi-pervious casing for breached /damaged portion of embankment
with soil from approved dump areas in layers of 10 to 15 cm before compaction including
cost of all materials, machinery, labour, all operations such as collection of soil, sorting out,
spreading soil to specified thickness, breaking clods, sectioning, watering, compacting each
layer to density control of not less than 98 percent or as stipulated by rolling or by using
mechanical tampers etc., complete with initial lead upto 1 km and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Angle dozer 90 hp Hour 3.00 1453.50 4360.50
Fuel / Energy charges Hour 3.00 843.60 2530.80
2 Shovel 0.50 cum capacity Hour 8.00 869.30 6954.40
Fuel / Energy charges Hour 8.00 657.80 5262.40
3 Tippers 5.00 cum capacity 4 Nos. Hour 32.00 384.40 12300.80
Fuel / Energy charges Hour 32.00 414.40 13260.80
4 Pump 5 hp ( diesel ) Hour 3.00 8.50 25.50
Fuel / Energy charges Hour 3.00 109.60 328.80
5 Water tanker 8000 ltr Hour 6.00 358.00 2148.00
Fuel / Energy charges Hour 6.00 414.40 2486.40
6 Vibratory pad foot roller 8 tonne Hour 5.50 1175.20 6463.60
Fuel / Energy charges Hour 5.50 1425.20 7838.60
7 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 64024.60
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Dozer Hour 3.00 287.30 861.90
2 Crew for Shovel Hour 8.00 287.30 2298.40
3 Crew for Tipper Hour 32.00 215.50 6896.00
4 Crew for Pump Hour 3.00 134.80 404.40
5 Crew for Water tanker Hour 6.00 215.50 1293.00
6 Crew for Roller Hour 5.50 324.50 1784.75
7 work inspector Day 2.00 600.00 1200.00
8 mazdoor Day 6.00 460.00 2760.00
Total cost of Labour Rs: 17498.45
labour component/unit qty 39.80
Add contractor's profit and overhead charges 13.615% 5.40
labour component/unit qty (including contractor's profit) 45.20
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 64024.60
C. Cost of Labour Rs: 17498.45
Total Rs: 81523.05
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 11099.36326
Total cost for 440.00 cum Rs: 92622.41
Rate per cum (A+B+C+D)/440.0 Rs. 210.50
IRR-PMW-3-12 Repairing rain cuts / resectioning canal slopes to required lines and grades as directed
using available soil including dressing, clod breaking, packing, tamping etc., complete with
all leads and lifts.
323
Preliminary and Maintenance Works - Item Unit Rates 2020-21
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 work inspector Day 1.00 600.00 600.00
2 mazdoor Day 8.00 460.00 3680.00
Total cost of Labour Rs: 4280.00
labour component/unit qty 4.28
Add contractor's profit and overhead charges 13.615% 0.58
labour component/unit qty (including contractor's profit) 4.90
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 4280.00
Total Rs: 4280.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 582.722
Total cost for 1000.00 sqm Rs: 4862.72
Rate per sqm (A+B+C+D)/1000.0 Rs. 4.90
IRR-PMW-3-13 Cleaning drainage gallery, adits, instrumentation galleries etc., by scrubbing / brushing
including chiselling and removing leached lime deposit and disposing off all the waste material
out side adits in specified location etc., complete with all leads and lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Chiseller Cl II Day 2.00 500.00 1000.00
2 mazdoor Day 6.00 460.00 2760.00
Total cost of Labour Rs: 3760.00
labour component/unit qty 37.60
Add contractor's profit and overhead charges 13.615% 5.10
labour component/unit qty (including contractor's profit) 42.70
ABSTRACT:
A. Cost of Materials Rs: 679.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 3760.00
Total Rs: 4439.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 604.36985
Total cost for 100.00 Rm Rs: 5043.37
Rate per Rm (A+B+C+D)/100.0 Rs. 50.40
IRR-PMW-3-14 Cleaning dam parapet inner face and top using oxalic acid and water by scrubbing /
brushing and washing to remove all surface coatings etc., complete .
