PVI 3.0 3.6 4.2 TL OUTD Product Manual en
PVI 3.0 3.6 4.2 TL OUTD Product Manual en
PVI 3.0 3.6 4.2 TL OUTD Product Manual en
Product manual
PVI-3.0/3.6/4.2-TL-OUTD
(3.0 to 4.2 kW)
IMPORTANT SAFETY INSTRUCTIONS
This manual contains important safety instructions that must be followed during installation
and maintenance of the equipment.
Operators are required to read this manual and scrupulously follow the indications reported
in it, since ABB cannot be held responsible for damages caused to people and/or things, or
the equipment, if the warranty conditions are not observed.
000397AG
-2-
Product Manual
2 - Characteristics
5 - Installation
6 - Instruments
7 - Operation
8 - Maintenance
EFFECTIVE 10/10/2014
© Copyright 2014 ABB. All Rights Reserved.
-3-
1
Introduction and general information
The equipment complies with the pertinent legislation currently in force in the country of in-
stallation and it has issued the corresponding declaration of conformity.
ABB will NOT be held liable for defects or malfunctions arising from: im-
proper use of the equipment; deterioration resulting from transportation
or particular environmental conditions; performing maintenance incor-
rectly or not at all; tampering or unsafe repairs; use or installation by
unqualified persons.
ABB will NOT be held responsible for the disposal of: displays, cables,
batteries, accumulators etc. The Customer shall therefore arrange for the
disposal of substances potentially harmful to the environment in accor-
dance with the legislation in force in the country of installation.
000002EG
-4-
1- Introduction and general information
Contents
Introduction and general information................................................................................................ 4
Warranty and Supply Conditions...........................................................................................................4
Not included in the supply........................................................................................................4
Contents...................................................................................................................................................5
Reference number index........................................................................................................................8
Graphical representation of references................................................................................................8
The document and who it is for ............................................................................................................9
Purpose and structure of the document..................................................................................9
List of annexes ........................................................................................................................9
Staff characteristics..................................................................................................................9
Symbols ad signs..................................................................................................................................10
Field of use, general conditions .........................................................................................................11
Intended or allowed use.........................................................................................................11
Limits in field of use................................................................................................................11
Improper or prohibited use ....................................................................................................11
Characteristics.................................................................................................................................. 12
General conditions................................................................................................................................12
Models and range of equipment..........................................................................................................13
Identification of the equipment and the manufacturer...........................................................14
Characteristics and technical data......................................................................................................16
Tightening torques.................................................................................................................18
Overall dimensions................................................................................................................18
Bracket dimensions................................................................................................................19
Efficiency curves...................................................................................................................................20
Power derating.......................................................................................................................................21
Power derating due to environmental conditions..................................................................22
Power reduction due to the input voltage..............................................................................22
Characteristics of a photovoltaic generator.......................................................................................23
Strings and Arrays..................................................................................................................23
Description of the equipment...............................................................................................................24
Operating diagram.................................................................................................................24
Connection of several inverters together...............................................................................25
Notes on the sizing of the system..........................................................................................25
Functionality and components of the equipment ..................................................................26
Topographic diagram of the equipment.................................................................................27
Safety devices........................................................................................................................................29
Anti-Islanding.........................................................................................................................29
Ground fault of the photovoltaic panels.................................................................................29
Other safety devices..............................................................................................................29
Safety and accident prevention...................................................................................................... 30
Safety instructions and general information .....................................................................................30
Hazardous areas and operations ........................................................................................................31
Environmental conditions and risks.......................................................................................31
Signs and Labels...................................................................................................................31
Thermal hazard .....................................................................................................................32
000398AG
-6-
1- Introduction and general information
-7-
1- Introduction and general information
01
03
04
02
POW
ER
ALARM
GFI
05 ESC
UP
DOW
N
ENTER
UNO
06
07
08
16 17 18 19 20 17 18 19 20
-8-
1- Introduction and general information
If the equipment is used in a manner not specified in the installer manual, the protection pro-
vided by the equipment may be impaired.
The language in which the document was originally written is ITALIAN; therefore, in the event of
inconsistencies or doubts please ask the manufacturer for the original document.
List of annexes
In addition to this operating and maintenance manual, (if applicable or on
request) the following enclosed documentation is supplied:
- EC declaration of conformity
- quick installation guide
WARNING: Part of the information given in this document is taken from the original docu-
ments of the suppliers. This document contains only the information considered necessary
for the use and routine maintenance of the equipment.
Staff characteristics
The customer must make sure that the operator has the necessary skill and training to do his/
her job. Personnel in charge of using and maintaining the equipment must be expert, aware
and skilled for the described tasks and must reliably demonstrate their capacity to correctly
interpret what is described in the manual.
