Hidrolik Diagram sk200-8 ALL Warna
Hidrolik Diagram sk200-8 ALL Warna
Hidrolik Diagram sk200-8 ALL Warna
HYDRAULIC SYSTEM
SE22 SE23 P MB MB P
P P
MAIN PUMP PSV1 a1 A1 A2 a2 PSV2
PH1 PH2
PSV-P1 PSV-P2
4
Pcr Pcr
35.8~37.8
MPa VB VB
35.8~37.8
MPa 3 SWING
PG
VA VA DB
REG REG
651
652 M
1 29.0MPa
611 D MA MA D
PB PA
TRAVEL RIGHT TRAVEL LEFT
643
a3
532 8
646 a4
Dr
5.0MPa
M A B
a5
114kw B1
/2000min-1 B3 Dr3 A3
PTO
(OCEANIA) 2
11 MAIN CONTROL VALVE P2 P1 T1 T2 SWING RIGHT
34.3MPa
37.8MPa SWING LEFT
15 14 PL
CMR1
ARM OUT
ARM IN
PTb CMR2 PBL BUCKET DUMP
TRAVEL BUCKET DIGGING BOOM UP
P1UNLOAD PRIORITY TRAVEL LEFT BOOM DOWN
PCb PAL
AL SE1 SE2 SE3 SE4 SE7 SE8
BL
12 CT2 CP2
BOOM 1
P P
2
P P
3 4 5 6 7
P P
8
T3
HYD.TANK TRAVEL RIGHT P2UNLOAD CONFLUX
PAr CT1 PB1
BR CP1
PCa K M H
AR
PBr CCb
PAs
Dr 1 2 3 4 5 6 7 8
SE5
BOOM LCb LCs Pss
SWING P
PBb PBs 16
As (OCEANIA)
(ROD)Bb
37.7MPa Bs
PAa1
9
CRb
LCa RH LH
(HEAD)Ab
39.7MPa ARM 1
SOL/V BLOCK PBa1
PAb BUCKET
P1 CYLINDER
LEVER
A1 LOCK 37.7MPa
SV-4
LCc Aa (HEAD)
PCc
PBc
BUCKET
7 P T
ARM
P T
SWING BOOM
A2 P/B & BUCKET & SWING
SV-1 37.7MPa
TRAVEL
(ROD)Bc
CRar
PLc2
ARM
CYLINDER 6
1/2 SPEED (HEAD)Ac RH LH
P T
A3 CHANGEOVER Ba (ROD)
SV-3 39.7MPa
39.7MPa
PAc
ATT LCAT2
A4 BOOSTING ARM 2
SV-2 PBa2 LCAP2
LCo OPTION
PAo
5 10
BOOM
PSV-B
A5 P2UNLOAD 17 Ao
Bo
CYLINDER RIGHT TRAVEL FORWARD
3 6 4
P SE9
1 5 2
P SE10
PAa2 RIGHT TRAVEL REVERSE
MU PBo LEFT TRAVEL FORWARD
TRAVEL PBp1 LEFT TRAVEL REVERSE
A6 PRIORITY P1 BYPASS P2 BYPASS PBp2
PSV-C CUT CUT
A7 P1UNLOAD
PSV-D (T3b) (T3a) (T4a) (Dr4)
(P3) (P4)
A8 ARM2
PSV-A 17
T2 P2 YN01Z00185P1 01
YN01Z00161P1 03
13
Fig. 22-1 NEUTRAL CIRCUIT : Positive control function at safety lock lever down (unlocked position)
22-9
22. HYDRAULIC SYSTEM
22-10
22. HYDRAULIC SYSTEM
SE22 SE23 P MB MB P
P P
MAIN PUMP PSV1 a1 A1 A2 a2 PSV2
PH1 PH2
PSV-P1 PSV-P2
4
Pcr Pcr
35.8~37.8
MPa VB VB
35.8~37.8
MPa 3 SWING
PG
VA VA DB
REG REG
1 29.0MPa
D MA MA D
PB PA
TRAVEL RIGHT TRAVEL LEFT
a3
8
a4
Dr
5.0MPa
M A B
a5
114kw B1
/2000min-1 B3 Dr3 A3
PTO
(OCEANIA) 2
11 MAIN CONTROL VALVE P2 P1 T1 T2 SWING RIGHT
34.3MPa
37.8MPa SWING LEFT
15 14 PL
CMR1
ARM OUT
ARM IN
PTb CMR2 PBL BUCKET DUMP
TRAVEL BUCKET DIGGING BOOM UP
P1UNLOAD PRIORITY TRAVEL LEFT BOOM DOWN
PCb PAL
AL SE1 SE2 SE3 SE4 SE7 SE8
BL
12 CT2 CP2
BOOM 1
P P
2
P P
3 4 5 6 7
P P
8
T3
HYD.TANK TRAVEL RIGHT P2UNLOAD CONFLUX
PAr CT1 PB1
BR CP1
PCa K M H
AR
PBr CCb
PAs
Dr 1 2 3 4 5 6 7 8
SE5
BOOM LCb LCs Pss
SWING P
PBb PBs 16
As (OCEANIA)
(ROD)Bb
37.7MPa Bs
PAa1
9
CRb
LCa RH LH
(HEAD)Ab
39.7MPa ARM 1
SOL/V BLOCK PBa1
PAb BUCKET
P1 CYLINDER
LEVER
A1 LOCK 37.7MPa
SV-4
LCc Aa (HEAD)
PCc
PBc
BUCKET
7 P T
ARM
P T
SWING BOOM
A2 P/B & BUCKET & SWING
SV-1 37.7MPa
TRAVEL
(ROD)Bc
CRar
PLc2
ARM
CYLINDER 6
1/2 SPEED (HEAD)Ac RH LH
P T
A3 CHANGEOVER Ba (ROD)
SV-3 39.7MPa
39.7MPa
PAc
ATT LCAT2
A4 BOOSTING ARM 2
SV-2 PBa2 LCAP2
LCo OPTION
PAo
5 10
BOOM
PSV-B
A5 P2UNLOAD 17 Ao
Bo
CYLINDER RIGHT TRAVEL FORWARD
3 6 4
P SE9
1 5 2
P SE10
PAa2 RIGHT TRAVEL REVERSE
MU PBo LEFT TRAVEL FORWARD
TRAVEL PBp1 LEFT TRAVEL REVERSE
A6 PRIORITY P1 BYPASS P2 BYPASS PBp2
PSV-C CUT CUT
A7 P1UNLOAD
PSV-D (T3b) (T3a) (T4a) (Dr4)
(P3) (P4)
A8 ARM2
PSV-A 17
T2 P2 YN01Z00185P1 01
YN01Z00161P1 03
13
Fig. 22-2 TRAVEL CIRCUIT : Travel 2nd speed, RH & LH simultaneous operation.