B. MACHINERY:
324
Preliminary and Maintenance Works - Item Unit Rates 2020-21
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 mazdoor Day 6.00 460.00 2760.00
Total cost of Labour Rs: 2760.00
labour component/unit qty 27.60
Add contractor's profit and overhead charges 13.615% 3.80
labour component/unit qty (including contractor's profit) 31.40
ABSTRACT:
A. Cost of Materials Rs: 1039.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 2760.00
Total Rs: 3799.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 517.23385
Total cost for 100.00 Rm Rs: 4316.23
Rate per Rm (A+B+C+D)/100.0 Rs. 43.20
IRR-PMW-3-20 Excavation and removal of silt and silt mixed with sand from canal bed in dry condition
including disposing off the same in spoil bank or on the canal embankment in layers as
directed etc., complete with initial lead upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 mazdoor Day 4.00 460.00 1840.00
Total cost of Labour Rs: 1840.00
labour component/unit qty 184.00
Add contractor's profit and overhead charges 13.615% 25.10
labour component/unit qty (including contractor's profit) 209.10
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 1840.00
Total Rs: 1840.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 250.516
Total cost for 10.00 cum Rs: 2090.52
Rate per cum (A+B+C+D)/10.0 Rs. 209.10
IRR-PMW-3-21 Excavation and removal of silt or silt mixed with sand in slussy condition from canal bed
including disposing off the same in spoil bank or on the canal embankment in layers as
directed etc., complete with initial lead upto 50 m and all lifts.
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total hire charges of Machinery Rs: 0.00
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 mazdoor Day 6.00 460.00 2760.00
Total cost of Labour Rs: 2760.00
labour component/unit qty 230.00
Add contractor's profit and overhead charges 13.615% 31.30
labour component/unit qty (including contractor's profit) 261.30
325
Preliminary and Maintenance Works - Item Unit Rates 2020-21
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 0.00
C. Cost of Labour Rs: 2760.00
Total Rs: 2760.00
D. Add for contractor's profit and overheads
on (A+B+C) 13.615% Rs: 375.774
Total cost for 12.00 cum Rs: 3135.77
Rate per cum (A+B+C+D)/12.0 Rs. 261.30
RATE ANALYSIS
A. MATERIALS: Unit: 807.00 cum
Sl No Particulars Unit Quantity Rate Amount
in Rs. in Rs
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total cost of Materials Rs: 0.00
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Angle dozer 90 hp Hour 2.70 1453.50 3924.45
Fuel / Energy charges Hour 2.70 843.60 2277.72
2 Shovel 0.85 cum capacity Hour 8.00 1452.20 11617.60
Fuel / Energy charges Hour 8.00 1205.90 9647.20
3 Tippers 5.00 cum capacity 5 Nos. Hour 40.00 384.40 15376.00
Fuel / Energy charges Hour 40.00 414.40 16576.00
Total hire charges of Machinery Rs: 59418.97
C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Crew for Dozer Hour 2.70 287.30 775.71
2 Crew for Shovel Hour 8.00 287.30 2298.40
3 Crew for Tipper Hour 40.00 215.50 8620.00