For safety reasons, only a qualified electrician who has received training and/or demonstra-
ted skills and knowledge on the structure and operation of the unit may install the inverter.
The installation must be performed by qualified installers and/or licensed electricians in ac-
cordance with the existing regulations in the country of installation.
The employment of a person who is NOT qualified, is drunk, or on narcotics, is strictly forbid-
den.
The customer has civil liability for the qualification and mental or physical state of the profes-
sional figures who interact with the equipment. They must always use the personal protective
equipment required by the laws of the country of destination and whatever is provided by their
employer.
000004EG
-9-
1- Introduction and general information
Symbols ad signs
In the manual and/or in some cases on the equipment, the danger or
hazard zones are indicated with signs, labels, symbols or icons.
Table: Symbols
This points out that it is mandatory to consult the manual or original do-
cument, which must be available for future use and must not be dama-
ged in any way.
Generic hazard - Important safety information. This points out operations
or situations in which staff must be very careful.
Hot parts - This points out a hazard due to the presence of heated areas
or in any case areas that have hot parts (danger of burns).
This points out that the examined area must not be entered or that the
described operation must not be carried out.
This points out that it is mandatory to carry out the described operations
using the clothing and/or personal protective equipment provided by the
employer.
This indicates the degree of protection of the equipment according to
IP20 IP65 IEC standard 70-1 (EN 60529 June 1997).
This indicates the risk of electric shock. Time need to discharge stored
5 10
energy: 5/10 minutes
Respectively direct current and alternating current
Isolating transformer present or not present
- 10 -
1- Introduction and general information
You may not use the equipment for a use that does not conform to that provided for in the
field of use. The equipment MUST NOT be used by inexperienced staff, or even experienced
staff if carrying out operations on the equipment that fail to comply with the indications in this
manual and enclosed documentation.
- 11 -
2
Characteristics
General conditions
A description of the characteristics of the equipment is given so as to
identify its main components and specify the technical terminology used
in the manual.
Technical terminology and the fast retrieval system for information, are
supported by:
• Contents
• Reference number index
The customer/Installer takes full responsibility if, when reading this manual, the chronological
order of its presentation established by the manufacturer is not observed. All information is
provided considering occasional inclusion of that provided in previous chapters.
- 12 -
2 - Characteristics
The choice of the inverter model must be made by a qualified technician who knows about
the installation conditions, the devices that will be installed outside the inverter and possible
integration with an existing system.
• PVI-3.0/3.6-TL-OUTD MODELS
PVI-3.0/3.6-TL-OUTD:
• Number of input channels: 2
• DC disconnect switch 16 : No
• Input connectors: quick fit connectors (1 pair for each channel)
PVI-3.0/3.6-TL-OUTD-S:
• Number of input channels: 2
• DC disconnect switch 16 : Yes
• Input connectors: quick fit connectors (1 pair for each channel)
• PVI-4.2-TL-OUTD MODELS
PVI-4.2-TL-OUTD:
• Number of input channels: 2
• DC disconnect switch 16 : No
• Input connectors: quick fit connectors (2 pairs for ch.1, 1 pair ch.2)
PVI-4.2-TL-OUTD-S
• Number of input channels: 2
• DC disconnect switch 16 : Yes
• Input connectors: quick fit connectors (2 pairs for ch.1, 1 pair ch.2)
000399AG
- 13 -
2 - Characteristics
The labels attached to the equipment must NOT be removed, damaged, dirtied, hidden, etc.
4
PROTECTIVE CLASS: I
Made in Italy
www.abb.com/solar
SOLAR INVERTER 2 MODEL:
PVI-3.0-TL-OUTD
4
PROTECTIVE CLASS: I
Made in Italy
www.abb.com/solar
SOLAR INVERTER 2 MODEL:
PVI-3.6-TL-OUTD
IP65
-25 to +60 °C 5 minutes
-13 to +140 °F
4
POW
ER
ALARM
GFI
PROTECTIVE CLASS: I
Made in Italy
www.abb.com/solar
2 MODEL:
ESC
UP
UNO
V dc max 600 V V acr 230 V 1Ø
3 V dc MPP
V dc, Full Power
90 - 580 V
140 - 530 V
fr
Pacr (cos φ = 1)
50 Hz
4200 W @ 50°C amb.
Idc max 2 x 16 A Pacr (cos φ = ±0.9) 4200W @ 45°C amb.
