Checklist-Structural Concrete Pre Pouring

The document is a checklist for inspecting structural concrete pouring with sections for pre-pour and during-pour checks. It lists 16 items to check before pouring including verifying reinforcement, formwork, construction joints, safety measures, and approved mix design. It also lists 4 items to check during pouring, such as ensuring proper slump, vibration for compaction, curing arrangement, and taking concrete cube specimens. The checklist provides a comprehensive list of critical steps to inspect for quality control of structural concrete placement.

Uploaded by

ajit karandikar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
7K views1 page

Checklist-Structural Concrete Pre Pouring

The document is a checklist for inspecting structural concrete pouring with sections for pre-pour and during-pour checks. It lists 16 items to check before pouring including verifying reinforcement, formwork, construction joints, safety measures, and approved mix design. It also lists 4 items to check during pouring, such as ensuring proper slump, vibration for compaction, curing arrangement, and taking concrete cube specimens. The checklist provides a comprehensive list of critical steps to inspect for quality control of structural concrete placement.

Uploaded by

ajit karandikar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

CHECKLIST- STRUCTURAL CONCRETE

PRE & DURING POURING INSPECTION

S.N Description Yes No N/A


Pre Pour Checks
1 Is it the centre line checked as per drawing?
2 Is it the Bar Bending Schedule approved?
3 Is it the reinforcement used of approved brand?
4 Is it the diameter of bars, spacing provided as per approved drawing?
5 Is it the laps in staggered manner and chairs provided as required?
6 Is it the formwork and staging as per drawing and in exact plum?
7 Is it the construction joint provided at location shown in drawing?
8 Are the platforms and access for materials and labour movement provided?
9 Is adequate illumination arrangement provided?
10 Are the sufficient niddle vibrators available at site and checked for working
conditions?
11 Has safety measures as per safety Assurance Plan taken?
12 Is it the methodology approved for structural concrete?
13 Is batching plant approved and calibrated?
14 Are the sufficient number of transit mixers available at plant?
15 Is it the Mix Design approved?
16 Has the concreting sequence been approved?
15 Is it the provision made at plant for controlling the temperature of concrete ?
16 Are materials/ingredients inspected, tested and approved prior to use?
During Pouring Checks
17 Does the slump of concrete meet the requirement? Number of cube specimens
taken as per frequency mentioned in IS:456?
18 Is the previously placed layer of concrete green to receive the succeeding layer for
amalgamation?
19 Is proper vibration done to ensure compaction?
20 Is the proper curing arrangement provided in place?