4 work inspector Day 1.00 600.00 600.00
5 mazdoor Day 2.00 460.00 920.00
Total cost of Labour Rs: 13214.11
labour component/unit qty 16.40
Add contractor's profit and overhead charges 13.615% 2.20
labour component/unit qty (including contractor's profit) 18.60
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 59418.97
C. Cost of Labour Rs: 13214.11
Total Rs: 72633.08
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 9888.99
Total cost for 807.00 cum Rs: 82522.07
Rate per cum (A+B+C+D)/807 Rs: 102.30
RATE ANALYSIS
A. MATERIALS: UNIT : 807.00 cum
Sl No Particulars Unit Quantity Rate Amount
in Rs. in Rs
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total cost of Materials Rs: 0.00
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Angle dozer 90 hp Hour 2.70 1453.50 3924.45
Fuel / Energy charges Hour 2.70 843.60 2277.72
2 Pump 5 hp ( ele ) Hour 4.00 2.50 10.00
Fuel / Energy charges Hour 4.00 42.50 170.00
3 Water tanker 8000 ltr Hour 8.00 358.00 2864.00
Fuel / Energy charges Hour 8.00 414.40 3315.20
4 Vibratory pad foot roller 8 tonne Hour 6.40 1175.20 7521.28
Fuel / Energy charges Hour 6.40 1425.20 9121.28
5 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 29267.93
326
Preliminary and Maintenance Works - Item Unit Rates 2020-21
C. LABOUR:
ABSTRACT:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 29267.93
C. Cost of Labour Rs: 6500.91
Total Rs: 35768.84
D.Add for contractor's profit and overheads on (A+B+C) 13.615% Rs. 4869.93
Total cost
for 807.00 cum Rs: 40638.77
Rate per cum (A+B+C+D)/807 Rs: 50.40
RATE ANALYSIS
A. MATERIALS: UNIT : 807.00 cum
Sl No Particulars Unit Quantity Rate Amount
in Rs. in Rs
1 NIL 0.00 0.00 0.00
0.00 0.00 0.00
Total cost of Materials Rs: 0.00
B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs
1 Tractor with 2T Roller Hour 10.00 345.00 3450.00
2 Sundries LS 2.00 32.00 64.00
Total hire charges of Machinery Rs: 3514.00
C. LABOUR:
ABSTRAC
T:
A. Cost of Materials Rs: 0.00
B. Hire charges of Machinery Rs: 3514.00
C. Cost of Labour Rs: 1220.00
Total Rs: 4734.00
D.Add for contractor's profit and overheads on 13.615% Rs. 644.5341
Total cost for 807.00 cum Rs: 5378.53
Rate per cum (A+B+C+D)/807 Rs: 6.70
RATE ANALYSIS
Unit : 2000 Sqm
A. MATERIALS
B. MACHINERY
C. LABOUR
327
Preliminary and Maintenance Works - Item Unit Rates 2020-21
ABSTRACT:
A.COST OF MATERIALS Rs. 0.00
B.COST OF MACHINERY Rs. 0.00
C.COST OF LABOUR Rs. 14980.00
Total 14980.00
D. Add for Contractor's Profit and overheads 13.615% 2039.527
Total Cost for removal weed in the extent of 2000 Sqm 17019.53
Rate per Sqm (A+B+C+D)/2000 8.5
RATE ANALYSIS
Unit : 2000 Sqm
A. MATERIALS
B. MACHINERY
C. LABOUR
RATE ANALYSIS
Unit : 2000 Sqm
A. MATERIALS
B. MACHINERY
C. LABOUR
ABSTRACT:
A.COST OF MATERIALS Rs. 0.00
B.COST OF MACHINERY Rs. 0.00
C.COST OF LABOUR Rs. 13760.00
Total 13760.00
D. Add for Contractor's Profit and overheads 14% 1873.424
Total Cost for removal weed in the extent of 2000 Sqm 15633.42
Rate per Sqm (A+B+C+D)/2000 7.8
B. MACHINERY
C. LABOUR
Sl. No.
Description Unit Quantity Rate in Rs. Amount in Rs.