Isc max 2 x 20 A Iac max 20 A
IP65
000399AG
- 14 -
2 - Characteristics
• Inverter model
ABB
PVI-X.X-TL-OUTD-Y - X.X = Inverter power rating:
- Y = Integrated disconnect switch
• Inverter Part Number
P/N:PPPPPPPPPPP • Inverter Serial Number composed of:
SN:YYWWSSSSSS WK:WWYY - YY = Year of manufacture
- WW = Week of manufacture
WO:XXXXXXX - SSSSSS = sequential number
• Week/Year of manufacture
SO:SXXXXXXXX Q1
The officially required information is located on the approval label. The identification label
is an accessory label which shows the information necessary for the identification and cha-
racterisation of the inverter by ABB.
N.B. The labels must NOT be hidden with objects and extraneous parts (rags, boxes, equip-
ment, etc.); they must be cleaned regularly and kept visible at all times.
000399AG
- 15 -
2 - Characteristics
1. The output voltage range may vary according to the grid standard of the country of installation
2. For G83/2 setting, maximum output current limited to 16 A up to a maximum output power of 3.68 kW
3. The output frequency range may vary according to the grid standard of the country of installation
000400AG
- 17 -
2 - Characteristics
Tightening torques
To maintain the IP65 protection of the system and for optimal installa-
tion, the following tightening torques must be used:
AC cable gland 19 M25 (ring nut fixing) 5.0 Nm
AC cable gland M25 (locknut fixing)
19 7.5 Nm
Service cable glands 20 M20 (ring nut fixing) 2.5 Nm
Service cable glands 20 M20 (locknut fixing) 7.0 Nm
MC4 or Weidmuller quick fit connectors 17 18 2.5 Nm
Front cover 05 1.5 Nm
AC output terminal block 10 - 16 mm Max2
1.5 Nm
Signal terminal block 13 - 1.5 mm Max
2
0.25 Nm
Overall dimensions
The overall dimensions are expressed in millimetres and inches and in-
clude the wall installation bracket
325
mm
12.8
”
mm
222
”
8.7
618 mm
24.3”
UNO
000400AG
- 18 -
2 - Characteristics
Bracket dimensions
The wall mounting bracket dimensions are expressed in mm and inches
15.0 mm 105.0 mm
0.6 in 4.1 in
0 13.8 mm
60.0 mm 120.0 mm
0.5 in
2.4 in 4.7 in
0
55.5 mm
2.2 in
10.0 mm
0.49 in
260.5 mm
10.3 in
8.0 mm
0.31 in
460.5 mm
18.1 in
578.0 mm
22.8 in
000400AG
587.5 mm
23.1 in
- 19 -
2 - Characteristics
Efficiency curves
The equipment was designed in consideration of current energy conser-
vation standards, to avoid waste and unnecessary leakage.
The efficiency curves are linked to technical parameters that are continually being developed
and improved and should therefore be considered approximate.
PVI-3.0-TL-OUTD
PVI-3.0-TL-OUTD-S PVI-3.0-TL-OUTD - Efficiency Curves
99
97
95
93
Efficiency [%]
91
89
200Vdc
87 360Vdc
480Vdc
85
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
PVI-3.6-TL-OUTD
PVI-3.6-TL-OUTD-S PVI-3.6-TL-OUTD - Efficiency Curves
99
97
95
93
Efficiency [%]
91
89
200Vdc
87 360Vdc
480Vdc
85
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
000401AG
- 20 -
2 - Characteristics
PVI-4.2-TL-OUTD
PVI-4.2-TL-OUTD-S PVI-4.2-TL-OUTD - Efficiency Curves
99
97
95
93
Efficiency [%]
91
89
215Vdc
360Vdc
87
480Vdc
85
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Power derating
In order to allow inverter operation in safe thermal and electrical condi-
tions, the unit automatically reduces the value of the power fed into the
grid.
Power limiting may occur due to:
• Adverse environmental conditions (thermal derating)
• Percentage of output power (value set by the user)
• Grid voltage over frequency (mode set by user)
• Grid over voltage U>10min Der. (enabling carried out by user)
• Anti-islanding
• Grid under voltage
• Input voltage values too high.
• Input current values too high.
000401AG
- 21 -
2 - Characteristics
PVI-3.0-TL-OUTD
PVI-3.0-TL-OUTD-S Pout Vs Vin (single input channel)
PVI-3.6-TL-OUTD
PVI-3.6-TL-OUTD-S PVI-3.6/4.2-TL-OUTD
PVI-4.2-TL-OUTD 4500
4000
PVI-3.0-TL-OUTD
PVI-4.2-TL-OUTD-S 3500
Pout (kW)
3000
2500
2000
1500
1000
500
0
100
150
200
250
300
350
400
450
500
550
600
650
700
50
0
Vin (V)
PVI-3.0-TL-OUTD
PVI-3.0-TL-OUTD-S Pout Vs Vin (double input channel)
PVI-3.6-TL-OUTD
PVI-3.6-TL-OUTD-S
PVI-4.2-TL-OUTD
4500
4000
PVI-4.2-TL-OUTD-S 3500
Pout (kW)
3000
2500
2000
PVI-4.2-TL-OUTD
1500
PVI-3.6-TL-OUTD
1000
PVI-3.0-TL-OUTD
500
0
100
150
200
250
300
350
400
450
500
550
600
650
700
50
0
Vin (V)
000401AG
- 22 -
2 - Characteristics
The current of each array must fall within the limits of the inverter.