22-11
22. HYDRAULIC SYSTEM
22.6 BUCKET CIRCUIT 5) The secondary pressure delivered in travel 3) With the function of pilot circuit, the oil flow is
straight proportional valve (PSV-C) is led to switched from bucket spool, and is fed into
This section describes the following.
PTb port provided in control valve (2) and shifts bucket cylinder head side through AC port of C/
(1) Bucket digging pilot circuit
the travel straight valve one stage. V (2). On the other hand, the return oil from
(2) Auto accel operation cylinder rod (R) side is throttled by bucket spool
22.6.2 AUTO ACCELERATION OPERATION
(3) Flow control in the work mode and returns to tank circuit from BC port of C/V
(1) Principle : (2).
(4) Bucket digging travel straight main circuit
Auto acceleration actuates according to signals
(5) Bucket spool stroke limiter References :
from low pressure sensor.
• In bucket dumping operation, the travel straight
22.6.1 PILOT CIRCUIT FOR BUCKET DIGGING (2) Operation :
valve also switches like digging operation,
(1) Mechatronics : <When lever is set to neutral position>
resulting in confluence with travel straight.
In the event where the sensor does not receive
1) When the operation for bucket digging is • When the bucket operation and other operation
signal for 4 seconds or more even though the
performed, the pilot proportional secondary are simultaneously performed, the travel straight
acceleration dial is set to MAX position, the engine
pressure is delivered through port 1 of the right valve does not actuate, resulting in single flow of
speed should be raised to 1000rpm.
pilot V (9), flows to PAc port, and acts on the low bucket circuit.
<When lever is operated>
pressure sensor (SE-1), and at the same time
When the pressure 0.6MPa (87psi) is input to low 22.6.5 BUCKET SPOOL STROKE LIMITER
the bucket spool is switched.
pressure sensor in STD specification (travel,
2) The voltage output by low pressure sensor (1) Purpose :
bucket, swing, arm), proportional voltage from low
inputs in mechatro controller. The mechatro To secure simultaneous operability of boom and
pressure sensor inputs in mechatro controller, and
controller performs signal processing and arm on boosting up attachment pressure (Pump
then the engine speed returns to the dial set
outputs current corresponding to the increase flow rate decreases.) and to prevent cavitations at
position corresponding to the lever operation.
of pump flow rate to pump proportional valves low engine speed
(PSV-P1) and (PSV-P2) on the P1 and P2 22.6.3 STAND-BY CURRENT CONSTANT (2) Operation :
pump sides, and at the same time the CONTROL On boosting up attachment pressure, pilot primary
command current is output to P1 unloading (1) Principle : pressure exerts on PCc port of C/V(2) through
valve (PSV-D), P2 unloading valve (PSV-B) and When the engine speed is intermediate speed or attachment booster solenoid valve, operates stroke
travel straight proportional valve (PSV-C). lower, command current value to have the pump limiter of bucket spool, and throttle oil path of spool.
In the following pages, the relation of operation delivery rate constant is output. As a result, P1 pump pressure increases, making
of low pressure sensor to both the increase of the simultaneous operation of boom up and bucket
(2) Operation :
pump flow rate and unloading proportional digging possible.
Even if the engine speed specified by acceleration
valve is the same. Therefore the explanation is Even though the engine speed is low, similarly the
potentiometer is low speed, as the delivery rate
omitted. cavitations can be prevented by actuating the
corresponds to the intermediate speed, the
3) The secondary pressure output by P1 pump stroke limiter.
actuator moves earlier than the movement
proportional valve (PSV-P1) and P2 pump equivalent to the control lever angle rate in light
proportional valve (PSV-P2) exerts on pump load operation.
regulator, actuating the pump onto the delivery
flow increase side. 22.6.4 BUCKET DIGGING AND TRAVEL
STRAIGHT CONFLUENCE (CONFLUX)
4) The secondary pressure delivered in P1
MAIN CIRCUIT
unloading valve (PSV-D) and P2 unloading
valve (PSV-B) is led to PBp1, PCb, PBp2 and (1) Operation :
PCa ports provided in control valve (2). 1) The oil delivered through A1 port of P1 pump
The secondary pressure from proportional goes into P1 port of C/V (2), opens load check
valve which has exerted on PBp1 and PBp2 valve LCc through parallel circuit and enters in
ports holds the by-pass cut spool on CLOSE bucket spool.
side, like the operation in the lever neutral 2) On the other hand, the oil delivered through P2
position. port of P2 pump goes into P2 port of C/V (2),
The secondary pressure from proportional confluences with oil from P1 pump through
valve which has exerted on PCb and PCa ports travel straight valve, and goes into bucket
switches the unloading spool in CLOSE side. spool. (Confluence of oil from 2 pumps)
22-12
22. HYDRAULIC SYSTEM
SE22 SE23 P MB MB P
