S-707Q 2019
Quality requirements
for Actuators for On-Off Valves
Revision history
Acknowledgements
This IOGP Specification was prepared by a Joint Industry Project 33
Standardization of Equipment Specifications for Procurement organized
by IOGP with support by the World Economic Forum (WEF).
Disclaimer
Whilst every effort has been made to ensure the accuracy of the information
contained in this publication, neither IOGP nor any of its Members past present or
future warrants its accuracy or will, regardless of its or their negligence, assume
liability for any foreseeable or unforeseeable use made thereof, which liability is
hereby excluded. Consequently, such use is at the recipient's own risk on the basis
that any use by the recipient constitutes agreement to the terms of this disclaimer.
The recipient is obliged to inform any subsequent recipient of such terms.
This publication is made available for information purposes and solely for the private
use of the user. IOGP will not directly or indirectly endorse, approve or accredit the
content of any course, event or otherwise where this publication will be reproduced.
Copyright notice
The contents of these pages are © International Association of Oil & Gas Producers.
Permission is given to reproduce this report in whole or in part provided (i)
that the copyright of IOGP and (ii) the sources are acknowledged. All other rights are
reserved. Any other use requires the prior written permission of IOGP.
These Terms and Conditions shall be governed by and construed in accordance
with the laws of England and Wales. Disputes arising here from shall be exclusively
subject to the jurisdiction of the courts of England and Wales.
Quality requirements for Actuators for On-Off Valves
Foreword
This specification was prepared under Joint Industry Programme 33 (JIP33) "Standardization of Equipment
Specifications for Procurement" organized by the International Oil & Gas Producers Association (IOGP) with
the support from the World Economic Forum (WEF). Companies from the IOGP membership participated in
developing this specification to leverage and improve industry level standardization for projects globally in the
oil and gas sector. The work has developed a minimized set of supplementary requirements for procurement,
with life cycle cost in mind, resulting in a common and jointly approved specification, building on recognized
industry and/or international standards.
Recent trends in oil and gas projects have demonstrated substantial budget and schedule overruns. The Oil
and Gas Community within the World Economic Forum (WEF) has implemented a Capital Project Complexity
(CPC) initiative which seeks to drive a structural reduction in upstream project costs with a focus on industry-
wide, non-competitive collaboration and standardization. The CPC vision is to standardize specifications for
global procurement for equipment and packages, facilitating improved standardization of major projects across
the globe. JIP33 provides the oil and gas sector with the opportunity to move from internally to externally
focused standardization initiatives and provide step change benefits in the sector's capital projects
performance.
This specification has been developed in consultation with a broad user and supplier base to realize benefits
from standardization and achieve significant project and schedule cost reductions.
The JIP33 work groups performed their activities in accordance with IOGP's Competition Law Guidelines
(November 2014).
Table of Contents
1 Scope ....................................................................................................................................................... 4
2 Normative References ............................................................................................................................. 4
3 Terms and Definitions .............................................................................................................................. 4
3.1 Conformity assessment................................................................................................................. 4
3.2 Conformity assessment system (CAS) .........................................................................................4
3.3 Conformity assessment - hold point.............................................................................................. 4
3.4 Conformity assessment - witness point ........................................................................................ 5
3.5 Conformity assessment - surveillance .......................................................................................... 5
3.6 Conformity assessment - review ................................................................................................... 5
3.7 Critical ........................................................................................................................................... 5
4 Symbols and abbreviations ...................................................................................................................... 5
5 Quality requirements ................................................................................................................................ 5
5.1 Quality management system.......................................................................................................... 5
5.2 Conformance assessment ............................................................................................................. 5
6 Traceability ............................................................................................................................................... 6
7 Control of nonconforming products and services ..................................................................................... 6
8 Evidence (records) ................................................................................................................................... 6
Annex A (normative) Customer conformity assessment requirements ..............................................................7
Annex B (normative) Material traceability and certification requirements .......................................................... 9
Introduction
The purpose of this quality requirements specification (QRS) is to define quality management requirements for
the supply of actuators for on-off valves in accordance with ISO 12490 First Edition, 2011, Petroleum and
natural gas industries - Mechanical integrity and sizing of actuators and mounting kits for pipeline valves for
application in the petroleum and natural gas industries.