To work, the inverter must be connected to the national electricity grid since its operation can
be equated to a current generator that supplies power in parallel with the grid voltage. That is
why inverters cannot support the grid voltage (islanding).
000011CG
- 23 -
2 - Characteristics
Operating diagram
PV DC disconect
Panels switch
Inverter
AC discon- Distributor Grid
nect switch
000012EG
- 24 -
2 - Characteristics
- 25 -
2 - Characteristics
Remote switch-on/switch-off
This command can be used to turn off/turn on the inverter via an external
(remote) command.
This functionality must be enabled in the menu and when active, switching
on the inverter, besides being dictated by the presence of normal para-
meters which allow the inverter to be connected to the grid, also depends
on the external control for switching on/off.
- 26 -
2 - Characteristics
The main blocks are the DC-DC input converters (called "boosters") and
the output inverter. The DC-DC converter and the output inverter both
work at a high switching frequency, and so are small and relatively light.
Each of the input converters is dedicated to a separate array, with inde-
pendent maximum power point tracking (MPPT) control.
This means that the two arrays may be installed with various positions or
orientations. Each array is controlled by an MPPT control circuit.
This inverter version is of the type without transformer, that is without gal-
vanic insulation between the input and the output. This allows ultimately
an increase in conversion efficiency. The inverter is already equipped
with all the protections necessary for safe operation and compliance with
the norms, even without the insulating transformer.
The connection to the power grid is thus kept under control by two inde-
pendent computers, in full compliance with the electric field norms both
for power supply to the systems as well as security.
The operating system carries out the task of communicating with its com-
ponents in order to carry out data analysis.
- 27 -
IN1.1(+) IN1.1(+) MPPT 1 Inverter
(DC/DC) Bulk caps (DC/AC)
+ + +
IN1.2(+)* IN1.2(+)*
MPPT 2 PE
(DC/DC)
+ + +
IN2.1(+) IN2.1(+)
- 28 -
IN2.1(-) IN2.1(-)
- - -
RS485
+ T/R
Standard version -S version - T/R
RTN
(*)Not available in PVI-3.0/3.6-TL-OUTD
DC/DC DC/AC
DSP DSP Remote Control
contr. contr.
+R
-R
µP Alarm
N.C
N.O
C
Control circuit
2 - Characteristics
000403AG
2 - Characteristics
Safety devices
Anti-Islanding
In the event of a local grid outage by the electricity company, or when
the equipment is switched off for maintenance operations, the inverter
must be physically disconnected to ensure the protection of the people
working on the grid, in accordance with the relevant national laws and
regulations. To prevent possible islanding, the inverter is equipped with
an automatic safety disconnection system called “Anti-Islanding”.
Anti-islanding protection mechanisms are different depending on the grid standards, even if
they all have the same purpose.
The numerous control systems determine a redundant structure to ensure absolutely safe
operations.
000322BG
- 29 -
3
Safety and accident prevention
For obvious reasons, it is not possible to anticipate the great number of installations and
environments in which the equipment will be installed; it is therefore necessary for the
customer to appropriately inform the manufacturer about particular installation conditions.
ABB accepts no liability for failure to comply with the instructions for correct
installation are cannot be held responsible for the systems upstream or
downstream of the equipment it has supplied.
It is essential to provide operators with correct information. They must therefore read and
comply with the technical information given in the manual and in the attached documentation.
The instructions given in the manual do not replace the safety devices
and technical data for installation and operation stuck on the product,
1 TRAINING and they certainly do not replace the safety regulations in force in the
2 country of installation and common sense rules.
The manufacturer is willing to train staff, at its premises or on site, in
accordance with conditions to be set out in the contract.
Avoid temporary repairs. All repairs should be carried out using only
genuine spare parts, which must be installed in accordance with their
intended use.
- 30 -
3 - Safety and accident prevention
The equipment is not equipped to operate in environments that have particular flammability
or explosive conditions.
The labels must be cleaned regularly and kept visible at all times, that
is, they must NOT be hidden with objects and extraneous parts (rags,
boxes, equipment, etc.)
The technical data shown in this manual do not in any case replace those
shown on the labels attached to the equipment.