P P
MAIN PUMP PSV1 a1 A1 A2 a2 PSV2
PH1 PH2
PSV-P1 PSV-P2
4
Pcr Pcr
35.8~37.8
MPa VB VB
35.8~37.8
MPa 3 SWING
PG
VA VA DB
REG REG
1 29.0MPa
D MA MA D
PB PA
TRAVEL RIGHT TRAVEL LEFT
a3
8
a4
Dr
5.0MPa
M A B
a5
114kw B1
/2000min-1 B3 Dr3 A3
PTO
(OCEANIA) 2
11 MAIN CONTROL VALVE P2 P1 T1 T2 SWING RIGHT
34.3MPa
37.8MPa SWING LEFT
15 14 PL
CMR1
ARM OUT
ARM IN
PTb CMR2 PBL BUCKET DUMP
TRAVEL BUCKET DIGGING BOOM UP
P1UNLOAD PRIORITY TRAVEL LEFT BOOM DOWN
PCb PAL
AL SE1 SE2 SE3 SE4 SE7 SE8
BL
12 CT2 CP2
BOOM 1
P P
2
P P
3 4 5 6 7
P P
8
T3
HYD.TANK TRAVEL RIGHT P2UNLOAD CONFLUX
PAr CT1 PB1
BR CP1
PCa K M H
AR
PBr CCb
PAs
Dr 1 2 3 4 5 6 7 8
SE5
BOOM LCb LCs Pss
SWING P
PBb PBs 16
As (OCEANIA)
(ROD)Bb
37.7MPa Bs
PAa1
9
CRb
LCa RH LH
(HEAD)Ab
39.7MPa ARM 1
SOL/V BLOCK PBa1
PAb BUCKET
P1 CYLINDER
LEVER
A1 LOCK 37.7MPa
SV-4
LCc Aa (HEAD)
PCc
PBc
BUCKET
7 P T
ARM
P T
SWING BOOM
A2 P/B & BUCKET & SWING
SV-1 37.7MPa
TRAVEL
(ROD)Bc
CRar
PLc2
ARM
CYLINDER 6
1/2 SPEED (HEAD)Ac RH LH
P T
A3 CHANGEOVER Ba (ROD)
SV-3 39.7MPa
39.7MPa
PAc
ATT LCAT2
A4 BOOSTING ARM 2
SV-2 PBa2 LCAP2
LCo OPTION
PAo
5 10
BOOM
PSV-B
A5 P2UNLOAD 17 Ao
Bo
CYLINDER RIGHT TRAVEL FORWARD
3 6 4
P SE9
1 5 2
P SE10
PAa2 RIGHT TRAVEL REVERSE
MU PBo LEFT TRAVEL FORWARD
TRAVEL PBp1 LEFT TRAVEL REVERSE
A6 PRIORITY P1 BYPASS P2 BYPASS PBp2
PSV-C CUT CUT
A7 P1UNLOAD
PSV-D (T3b) (T3a) (T4a) (Dr4)
(P3) (P4)
A8 ARM2
PSV-A 17
T2 P2 YN01Z00185P1 01
YN01Z00161P1 03
13
Fig. 22-3 BUCKET CIRCUIT : Bucket digging (Travel straight conflux), Auto-accelation and Standby flow rate constant control
22-13
22. HYDRAULIC SYSTEM
22-14
22. HYDRAULIC SYSTEM
SE22 SE23 P MB MB P
P P
MAIN PUMP PSV1 a1 A1 A2 a2 PSV2
PH1 PH2
PSV-P1 PSV-P2
4
Pcr Pcr
35.8~37.8
MPa VB VB
35.8~37.8
MPa 3 SWING
PG
VA VA DB
REG REG
1 29.0MPa
D MA MA D
PB PA
TRAVEL RIGHT TRAVEL LEFT
a3
8
a4
Dr
5.0MPa
M A B
a5
114kw B1
/2000min-1 B3 Dr3 A3
PTO
(OCEANIA) 2
11 MAIN CONTROL VALVE P2 P1 T1 T2 SWING RIGHT
34.3MPa
37.8MPa SWING LEFT
15 14 PL
CMR1
ARM OUT
ARM IN
PTb CMR2 PBL BUCKET DUMP
TRAVEL BUCKET DIGGING BOOM UP
P1UNLOAD PRIORITY TRAVEL LEFT BOOM DOWN
PCb PAL
AL SE1 SE2 SE3 SE4 SE7 SE8
BL
12 CT2 CP2
BOOM 1
P P
2
P P
3 4 5 6 7
P P
8
T3
HYD.TANK TRAVEL RIGHT P2UNLOAD CONFLUX
PAr CT1 PB1
BR CP1
PCa K M H
AR
PBr CCb
PAs
Dr 1 2 3 4 5 6 7 8
SE5
BOOM LCb LCs Pss
SWING P
PBb PBs 16
As (OCEANIA)
(ROD)Bb
37.7MPa Bs
PAa1
9
CRb
LCa RH LH
(HEAD)Ab
39.7MPa ARM 1
SOL/V BLOCK PBa1
PAb BUCKET
P1 CYLINDER
LEVER
A1 LOCK 37.7MPa
SV-4
LCc Aa (HEAD)
PCc
PBc
BUCKET
7 P T
ARM
P T
SWING BOOM
A2 P/B & BUCKET & SWING
SV-1 37.7MPa
TRAVEL
(ROD)Bc
CRar
PLc2
ARM
CYLINDER 6
1/2 SPEED (HEAD)Ac RH LH
P T
A3 CHANGEOVER Ba (ROD)
SV-3 39.7MPa
39.7MPa
PAc
ATT LCAT2
A4 BOOSTING ARM 2
SV-2 PBa2 LCAP2
LCo OPTION
PAo
5 10
BOOM
PSV-B
A5 P2UNLOAD 17 Ao
Bo
CYLINDER RIGHT TRAVEL FORWARD
3 6 4
P SE9
1 5 2
P SE10
PAa2 RIGHT TRAVEL REVERSE
MU PBo LEFT TRAVEL FORWARD
TRAVEL PBp1 LEFT TRAVEL REVERSE
A6 PRIORITY P1 BYPASS P2 BYPASS PBp2
PSV-C CUT CUT
A7 P1UNLOAD
PSV-D (T3b) (T3a) (T4a) (Dr4)
(P3) (P4)
A8 ARM2
PSV-A 17
T2 P2 YN01Z00185P1 01
YN01Z00161P1 03
13
Fig. 22-4 BOOM CIRCUIT : Boom up operation, Confluence function.
22-15
22. HYDRAULIC SYSTEM
This section describes boom lower operation. 22.7.5 CONSTANT RECIRCULATION FUNCTION
(1) Boom down pilot circuit OF BOOM DOWN MAIN CIRCUIT
(2) Prevention of natural fall by lock valve and (1) Purpose :
actuation at lowering Prevention of cavitation during boom
lowering motion.
(3) Constant recirculation function of boom down main
circuit (2) Principle :
The oil returning from the boom cylinder head (H) is
22.7.3 BOOM DOWN PILOT CIRCUIT recirculated to the rod (R).
(1) Operation : (3) Operation :
1) If the boom down operation is performed, the When the oil is supplied to the boom cylinder rod
secondary pilot proportional pressure comes (R) side during boom down operation, the boom
out of portáC of the right pilot valve (9) and acts moves faster than it should do in some cases by the
upon the low pressure sensor (SE-4). self weight of the attachment.
At the same time, the pressure acts upon the On that occasion, the circuit pressure on the rod (R)
PBb port of C/V (2). side is on the negative side.
2) The voltage output of the low pressure sensor The oil supplied to the boom cylinder rod (R) flows
(SE-4) enters the mechatro controller and into the A1 port of the P1 pump and the P1 port of
processed in it. C/V. The oil then passes through the boom spool
and goes out of the Bb port.
3) Then, the proportionl secondary pressure fed
On that occasion, the oil returning from the head
into C/V (2) PBb port and branches off in two
(H) goes through the recirculation path in the boom
lines and switches boom spool and releases
spool, pushes the check valve in the spool open, is
boom lock valve.
recirculated to the Bb port and is supplied to the rod
22.7.4 PREVENTION OF NATURAL FALL BY (R). When the (R) pressure is larger than the head
LOCK VALVE AND ACTUATION AT (H) pressure, the check valve in spool closes.
