Structural Notes:: Foundation Plan TB/GB & Wall Footing

This document provides structural notes for a building project, including the following key points: 1. All provisions of the National Structural Code of the Philippines must be followed for fabrication, erection, construction and quality control. 2. No changes can be made to the approved structural plans without written consent from the structural engineer. 3. The structural engineer will not be liable for any defects or damage resulting from violations of the structural notes or code. Steel shop drawings must be submitted to the structural engineer prior to fabrication, with emphasis on joint details.

Uploaded by

Mae Maglinte
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views4 pages

Structural Notes:: Foundation Plan TB/GB & Wall Footing

This document provides structural notes for a building project, including the following key points: 1. All provisions of the National Structural Code of the Philippines must be followed for fabrication, erection, construction and quality control. 2. No changes can be made to the approved structural plans without written consent from the structural engineer. 3. The structural engineer will not be liable for any defects or damage resulting from violations of the structural notes or code. Steel shop drawings must be submitted to the structural engineer prior to fabrication, with emphasis on joint details.

Uploaded by

Mae Maglinte
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

STRUCTURAL NOTES:

I. GENERAL CONDITIONS
A. All pertinent provisions of the National Structural Code of the Philippines,
Architecture & Space Planning
(NSCP C101-01), 2001, 5th edition, shall be strictly followed in the
fabrication, erection, construction & quality control aspects of the structure.
B. No changes, revisions, modifications, alterations, additions, deletions to
the approved Structural Plans, shall be done, without the written consent
of the Structural Engineer.
A0 A A1 B C A0 A A1 B C
C. The Structural Engineer shall not be liable for any defects and/or damage on the
9950 MM 9950 MM
building or structure as a result of violations/non-conformances of any provisions
2250 3350 1350 3000 2250 3350 1350 3000
of these Structural Notes as well pertinent provisions of NSCP C101-01 2000

II.STRUCTURAL STEEL Drawings and Specifications duly signed and sealed, as instruments of
service, are the properties and documents of the ARCHITECT ,
whether the object for which they are made is executed or not. It shall

A. Yield Strenght, ASTM - 36 Fy = 248 Mpa 4A 4A be unlawful for any person, without the written consent of the Architect
of said documents, to duplicate or to make copies for use, whether
executed partly or in whole. ( R.A. 9266, Sec.33 )
B. Shop drawings for all steel structures (trusses), to be submitted by Contractor C-2 C-2 WF-1
Written dimensions on these drawings shall have precedence over scaled

2500

2500
and /or Fabricator to Structural Engineer prior to fabrication with emphasis STAIRWELL
dimensions. Contractors shall verify and be responsible for all dimen-
sions and conditions on the site / job. The Architect must be notified
immediately of any variations or discrepancies from the dimensions and
on the '' Working Point" of each joint concerned.

3900

3900
conditions shown by these drawings.

WF-1
III.STRUCTURAL WELDING WORKS
4 PROPERTY LINE
4 PROPERTY LINE

1400

1400
C-1 C-1 C-1 TB/GB

2150
A. Minimum size of Fillet Welds shall be 4.0 mm with a minimum weld length of 50 mm

2300

WF-2

WF-2

WF-2
on each side of the steel member to be welded. 3A C-2 3A
WF-1
B. Use E-7011 Welding Electrodes ( Fujiweld) for all initial Welding pass for full penetration. ENGINEER
C. Use E-7013 Welding Electrodes ( Fujiweld) for all final welding passes on all steel

TB/GB

TB/GB
WF-2 WF-2

TG/GB
REG.NO. : TIN :
members to be welded. F-1

4100

4100

WF-2

WF-2
PTR NO. : DATE :

3550
IV.STRUCTURAL CONCRETE PLACE :

A. Ultimate Compressive strength after 28-days, F'c=20.70 Mpa (3000 psi)


PROJECT TITLE :
for all footings, columns, tie-beams, floor beams, roof beams and suspended slab. 3 C-1 C-1 C-1
3
TB/GB

WF-2
B. Concrete test specimens shall be undertaken for all structures in
F-1
the presence of the Structural Engineer or his duly authorized representative.