1 Work Inspector Day 2.5 600.00 1500
2 Mazdoor Day 22 460.00 10120
Total Cost of Labour Rs. 11620.00
ABSTRACT:
328
Preliminary and Maintenance Works - Item Unit Rates 2020-21
A.COST OF MATERIALS Rs. 0.00
B.COST OF MACHINERY Rs. 0.00
C.COST OF LABOUR Rs. 11620.00
Total 11620.00
D. Add for Contractor's Profit and overheads 14% 1582.063
Total Cost for removal weed in the extent of 2000 Sqm 13202.06
Rate per Sqm (A+B+C+D)/2000 6.6
B. MACHINERY
C. LABOUR
ABSTRACT:
A.COST OF MATERIALS Rs. 0.00
B.COST OF MACHINERY Rs. 0.00
C.COST OF LABOUR Rs. 13760.00
Total 13760.00
D. Add for Contractor's Profit and overheads 14% 1873.424
Total Cost for removal weed in the extent of 2000 Sqm 15633.42
Rate per Sqm (A+B+C+D)/2000 7.8
RATE ANALYSIS
Unit : 2000 Sqm
A. MATERIALS
B. MACHINERY
C. LABOUR
ABSTRACT:
A.COST OF MATERIALS Rs. 0.00
B.COST OF MACHINERY Rs. 0.00
C.COST OF LABOUR Rs. 4400.00
Total 4400.00
D. Add for Contractor's Profit and overheads 14% 599.06
Total Cost for removal weed in the extent of 2000 Sqm 4999.06
Rate per Sqm (A+B+C+D)/2000 2.5
IRR-PMW-3-26
New Item 2015-16-
8 PAINTING OF SLUICES FOR MAINTENANCE WORKS
Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners
and removing dust. After cleaniong, applying primary coat with one coat of Zinc rich
epoxy primer to a thickness of 100 microns, followed by finishing coats 2 coats with
Coal tar epoxy with material, labour, and all accessories with all leads and lifts.
B. Machinery
Sl. No. Particulars Unit Quantity Rate in Rs. Amount in Rs.
329
Preliminary and Maintenance Works - Item Unit Rates 2020-21
NIL
Total Cost of Machinery 0
C. Labour
Sl. No. Particulars Unit Quantity Rate in Rs. Amount in Rs.
1 Painter Class-II Day 20 500.00 10000
2 Helper Day 20 460.00 9200
Total Cost of Machinery 19200
Labour Component/ Unit Qty. 192
Add Contractor's Profit and and Overhead Charges @ 13.615% 26.1408
Labour Component/ Unit Qty (including contractor' profit) 218.1408
ABSTRACT:
A. Cost of Materials: 17877
B. Hire Charges of Machinery 0
C. Cost of Labour 19200
Total 37077
D. Add for Excise Duty on 75% cost excluding cost of materials) 0% 0
Total 37077
E. Add for transportation Charges upto worksite @ 3% 1112.31
Total 38189.31
F. Add for Contractor's Profit and Overhead Charges @13.615% 13.615% 5199.47
Total Cost per 100 Sqm 43388.78
Rate per Sqm 433.9
IRR-PMW-3-27
New Item2018-19 A. Lifting of water from rivers/drains to agricultural fields and where there is no element of excavation-
Water lifting charges using Electrical driven pump
Rate Analysis
330
Preliminary and Maintenance Works - Item Unit Rates 2020-21
B. Lifting of water from rivers/drains to agricultural fields and where there is no element of excavation-
Water lifting charges using Diesel driven pump
Rate Analysis
MACHINERY: Hp_hr calculation
5 HP 10 HP 20 HP
Sl No Description Unit Quantity Rate Amount Rate Amount Rate Amount
in Rs. in Rs. in Rs. in Rs. in Rs. in Rs.
1 Diesel Pump Hour 1 8.50 8.5 12.90 12.9 40.70 40.7
2 Fuel / Energy charges Hour 1 109.60 109.6 219.30 219.3 438.50 438.5
3 per hour 118.1 232.2 479.2
Total hire charges of Machinery
4 @ 0.13615 16.079315 31.61403 65.2431
Add Contractor’s Profit and Overheads
5 Total hire charges of Machinery per hour 134.179315 263.81403 544.443
6 Total hire charges of Machinery per hphr 26.835863 26.381403 27.2222
7 26.81
Average of the above three per hphr
B. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew charges for Pump Hour 1 134.80 134.8
2 Laying & dismantling pipe LS 0.05 32.00 1.6
3 mazdoor Day 0.1 460 46
Total cost of Labour Rs: 182.4
331
Manual works - 2020-21
COM_MWRK-2 (Manual)Excavation in all kinds of soil/ HDR including boulders upto 0.30 m dia. for
foundations of canal cross drainage and other appurtenant structures
and placing excavated stuff neatly in specified dump area or disposing
off the same as directed etc., complete with initial lead upto 10 m and per cum 184.00
initial lift upto 1.5 m. (WIthout involving the contractors for specified works )
With 2.5 Cum per day output
COM_MWRK-3 (Manual)Excavation in soft rock (including F&F) without blasting, including boulders upto 0.30 m dia. for
foundations of canal cross drainage and other appurtenant structures
and placing excavated stuff neatly in specified dump area or disposing
off the same as directed etc., complete with initial lead upto 10 m and per cum 345.90
initial lift upto 1.5 m. (WIthout involving the contractors for specified works )
Soft rock 1.33 Cum/Day
COM_MWRK-4 (Manual)Excavation in hard rock, including boulders upto 0.30 m dia. for
foundations of canal cross drainage and other appurtenant structures
and placing excavated stuff neatly in specified dump area or disposing
off the same as directed etc., complete with initial lead upto 10 m and per cum 686.60
initial lift upto 1.5 m. (WIthout involving the contractors for specified works )
Hard rock 0.67Cum/ day
332
COM-LDLFT-2020-21
COM-LDLFT 1. For total lead upto 150 m ( including initial lead ) lead charges by head load only shall be
adopted irrespective of mode of conveyance.
