CMT Calculations.

This document provides cement calculations for a 13 3/8" surface casing job. It estimates: 1) A total lead slurry volume of 175.31 m3 or 1102.67 bbl and a lead slurry yield of 108.89 tons of cement. 2) A total tail slurry volume of 15.10 m3 or 95 bbl and a tail slurry yield of 19.62 tons of cement. 3) A total cement slurry volume of 1197.68 bbl. The document also calculates annular volumes, casing displacement, and pump requirements.

Uploaded by

thomas_ugders
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
168 views16 pages

CMT Calculations.

This document provides cement calculations for a 13 3/8" surface casing job. It estimates: 1) A total lead slurry volume of 175.31 m3 or 1102.67 bbl and a lead slurry yield of 108.89 tons of cement. 2) A total tail slurry volume of 15.10 m3 or 95 bbl and a tail slurry yield of 19.62 tons of cement. 3) A total cement slurry volume of 1197.68 bbl. The document also calculates annular volumes, casing displacement, and pump requirements.

Uploaded by

thomas_ugders
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 16

CEMENT CALCULATIONS 26" CONDUCTOR

Date 30-Aug-04 Location Diffra C-1 Csg Job 26" Conductor

Volumes as per CNLC caliper log.+ 15%

Lead from 10 30 20 meters


Volume open hole 20 meters 113.5 lt/m + 50% = 3.41 m³
Voume inside 13 3/8" cs 5 meters 316.8 lt/m = 1.6 m³
Total lead slurry m³ = 4.99 m³
Total lead slurry bbl = 31.38 bbl

Lead slurry yield 1.2 m³/ton cmt 4.16 Tons cmt

Tail slurry 0 meters 28.94 lt/m + 50% = 0.00 m³


Shoe track 5 meters 316.8 lt/m = 1.58 m³
Total tail slurry m³ = 1.58 m³
Total tail slurry bbl = 10.0 bbl

Capacity of 26" conductor = 316.8 lt/m 23 meters = 7.286 m³

45.8 bbl

Displacement = 18 m 5.70 m³ 35.9 bbl

Annulas Volume
Pump displacement 16.67 lt/str 4.41 gal/str

26" csg shoe 30 m

Hole depth 30 m

Annular Vol 30" H - 26" csg 28.94 lt/m

Between csg. 0 m Ann/Vol m³


Open Hole= 20 m Ann/Vol 0.00 m³
Total 0.00 m³ = 0 str
Annulus and Displacement calculations 9 5/8" csg
Length Volume m³
Annulas between 9 5/8" and 13 3/8" csg 30.98 lt/m 1015 meter 31.445 m³

Annulas between 9 5/8" and 12¼" open hole 28.94 lt/m 1170 meter 33.860 m³

Annulas between 4¾ DC" and 8½" open hole 25.2 lt/m 465 meter 11.718 m³

Annulas between 3½ DP" and 8½" open hole 30.1 lt/m 465 meter 13.997 m³

Annulas between 3½ DP" and 7" casing 11.7 lt/m 465 meter 5.441 m³

Total = 65.305 m³

Casing Volume, 9 5/8" 40 lb/ft 39.55 lt/m 2185 meter 86.417 m³

Number of Pump strokes 16.67 lt/str 2185 meter 36424 strokes

Open Hole Volume 76.04 lt/str 1170 meter 88.967

4¾" DC and 8½" open hole


9 5/8" csg
CEMENT CALCULATIONS
Date 27-Jul-03 Location Heglig 28 Csg Job

Volumes as per CNLC caliper log.+ 15%

Lead from 1279 to 402 meters 42.9 m³

Inside 10¾" casing, 100 meters 0.026 m³/m = 2.627 m³

Total lead = 49.335 m³ + c/a = 51.962

Lead slurry yield 1.55 m³/ton cmt 33.524 Tons cmt

Shoe track 177.8 mm 0.01996 lt/m

Length 11.6 m Volume = 0.232 m³


7" Production
CEMENT CALCULATIONS
Date 23-Oct-04 Location Diffra C-1 Csg Job 9 5/8" Production

Volumes as per CNLC caliper log.