000017FG
- 31 -
3 - Safety and accident prevention
Thermal hazard
WARNING: removal of guards or covers is allowed only after the voltage
has been removed; ; this is to let components cool down and allow any
electrostatic charges and parasitic voltages to be discharged.
solar
MODEL
:
DIN
PROTEC
0126-1- I
V VDE CLASS:
TIVE
1
Made
in
5 minute
Italy
s
When the equipment has just been switched, it may have hot parts, as a
result of overheating of the surfaces at temperature (e.g.: transformers,
com/ RTER
.abb.INVE
wwwAR
SOL
IP65
°C
+60 °F
to
-25to +140
-13
In the event of fire, use CO2 extinguishers and use auto extraction systems to fight fire in
closed environments.
Staff must not wear clothes or accessories that can start fires or generate electrostatic char-
ges or, in gener, clothing that can impede personal safety.
Staff must NOT go near the equipment with bare feet or wet hands.
The maintenance technician must in any case make sure no one else
can switch on or operate the equipment during the maintenance opera-
tions, and must report any anomaly or damage due to wear or ageing so
that the correct safety conditions can be restored.
In the installation, consider or make sure the noise emitted based on the
000017FG
- 32 -
3 - Safety and accident prevention
Residual risks
Despite the warnings and safety systems, there are still some residual
risks that cannot be eliminated.
These risks are listed in the following table with some suggestions to
prevent them.
Noise pollution due to installation in unsuitable environments or where Reassess the environment or the
staff work permanently. place of installation.
Suitable local ventilationthat does not cause overheating of the equipment Restore suitable ambient
and is sufficient not to create discomfort to people in the room. conditions and air the room.
External weather conditions, such as water seepage, low temperatures, Maintain ambient conditions
high humidity, etc. suitable for the system.
Overheating of surfaces at temperature (transformers, accumulators, Use suitable protective equipment
coils, etc. ) can cause burns. Also be careful not to block the cooling slits or wait for the parts to cool down
or systems of the equipment. before switching on the equipment.
Inadequate cleaning: compromises cooling and does not allow the safe- Clean the equipment, labels and
ty labels to be read. work environment adequately.
Accumulation of electrostatic energy can generate hazardous dischar- Ensure the devices have
ges. discharged their energy before
working on them.
Inadequate training of staff. Ask for a supplementary course.
During installation, temporarily mounting the equipment or its components Be careful about and disallow
may be risky. access to the installation area.
Accidental disconnections of the quick-fit connectors with the equipment Be careful about and disallow
in operation, or wrong connections, may generate electric arcs access to the installation area.
000018CG
- 33 -
4
Lifting and transport
General conditions
Some recommendation apply only to large size product or multiple small size packings.
Lifting
ABB usually stores and protects individual components by suitable
means to make their transport and subsequent handling easier, but as a
rule it is necessary to turn to the experience of specialized staff in change
of loading and unloading the components.
Where indicated and/or where there is a provision, eyebolts or handles,
which can be used as anchorage points, are inserted and/or can be
inserted.
The ropes and means used for lifting must be suitable for bearing the weight of the equipment.
Do not lift several units or or parts of the equipment at the same time,
unless otherwise indicated.
- 34 -
4 - Lifting and transport
M6x10 screw 1
D.18 washer 3
Two-hole gasket for M20 signal cable glands and cap 1+1
2(3.0/3.6 kW)
Quick fit connectors (female)
3(4.2 kW)
2(3.0/3.6 kW)
Quick fit connectors (male)
3(4.2 kW)
ABB
solar
XXXX inverters
XXXXXXXXXXXX
XXXX
XXXXXXXXXXX
XXXX
XXX
000404AG
In addition
The to what
technical
is explained
documenta
Technical documentation 1
tion in this
and guide,
the the
interface safety
and and
installation
manageme
nt software
information
for the provided
product in
are the installation
available
at the manual
website. mus
t be
read
and
followed.
- 35 -
4 - Lifting and transport
NO
POWE
R
ALAR
M
GFI
ESC
UP
DOWN
ENTE
R
UNO
000404AG
- 36 -
5
Installation
General conditions
Installation of the equipment is carried out based on the system and the place in which
the equipment is installed; therefore, its performance depends on the correctness of the
connections.
For Safety reason only a qualified electrician, who has received training and / or has de-
mostrated skills and knowledge in construction and in operation of this unit, can install this
inverter.
The installation is done by qualified installers and/or licensed electrician according to the
applicable local code regulations
The installation must be carried out with the equipment disconnected from the grid and from
the photovoltaic generator.
When the photovoltaic panels are exposed to light, these supplies a direct current voltage to
the inverter.
000021EG
- 37 -
5 - Installation
Environmental checks
• Consult the technical data to check the environmental parameters to
be observed (degree of protection, temperature, humidity, altitude, etc.)