2. For total lead exceeding 150 m conveyance by mechanical means only shall be adopted
irrespective of mode of conveyance.
3. The rates for loading at quarry including idle hire charges of trucks and hire charges per for
each kilometer and upto 5 km are cumulative and inclusive of total charges for preceding lead.
4. Unless otherwise specified lead charges for Earth / Sand / Gravel / Aggregates and Stones
are for loose volume and not for compacted or in-situ volume.
5. The rates for lift charges,lead charges, hire charges are cumulative and inclusive of
rates for preceding lift,lead and hire charges
6. Lift charges are not payable where conveyance of materials is by mechanical means to
final placing point.
7. Loading and unloading charges are not payable for conveyance by head load.
8. Loading charges are not payable for conveyance by mechanical means for disposal of
excavated materials beyond initial lead of 50 m wherever specified.
9. Loading and unloading charges are not payable for conveyance by mechanical means for
disposal of excavated materials beyond initial lead of 1 km wherever specified.
10. The rates for unloading of materials except earth, sand, gravel, coarse aggregate, rubble,
size stone and cut stone are inclusive of stacking.
11. Hire charges are per 1KM for tippers and trucks for tranport of materials from work site to dump
yard & other places are cumulative and includes previous km upto 5 kms
12. The lead & lift charges are exclusive of contractor's profit and overhead charges of 13.615%
13. The loading & unloading charges are exclusive of contractor's profit and overhead charges of 13.615%
14. During the BoCE meeting held on 10.06.2015,the BoCEs has recommended to withdraw lead charges,loading and
unloading charges for Cement as per the minutes of meeting of Sub-Committee held on 29.06.2015.(The conveyance
charges ,loading & unloading charges for cement are displayed for information purpose only).
FOR THE YEAR: 2020-21
COM-LDLFT-1 A. (Lead) Conveyance Charges for materials by head load
Earth / Sand
/Gravel / Murrum/ Cement /
PCC slab/ Shahbad
Total distance Lime/ Surki/ Size Reinforce-
slab / CC block/ BS
Sl No. ( Total lead includes initial stone / Cut stone ment steel
slab/ Late-rite / Wood
lead ) Rubble / Coarse Str steel
Rs / cum
aggregate Rs/ Rs / tonne
Cum
1 2 3 4 5
Total lead upto 50 m
1 (covered by item rate) initial lead initial lead initial lead
2 Total lead upto 100 m 65.70 38.30 83.60
3 Total lead upto 150 m 131.40 76.70 167.30
Notes: 1. No loading or unloading charges are admissible for conveyance by head load.
2. For total lead exceeding 150 m conveyance charges by mechanical means only shall
be adopted irrespective of mode of conveyance.
333
COM-LDLFT-2020-21
COM-LDLFT-2 B.( Lead) Conveyance charges for machinery per kilometer for transporting materials
by tippers and trucks excluding loading, unloading and idle hire charges of machinery.
