TC2 56300 49400 STAGE 2 - Upon GM/F Completion - Install TC1 & TC3 After GM/F Complete. - Change TC2 Jib To Shorter 40m-Long Jib TC1 TC3 TC2
TC2 56300 49400 STAGE 2 - Upon GM/F Completion - Install TC1 & TC3 After GM/F Complete. - Change TC2 Jib To Shorter 40m-Long Jib TC1 TC3 TC2
TC2 56300 49400 STAGE 2 - Upon GM/F Completion - Install TC1 & TC3 After GM/F Complete. - Change TC2 Jib To Shorter 40m-Long Jib TC1 TC3 TC2
5500
ECTS
ECTS
42100
47600
46800
41000
35220
35220
33600
33600
GM/F +22.15
G/F +18.40 G/F +18.40 +17.40
+15.90 +15.90 +14.60
56300 49400
TC2 TC1 TC2 TC3
STAGE 1 STAGE 2 - Upon GM/F Completion
- Install TC2 with jib length 75m - Install TC1 & TC3 after GM/F
complete.
- Change TC2 jib to shorter 40m-Long
jib
Guide Section
5500
Guide Section
ECTS
Mounting Device
42100
47600
Lower working platform
46800
41000 will be removed
35220
33600
1M/F +30.15
1/F +26.00
GM/F +22.15
G/F +18.40 +17.40
+15.90 +14.60
56300 49400
TC1 TC2 TC3
STAGE 3 - Upon GM/F / 1M/F Completion
- Install Guide Section on TC2 after GM/F or 1M/F
Slab is finished.
- TC2's 1st Climb up 2.9m
76600
76600
71900
71900
75800
75800
70000
70000
ECTS
ECTS
Wall Tie 2nd 2.9m Tower Section Collar Frame Wall Tie Collar Frame
3/F +44.00 3/F +44.00
639
38120
36500
38120
36500
420 500
2/F +35.00 2/F +35.00 Collar Frame
ECTS
4639
9700
TR/F +73.65
UR/F +69.60 UR/F +70.70
R/F +65.00
5/F +58.60
78000
71900
75800
70000
4/F +53.00
64200
62600
3M/F +48.15
Wall Tie Collar Frame
3/F +44.00
2M/F +39.15
2/F +35.00 Collar Frame
1M/F +30.15
1/F +26.00
GM/F +22.15
G/F +18.40 +17.40
+15.90 +14.60
56300 49400
TC1 TC2 TC3
STAGE 5
- Continue TC2 Climbing to Full height
- Guide section will be removed after
climbing completion