16000 MM

16000 MM

16000 MM

16000 MM
C. Concrete Tests for compressive strength shall be done at 14th day

4500
TB/GB
and 28th day of each concrete specimen.

TB/GB

TB/GB
6150

6150
PART OF EXISTING BUILDING

PART OF EXISTING BUILDING


100MM THK CONC.
D. Concrete test results shall be submitted to the Structural Engineer SLAB ON FILL W/
for evaluation. 10MMØ REBARS SPACED
@ 450MM OCBW
E. All concrete pouring activities shall be done with the concurrence of the

1300
STAIRWELL
Structural Engineer or his duly authorized representative.

250

250
2 2
C-1 TB/GB
V.REINFORCING BARS

2350

2350
2600

2600
TB/GB
A. Yield strengths : ELEV. PIT ELEV. PIT

TB/GB
1. 10MM dia. and below, Fy=230 Mpa (Grade 33) ASTM Grade 33

4350

4350
250

1250 250
F-1 SHEET CONTENTS :
shall havedia.
been implemented and subsequently
Mpa (Gradeapproved by the Structural
40 Engineer.

500
2. 12MM and above, Fy=275 40) ASTM Grade

WF-2
150
B
/G

1900

1900
B. Testing of all deformed bars shall be done prior to cutting, bending AS SHOWN
TB
WF-2
and placement into forms.
C. All reinforcing bars shall be bent cold.
1 C-1 C-1 C-1
1 OWNER :
TB/GB

PROPERTY LINE

PROPERTY LINE
D. Shop drawing shall be submitted to the Structural Engineer showing bar cut-offs.
bend points,lap splices,concrete covering before any installation of rebars F-1

VI. CONRETE MASONRY UNIT


NO. REVISIONS DATE
A. All load bearing concrete hollow blocks shall be 150 mm thickness and a
minimum compressive strenght of F'm = 4.50 M Pa ( 650 psi)
B. All non load bearing hollow blocks of thickness 100 mm and 150 mm shall have
a minimum compressive strenght of F'm = 2.40 M Pa (350 psi) 2250 1300 1550 1200
3350 4350 3350 4350
7700 MM 7700 MM
VII. FOUNDATION BED
A. Allowable Soil Bearing Capacity is assumed to be not less than
200Kpa, for a minimum depth of 1.50m. from the Natural Grade Line,
and to be verified on site by the Structural Engineer
B. Final depth of footings shall be determined by the Structural Engineer
upon proper evaluation of actual site conditions.
C. Any adjustments to the depth and size of footings to be made by the
DESIGNED BY :
Structural Engineer, shall be done so in writing.
D. Foundation dimensions and thickness may be increased by the Structural
FOUNDATION PLAN TB/GB & WALL FOOTING CADD BY :
SCALE 1 : 100 Mts. SCALE 1 : 100 Mts.
Engineer, depending on the actual soil condition / soil bearing capacity of CHECKED BY :

the foundation bed. DATE :

F:\ACAD Proj\LACERNA BONI\Arch'l


SHEET NO.:

01-COM-2012
1

PROJECT NO.:

File Name :
S
4
Architecture & Space Planning

A0 A A1 B C A0 A A1 B C A0 A A1 B C
9950 MM 9950 MM 9950 MM
2250 3350 1350 3000 2250 3350 1350 3000 2250 3350 1350 3000
2000 2000 2000
Drawings and Specifications duly signed and sealed, as instruments of
service, are the properties and documents of the ARCHITECT,
whether the object for which they are made is executed or not. It shall

4A 4A 4A be unlawful for any person, without the written consent of the Architect
of said documents, to duplicate or to make copies for use, whether
executed partly or in whole. ( R.A. 9266, Sec.33 )
B-4 B-4 B-4
Written dimensions on these drawings shall have precedence over scaled
2500

2500

2500
dimensions. Contractors shall verify and be responsible for all dimen-
STAIRWELL STAIRWELL STAIRWELL sions and conditions on the site / job. The Architect must be notified
immediately of any variations or discrepancies from the dimensions and
3900

