Test Report For

The document is a test report for interlock testing of a 220kV GIS substation. It details the procedures for testing the interlocks of circuit breaker Q0 and busbar disconnectors Q1 and Q2. For each component, it lists the conditions that must be met in order to close or open the device, and confirms the device is interlocked if any single condition is not met. This ensures the safe and proper operation of the high voltage equipment.

Uploaded by

Ahmed Fathy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
170 views12 pages

Test Report For

The document is a test report for interlock testing of a 220kV GIS substation. It details the procedures for testing the interlocks of circuit breaker Q0 and busbar disconnectors Q1 and Q2. For each component, it lists the conditions that must be met in order to close or open the device, and confirms the device is interlocked if any single condition is not met. This ensures the safe and proper operation of the high voltage equipment.

Uploaded by

Ahmed Fathy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 12

Main Contractor: Owner: Consultant: Project Name:

Toshka 3 (220/66/22 KV) GIS S/S


Date: Page:
SEP, 2021 1 of 12
Vendor: Document Number:
Sieyuan

Title.

OPERATION & INTERLOCK TEST

Test Report

for

220 KV GIS OPERATION & INTERLOCK

Company MADKOUR WITNESSED BY (EETC)


Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 2 of 12
Vendor: Document Number:
Sieyuan

Title.

OPERATION & INTERLOCK TEST

W502 (AL ALMAIN-1)


 Test procedure
-Achieve all conditions mentioned in oreder to release the interlock.
-opposite one condition by one to check that the switch is interlocked.

1- CIRCUIT BREAKER (Q0) CLOSE


MAINTENANCE

- Q1 OPEN
- Q2 OPEN
- Q9 OPEN
- Selector Switch (SF01) Local
- CB SF6 gas pressure stage 1 normal
- CB Spring Charged
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- Lockout Reset
- TCS Healthy

SERVICE
- Q1 CLOSE
- BB-1 PT1 Q11 CLOSED (W505A)
- BB-1 PT1 MCB CLOSED (W505A)
- Line VT MCB CLOSED
- Q9 CLOSE
- Selector Switch (SF01) Local
- CB SF6 gas pressure stage 1 normal
- CB Spring Charged
- All DS/ES in normal position (No incomplete position)
Company MADKOUR WITNESSED BY (EETC)
Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 3 of 12
Vendor: Document Number:
Sieyuan

Title.

OPERATION & INTERLOCK TEST

- No double operation from bay itself


- No double operation from other bays
- Lockout Reset
- TCS Healthy
OR
- Q2 CLOSE
- BB-2 PT2 Q21 CLOSED (W505A)
- BB-2 PT2 MCB CLOSED (W505A)
- Line VT MCB CLOSED
- Q9 CLOSE
- Selector Switch (SF01) Local
- CB SF6 gas pressure stage 1 normal
- CB Spring Charged
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- Lockout Reset
- TCS Healthy

2- CIRCUIT BREAKER (Q0) OPEN

- Selector Switch (SF01) Local


- CB SF6 gas pressure stage 2 normal

Company MADKOUR WITNESSED BY (EETC)


Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 4 of 12
Vendor: Document Number:
Sieyuan

Title.

OPERATION & INTERLOCK TEST

3- BUS BAR DISCONNECTOR (Q1) CLOSE/OPEN


MAINTENANCE

- Q31 CLOSE (W505A)


- Q52 CLOSE
- Q0 CLOSE
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES

SERVICE

- Q31 OPEN (W505A)


- Q52 OPEN
- Q51 OPEN
- Q0 OPEN
- Q2 OPEN
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES

Company MADKOUR WITNESSED BY (EETC)


Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 5 of 12
Vendor: Document Number:
Sieyuan

Title.

