"STC - PTMP Project": Cpe Installation Report Customer Site Details

This document provides a report on the installation of a CPE unit for a customer in Dammam, Saudi Arabia, including details of the customer site, equipment installed, installation photos that document the setup and labeling, and tests confirming the connection quality and speed. Signoff was provided by the field operations team accepting the installation and clearance photos show any follow up work.

Uploaded by

mogahed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views16 pages

"STC - PTMP Project": Cpe Installation Report Customer Site Details

This document provides a report on the installation of a CPE unit for a customer in Dammam, Saudi Arabia, including details of the customer site, equipment installed, installation photos that document the setup and labeling, and tests confirming the connection quality and speed. Signoff was provided by the field operations team accepting the installation and clearance photos show any follow up work.

Uploaded by

mogahed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 16

“STC – PtMP project”

CPE Installation Report

Customer site Details:-


Path Name DAMMAM-RIYADH DIAL11174

W.O ID I4706890256291

Customer Name SOAAN‫مصنع شركة االدريس لالبواب‬

Contact Name ‫محمد معز الدين‬

Contact Number 595188811

Coordinates 26.5093 50.00229


BS ZNDA992

Sector/ POL C-H

Antenna Dia. 0.3

Antenna S/N A03051822008000139

Design RSL -49

Actual RSL (dbm)/SNR(db) -52.4/31.4

CPE AUID a1155243

Civil work(pole/tower) 3m pole

Length of Cable 70m

Delivery note signed Yes

Implemented Team Mohammed Alorabi

Installation Date(Day-Month-Year) 09-11-2021


Installation Quality Pictures:-

# Picture Content No Of PICs

1 Customer building 1
2 Tower / Pole ( close up / Far distant) 2
3 Line of Sight from [Top / Down] 2
4 ODU Cable Termination 5
5 IDU & PWR Cable Termination 5
6 IDU Install Location ( close up / Far distant) 2
7 Site Labels (FiveLabels) 5
8 ODU Grounding Cable (Wall Side) 1
9 Serial Numbers (CPE / Antenna / IDU) 3
10 RSL/SNR Snapshot 1
11 Ping testSnapshot 1
12 Completion Report 1
13 Field Operation Acceptance Page (For STC Team Use)
14 Field Operation Clearance If Any (For 2nd Clearance Visit)
 Picture (1): Customer Site building:

 Picture (2): Customer Site building:


Picture (2.1): Tower / Pole (close up):-
Picture (2.2): Tower / Pole (Far distant):-

 Picture (3): Line Of Sight Pictures:


Picture (3.1): Line of Sight from [From Top Side]:-
Picture (3.2): Line of Sight from [From Down Side]:-

 Picture (4): Outdoor Cable Termination Pictures:


Picture (4.1): ODU Cable Termination:-
Picture (4.2): ODU Cable Termination:-
Picture (4.3): ODU Cable Termination:-

Picture (4.4): ODU Cable Termination:-


Picture (5.4): IDU PWR Cable Termination:-

Picture (5.5): IDU PWR Source Location:-


 Picture (6): Indoor Unit Install Location:

Picture (6.1): IDU Install Location (Far Distant):-

Picture (6.2): IDU Install Location (Close up):-


 Picture (7): Site Labelling:
-:Picture (7.1): ODU CPE: -Picture (7.2): ODU Cable Start End

-:Picture (7.3): ODU Cable End: -Picture (7.4): IDU Label

-:Picture (7.5): IDU PWR Label

 Picture (8): Outdoor Grounding Cable:


 Picture (9): Site Inventory:

Picture (9.1): CPE Serial Number:-

Picture (9.2): Antenna Serial Number:-


Picture (9.2): IDU Serial Number:-

 Picture (10): RSL/SNR Snapshot:


 Picture (11): Ping Test Snapshot:

 Picture (12): Completion Report:


 Picture (13): speed test :
 (14): Field Operation Acceptance:

# Field Operation Inspection List  x


1 External/Internal Wiring
2 Proper Site Labelling
3 Serial Numbers Verification for Equipment
4 Power Source
5 Proper Antenna Fixing and Grounding Check
6 Ping Test

Field Operation Site Acceptance  x


Accepted

If rejected, please state your reasons below:

# Field Operation Rejection Reasons

1
2
3
4
 (15): Field Operation Clearance If Any:

Clearance PIC (1):-

Clearance PIC (2):-

Clearance PIC (3):-

Clearance PIC (4):-