LOWERING Thereupon, the recirculation is stopped.
(1) Purpose :
Prevention of natural fall when the lever is neutral
(2) Principle :
The oil is prevented from returning to the boom
spool by the poppet seat of the boom lock valve.
(3) Operation :
In the boom down action, the selector valve is
changed over by the secondary proportional
pressure of PBb port. Then the poppet spring
chamber of the lock valve CRb gets through the
drain line (Dr) and makes the lock valve poppet
open.
When the boom lever is at neutral, the drain line on
the lock valve CRb poppet spring chamber is
closed which causes the poppet closed.
The result is that the oil returning from the boom
cylinder head (H) to the boom spool is held and
makes the leak from the boom spool zero.
Thus the boom cylinder is prevented from making a
natural fall.
22-16
22. HYDRAULIC SYSTEM
SE22 SE23 P MB MB P
P P
MAIN PUMP PSV1 a1 A1 A2 a2 PSV2
PH1 PH2
PSV-P1 PSV-P2
4
Pcr Pcr
35.8~37.8
MPa VB VB
35.8~37.8
MPa 3 SWING
PG
VA VA DB
REG REG
1 29.0MPa
D MA MA D
PB PA
TRAVEL RIGHT TRAVEL LEFT
a3
8
a4
Dr
5.0MPa
M A B
a5
114kw B1
/2000min-1 B3 Dr3 A3
PTO
(OCEANIA) 2
11 MAIN CONTROL VALVE P2 P1 T1 T2 SWING RIGHT
34.3MPa
37.8MPa SWING LEFT
15 14 PL
CMR1
ARM OUT
ARM IN
PTb CMR2 PBL BUCKET DUMP
TRAVEL BUCKET DIGGING BOOM UP
P1UNLOAD PRIORITY TRAVEL LEFT BOOM DOWN
PCb PAL
AL SE1 SE2 SE3 SE4 SE7 SE8
BL
12 CT2 CP2
BOOM 1
P P
2
P P
3 4 5 6 7
P P
8
T3
HYD.TANK TRAVEL RIGHT P2UNLOAD CONFLUX
PAr CT1 PB1
BR CP1
PCa K M H
AR
PBr CCb
PAs
Dr 1 2 3 4 5 6 7 8
SE5
BOOM LCb LCs Pss
SWING P
PBb PBs 16
As (OCEANIA)
(ROD)Bb
37.7MPa Bs
PAa1
9
CRb
LCa RH LH
(HEAD)Ab
39.7MPa ARM 1
SOL/V BLOCK PBa1
PAb BUCKET
P1 CYLINDER
LEVER
A1 LOCK 37.7MPa
SV-4
LCc Aa (HEAD)
PCc
PBc
BUCKET
7 P T
ARM
P T
SWING BOOM
A2 P/B & BUCKET & SWING
SV-1 37.7MPa
TRAVEL
(ROD)Bc
CRar
PLc2
ARM
CYLINDER 6
1/2 SPEED (HEAD)Ac RH LH
P T
A3 CHANGEOVER Ba (ROD)
SV-3 39.7MPa
39.7MPa
PAc
ATT LCAT2
A4 BOOSTING ARM 2
SV-2 PBa2 LCAP2
LCo OPTION
PAo
5 10
BOOM
PSV-B
A5 P2UNLOAD 17 Ao
Bo
CYLINDER RIGHT TRAVEL FORWARD
3 6 4
P SE9
1 5 2
P SE10
PAa2 RIGHT TRAVEL REVERSE
MU PBo LEFT TRAVEL FORWARD
TRAVEL PBp1 LEFT TRAVEL REVERSE
A6 PRIORITY P1 BYPASS P2 BYPASS PBp2
PSV-C CUT CUT
A7 P1UNLOAD
PSV-D (T3b) (T3a) (T4a) (Dr4)
(P3) (P4)
A8 ARM2
PSV-A 17
T2 P2 YN01Z00185P1 01
YN01Z00161P1 03
13
Fig. 22-5 BOOM CIRCUIT : Boom down operation & Prevention of natural boom falling.
22-17
22. HYDRAULIC SYSTEM
2) The voltage output by the low pressure sensor 3) The swing parking solenoid (SV-1) is excited
is input in the mechatro controller, and is signal- five seconds after the pressure of the swing low
processed. pressure sensors (SE-5) is reduced to zero.
In the case of arm in operation, the swing
3) Then, the secondary pressure led into PBs port
parking solenoid (SV-1) is excited the moment
of C/V (2) switches the swing spool.
the pressure of the arm in low pressure sensor
(SE-7) is reduced to zero. This causes the
mechanical brake to operate.
22-18
22. HYDRAULIC SYSTEM
SE22 SE23 P MB MB P
P P
MAIN PUMP PSV1 a1 A1 A2 a2 PSV2
PH1 PH2
PSV-P1 PSV-P2
4
Pcr Pcr
35.8~37.8
MPa VB VB
35.8~37.8
MPa 3 SWING
PG
VA VA DB
REG REG
1 29.0MPa
D MA MA D
PB PA
TRAVEL RIGHT TRAVEL LEFT
a3
8
a4
Dr
5.0MPa
M A B
a5
114kw B1
/2000min-1 B3 Dr3 A3
PTO
(OCEANIA) 2
11 MAIN CONTROL VALVE P2 P1 T1 T2 SWING RIGHT
34.3MPa
37.8MPa SWING LEFT
15 14 PL
CMR1
ARM OUT
ARM IN
PTb CMR2 PBL BUCKET DUMP
TRAVEL BUCKET DIGGING BOOM UP
P1UNLOAD PRIORITY TRAVEL LEFT BOOM DOWN
PCb PAL
AL SE1 SE2 SE3 SE4 SE7 SE8
BL
12 CT2 CP2
BOOM 1
P P
2
P P
3 4 5 6 7
P P
8
T3
HYD.TANK TRAVEL RIGHT P2UNLOAD CONFLUX
PAr CT1 PB1
BR CP1
PCa K M H
AR
PBr CCb
PAs
Dr 1 2 3 4 5 6 7 8
SE5
BOOM LCb LCs Pss
SWING P
PBb PBs 16
As (OCEANIA)
(ROD)Bb
37.7MPa Bs
PAa1
9
CRb
LCa RH LH
(HEAD)Ab
39.7MPa ARM 1
SOL/V BLOCK PBa1
PAb BUCKET
P1 CYLINDER
LEVER
A1 LOCK 37.7MPa
SV-4
LCc Aa (HEAD)
PCc
PBc
BUCKET
7 P T
ARM
P T
SWING BOOM
A2 P/B & BUCKET & SWING
SV-1 37.7MPa
TRAVEL
(ROD)Bc
CRar
PLc2
ARM
CYLINDER 6
1/2 SPEED (HEAD)Ac RH LH
P T
A3 CHANGEOVER Ba (ROD)
SV-3 39.7MPa
39.7MPa
PAc
ATT LCAT2
A4 BOOSTING ARM 2
SV-2 PBa2 LCAP2
LCo OPTION
PAo
5 10
BOOM
PSV-B
A5 P2UNLOAD 17 Ao
Bo
CYLINDER RIGHT TRAVEL FORWARD
3 6 4
P SE9
1 5 2
P SE10
PAa2 RIGHT TRAVEL REVERSE
MU PBo LEFT TRAVEL FORWARD
TRAVEL PBp1 LEFT TRAVEL REVERSE
A6 PRIORITY P1 BYPASS P2 BYPASS PBp2
PSV-C CUT CUT
A7 P1UNLOAD
PSV-D (T3b) (T3a) (T4a) (Dr4)
(P3) (P4)
A8 ARM2
PSV-A 17
T2 P2 YN01Z00185P1 01
YN01Z00161P1 03
13
Fig. 22-6 SWING CIRCUIT : Swing operation (LH)
22-19
22. HYDRAULIC SYSTEM
22.9 ARM CIRCUIT with P2 pump delivery oil in the valve section,
and then is flowed into arm cylinder head (H)
This section describes the following operations.