Lead from 1200 1950 750 meters


Volume open hole 650 meters 33.84 lt/m+15% = 25.30 m³
Voume inside 13 3/8" cs 100 meters 30.98 lt/m = 3.1 m³
Total lead slurry m³ = 28.39 m³
Total lead slurry bbl = 178.59 bbl

Lead slurry yield 1.2 m³/ton cmt 23.66 Tons cmt

Tail slurry 1350 meters 35.48 lt/m + 15% = 55.08 m³


Shoe track 24 m.P110 47 38.19 lt/m = 0.92 m³
Total tail slurry m³ = 56.00 m³
Total tail slurry bbl = 352.2 bbl

Capacity of 9 5/8" P110, 47 lb/ft = 38.19 lt/m 2740 meters = 104.641 m³


Capacity of 9 5/8" N80, 47 lb/ft = 38.19 lt/m 536 meters = 20.470 m³
125.110
786.9 bbl

Annulas Volume
Pump displacement 16.67 lt/str 4.41 gal/str

13 3/8" csg shoe 1506 m

Hole depth 3220 m

Annular Vol 13 3/8" - 9 5/8" csg 30.98 lt/m

Annular Vol 12¼" H - 9 5/8" csg 28.94 lt/m

Between csg. 1506 m Ann/Vol 46.66 m³


Open Hole= 1714 m Ann/Vol 65.00 m³
Total 111.66 m³ = 6698 str
CEMENT CALCULATIONS
Date 6-Jun-05 Location Hilba East 2 Csg Job 10¾" surface

Volumes , gauge hole + 30%

Lead from 31 838 807 meters


Volume open hole 807 meters 51.5 lt/m + 30% = 54.03 m³
Voume inside 16" cond 31 meters 55.45 lt/m = 1.7 m³
Total lead slurry m³ = 55.75 m³
Total lead slurry bbl = 350.65 bbl

Lead slurry yield 1.2 m³/ton cmt 46.46 Tons cmt

Tail slurry 50 meters 51.5 lt/m + 30% = 3.35 m³


Shoe track 12 meters 39.55 lt/m = 0.47 m³
Total tail slurry m³ = 3.82 m³
Total tail slurry bbl = 24.0 bbl

Capacity of 9 5/8" K55, 40 lb/ft = 39.55 lt/m 2172.09 meters = 85.906 m³

540.3 bbl

Annulas Volume
Pump displacement 16.67 lt/str 4.41 gal/str

13 3/8" csg shoe 1506 m

Hole depth 3220 m

Annular Vol 13 3/8" - 9 5/8" csg 30.98 lt/m

Annular Vol 12¼" H - 9 5/8" csg 28.94 lt/m

Between csg. 1506 m Ann/Vol 46.66 m³


Open Hole= 1714 m Ann/Vol 65.00 m³
Total 111.66 m³ = 6698 str
CEMENT CALCULATIONS 13 3/8" CSG
Date 12-Sep-04 Location Diffra C-1 Csg Job 13 3/8" Surface casing
Hole size 17.5 "
Volumes hole size plus 125%%

Lead from 10 1244 1234 meters


Volume open hole 1224 meters 64.4 lt/m + % 120 173.42 m³
Voume inside 20" cond 20 meters 94.48 lt/m = 1.9 m³
Total lead slurry m³ = 175.31 m³
Total lead slurry bbl = 1102.67 bbl

Lead slurry yield 1.61 m³/ton cmt 108.89 Tons cmt

Tail slurry 100 meters 64.4 lt/m + % 120 14.17 m³


Shoe track 12 meters 78.08 lt/m = 0.94 m³
Total tail slurry m³ = 15.10 m³
Total tail slurry bbl = 95.0 bbl

Tail slurry yield 0.77 m³/ton cmt 19.62 Tons cmt


Total cement slurry 1197.68 bbl

Dicplacement
Capacity of 13 3/8" N-80, 61 lb/ft = 79.37 lt/m 1109.59 meters = 88.068 m³
78.08 lt/m 220.95 meters = 17.252 m³
105.320

Total displacement. 662.5 bbl


Displace 10 bbl w/ Dowell 15.0 bbl

Displace with Rig pumps 647.5 bbl

Pump out put 0.1019 bbl/str Total str 6354 Stokes

Annulas Volume
Pump displacement 16.67 lt/str 4.41 gal/str

20" csg shoe 30 m

Hole depth 1344 m

Annular Vol 13 3/8" - 26" csg 94.48 lt/m

Annular Vol 17½" H - 13 3/8" csg 64.4 lt/m

Between csg. 31 m Ann/Vol 2.93 m³


Open Hole= 1314 m Ann/Vol 84.62 m³
Total 87.55 m³ = 5252 str

Strokes X 2 = 10504 Stokes


CEMENT PLUG CALCULATION
Hole size 8½ capacity 36.61 lt/m
Annulas capacity 8½" x 5" = 23.94 lt/m
Drill pipe capacity 9.27 lt/m
Plug depth 100 meter volume = 3.66 m³ 23.0 bbl

