The document contains calculations for wave, current and wind forces on piles based on various design standards like BS 6349 and ASCE 7-95.

Calculations are being performed to determine the wave drag force, wave inertia force, total wave force, current force and wind force on piles based on parameters like diameter, velocity, period, drag coefficient, inertia coefficient etc.

The current force is calculated based on the projected area, current velocity and drag coefficient of the pile. The force is calculated at different elevations from the sea bed level.

CALCULATION FOR WAVE, CURRENT & WIND FORCES

(For the Piles at Grid B & C)

DESIGN DATA.
Pipe rack bottom level = 3.41 m
Wave crest = 2.60 m
Refer Design
Wave trough = 0.66 m criteria
Sea bed level = -3.50 m
Trough of the wave above the sea bed = h = 4.16 m
Depth of fixity below sea bed = 1.00 m
Grade of Pile material (API X-65) = 450.00 N/mm2
Elastic Modulus of steel pipe = 2.00E+08 kN/m2
Outer dia. of pile = B = 914.40 mm
Actual wall thickness of pile = 17.70 mm
Theoretical wall thickness of pile = 11.70 mm
Marine growth = 50.00 mm
100.00 mm on a diameter
Drag force coefficient = CD = 0.65
Inertia coefficient = CI = 2.00 Table 5, BS 6349
Mass per unit volume of water = r = 1.025 t/m
3

T is the wave period = T = 5 sec Design criteria

Pipe Rack
3.41

Pipe rack bottom

Wave crest 2.60

MSL 1.26

Wave trough 0.66


Ls

Sea bed -3.50

H:\71146 Sabtank JPE\11\Deliverable\Calc\MARINE\561301118.xls


CALCULATION FOR CURRENT FORCE (As per BS 6349 : Part 1)
By considering the barnacle growth on the piles
Diameter of pile to be considered = 1.014 m
Total drag force per unit length(in kN/m 2) = FD = 0.5 CD r V2 A
= 3.331 V2 A
Where,
V = Current velocity
A = Projected area per unit length
Elevation - m (CD) Average Pile Current
height above
U. Limit L. Limit sea bed diameter - D (m) Velocity (m/s) Force (kN)

2.60 1.73 5.66 1.014 0.26 0.20


1.73 0.86 4.79 1.014 0.26 0.20
0.86 -0.01 3.92 1.014 0.26 0.20
-0.01 -0.89 3.05 1.014 0.26 0.20
-0.89 -1.76 2.18 1.014 0.26 0.20
-1.76 -2.63 1.31 1.014 0.26 0.20
-2.63 -3.50 0.44 1.014 0.26 0.20

CALCULATION FOR WAVE FORCE


Referring to the Morrison's Equation, 39.4.4., BS 6349, Part 2
Total wave force = Fw = FD + FI

Wave Drag Force = FD = 0.5 CDrD u2 Ls


Ls is the submerged length of the pile

u is the instantaneous velocity = u = 0.26 m/s (conservatively)

Wave Inertia force = FI = C I r A u Ls

u is the instantaneous acceleration = u = u/T


= 0.052 m/s2

Wave Drag Wave Inertia Lever arm from


Total force
the point of fixity
(kN/m2)
Ls Force (kN/m2) Force (kN/m2) (m)

5.66 1.29 4.88 6.37 6.66


4.79 1.09 4.13 5.42 5.79
3.92 0.90 3.38 4.47 4.92
3.05 0.70 2.63 3.52 4.05
2.18 0.50 1.88 2.57 3.18
1.31 0.30 1.13 1.62 2.31
0.44 0.10 0.38 0.67 1.44

H:\71146 Sabtank JPE\11\Deliverable\Calc\MARINE\561301118.xls


Maximum lateral load in = 24.65 kN

CALCULATION FOR WIND FORCE (As per BS 6399 Part 2)


Basic wind speed (based on 3 sec gust) = 43.10 m/s Refer B02 - E03
Referring to the Commentary ASCE 7-95, above wind speed is converted to average
mean wind speed
Basic wind speed(average mean) = V = 30.17 m/s
Dynamic wind pressure = q = kVs2
= 0.613 Ve2
Where,
V e = V s Sb
Vs = V S a Sd Ss Sp
Sa = 1.002 Altitude factor
Sd = 1.0 Direction factor
Ss = 1.0 Seasonal factor
Sp = 1.0 Probability factor
Sb = 1.48 Terrain and building factor

Dynamic wind pressure = q = 1.23 kN/m2


Wind Load on structure
Force coefficient considered = 2 2.7.2.1
Wind load on structures = 2.45 kN/m2
Wind Load on Pile
Wind force on Pile = F = 1.76 kN/m