side through Aa port of C/V (2).
(1) Arm in, light-load operating pilot circuit
3) The return oil from arm cylinder (R) side flows
(2) Arm in, light-load variable normal recirculation main
in Ba port of C/V (2) and passes through the Ba
circuit / internal conflux main circuit
port because the arm lock valve CRar is open,
22.9.1 ARM IN, LIGHT-LOAD OPERATING PILOT and is flowed into arm 2 spool through arm 1
CIRCUIT spool.
P1 port of C/V (2), and the flows in travel
straight section and travel right tandem path.
Then because arm 2 spool was switched, the
delivery oil opens load check valve LCAT2,
goes through arm 2 spool, and confluences
22-20
22. HYDRAULIC SYSTEM
SE22 SE23 P MB MB P
P P
MAIN PUMP PSV1 a1 A1 A2 a2 PSV2
PH1 PH2
PSV-P1 PSV-P2
4
Pcr Pcr
35.8~37.8
MPa VB VB
35.8~37.8
MPa 3 SWING
PG
VA VA DB
REG REG
1 29.0MPa
D MA MA D
PB PA
TRAVEL RIGHT TRAVEL LEFT
a3
8
a4
Dr
5.0MPa
M A B
a5
114kw B1
/2000min-1 B3 Dr3 A3
PTO
(OCEANIA) 2
11 MAIN CONTROL VALVE P2 P1 T1 T2 SWING RIGHT
34.3MPa
37.8MPa SWING LEFT
15 14 PL
CMR1
ARM OUT
ARM IN
PTb CMR2 PBL BUCKET DUMP
TRAVEL BUCKET DIGGING BOOM UP
P1UNLOAD PRIORITY TRAVEL LEFT BOOM DOWN
PCb PAL
AL SE1 SE2 SE3 SE4 SE7 SE8
BL
12 CT2 CP2
BOOM 1
P P
2
P P
3 4 5 6 7
P P
8
T3
HYD.TANK TRAVEL RIGHT P2UNLOAD CONFLUX
PAr CT1 PB1
BR CP1
PCa K M H
AR
PBr CCb
PAs
Dr 1 2 3 4 5 6 7 8
SE5
BOOM LCb LCs Pss
SWING P
PBb PBs 16
As (OCEANIA)
(ROD)Bb
37.7MPa Bs
PAa1
9
CRb
LCa RH LH
(HEAD)Ab
39.7MPa ARM 1
SOL/V BLOCK PBa1
PAb BUCKET
P1 CYLINDER
LEVER
A1 LOCK 37.7MPa
SV-4
LCc Aa (HEAD)
PCc
PBc
BUCKET
7 P T
ARM
P T
SWING BOOM
A2 P/B & BUCKET & SWING
SV-1 37.7MPa
TRAVEL
(ROD)Bc
CRar
PLc2
ARM
CYLINDER 6
1/2 SPEED (HEAD)Ac RH LH
P T
A3 CHANGEOVER Ba (ROD)
SV-3 39.7MPa
39.7MPa
PAc
ATT LCAT2
A4 BOOSTING ARM 2
SV-2 PBa2 LCAP2
LCo OPTION
PAo
5 10
BOOM
PSV-B
A5 P2UNLOAD 17 Ao
Bo
CYLINDER RIGHT TRAVEL FORWARD
3 6 4
P SE9
1 5 2
P SE10
PAa2 RIGHT TRAVEL REVERSE
MU PBo LEFT TRAVEL FORWARD
TRAVEL PBp1 LEFT TRAVEL REVERSE
A6 PRIORITY P1 BYPASS P2 BYPASS PBp2
PSV-C CUT CUT
A7 P1UNLOAD
PSV-D (T3b) (T3a) (T4a) (Dr4)
(P3) (P4)
A8 ARM2
PSV-A 17
T2 P2 YN01Z00185P1 01
YN01Z00161P1 03
13
Fig. 22-7 ARM CIRCUIT : Arm in (Light load) operation, Arm variable recirculation & Anti cavitation function
22-21
22. HYDRAULIC SYSTEM
This section describes the following operations. 4) The return oil returns directly into tank circuit
(3) Arm in, heavy load operating pilot circuit because arm 2 spool is switched to
(recirculation cut) recirculation cut position.
(4) Arm in, heavy load operating sequence confluxed
Position of arm 2 spool
main circuit
Neutral position Recirculation cut position
22.9.3 ARM IN, HEAVY LOAD OPERATING
PILOT CIRCUIT
From arm out
(1) Operation :
P/V
1) In arm-in operation, when the heavy loading is
From arm 2 inverse
applied to arm and the P2 pump pressure proportional valve
increases to the set pressure, the voltage
output by P2 pump pressure sensor (SE-23) is
converted to signal (signal processing) by
mechatro controller, consequently the current
of arm 2 solenoid proportional valve is
controlled according to the load pressure and
the arm variable recirculation is cut.
When the recirculation is cut, internal
confluence is held similarly to that in light load
operation.
2) Left pilot valve actuation due to arm-in
operation is equivalent to that at light load
operation.