3900

3900
conditions shown by these drawings.
B-3

B-3

B-3

B-3

B-3

B-3
4 4 4
B-4 B-1 B-1 B-4 B-1 B-1 B-4 B-1 B-1
1400

1400

1400
2150

2150

2150
STLDECK STLDECK STLDECK
OPEN OPEN OPEN
3A 3A 3A

B-3

B-3

B-3
B-4 B-4 B-4
ENGINEER
B-3 B-3 B-3
B-2

B-2

B-2

B-2

B-2

B-2

B-2

B-2

B-2

B-2

B-2

B-2
REG.NO. : TIN :
4100

4100

4100
STLDECK STLDECK STLDECK STLDECK STLDECK STLDECK

3350
PTR NO. : DATE :

3500

3500
STLDECK STLDECK STLDECK
PLACE :

PROJECT TITLE :
3 3 3
B-1 B-1 B-1 B-1 B-1 B-1

3450

3300

3300
STLDECK STLDECK STLDECK STLDECK STLDECK STLDECK STLDECK STLDECK STLDECK

CONCRETE LEDGE

CONCRETE LEDGE
16000 MM

16000 MM

16000 MM

16000 MM

16000 MM

16000 MM
B-2

B-2

B-2

B-2

B-2

B-2

B-2

B-2

B-2

B-2

B-2

B-2
6150

6150

6150
PART OF EXISTING BUILDING

PART OF EXISTING BUILDING

PART OF EXISTING BUILDING


B-1 B-1 B-1 B-1 B-1
2550

2550

2550
STLDECK STLDECK STAIRWELL STLDECK STLDECK STAIRWELL STLDECK STLDECK STLDECK
250 250

2 B-1
2 B-1
2 B-1
ELEVATOR ELEVATOR ELEVATOR
2600

2600

2600
OPEN SHAFT STLDECK STLDECK SHAFT STLDECK STLDECK SHAFT

B-1
B-1
4350

4350

4350
B-1

B-1

B-2

B-2

B-1

B-1

B-2
OPEN
250

250

250
SHEET CONTENTS :
B-2 B-2 B-2
2000

B-3
1900

1900

1900
STLDECK STLDECK STAIRWELL STLDECK STLDECK STAIRWELL AS SHOWN

B-3
1 B-2 1 B-2 B-2 1 B-2 B-2 OWNER :
650 1000

650 1000
B-1

B-1
B-1

B-1
400 STLDECK STLDECK 400 STLDECK
2250 2 2
B- B-

B-

B-
2

2
B-3 B-3

NO. REVISIONS DATE

2250 2250
3350 4350 3350 4350 3350 4350
7700 MM 7700 MM 7700 MM

MEZZANINE FLOOR FRAMING PLAN 2ND. FLOOR FRAMING PLAN TYP. FLOOR FRAMING PLAN DESIGNED BY :

SCALE 1 : 100 Mts. SCALE 1 : 100 Mts. SCALE 1 : 100 Mts. CADD BY :

CHECKED BY :

DATE :

F:\ACAD Proj\LACERNA BONI\Arch'l


SHEET NO.:

01-COM-2012
3

PROJECT NO.:

File Name :
S
4
8MM 200MM

Architecture & Space Planning


2 - 1.6MMx50x200MM THK C-CHANNEL
RAFTER ( TYP. TO 3 )
WELDING PASSES:
1ST PASS : E6011
6MM THK STEEL STIFFENER PLATES
2ND PASS : E6013
(BOTH SIDES)
3RD PASS : E7011
6MM THK STEEL STIFFENER PLATES
(BOTH SIDES)
A0 A A1 B C
9950 MM
WELDING CONNECTION DETAILS
SCALE 1 : 5 Mts.
2250 3350 1350 3000 STEEL BEAM (SEE SCHEDULE) STEEL BEAM (SEE SCHEDULE)
2000
Drawings and Specifications duly signed and sealed, as instruments of
service, are the properties and documents of the ARCHITECT,
whether the object for which they are made is executed or not. It shall
2 - ∠ 50x6 CLIP ANGLE
4A 1.2x50x150MM C- CHANNEL
2 - ∠ 50x6 CLIP ANGLE
∠ 50x6 SHEAR CONNECTORS
be unlawful for any person, without the written consent of the Architect
of said documents, to duplicate or to make copies for use, whether
executed partly or in whole. ( R.A. 9266, Sec.33 )
B-4
PURLINS @ 750 MM OC ∠ 50x6 SEAT ANGLE @ EVERY 400 MM OC (L = 150MM)
STEEL DECK t = 0.80MM Written dimensions on these drawings shall have precedence over scaled
2500

dimensions. Contractors shall verify and be responsible for all dimen-


150MM (MIN) (Fy = 414MPa) sions and conditions on the site / job. The Architect must be notified
∠ 50x6 SEAT ANGLE immediately of any variations or discrepancies from the dimensions and
3900

conditions shown by these drawings.