• The installation to direct sunlight must be avoid beacuse it may cause:
- phenonmena of power limitation by the inverter (with consequent reduc-
tion of energy production)
- premature aging of electronic/electromechanical components
- premature aging of mechanical components (gaskets) and user inter-
face (display)
• Do not install in small closed rooms where air cannot circulate freely.
• To avoid overheating, always make sure the flow of air around the
inverter is not blocked.
• Do not install in places where gases or flammable substances may
be present.
• Do not install in rooms where people live or where the prolonged pres-
ence of people or animals is expected, because of the noise (about
50dB(A) at 1 m) that the inverter makes during operation.
• Avoid electromagnetic interference that can compromise the correct
operation of electronic equipment, with consequent situations of danger.
The final installation of the inverter should not prevent access to any outside disconnection
means.
Refer to the warranty conditions to evaluate the possible exclusions from warranty related to
improper installation.
All installations at altitudes of over 2000 metres must be assessed case by case considering
the aforesaid criticalities.
000405AG
- 38 -
5 - Installation
Installation position
When choosing the place of installation, comply with the following condi-
tions:
• Install on a wall or strong structure suitable for bearing the weight.
• Install in safe, easy to reach places.
• If possible, install at eye-level so that the display and status LEDs can
be seen easily.
• Install at a height that considers the heaviness of the equipment. If
this condition is not complied with, it can create problems in the event of
servicing unless suitable means are provided to carry out the operation.
• Install vertically with a maximum inclination of +/- 5°. If this condition
is not complied with, the inverter could go into temperature derating be-
cause of the worsening of heat dissipation.
15
cm
• To carry out maintenance of the hardware and software of the equip-
ment, remove the covers on the front. Check that there are the correct
safety distances for the installation that will allow the normal control and
10cm 10cm maintenance operations to be carried out.
• Comply with the indicated minimum distances.
20
cm
• If the space available does not allow this arrangement, position the
inverters in a staggered arrangement as shown in the figure so that heat
dissipation is not affected by other inverters.
000405AG
- 39 -
5 - Installation
Wall/Pole mounting
During installation do not place the
inverter with the front cover facing
towards the ground.
3
000406AG
- 40 -
5 - Installation
If the voltage without load of the string is near the maximum value ac-
cepted by the inverter, it must be borne in mind that with low ambient
temperatures the string voltage tends to increase (in a different way ac-
cording to the photovoltaic module used). In this case, it is necessary to
carry out a check of the sizing of the system and/or a check on the con-
nections of the modules of the system (e.g.: number of modules in series
higher than the design number).
Do not connect the strings if a leakage to ground has been found because the inverter might
not connect to the grid.
In addition, there are another three tripping levels with thresholds re-
spectively at 30 mA/sec, 60 mA/sec and 150 mA/sec to cover the “rapid”
changes in fault current induced by accidental contact with leaking live
- 41 -
5 - Installation
parts. The max. tripping times are progressively shortened as the speed
of change in the fault current increases and, starting from the 300 msec/
max for the 30 mA/sec change, they are shortened respectively to 150
msec and 40 msec for 60 mA and 150 mA changes.
It should in any case be noted that the integrated device only protects the
system against ground faults that occur upstream of the AC terminals of
the inverter (namely towards the DC side of the photovoltaic system and
consequently towards the photovoltaic modules). The leakage currents
that can occur in the AC section between the draw/feed in point and the
inverter are not detected and require an external protection device.
For protection of the AC line, on the basis of the aforesaid with regard
to the differential protection integrated in ABB inverters, it is not neces-
sary to install a type B ground fault interrupter.
In accordance with article 712.413.1.1.1.2 of Section 712 of IEC Standard 64-8/7, we hereby
declare that, because of their construction, ABB inverters do not inject ground fault direct
currents.
The use of an AC type circuit breaker with differential thermal magnetic protection with trip-
ping current of 300 mA is advisable so as to prevent false tripping, due to the normal capaci-
tive leakage current of photovoltaic modules.
In the case of systems consisting of multiple inverters connected to a single switch with diffe-
rential protection, it is recommended to install a device that allows the adjustment of the trip
value and timing of intervention.
000024CG
- 42 -
5 - Installation
When connecting the two input channels in parallel, you must comply
with the above requirements in order to benefit from the ability to levera-
ge the full power of the inverter output on a single channel.
MPPT
The dual MPPT structure however allows management of two photovol-
taic generators which are independent of each other (one for each input
channel), and which may differ between themselves with regard to instal-
lation conditions, type and number of photovoltaic modules connected in
series. A necessary condition for the two MPPT to be used independently
is that the photovoltaic generator connected to each of the inputs has a
lower power than the power limit of the single input channel and a maxi-
mum current lower than the current limit of the single input channel.