Plus 50 % 5.49 m³ 34.5 bbl

Hole volume w/ DP I hole = 33.21 lt/m

Hole depth 3600 m

Plug hieght from 3600 to 3500 = 100 meter + 50% = 150 m

Plug hieght with DP in hole = 165.4 m

Top of plug w/ DP in hole = 3434.6 m

Pump 20 bbl water ahead 3.179 m³ 19.9959 bbl


Annulas hieght water = 132.7903 m
Total annulas height 298.1 m
Water behind 1.231 m³ 7.74278 bbl
Top of cmt & water 3302 m

Cement displace ment in DP = 3301.9 m X 9.27 lt/m = 30.61 m³


192.5 bbl
Under displace 5 bbl 187.5 bbl

Balanced plug w/ 20 bbl water ahead and 7.75 bbl water behind cement.

Hole depth 3480 m

Surface to bit Volume and pump strokes

Pump bbl/stk 0.0998 bbl


8" DC cap 4.188 lt/m
5" HWDP cap 4.61 lt/m

5" DP 3100 Meters = 28737 lt 28.74 m³ 180.76 bbl

5" HWDP 200 Meters = 922 lt 0.92 m³ 5.7994 bbl

7" DC 180 Meters = 753.84 lt 0.75 m³ 4.7417 bbl


191.3 bbl
Strokes required = 1917
CEMENT CALCULATIONS
Date 14-May-04 Location Balome 2 Csg Job 7" Production

Volumes as per CNLC caliper log.+ 25%

Cmt from 3085 3649 564 meters


Vol O/H an 8½" - 5" 244 meters 23.3 lt/m + 35% = 7.68 m³
Voume inside 7" + 5" csg 329 meters 7.26 lt/m = 2.4 m³
Voume inside 7" + 3½" DP 60 meters 13.5 lt/m = 0.8 m³
Total lead slurry m³ = 10.06 m³
Total lead slurry bbl = 63.30 bbl

Lead slurry yield 0.9 m³/ton cmt 11.18 Tons cmt

Displacement

Capacity of 3½" DP = 3.87 lt/m 2856.39 meters = 11.054 m³


Capacity of 5" liner = 9.26 lt/m 565 meters = 5.232 m³
Total = 16.286 m³

102.4 bbl
95% Strokes = 1036.84
97% Strokes = 1005.297

Differential pressure /w 11.1 lbs/gal ann TVD 1330 kg/m³ 3190 meters

8.3 lbs/gal csg 995 3190 meters

Displacement
9 bbl = 1.431 m³ = 1431 lt = #REF! m annulas
CEMENT CALCULATIONS
Date 8-Aug-05 Location Neem South West 1 Csg Job 7" Production

Volumes as per Schlumberger caliper log.+ 30%

Cmt from 3400 2100 1300 meters


Vol O/H an 8½" - 7" 961 meters 16.6 m³ + 20% 19.92 m³
Vol O/H an 8½" - 7" 60 11.73 lt/m + 20% = 0.84
Vol inside 9 5/8" + 7" csg 78 meters 13.51 lt/m = 1.1 m³
Vol inside 9 5/8" + 5" DP 100 meters 25.5 lt/m = 2.6 m³
Total lead slurry m³ = 20.97 m³
Total lead slurry bbl = 131.93 bbl

Lead slurry yield 0.9 m³/ton cmt 23.30 Tons cmt

Displacement

Capacity of 5" DP = 9.27 lt/m 2266 meters = 21.006 m³


Capacity of 7" liner = 19.38 lt/m 1092.28 meters = 21.168 m³
Total = 42.174 m³

265.3 bbl
95% Strokes = 2684.977
97% Strokes = 2603.295

Differential pressure /w 11.1 lbs/gal ann TVD 1330 kg/m³ 3190 meters

8.3 lbs/gal csg 995 3190 meters

Displacement
9 bbl = 1.431 m³ = 1431 lt = #REF! m annulas
CEMENT CALCULATIONS
Date 6-May-04 Location Balome 2 Csg Job 7" Production

Volumes as per CNLC caliper log.+ 25%

Lead from 2085 3185 1100 meters


Volume open hole 1000 meters 11.73 lt/m + 35% = 15.84 m³
Voume inside 9 5/8" csg 100 meters 14.67 lt/m = 1.5 m³
Total lead slurry m³ = 17.30 m³
Total lead slurry bbl = 108.83 bbl