B-3

B-3

4
B-4 B-1 B-1
1400

2150
OPEN
3A

B-3
B-4 STEEL COLUMN (SEE SCHEDULE) STEEL COLUMN (SEE SCHEDULE) STITCH WELDED

PC ENGINEER
B-3 STEEL BEAM (SEE SCHEDULE)
B-2

B-2

B-2

B-2
PC REG.NO. : TIN :
4100

PC
STLDECK STLDECK PTR NO. : DATE :
STLDECK
PLACE :

COLUMN TO BEAM CONNECTION DETAILS PROJECT TITLE :


3 B-1
SCALE 1 : 20 Mts.
BEAM TO STEEL DECK CONNECTION DETAILS

STLDECK STLDECK STLDECK 10MMØ TOP BARS @ 125MM


CONCRETE LEDGE
16000 MM

16000 MM
CUT AT L/4
B-2

B-2

B-2

B-2
6150

PC PC

125
B-1
A A1 B C A1 B C
STLDECK STLDECK STLDECK
7700 MM 4350 MM

50
10MMØ BOTTOM REBARS
3350 1350 3000 1350 3000 @ 300MM OCBW CONT.
2 PC 2000
STEEL DECK t = 0.80MM
B-1 CONCRETE: 9MMØ PAN BARS
(Fy = 414MPa)
2350

ELEVATOR F'c = 4000 psi


2600

STLDECK STLDECK SHAFT (27 MPa)


B-1
4350

B-1

B-2

TYPICAL SECTION
1250 250

B-1 B-3

B-1
SHEET CONTENTS :
PC
B-2
2 STLDECK
PCB-1
2 B-3
1900

STLDECK STLDECK STAIRWELL AS SHOWN


B-3

2100

2200

2200
2350
B-2

B-2

2450

2450
B-4

B-4

B-4
STLDECK STLDECK STLDECK STLDECK STLDECK
1 TYP. STEEL DECK DETAILS OWNER :
4350 MM

4350 MM

4350 MM

4350 MM
B-1
B-2
650 1000

B-1

B-1

B-1

B-2
400

1250 250
STLDECK
SCALE NTS.
B-

B-2 PC B-3
B-
2

B-3
2250

2000
1900

1900
STLDECK

B-
2
B-

2
150 1 B-2 1
650 1000

DATE
B-1

NO. REVISIONS
STLDECK 3000
4350
BEAMS SCHEDULE
B-

2
B- 1.2x50x150MM C- CHANNEL
2

B-3
PURLINS @ 750 MM OC
TYPICAL BEAM SIZE FROM MEZZANINE FLOOR TO ROOF DECK
3000
150 3000
3350 4350 2 - 1.6MMx50x200MM THK C-CHANNEL
7700 MM 3350 4350 RAFTER ( TYP. TO ALL )
7700 MM
B1 B2 B3 B4

W18x65 W18x60 W16x45 W16x36

MACH. ROOM DESIGNED BY :

ROOF DECK FRAMING PLAN UPPER DECK FRAMING PLAN DECK FRAMING PLAN CADD BY :

SCALE 1 : 100 Mts. SCALE 1 : 100 Mts. SCALE 1 : 100 Mts. CHECKED BY :

DATE :

F:\ACAD Proj\LACERNA BONI\Arch'l


SHEET NO.:

01-COM-2012
4

PROJECT NO.:

File Name :
S
4
400 400

COLUMNS SCHEDULE
4-20MMØ (GRADE 60)TOP REBARS 10-20MMØ (GRADE 60) BOT. REBARS
CORNER BUNDLED AS SHOWN Architecture & Space Planning

2-20MMØ (GRADE 60) 2-20MMØ (GRADE 60) FLOOR C1 C2 PC

600
CONT. TORSION REBARS CONT. TORSION REBARS
CONCRETE: 4000 Psi (27 MPa)
10-20MMØ (GRADE 60) BOT. REBARS 4-20MMØ (GRADE 60) BOT. REBARS PEDESTAL TO MEZZANINE W10x68 W10x54
CORNER BUNDLED AS SHOWN
STEEL : 60000 PSI (414 MPA)
MEZZANINE TO THIRD FLOOR W10x65 W10x54 250 MM
AT SUPPORT AT MIDSPAN
THIRD FLOOR TO FIFTH FLOOR W10x54 W10x54
STIRRUPS: CONCRETE:
10MMØ (GRADE 40) - 1 @ 50MM; F'c = 4000 psi FIFTH FLOOR TO ROOF DECK W10x49 W10x54 W10x49
7 @ 100; REST @ 200MM OC. (27 MPa) 20MMØ VERTICAL BARS
AT 200MM O.C. EACH FACE
Drawings and Specifications duly signed and sealed, as instruments of
service, are the properties and documents of the ARCHITECT,
20MMØ HORIZONTAL BARS whether the object for which they are made is executed or not. It shall
be unlawful for any person, without the written consent of the Architect
AT 250MM O.C. EACH FACE of said documents, to duplicate or to make copies for use, whether
executed partly or in whole. ( R.A. 9266, Sec.33 )

TYPICAL FB/GB DETAILS


Written dimensions on these drawings shall have precedence over scaled
dimensions. Contractors shall verify and be responsible for all dimen-
sions and conditions on the site / job. The Architect must be notified
immediately of any variations or discrepancies from the dimensions and
SCALE 1 : 20 Mts. conditions shown by these drawings.