FOR THE YEAR: 2020-21
( No loading and unloading charges allowed for machinery loading and unloading )
(Lead)
(Lead) charges
charges for
(Lead) charges for trucks and
trucks and (Lead) charges for (Lead) (Lead)
for trucks and tippers per
tippers for trucks and tippers for charges charges
tippers for Earth cu.meter for
Rubble/Size Cement/ Steel/ RCC for per for trucks
Sl No. Distance / Sand /Gravel / PCC slabs/
stones/ Cut poles/ AC & GI sheets/ cu.meter per 1000
Murrum/ Lime/ Shahabad
Stones/ Packed for water/ Nos. of
Surki/ per slabs/ CC &
Coarse materials/tonne 1000 litres Bricks
cu.meter Laterite blocks/
aggregate
Wood/ cum
per cu.meter
1 2 3 4 5 6 7 8
1 Lead upto 1 km 30.40 29.40 18.30 43.20 18.50 48.90
2 Lead upto 2 km 42.60 41.10 25.70 60.40 25.90 68.50
3 Lead upto 3 km 56.80 54.80 34.20 80.60 34.60 91.30
4 Lead upto 4 km 69.00 66.50 41.60 97.80 42.00 110.90
5 Lead upto 5 km 81.10 78.30 48.90 115.10 49.40 130.40
for Every km beyond 5 km
6 upto 30 km 12.20 11.70 7.30 17.30 7.40 19.60
COM-LDLFT-3 C. LOADING AND UNLOADING CHARGES BY MANUAL MEANS (idle hire charges of trucks are not added)
Rubble/ size
Earth / Sand stone/ cut
/Gravel stone/ brick work
steel in
Sl No. Description of item Murrum/ / Surki/ Coarse cement in Rs/tonne Rs/1000
Rs./tonne
aggregate,Li No
Rs / cum me in
Rs/cum
1 2 3 4 5 6 7
1 Loading 21.80 43.60 72.00 86.30 60.00
2 Unloading 10.90 21.80 72.00 86.30 60.00
COM-LDLFT-4 D. LOADING AND UNLOADING CHARGES BY MANUAL MEANS (including idle hire charges of trucks )
Rubble/ size
Earth / Sand stone/ cut
/Gravel stone/ brick work
steel in
Sl No. Description of item Murrum/ / Surki/ Coarse cement in Rs/tonne Rs/1000
Rs./tonne
aggregate,Li No
Rs / cum me in
Rs/cum
1 2 3 4 5 6 7
1 Loading 110.80 132.60 169.80 184.10 221.40
2 Unloading 40.40 66.30 169.80 184.10 221.40
E. LOADING AND UNLOADING CHARGES BY MECHANICAL MEANS (including idle hire charges of trucks)
Rubble/ size
Earth / Sand stone/ cut
/Gravel stone/
COM-LDLFT-5 Sl No. Description of item Murrum/ / Surki/ Coarse
aggregate,Li
Rs / cum me in
Rs/cum
1 2 3 4
1 Loading 48.80 97.20
2 Unloading 15.40 15.40
334
COM-LDLFT-2020-21
DETAILED DATA
For the purpose of working out conveyance charges by head load the category of materials as
classified in ( I ) above are grouped together as under :
CATEGORY : Earth / Sand / Gravel / Murrum / Lime / Surki / Coarse aggregate /
Rubble stone / Size stone / Cut stone
In this group materials which are comperatively lighter and generally conveyed by head load
by light / heavy mazdoor are included. Method of conveyance, approximate weight per load
and time required to cover specified additional distance will be generally same
Therefore common data is considered for conveyance by head load for materials under this category.
CATEGORY : PCC slab / Shahabad stone slab / CC block / Laterite stone / BS slab / Wood
In this group the materials in moulded condition / cut to standard size which are heavier per
load compared to materials under Category above are included.
335
COM-LDLFT-2020-21
CATEGORY : PCC slab / Shahabad stone slab / CC block / Laterite stone / BS slab / Wood
Lead: Upto 50 m :
This is initial lead and cost is covered under item basic rate.
COM-DTL-LDLFT-2 B.( Lead) Conveyance charges for machinery per kilometer for transporting materials by tippers and trucks
excluding loading, unloading and idle hire charges of machinery.