The QRS includes definition of a conformity assessment system (CAS) which specifies standardized customer
interventions against quality management activities at four different levels. The applicable CAS level is
specified by the customer in the equipment datasheet or purchase order.
This QRS shall be used in conjunction with the supplementary requirements specification IOGP S-707, the
information requirements specification IOGP S-707L and the equipment datasheet IOGP S-707D which
together comprise the full set of specification documents. The introduction section in the supplementary
requirements specification provides further information on the purpose of each of these documents and the
order of precedence for their use.
1 Scope
To specify quality management requirements for the supply of actuators for on-off valves to IOGP
S-707, Supplementary Specification to ISO 12490 Actuators for On-off Valves including:
c) traceability requirements;
d) evidence of conformance;
e) factory acceptance.
2 Normative References
ISO 29001 Petroleum, petrochemical and natural gas industries - Sector-specific quality
management systems - Requirements for product and service supply
organizations
API Specification Q1 Specification for Quality Management System Requirements for Manufacturing
Organizations for the Petroleum and Natural Gas Industry
ISO 12490:2011 Petroleum and natural gas industries - Mechanical integrity and sizing of
actuators and mounting kits for pipeline valves
IOGP S-707 Supplementary Specification to ISO 12490 Actuators for On-Off Valves
Demonstration that requirements relating to a product, process, system, person or body are fulfilled.
NOTE 1 Conformity assessment (or assessment) includes but is not limited to review, inspection, verification and
validation activities.
NOTE 2 Assessment activities may be undertaken at a supplier/sub-supplier's premises, virtually by video link, desktop
sharing, etc. or by review of information formally submitted for acceptance or for information.
System providing different levels of assessment of the supplier's control activities by the customer (second
party) or independent body (third party) based on evaluation of the supplier's capability to conform to the
product or service specification and obligatory requirements.
NOTE CAS A reflects the highest risk and associated extent of verification. CAS D is the lowest.
The point in the chain of activities beyond which an activity shall not proceed without the approval of the
purchaser or purchaser's representative.
The point in the chain of activities that the supplier shall notify the purchaser or purchaser's representative
before proceeding. The operation or process may proceed without witness if the purchaser does not attend
after the agreed notice period.
NOTE Information review requirements are managed on a surveillance basis and as such do not impose
schedule constraints, unless specified as hold points in Annex A or as conditions specified in the associated
IRS.
3.7 Critical
5 Quality requirements
The supplier shall demonstrate that the quality management arrangements established for the supply of
products and services conform to ISO 9001, ISO 29001, API Specification Q1 or an equivalent quality
management system standard agreed with the purchaser.
5.2.1
Quality and inspection plans and test plans developed as outputs to operational planning and control for the
products and services shall define the specific controls to be implemented by the supplier and when applicable,
their sub-suppliers, to ensure conformance with the specified requirements.
5.2.2
Controls shall address both internally and externally sourced processes products and services.
5.2.3
Quality plans and inspection plans and test plans shall include provision for the customer conformity
assessment system (CAS) as specified in the data sheet IOGP S-707D; see Annex A.
5.2.4
Supplier performance in meeting the requirements will be routinely assessed during execution of the scope
and where appropriate, corrective action requested and conformity assessment activities increased or
decreased consistent with criticality and risk.
NOTE 1 For industrial well proven solutions CAS level D is specified unless risk assessment indicates that a more
stringent CAS level is required.