Lead slurry yield 0.9 m³/ton cmt 19.23 Tons cmt

Tail slurry 400 meters 11.73 lt/m + 25% = 7.04 m³


Shoe track 24 meters 19.96 lt/m = 0.48 m³
Total tail slurry m³ = 7.52 m³
Total tail slurry bbl = 47.3 bbl

Capacity of 7" K55, 26 lb/ft = 19.96 lt/m 2600 meters = 51.896 m³


Capacity of 7" K55, 29 lb/ft = 19.36 lt/m 531 meters = 10.280 m³
Total = 62.176 m³

391.1 bbl
95% Strokes = 3958.381
75% Strokes = 3837.959

Differential pressure /w 11.1 lbs/gal ann TVD 1330 kg/m³ 3190 meters

8.3 lbs/gal csg 995 3190 meters

Displacement
9 bbl = 1.431 m³ = 1431 lt = 122.0 m annulas
Pill spoting
DP cap 9.27 lt/m length 2388 m = 22136.76 lt 22.137 m³ = 139.2 bbl

HWDP cap 4.61 lt/m length 445 m = 2051.45 lt 2.051 m³ = 12.9 bbl
Total string 24.188 1451 str
0.1019 bbl/str

27.00 bbl in pipe 112.2 bbl to pump 1101 str

10 bbl in annulus = 98 str

40 bbl = 393 str

30 bbl = 294 str 12 hrs 25 str/hr 6 str every 15 minutes

1451 str - 393 str 1058 str + 98 str = 1157

Pill Hight
Total pill volume 100 bbl

Hole depth 3650 m csg shoe 3185 m Open hole .= 465 m


Hole size 8.5 in
Hole cap 36.31 lt/m Total cap 16.88 m³ 106.2013 bbl

4¾" DC dis 9.4 lt/m Mud vol 26.91 lt/m

DC length 129 m Mud colum DC .= 1.2126 m³ 7.63 bbl

3½" HW dis 0.44670 lt/m Mud vol 35.86 lt/m

HWDP len 175 m Mud colum HWDP .= 6.27608 m³ 39.48 bbl

3½" DP dis 6.21 lt/m Mud vol 30.10 lt/m

3½" DP len 161 m Mud colum 3½"DP .= 4.8461 m³ 30.48 bbl

Total 77.59 bbl

Remaining pill in 7" csg - 3½" DP annulas = 22.41 bbl

7" csg - 3½" DP annulas = 3.87 lt/m + 13.5 lt/m = 17.37 lt/m

0.1095 bbl/m

Height in casing = 204.7 m


Remaining 3½ DP in string = 11.5338 m³ 691.9 strokes
Pill spoting
DP cap 9.27 lt/m length 1090 m = 10104.3 lt 10.104 m³ = 63.6 bbl

HWDP cap 4.61 lt/m length 254 m = 1170.94 lt 1.171 m³ = 7.4 bbl
Total string 11.275 676 str
0.1019 bbl/str

27.00 bbl in pipe 176 bbl to pump 1727 str

10 bbl in annulus = 98 str

40 bbl = 393 str

30 bbl = 294 str 12 hrs 25 str/hr 6 str every 15 minutes

676 str - 393 str 284 str + 98 str = 382

Hole depth 3220 m


100 bbl 15.90 m³

12¼" hole cap = 76.04 lt/m 30 bbl = 237.14575 m open hole

Hole V w/ P lt/m Hole V


9" DC displacement = 36.48 lt/m 39.56 lt/m 0 m 0.00 m³
8" DC displacement = 28.24 lt/m 47.8 lt/m 100 m 4.78 m³
6½" DC displac. = 18.22 lt/m 57.82 lt/m 35 m 2.02 m³
5" HWDP displac. = 9.36 lt/m 66.68 lt/m 25 m 1.67 m³
5" DP displac. = 3.4 lt/m 72.64 lt/m 160 m 8.47
Hole volume 8" DC = 47.8 lt/m 100 m = 2.824 m³

Hole volume 6½" DC = 57.82 lt/m 62 m = 3.585 m³

Hole volume 5" HW = 66.68 lt/m 137 m = 9.135 m³


299 m = 15.544 m³
Hole volume 5" DP = 72.64 lt/m
Remaining = 0.354 m³ 4.88 m
304 m = 11 std

Drill pipe displacement 1200 m 9.27 lt/str 11124 lt = 667 strokes