336
COM-LDLFT-2020-21
337
COM-LDLFT-2020-21
CATEGORY : Cement/ Steel/ Pipes/ RCC poles/ AC & GI sheets/ Packed materials
For total lead upto 1 km Unit: 8 tonne
Rate Amount
Sl No. Description Unit Quantity in Rs. in Rs.
1 Truck hire charges Hour 0.15 348.40 52.26
Fuel charges Hour 0.15 414.40 62.16
2 Crew charges Hour 0.15 215.50 32.33
Total Rs: 146.75
Total for 8 tonne Rs: 146.75
Rate per tonne 18.30
338
COM-LDLFT-2020-21
CATEGORY : PCC slabs/ Shahabad slabs/ BS slabs/ CC & Laterite blocks/ Wood
For total lead upto 1 km Unit: 3.4 cum
Rate Amount
Sl No. Description Unit Quantity in Rs. in Rs.
1 Truck hire charges Hour 0.15 348.40 52.26
Fuel charges Hour 0.15 414.40 62.16
2 Crew charges Hour 0.15 215.50 32.33
Total Rs: 146.75
Total for 3.4 cum Rs: 146.75
Rate per cum 43.20
339
COM-LDLFT-2020-21
CATEGORY : water
For total lead upto 1 km Unit: 8000 litres
Rate Amount
Sl No. Description Unit Quantity in Rs. in Rs.
1 Water tanker hire charges Hour 0.15 358.00 53.70
Fuel charges Hour 0.15 414.40 62.16
2 Crew charges Hour 0.15 215.50 32.33
Total Rs: 148.19
Total for 8000 litres Rs: 148.19
Rate per 1000 litres 18.50
340
COM-LDLFT-2020-21
341
COM-LDLFT-2020-21
COM-DTL-LDLFT-3 C. LOADING AND UNLOADING CHARGES BY MANUAL MEANS (idle hire charges of trucks are not added)
MORD -data
1 Loading of Lime, Aggregate, Stone Boulder,
a) Loading Brick Aggregate, Kankar, Building Rubbish, Unit Quantity Rate Rs. Amount Rs.
Building Rubbish, Crushed Slag, Stone for Masonry
Work by manual means including a lead upto 30 m
Unit = cum
Taking output = 5.5 cum
Labour
Head Mazdoor day 0.02 500.00 10.00
Mazdoor day 0.5 460 230.00
Total in Rs. 240.00
Rate per cum = Rs. 43.60
Amount
2 Loading of Earth, Sand, Moorum, Manure, Flyash Unit Quantity Rate Rs. Rs.
a) Loading by manual means including a lead upto 30 m
Unit = cum
Taking output = 5.5 cum
Labour
Head Mazdoor day 0.01 500.00 5.00
Mazdoor day 0.25 460 115.00
Total in Rs. 120.00
Rate per cum = Rs. 21.80
3 Loading of Bricks by manual means Unit Quantity Rate Rs. Amount Rs.
a) Loading including a lead upto 30 m
Unit = 1000 Nos.
Taking output = 2000 Nos
a) Labour
Head Mazdoor day 0.01 500.00 5.00
Mazdoor day 0.25 460 115.00
Cost for 2000 Nos. = 120.00
Rate per cum = Rs. 60.00
4 Loading of Cement by manual means Unit Quantity Rate Rs. Amount Rs.
a) Loading including a lead upto 30 m
Unit = 1 t
Taking output = 10 t
a) Labour
Head mazdoor day 0.06 500.00 30.00
Mazdoor day 1.5 460 690.00
Cost for 10 t = 720.00
Rate per 1 tonne = Rs. 72.00
b) Unloading100%
+ stacking
of loading charges I.e.,72.00
Rs.
342
COM-LDLFT-2020-21
6 Loading of Bricks - 1000 Nos (Regular sizes - Unit Quantity Rate Rs. Amount Rs.
a) Loading 225x140x70 mm) by manual means including
Unit = 1000 Nos.