22-22
22. HYDRAULIC SYSTEM
SE22 SE23 P MB MB P
P P
MAIN PUMP PSV1 a1 A1 A2 a2 PSV2
PH1 PH2
PSV-P1 PSV-P2
4
Pcr Pcr
35.8~37.8
MPa VB VB
35.8~37.8
MPa 3 SWING
PG
VA VA DB
REG REG
1 29.0MPa
D MA MA D
PB PA
TRAVEL RIGHT TRAVEL LEFT
a3
8
a4
Dr
5.0MPa
M A B
a5
114kw B1
/2000min-1 B3 Dr3 A3
PTO
(OCEANIA) 2
11 MAIN CONTROL VALVE P2 P1 T1 T2 SWING RIGHT
34.3MPa
37.8MPa SWING LEFT
15 14 PL
CMR1
ARM OUT
ARM IN
PTb CMR2 PBL BUCKET DUMP
TRAVEL BUCKET DIGGING BOOM UP
P1UNLOAD PRIORITY TRAVEL LEFT BOOM DOWN
PCb PAL
AL SE1 SE2 SE3 SE4 SE7 SE8
BL
12 CT2 CP2
BOOM 1
P P
2
P P
3 4 5 6 7
P P
8
T3
HYD.TANK TRAVEL RIGHT P2UNLOAD CONFLUX
PAr CT1 PB1
BR CP1
PCa K M H
AR
PBr CCb
PAs
Dr 1 2 3 4 5 6 7 8
SE5
BOOM LCb LCs Pss
SWING P
PBb PBs 16
As (OCEANIA)
(ROD)Bb
37.7MPa Bs
PAa1
9
CRb
LCa RH LH
(HEAD)Ab
39.7MPa ARM 1
SOL/V BLOCK PBa1
PAb BUCKET
P1 CYLINDER
LEVER
A1 LOCK 37.7MPa
SV-4
LCc Aa (HEAD)
PCc
PBc
BUCKET
7 P T
ARM
P T
SWING BOOM
A2 P/B & BUCKET & SWING
SV-1 37.7MPa
TRAVEL
(ROD)Bc
CRar
PLc2
ARM
CYLINDER 6
1/2 SPEED (HEAD)Ac RH LH
P T
A3 CHANGEOVER Ba (ROD)
SV-3 39.7MPa
39.7MPa
PAc
ATT LCAT2
A4 BOOSTING ARM 2
SV-2 PBa2 LCAP2
LCo OPTION
PAo
5 10
BOOM
PSV-B
A5 P2UNLOAD 17 Ao
Bo
CYLINDER RIGHT TRAVEL FORWARD
3 6 4
P SE9
1 5 2
P SE10
PAa2 RIGHT TRAVEL REVERSE
MU PBo LEFT TRAVEL FORWARD
TRAVEL PBp1 LEFT TRAVEL REVERSE
A6 PRIORITY P1 BYPASS P2 BYPASS PBp2
PSV-C CUT CUT
A7 P1UNLOAD
PSV-D (T3b) (T3a) (T4a) (Dr4)
(P3) (P4)
A8 ARM2
PSV-A 17
T2 P2 YN01Z00185P1 01
YN01Z00161P1 03
13
Fig. 22-8 ARM CIRCUIT : Arm in (Heavy load) operation, Arm confluence & recirculation cut function
22-23
22. HYDRAULIC SYSTEM
This section describes the following operations. 22.9.7 NATURAL FALL PROTECTION WITH ARM
(5) Arm out pilot circuit LOCK VALVE
(6) Arm out 2 pumps conflux main circuit (1) Purpose :
To prevent the arm from falling naturally by the
(7) Natural fall protection with arm lock valve
weight of the arm and bucket.
22.9.5 ARM OUT PILOT CIRCUIT (2) Principle :
(1) Operation : Complete seat of the return circuit against the arm
1) When the arm out operation is performed, the spool of the arm cylinder (R) side circuit.
secondary pilot proportional pressure gets out (3) Operation :
of port 8 of the left pilot valve (9), and acts upon 1) When the secondary pressure for arm
the low pressure sensor (SE-8). At the same operation disappears and the arm cylinder
time, the oil is branched off in two flows and act stops, the pressure on the rod (R) side passes
upon the PBa1 and Pba2 ports of C/V (2). through the selector of the lock valve from the
2) The operating proportional secondary pressure Ba port of C/V, acts the back pressure on the
flowed in Pba1 port of C/V (2) switches the arm lock valve CRar and seats the lock valve.
1 spool. 2) Since the oil flow into the arm spool from the
3) Then, the operating secondary pressure flowed lock valve is shut off completely, natural fall of
in PBa2 port of C/V (2) switches the arm 2 spool the arm due to oil leaks through the arm spool
valve. is prevented.