8-20MMØ CORNER REBARS


400 STEEL COLUMN
(SEE SCHEDULE)
6-20MMØ ANCHOR BOLTS

250 MM
(L = 500MM)
6MM THK. STIFFENER ENGINEER
STEEL COLUMN PLATES
REG.NO. : TIN :
GRID GRID GRID (SEE SCHEDULE)

400
20MM THK BASE PLATE

300
(400x400 MM)
6MM THK. STIFFENER PTR NO. : DATE :
PLATES FFL
VARIES VARIES
20MM THK BASE PLATE
SELF LEVELLING GROUT
(NON-SHIRNK)
PLAN IAPOA : PLACE :

( FOOTING TO 4TH FLOOR )


(400x400 MM) PROJECT TITLE :
6-20MMØ ANCHOR BOLTS
NGL (L = 500MM)
400 NOTES:
GB GB GB 1. FROM 4TH FLOOR TO ROOF DECK
16-20MMØ (GRADE 60) ADOPT THE SAME CONCRETE THICKNESS
MAIN COLUMN REBARS 400x400 MM CONCRETE BUT CHANGE THE VERTICAL REBARS
BUNDLED AT CORNERS PEDESTAL W/ 16-20MMØ TO 16MMØ.
REBARS (F'c = 4000 Psi)
LATERAL TIES: 2. CORNER REBARS ARE CONTINUOUS
2850MM

400
10MMØ (GRADE 40) - 1 @ 50; FROM FOOTING TO ROOF DECK.
3500MM

15-20MMØ (GRADE 60) 6 @ 100; REST @ 150MM OC


20-20MMØ (GRADE 60)
CONCRETE:
F'c = 4000 psi
(27 MPa)
FB FB FB
650MM

DETAIL OF CONC. PEDESTAL ELEVATOR SHEAR WALL DETAILS


SCALE 1 : 20 Mts. SCALE 1 : 20 Mts.

SECTION SHEET CONTENTS :

30-20MMØ (GRADE 60) 50MM THK GRAVEL BEDDING AS SHOWN


44-20MMØ (GRADE 60)

12MMØ TOP BARS OWNER :


@ 150 MM.O.C.

VER.
2ND FFL
3 12Ø VERT REBARS @600 MM OC
GRID GRID GRID 12MMØ NOSING BARS
L/ WITH 10Ø HOR. REBARS @ EVERY MR. & MRS. ARIEL LACERNA
3 LAYERS OF CHB
VARIES VARIES 10MMØ TREAD BARS GND FFL 3-12Ø LONG BAR WITH

200 MM
@ 200 MM.O.C. 10Ø TIES @300 MM OC
NO. REVISIONS DATE

400 MM
3
WF-2
VARIES

L/
12MMØ REBARS

RPOPERTY LINE
3600MM

GRID GND. FFL 16MMØ MAIN BARS @


C-1 C-1 C-1 150 MM.O.C. NGL
12Ø VERT REBARS @600 MM OC

600 MM (MIN.)
VERIFY
VARIES

12MMØ VERT. & HOR. WITH 10Ø HOR. REBARS @ EVERY


CONCRETE: BARS @ 200 MM.O.C. 3 LAYERS OF CHB
F'c = 4000 psi STAGGERED

200 MM
( 27 MPa ) 200 MM. THK. 3-12Ø LONG BAR WITH
F-1 6-12MMØ FOOTING BARS
10Ø TIES @300 MM OC

200
W/ 10MMØ SHORT BARS @ DESIGNED BY :
200 MM.O.C.

7700MM
600
400 MM CADD BY :

WF-1 50MM THK GRAVEL BEDDING CHECKED BY :

PLAN 50MM THK GRAVEL BEDDING


DATE :

TYPICAL FOOTING DETAILS STAIR/FOOTING DETAIL WALL FOOTING DETAILS

F:\ACAD Proj\LACERNA BONI\Arch'l


6 SHEET NO.:

01-COM-2012
5
SCALE 1 : 50 Mts. S-1 SCALE 1 : 20 Mts. SCALE 1:20 MTS.
S-1
2

PROJECT NO.:

File Name :
S
4

You might also like