Test Method Statement
Test Method Statement
Contract N:
Facility Name Location Squale Sheets of Sheets
Na. 1/10
Greenfield Photovoltaic Power plant in Tataouine Onshore
Supersedes N an
Document Titale Superseded by N an
Strings test Method statement Plant Area Plant Unit
Na. Na.
Company doc. Identification:
Revision: C
INDEX
1 INTRODUCTION.........................................................................................3
2 GENERAL...................................................................................................3
2.1 TERMS AND DEFINITIONS.................................................................3
2.2 REFERENCE DOCUMENTS...............................................................3
2.3 ABBREVIATIONS..................................................................................4
2.4 UNIT OF MEASUREMENT...................................................................4
3 TEST METHOD STATEMENT.....................................................................5
3.1 SAFETY...................................................................................................5
3.2 TEST CONDITION.................................................................................5
3.3 TESTING STEPS...................................................................................6
4 TEST REPORT............................................................................................8
This document is property of ENCM/ECMgroup. who will safeguard its rights according to the civil and penal provision of the law
Company doc. Identification:
Revision: C
1- INTRODUCTION:
The scope of this document is to define the testing methods that will be used during the testing of 239
strings then the verification and evaluation of overall performance of the photovoltaic characteristics.
2- GENERAL:
SUPPLIER: any of the third parties that manufactures or supplies equipment in order to perform the
activities required by the Client or by the Contractor under the EPC Contract.
This document is property of ENCM/ECMgroup. who will safeguard its rights according to the civil and penal provision of the law
Company doc. Identification:
Revision: C
2.3 ABBREVIATIONS:
A Ampere
V Volt
W Watt
° degree
°C degree Celsius
m² Meter square
All the units of measurement are and should be in accordance with the International System (S.I.).
This document is property of ENCM/ECMgroup. who will safeguard its rights according to the civil and penal provision of the law
Company doc. Identification:
Revision: C
Panel Temperature °C
Irradiation W/m²
Product power W
This document is property of ENCM/ECMgroup. who will safeguard its rights according to the civil and penal provision of the law
Company doc. Identification:
Revision: C
STEP 1: To install the reference cell for irradiance in the edge of the rack as bellow
STEP2 : To connect the SOLAR 02 remote unit to check the following parameters
- Panel temperature
- Ambient temperature
- Irradiance measurement
STEP 3: To select the solar panel data base according the availability in site (our case: to select
CS3U-340U Canadian solar)
This document is property of ENCM/ECMgroup. who will safeguard its rights according to the civil and penal provision of the law
Company doc. Identification:
Revision: C
This document is property of ENCM/ECMgroup. who will safeguard its rights according to the civil and penal provision of the law
Company doc. Identification:
Revision: C
4- Test report:
This document is property of ENCM/ECMgroup. who will safeguard its rights according to the civil and penal provision of the law