22-24
22. HYDRAULIC SYSTEM
SE22 SE23 P MB MB P
P P
MAIN PUMP PSV1 a1 A1 A2 a2 PSV2
PH1 PH2
PSV-P1 PSV-P2
4
Pcr Pcr
35.8~37.8
MPa VB VB
35.8~37.8
MPa 3 SWING
PG
VA VA DB
REG REG
1 29.0MPa
D MA MA D
PB PA
TRAVEL RIGHT TRAVEL LEFT
a3
8
a4
Dr
5.0MPa
M A B
a5
114kw B1
/2000min-1 B3 Dr3 A3
PTO
(OCEANIA) 2
11 MAIN CONTROL VALVE P2 P1 T1 T2 SWING RIGHT
34.3MPa
37.8MPa SWING LEFT
BOOST
15 14 PL
CMR1
CHECK ARM OUT
ARM IN
PTb CMR2 PBL BUCKET DUMP
TRAVEL BUCKET DIGGING BOOM UP
P1UNLOAD PRIORITY TRAVEL LEFT BOOM DOWN
PCb PAL
AL SE1 SE2 SE3 SE4 SE7 SE8
BL
12 CT2 CP2
BOOM 1
P P
2
P P
3 4 5 6 7
P P
8
T3
HYD.TANK TRAVEL RIGHT P2UNLOAD CONFLUX
PAr CT1 PB1
BR CP1
PCa K M H
AR
PBr CCb
PAs
Dr 1 2 3 4 5 6 7 8
SE5
BOOM LCb LCs Pss
SWING P
PBb PBs 16
As (OCEANIA)
(ROD)Bb
37.7MPa Bs
PAa1
9
CRb
LCa RH LH
(HEAD)Ab
39.7MPa ARM 1
SOL/V BLOCK PBa1
PAb BUCKET
P1 CYLINDER
LEVER
A1 LOCK 37.7MPa
SV-4
LCc Aa (HEAD)
PCc
PBc
BUCKET
7 P T
ARM
P T
SWING BOOM
A2 P/B & BUCKET & SWING
SV-1 37.7MPa
TRAVEL
(ROD)Bc
CRar
PLc2
ARM
CYLINDER 6
1/2 SPEED (HEAD)Ac RH LH
P T
A3 CHANGEOVER Ba (ROD)
SV-3 39.7MPa
39.7MPa
PAc
ATT LCAT2
A4 BOOSTING ARM 2
SV-2 PBa2 LCAP2
LCo OPTION
PAo
5 10
BOOM
PSV-B
A5 P2UNLOAD 17 Ao
Bo
CYLINDER RIGHT TRAVEL FORWARD
3 6 4
P SE9
1 5 2
P SE10
PAa2 RIGHT TRAVEL REVERSE
MU PBo LEFT TRAVEL FORWARD
TRAVEL PBp1 LEFT TRAVEL REVERSE
A6 PRIORITY P1 BYPASS P2 BYPASS PBp2
PSV-C CUT CUT
A7 P1UNLOAD
PSV-D (T3b) (T3a) (T4a) (Dr4)
(P3) (P4)
A8 ARM2
PSV-A 17
T2 P2 YN01Z00185P1 01
YN01Z00161P1 03
13
Fig. 22-9 ARM CIRCUIT : Arm out operation, Confluence function
22-25
22. HYDRAULIC SYSTEM
22-26
22. HYDRAULIC SYSTEM
SE22 SE23 P MB MB P
P P
MAIN PUMP PSV1 a1 A1 A2 a2 PSV2
PH1 PH2
PSV-P1 PSV-P2
4
Pcr Pcr
35.8~37.8
MPa VB VB
35.8~37.8
MPa 3 SWING
PG
VA VA DB
REG REG
1 29.0MPa
D MA MA D
PB PA
TRAVEL RIGHT TRAVEL LEFT
a3
8
a4
Dr
5.0MPa
M A B
a5
114kw B1
/2000min-1 B3 Dr3 A3
PTO
(OCEANIA) 2
11 MAIN CONTROL VALVE P2 P1 T1 T2 SWING RIGHT
34.3MPa
37.8MPa SWING LEFT
15 14 PL
CMR1
ARM OUT
ARM IN
PTb CMR2 PBL BUCKET DUMP
TRAVEL BUCKET DIGGING BOOM UP
P1UNLOAD PRIORITY TRAVEL LEFT BOOM DOWN
PCb PAL
AL SE1 SE2 SE3 SE4 SE7 SE8
BL
12 CT2 CP2
BOOM 1
P P
2
P P
3 4 5 6 7
P P
8
T3
HYD.TANK TRAVEL RIGHT P2UNLOAD CONFLUX
PAr CT1 PB1
BR CP1
PCa K M H
AR
PBr CCb
PAs
Dr 1 2 3 4 5 6 7 8
SE5
BOOM LCb LCs Pss
SWING P
PBb PBs 16
As (OCEANIA)
(ROD)Bb
37.7MPa Bs
PAa1
9
CRb
LCa RH LH
(HEAD)Ab
39.7MPa ARM 1
SOL/V BLOCK PBa1
PAb BUCKET
P1 CYLINDER
LEVER
A1 LOCK 37.7MPa
SV-4
LCc Aa (HEAD)
PCc
PBc
BUCKET
7 P T
ARM
P T
SWING BOOM
A2 P/B & BUCKET & SWING
SV-1 37.7MPa
TRAVEL
(ROD)Bc
CRar
PLc2
ARM
CYLINDER 6
1/2 SPEED (HEAD)Ac RH LH
P T
A3 CHANGEOVER Ba (ROD)
SV-3 39.7MPa
39.7MPa
PAc
ATT LCAT2
A4 BOOSTING ARM 2
SV-2 PBa2 LCAP2
LCo OPTION
PAo
5 10
BOOM
PSV-B
A5 P2UNLOAD 17 Ao
Bo
CYLINDER RIGHT TRAVEL FORWARD
3 6 4
P SE9
1 5 2
P SE10
PAa2 RIGHT TRAVEL REVERSE
MU PBo LEFT TRAVEL FORWARD
TRAVEL PBp1 LEFT TRAVEL REVERSE
A6 PRIORITY P1 BYPASS P2 BYPASS PBp2
PSV-C CUT CUT
A7 P1UNLOAD
PSV-D (T3b) (T3a) (T4a) (Dr4)
(P3) (P4)
A8 ARM2
PSV-A 17
T2 P2 YN01Z00185P1 01
YN01Z00161P1 03
13
Fig. 22-10 COMBINED CIRCUIT : Boom up & Travel forward 1st speed operation, Travel straight function.
22-27
22. HYDRAULIC SYSTEM
In this section, the independent operation is omitted 22.10.4 SWING / ARM IN, SWING PRIORITY MAIN
and describes difference in combined operation. CIRCUIT
(3) Swing / Arm in light load, pilot circuit (1) Purpose :
(4) Swing / Arm in, swing priority main circuit Stable swing speed.
(2) Principle :
22.10.3 SWING / ARM IN LIGHT LOAD, PILOT
Raise the oil pressure flowing to arm cylinder, and
CIRCUIT
give a priority of the delivery of P2 pump to swing
(1) Operation : operation.
1) On operating swing (left) and arm in motions (3) Operation :
simultaneously, mechatro controller outputs
1) The swing main circuit operates with P2 pump
command current to travel straight solenoid
flow. But on P2 pump circuit side, the flow goes
proportional valve (PSV-C) and arm 2 solenoid
to the swing circuit and arm circuit
inverse proportional valve according to signal
simultaneously because the swing circuit and
processing, and this proportional valve outputs
arm circuit are parallel. Then since the return oil
secondary pressure, which acts on PTb port
from arm cylinder rod (R) side is restricted in
and PAa2 port of C/V(2).
the arm 2 spool because the arm 2 spool is
2) PTb port pressure switches the travel straight switched to forced recirculation position, the
spool 2 steps, and the PAa2 port pressure pressure of return oil is raised, causing the rise
switches the arm 2 spool to the forced of circuit pressure on the arm cylinder head (H)
recirculation position. side.
2) At the same time meter-in of arm 2 spool closes
and arm in conflux is therefore cancelled, and
delivery oil from P2 pump and P1 pump are
combined in the parallel circuit on P2 pump side
because the travel straight spool was switched.
The conflux oil of P1 and P2 delivery oil in high
pressure flows in swing side taking priority over
all others.
This operation is called "Swing Priority Circuit".