NOTE 2 Irrespective of conformity assessment requirements defined by the customer, either, by reference to standard
or specification requirements or in the scope, the supplier remains responsible for operational planning and control and
demonstration of the conformity of products and services with the requirements (see ISO 9001:2015, 8.1 and 8.2).
6 Traceability
Material certification and traceability shall be maintained in accordance with Annex B.
8 Evidence (records)
Plans, procedures, methods and resultant records shall be provided in accordance with the associated IRS.
Annex A
(normative)
Customer conformity assessment requirements
This annex defines four conformity assessment systems (CAS) or levels of customer assessment.
The supplier shall provide for the specified CAS when developing quality plans and inspection and test plans
in accordance with Clause 5.
CAS
PURCHASER ASSESSMENT ACTIVITIES
A B C D
1 Planning and control activities
1.1 Quality planning (ISO9001, API Q1, ISO 29001, 8.1 and ISO10005) R R
1.2 Inspection and test planning (ISO 9001, API Q1, ISO 29001, 8.1 and ISO 10005) H H R R
1.3 Pre-Inspection/Pre-production planning H H W W
1.4 Review of deviations against PO and non-conformity process review H H H H
1.5 Calibration control and validity check for measuring instruments and equipment R R R
2 Design and development activities
2.1 Design and development
2.1.1 Orientation, accessibility and maintainability H H R R
2.1.2 Cross section drawings with bill of material H H H R
2.1.3 Calculations (Torque, blast, accumulator and SIL calculations) H H H R
2.1.4 Schematic review for pneumatic, hydraulic and electro-hydraulic actuators H H H R
2.2 Type test validation / verification
2.2.1 Actuator & motor type test certificates H R R
2.2.2 Hazardous area classification test certificate for electric actuator, accessories such
as solenoid valve, positioner, junction box, limit switches
R R R R
2.2.3 Solenoid valve coil insulation type test certificate H R R
2.2.4 Spring qualification test and sample test on each production batch R R R
2.2.5 IP certificate for actuator and accessories R R R R
2.2.6 Fire proofing type test certificate R R R R
2.3 Welding procedure qualification R R R R
2.3.1 Procedure qualification for welding, including repair welding, of pressure-
containing parts and attachment welding to pressure-containing parts to ISO
15607, ISO 15609 (all parts), ISO 15614-1 or ASME BPVC Section IX and 11.3,
R R
11.4 of ISO 12490)
2.3.2 Procedure qualification for welding, including repair welding, of structural welds,
including mounting kit to ANSI/AWS D1.1 /D1.1M or equivalent (ISO 12490, 11.2)
R R
2.3.3 Non-destructive testing process and personnel qualification to ISO 9712, EN 473
or ASNT SNT-TC-1A Level II (ISO 12490, 12.3.1)
R R
2.3.4 Welder performance qualification (WPQ) (ISO 12490, 11.1, 11.2) R R
3 Control of external supply
3.1 External supply scope, risk assessment and controls (ISO 9001, 8.4) R
3.2 Nominated sub-suppliers list for accessories, accumulator, air receiver and
pressure containing parts.
R R R R
CAS
PURCHASER ASSESSMENT ACTIVITIES
A B C D
4.1 Materials Verification
4.1.1 Material traceability for pressure-containing components, spring, spring canister as
per ISO 10474 or EN 10204, 3.1 certificate (S-707, 10.1, 10.3.1,10.3.2, 10.3.3, R R R
10.4)
4.1.2 Bolting hardness test for pressure-containing, mechanically loaded parts and
mounting kits as per EN 10204, 2.2 certificate, if applicable (ISO 12490, 10.5)
R R R
4.1.3 Material traceability for mechanically loaded parts and components of mounting
kits, EN 10204, 2.2 certificate (ISO 12490, 10.6)
R R R
4.1.4 Material requirements for pressure-containing parts and bolts exposed to sour
service to ISO 15156, all parts (if applicable) (ISO 12490, 10.7)
R R R R
Annex B
(normative)
Material traceability and certification requirements