CB Timing TEST: Test Close Trip Coil - 1 Trip Coil - 2 Close-Open-1 (C-O1) Close-Open-2 (C-O2)

This document outlines circuit breaker timing tests to be performed on equipment at the Toshka 3 substation project. It lists test procedures that involve connecting sensors to circuit breaker contacts and supplying voltage to test closing and opening times. Test results will be printed and compared to factory acceptance test criteria. The document provides information on circuit breaker type, voltage and current ratings, and serial numbers. Signatures from the main contractor, owner, and consultant are included to approve the test plan.

Uploaded by

Ahmed Fathy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
308 views2 pages

CB Timing TEST: Test Close Trip Coil - 1 Trip Coil - 2 Close-Open-1 (C-O1) Close-Open-2 (C-O2)

This document outlines circuit breaker timing tests to be performed on equipment at the Toshka 3 substation project. It lists test procedures that involve connecting sensors to circuit breaker contacts and supplying voltage to test closing and opening times. Test results will be printed and compared to factory acceptance test criteria. The document provides information on circuit breaker type, voltage and current ratings, and serial numbers. Signatures from the main contractor, owner, and consultant are included to approve the test plan.

Uploaded by

Ahmed Fathy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Main Contractor: Owner: Consultant: Project Name:

Toshka 3 (220/66/22 KV) GIS S/S


Date: Page:
SEP, 2021 1 of 2
Vendor: Document Number:
EGYMAC

Title.

CB Timing TEST

1. CIRCUIT BREAKER TIMING TEST:

1.1. Time (msec) Genera


Test l Data
R Y B and
Close

Trip Coil - 1

Trip Coil – 2

Close–Open–1 (C-O1)
Close–Open–2 (C-O2)
Information:

CB Type : Manufacture :
Rated Voltage: Rated Current:
CB Serial no.: Panel Name

1.2. Test Procedure:


 Connect DC wiring to the closing and opening points.
 Connect the sensors wires on the main or Auxiliary contacts of the CB.
 Supply voltage for Opening and Closing
 Initiate the command and the timer from the testing kit.
 Print the results.
 The test done according to the FAT procedure and results referred to the FAT criteria.

Company MADKOUR EETC PGESCO


Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 2 of 2
Vendor: Document Number:
EGYMAC

Title.

CB Timing TEST

Company MADKOUR EETC PGESCO


Name
Signature
Date