22-28
22. HYDRAULIC SYSTEM
SE22 SE23 P MB MB P
P P
MAIN PUMP PSV1 a1 A1 A2 a2 PSV2
PH1 PH2
PSV-P1 PSV-P2
4
Pcr Pcr
35.8~37.8
MPa VB VB
35.8~37.8
MPa 3 SWING
PG
VA VA DB
REG REG
1 29.0MPa
D MA MA D
PB PA
TRAVEL RIGHT TRAVEL LEFT
a3
8
a4
Dr
5.0MPa
M A B
a5
114kw B1
/2000min-1 B3 Dr3 A3
PTO
(OCEANIA) 2
11 MAIN CONTROL VALVE P2 P1 T1 T2 SWING RIGHT
34.3MPa
37.8MPa SWING LEFT
15 14 PL
CMR1
ARM OUT
ARM IN
PTb CMR2 PBL BUCKET DUMP
TRAVEL BUCKET DIGGING BOOM UP
P1UNLOAD PRIORITY TRAVEL LEFT BOOM DOWN
PCb PAL
AL SE1 SE2 SE3 SE4 SE7 SE8
BL
12 CT2 CP2
BOOM 1
P P
2
P P
3 4 5 6 7
P P
8
T3
HYD.TANK TRAVEL RIGHT P2UNLOAD CONFLUX
PAr CT1 PB1
BR CP1
PCa K M H
AR
PBr CCb
PAs
Dr 1 2 3 4 5 6 7 8
SE5
BOOM LCb LCs Pss
SWING P
PBb PBs 16
As (OCEANIA)
(ROD)Bb
37.7MPa Bs
PAa1
9
CRb
LCa RH LH
(HEAD)Ab
39.7MPa ARM 1
SOL/V BLOCK PBa1
PAb BUCKET
P1 CYLINDER
LEVER
A1 LOCK 37.7MPa
SV-4
LCc Aa (HEAD)
PCc
PBc
BUCKET
7 P T
ARM
P T
SWING BOOM
A2 P/B & BUCKET & SWING
SV-1 37.7MPa
TRAVEL
(ROD)Bc
CRar
PLc2
ARM
CYLINDER 6
1/2 SPEED (HEAD)Ac RH LH
P T
A3 CHANGEOVER Ba (ROD)
SV-3 39.7MPa
39.7MPa
PAc
ATT LCAT2
A4 BOOSTING ARM 2
LCAP2
SV-2 PBa2
LCo OPTION
PAo
5 10
BOOM
PSV-B
A5 P2UNLOAD 17 Ao
Bo
CYLINDER RIGHT TRAVEL FORWARD
3 6 4
P SE9
1 5 2
P SE10
PAa2 RIGHT TRAVEL REVERSE
MU PBo LEFT TRAVEL FORWARD
TRAVEL PBp1 LEFT TRAVEL REVERSE
A6 PRIORITY P1 BYPASS P2 BYPASS PBp2
PSV-C CUT CUT
A7 P1UNLOAD
PSV-D (T3b) (T3a) (T4a) (Dr4)
(P3) (P4)
A8 ARM2
PSV-A 17
T2 P2 YN01Z00185P1 01
YN01Z00161P1 03
13
Fig. 22-11 COMBINED CIRCUIT : Swing / Arm in operation, swing priority function
22-29
22. HYDRAULIC SYSTEM
22-30
22. HYDRAULIC SYSTEM
SE22 SE23 P MB MB P
P P
MAIN PUMP PSV1 a1 A1 A2 a2 PSV2
PH1 PH2
PSV-P1 PSV-P2
4
Pcr Pcr
35.8~37.8
MPa VB VB
35.8~37.8
MPa 3 SWING
PG
VA VA DB
REG REG
1 29.0MPa
D MA MA D
PB PA
TRAVEL RIGHT TRAVEL LEFT
a3
8
a4
Dr
5.0MPa
M A B
a5
114kw B1
/2000min-1 B3 Dr3 A3
PTO
(OCEANIA) 2
11 MAIN CONTROL VALVE P2 P1 T1 T2 SWING RIGHT
34.3MPa
37.8MPa SWING LEFT
15 14 PL
CMR1
ARM OUT
ARM IN
PTb CMR2 PBL BUCKET DUMP
TRAVEL BUCKET DIGGING BOOM UP
P1UNLOAD PRIORITY TRAVEL LEFT BOOM DOWN
PCb PAL
AL SE1 SE2 SE3 SE4 SE7 SE8
BL
12 CT2 CP2
BOOM 1
P P
2
P P
3 4 5 6 7
P P
8
T3
HYD.TANK TRAVEL RIGHT P2UNLOAD CONFLUX
PAr CT1 PB1
BR CP1
PCa K M H
AR
PBr CCb
PAs
Dr 1 2 3 4 5 6 7 8
SE5
BOOM LCb LCs Pss
SWING P
PBb PBs 16
As (OCEANIA)
(ROD)Bb
37.7MPa Bs
PAa1
9
CRb
LCa RH LH
(HEAD)Ab
39.7MPa ARM 1
SOL/V BLOCK PBa1
PAb BUCKET
P1 CYLINDER
LEVER
A1 LOCK 37.7MPa
SV-4
LCc Aa (HEAD)
PCc
PBc
BUCKET
7 P T
ARM
P T
SWING BOOM
A2 P/B & BUCKET & SWING
SV-1 37.7MPa
TRAVEL
(ROD)Bc
CRar
PLc2
ARM
CYLINDER 6
1/2 SPEED (HEAD)Ac RH LH
P T
A3 CHANGEOVER Ba (ROD)
SV-3 39.7MPa
39.7MPa
PAc
ATT LCAT2
A4 BOOSTING ARM 2
SV-2 PBa2 LCAP2
LCo OPTION
PAo
5 10
BOOM
PSV-B
A5 P2UNLOAD 17 Ao
Bo
CYLINDER RIGHT TRAVEL FORWARD
3 6 4
P SE9
1 5 2
P SE10
PAa2 RIGHT TRAVEL REVERSE
MU PBo LEFT TRAVEL FORWARD
TRAVEL PBp1 LEFT TRAVEL REVERSE
A6 PRIORITY P1 BYPASS P2 BYPASS PBp2
PSV-C CUT CUT
A7 P1UNLOAD
PSV-D (T3b) (T3a) (T4a) (Dr4)
(P3) (P4)
A8 ARM2
PSV-A 17
T2 P2 YN01Z00185P1 01
YN01Z00161P1 03
13
Fig. 22-12 PRESSURE DRAIN (RELEASE) CIRCUIT : At pressure release mode.
22-31