OPERATION & INTERLOCK TEST

BUS TRANSFER

- Q31 OPEN (W505A)


- Q52 OPEN
- Q51 OPEN
- Q0 CLOSED
- Q2 CLOSED
- Q35 CLOSED (W505)
- Q45 CLOSED (W505)
- Q10 CLOSED (W505)
- Q20 CLOSED (W505)
- Q0 CLOSED (W505)
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES

Company MADKOUR WITNESSED BY (EETC)


Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 6 of 12
Vendor: Document Number:
Sieyuan

Title.

OPERATION & INTERLOCK TEST

4- BUS BAR DISCONNECTOR (Q2) CLOSE/OPEN


MAINTENANCE

- Q41 CLOSE (W505A)


- Q51 CLOSE
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES

SERVICE

- Q41 OPEN (W505A)


- Q52 OPEN
- Q51 OPEN
- Q0 OPEN
- Q1 OPEN
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES

Company MADKOUR WITNESSED BY (EETC)


Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 7 of 12
Vendor: Document Number:
Sieyuan

Title.

OPERATION & INTERLOCK TEST

BUS TRANSFER

- Q41 OPEN (W505A)


- Q52 OPEN
- Q51 OPEN
- Q0 CLOSED
- Q1 CLOSED
- Q35 CLOSED (W505)
- Q45 CLOSED (W505)
- Q10 CLOSED (W505)
- Q20 CLOSED (W505)
- Q0 CLOSED (W505)
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES

Company MADKOUR WITNESSED BY (EETC)


Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 8 of 12
Vendor: Document Number:
Sieyuan

Title.

OPERATION & INTERLOCK TEST

5- LINE DISCONNECTOR (Q9) CLOSE/OPEN


MAINTENANCE

- Q8 CLOSE
- Q51 CLOSE
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES

SERVICE

- Q8 OPEN
- Q51 OPEN
- Q52 OPEN
- Q0 OPEN
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES

Company MADKOUR WITNESSED BY (EETC)


Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 9 of 12
Vendor: Document Number:
Sieyuan

Title.

OPERATION & INTERLOCK TEST

6- EARTH SWITCH (Q51) CLOSE/OPEN

- Q1 OPEN
- Q2 OPEN
- Q9 OPEN
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES

7- EARTH SWITCH (Q52) CLOSE/OPEN

- Q1 OPEN
- Q2 OPEN
- Q9 OPEN
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays

Company MADKOUR WITNESSED BY (EETC)


Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 10 of 12
Vendor: Document Number:
Sieyuan

Title.

OPERATION & INTERLOCK TEST

- No Run time Exceeded for DS/ES

8- HIGH SPEED EARTH SWITCH (Q8) CLOSE/OPEN

- Q9 OPEN
- LINE VT MCB OK
- NO Voltage in Line
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES

9- DISCONNECTOR (Q37) CLOSE/OPEN

- Q1 OPEN (W502)
- Q1 OPEN (W503)
- Q1 OPEN (W504)
- Q35 OPEN (W505)
- Q31 OPEN (W505A)
- Q61 OPEN
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)

Company MADKOUR WITNESSED BY (EETC)


Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 11 of 12
Vendor: Document Number:
Sieyuan

Title.

OPERATION & INTERLOCK TEST

- No double operation from bay itself


- No double operation from other bays
- No Run time Exceeded for DS/ES

10- DISCONNECTOR (Q47) CLOSE/OPEN

- Q2 OPEN (W502)
- Q2 OPEN (W503)
- Q2 OPEN (W504)
- Q45 OPEN (W505)
- Q41 OPEN (W505A)
- Q71 OPEN
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES

11- EARTH SWITCH (Q61) CLOSE/OPEN

- Q37 OPEN
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK

Company MADKOUR WITNESSED BY (EETC)


Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 12 of 12
Vendor: Document Number:
Sieyuan

Title.

OPERATION & INTERLOCK TEST

- All DS/ES in normal position (No incomplete position)


- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES

12- EARTH SWITCH (Q71) CLOSE/OPEN

- Q47 OPEN
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES

Company MADKOUR WITNESSED BY (EETC)


Name
Signature
Date