Taking output = 2000 Nos.
a) Labour
head Mazdoor day 0.01 500.00 5
Mazdoor day 0.25 460.00 115.00
Cost for 2000 Nos. = 120.00
Rate per 1000 Nos. = Rs. 60.00
COM-DTL-LDLFT-4 D. LOADING AND UNLOADING CHARGES BY MANUAL MEANS (including idle hire charges of trucks )
2 Loading of Earth, Sand, Moorum, Manure, Flyash Unit Quantity Rate Rs. Amount Rs.
a) Loading by manual means including a lead upto 30 m
Unit = cum
Taking output = 5.5 cum
Labour
Head Mazdoor day 0.01 500.00 5.00
Mazdoor day 0.25 460 115.00
b) Machinery
Truck 10t hour 0.5 978.30 489.15
Cost for 5.5 cum = 609.15
Rate per cum = Rs. 110.80
b) UnloadingUnloading of Earth, Sand, Moorum, Manure, FlyashUnit Quantity Rate Rs. Amount Rs.
by manual means including a lead upto 30 m
Unit = cum
Taking output = 5.5 cum
a) Labour
Mate day 0.005 500.00 2.50
Mazdoor(unskilled) day 0.125 460 57.50
b) Machinery
Truck 10t hour 0.166 978.30 162.40
Cost for 5.5 cum = 222.40
Rate per cum = Rs. 40.40
b) Unloading100%
+ stacking
of loading charges i.e.,221.40
Rs.
343
COM-LDLFT-2020-21
b) Unloading100%
+ stacking
of loading charges i.e.,169.80
Rs.
5 Loading of Structural Steel, Steel Bars by Unit Quantity Rate Rs. Total
a) Loading manual means including a lead upto 30 m
Unit = 1 t
Taking output = 10 t
a) Labour
Mate day 0.07 500.00 35.00
Mazdoor(unskilled) day 1.8 460 828.00
b) Machinery
Truck 10t hour 1 978.30 978.30
Cost for 10 t = 1841.30
Rate per 1 tonne = Rs. 184.10
b) Unloading100%
+ stacking
of loading charges i.e.,184.10
Rs.
COM-DTL-LDLFT-5 E. LOADING AND UNLOADING CHARGES BY MECHANICAL MEANS (including idle hire charges of trucks)
344
COM-LDLFT-2020-21
FOR CATEGORY : Earth / Sand / Gravel / Murrum / Lime / Surki / Coarse aggregate /
Rubble stone / Size stone / Cut stone
Lift : ADDITIONAL LIFT CHARGES FOR each 1 METER LIFT BEYOND 3 M INITIAL LIFT
For additional lift of 1m beyond initial lift of 3 m
one meter lift is taken equivalent to 6 meters lead
average speed of conveyance by head load 60 m/minute
Round trip cycle time for 1.00 m considering 50 min/ hr working
1 x6x 60 / 50 / 60 ) 0.12 min
No. of trips per day for lift 1.0 m above 3 m ( 8 x 60 / 0..12) 4000
Quantity of material by head load 0.015 cum
Quantity of material by head load per day ( 4000x 0.015 ) 60 cum
Deploy 1 mazdoor for every additional lift of 1.0 m beyond initial lift.
Lift : Upto 3.00 m for materials under this Category Unit: 60 cum
Rate Amount
Sl No. Description Unit Quantity in Rs. in Rs.
1 2 3 4 5 6
Mazdoor Day 1.00 460.00 460.00
Total Rs: for 60
cum 460.00
Rate per cum 7.70
FOR CATEGORY: Cement bag / Reinforcement steel / Structural steel sections
Lift : Upto 3.00 m
This is the initial lift and forms integral part of the activities in the basic rate of work item.
Lift charges are admissible only lifting effort beyond initial lift specified in the work item.
Lift : ADDITIONAL LIFT CHARGES FOR each 1 METER LIFT BEYOND 3 M INITIAL LIFT
345
COM-LDLFT-2020-21
FOR CATEGORY : PCC slab / Shahabad stone slab / CC block / Laterite stone / BS slab / Wood
346
Hire Charges- for the year 2020-21
347
Hire Charges- for the year 2020-21
348