MPPT1
MPPT2
All input parameters that must be met for correct inverter operation are shown in the "techni-
000407AG
- 43 -
5 - Installation
- 44 -
5 - Installation
11
11
09
000407AG
- 45 -
5 - Installation
The DC side connections are different according to power size of the inverter.
When the photovoltaic panels are exposed to sunlight they provide continuous DC voltage to
the inverter. To avoid risks of electrical shock, all wiring operations must be carried out with
the DC disconnect switch (internal or external to the inverter) off.
To connect the strings, you will need the quick fit connectors (Weidmüller
or Multi-Contact) located on the lower part of the mechanics.
The number of quick fit connectors varies in accordance with the number
of input channels.
PVI-3.0/3.6-TL-OUTD PVI-4.2-TL-OUTD
No. of input channels: 2 No. of input channels: 2
No. of quick fit connectors: No. of quick fit connectors:
4 (1 couple for MPPT1 17 , 4 + 2 (2 couple for MPPT1 17 ,
1 couple for MPPT2 18 ) 1 couple for MPPT2 18 )
17 18 17 18
000407AG
- 46 -
5 - Installation
According to the system configuration, check the correct setting of the channels to indepen-
dent or in parallel mode. An incorrect setting of the input channels can lead to loss of energy
production.
Polarity inversion can cause serious damage. Check polarity before connecting each string!
Connect all the strings required by the system, always checking the seal
of the connectors.
If any string inputs are not required, you must ensure that covers are installed to the connec-
tors, and install any which are missing.
This is necessary both for the inverter seal, and to avoid damage to the free connector which
IP65 may be used at a later time.
000407AG
- 47 -
5 - Installation
CAUTION: To avoid damage to the equipment, when attaching cables, pay particular atten-
tion to polarity.
Weidmüller
Installation of Weidmuller connectors does not require any special too-
ling.
- Strip the cable to which you want to apply the connector (after verifying
that it complies with the connector limits)
4...6mm2
15...16.5mm
5.5...7.5mm - Insert the wire into the connector until you hear a locking “click”
Click !
3 ... 4 Nm
0!
000026EG
- 48 -
5 - Installation
- Strip the cable to which you want to apply the connector (after verifying
4...6mm 2 that it complies with the connector limits)
12mm
5.5...9mm
- Apply the terminal to the conductor using suitable crimping pliers
- Insert the cable with the terminal into the interior of the connector, until
you hear the click indicating that the terminal is locked inside the con-
nector.
Click
2.5 Nm
000026EG
- 49 -
5 - Installation
Any failure of the inverter when it is not connected to earth through the appropriate terminal is not
covered by the warranty.
Plug the grid cable into the inverter using the specific AC cable gland 19
and connect the AC output screw terminal block 10 .
Use a properly sized tripolar cable and check the tightness of the AC
cable gland 19 at the end of the installation.
Cross-section of the
Maximum length of the line conductor (m)
line conductor (mm2)
PVI-3.0-TL-OUTD PVI-3.6-TL-OUTD PVI-4.2-TL-OUTD
4 mm² 19 m 16 m 14 m
6 mm² 29 m 24 m 21 m
10 mm² 48 m 41 m 35 m
16 mm² 77 m 65 m 56 m
- 50 -
5 - Installation
For all inverter models, connection is carried out using the AC output termi-
10 nal block 10 passing the cables internally through the AC cable gland 19 .
Remove the protective film located on the hole to be used for the AC
cables 19 , insert the M25 cable gland in the hole and secure it using the
M25 lock nut (to ensure environmental protection IP65 it is necessary
to fix the cable gland to the inverter chassis with a minimum tightening
torque of 7.5 Nm).
Once the connection to the terminal board has been made, tighten the
cable gland firmly (tightening torque 5.0Nm) and check the seal.
000408AG
- 51 -
5 - Installation
14 15
13
Ref. Ref.
Description
inverter manual
WIND 13 Connection of the Tachometer signal (WIND)
ALARM 13 Connection to the multi-function relay (ALARM)
REM 13 Connection to the remote ON/OFF (REM)
RS485 13 Connection of the RS485 (PC) line (RS485)
J24 - RS485 (A) 14 Connection of the RS485 (PC) line on RJ45 connector
J25 - RS485 (B) 14 Connection of the RS485 (PC) line on RJ45 connector
S2 15 RS485 line (PC) termination resistance selector switch
000409AG
- 52 -
5 - Installation
A B C
Cables connecting the RS485 line may use two different types of con-
nection:
14 13
OUT
IN • Connection of conductors with RJ45 connectors 14
The two RJ45 connectors RS485(A) and RS485(B) available for the
RS485 communication, are equivalent to each other and can be used
interchangeably for the arrival or for the output of the line in realising the
daisy chain connection of the inverters.
000409AG
The same is true for connections made using the terminal connectors 13 .
- 53 -
5 - Installation
Signal Symbol
LNK
+T/R Positive data +T/R
-T/R
RTN
Negative datum -T/R
LNK
Shield continuity must be provided along the communication line using the LNK terminal and
must be grounded at a single point.
Monitor
15 = ON 15 = OFF 15 = OFF
S2 OFF
ON
120
000409AG
TERM.
15
- 54 -
5 - Installation
The function must be enabled in the relevant menu. If the Remote control
function is disabled, the switching on of the inverter is dictated by the
presence of the normal parameters that allow the inverter to connect to
the grid.
When the R+ signal is brought to the same potential as the R- signal (i.e.
13
by making a short circuit between the two terminals of the connector),
this causes the inverter to disconnect from the grid.
The remote control OFF condition is shown on the display.
The connections of this control are made between the “R+” input and
K
LN TN “R-”.
Since this is a digital input, there are no requirements to be observed
R /R
85
-T T/R
RS4
+ TN
R -R
as regards cable cross-section (it only needs to comply with the sizing
+R
O.
N. C REM
C.
M
requirement for passing cables through the cable glands and the terminal
N.
T
-W WT ALAR
D
connector).
+
WIN
000409AG
- 55 -
5 - Installation
O.
N. C REM
+R
Different types of devices (light, sound, etc.) can be connected to the
relay, provided they comply with the following requirements:
C.
N. M
T
-W WT ALAR
D
+
WIN
Relay Ratings
Maximum Voltage: 230 Vac
Maximum Current: 1 A
Cable requirements
External diameter: from 5 to 17 mm
Conductor cross-section: from 0.14 to 1.5 mm2
000409AG
- 56 -
6
Instruments
General conditions
One of the first rules for preventing damage to the equipment and to
the operator is to have a thorough knowledge of the INSTRUMENTS.
We therefore advise you to read this manual carefully. If you are not
sure about anything or there is discrepancy in information, please ask for
more detailed information.
- 57 -
6 - Instruments
06 07 08
LED Description
POWER (GREEN) ON if the inverter is working correctly.
Flashes when checking the grid or if there is insufficient sunlight.
ALARM (YELLOW) The inverter has detected an anomaly; the anomaly is shown on the display.
GFI (RED) Ground fault on the DC side of the PV generator; the error is shown on the display.
The LEDs, in various multiple available combinations, can signal multiple conditions other
than the original single condition; see the various descriptions explained in the manual.
KEYS Description
ESC It is used to access the main menu, to go back to the previous menu or to go back to the
previous digit to be edited.
UP It is used to scroll up the menu options or to shift the numerical scale in ascending order.
DOWN It is used to scroll down the menu options or to shift the numerical scale in descending order.
ENTER It can be used to confirm an action, to access the submenu for the selected option (indicated
by the > symbol) or to switch to the next digit to be edited. By pressing and holding the key,
the cyclical display of the parameters can be: Locked or Cyclical.
The Keys, in various multiple available combinations, allow you to access actions other than the
original single action; see the various descriptions explained in the manual.
000410AG
- 58 -
7
Operation
General conditions
Before checking the operation of the equipment, it is necessary to have
a thorough knowledge of the INSTRUMENTS chapter and the functions
that have been enabled in the installation.
The equipment operates automatically without the aid of an operator;
operating state is controlled through the instruments.
The interpretation or variation of some data is reserved exclusively for specialized and
qualified staff.
The incoming voltage must not exceed the maximum values shown in the technical data in
order to avoid damaging the equipment.
Consult the technical data for further details.
- 59 -
7 - Operation
Measurement tolerance
The data supplied by the inverter may differ from measurements taken
by certified measuring instruments (e.g. output meters, multimeters and
grid analysers); since the inverter is not a measuring instrument it has
wider tolerances for the measurements it makes.
The tolerances are generally:
±5% for real-time measurements with output power below 20%
±3% for real-time measurements with output power above 20%
±4% for all statistical data
000032GG
- 60 -
7 - Operation
Commissioning
Do not place objects of any kind on the inverter during operation! Do not touch the heat sink
while the inverter is operating! Some parts may be very hot and could cause burns.
Before proceeding with commissioning, make sure you have carried out all the checks and
verifications indicated in the section on preliminary checks.
The procedure for commissioning the inverter consists of the following steps:
• Move the integrated switch 16 (version –S) to the ON position or close the
external switches: If the input voltage applied to one of the two input chan-
nels is greater than the minimum starting voltage, the inverter will start up.
• When the inverter is turned on for the first time you will be asked to
select the “Nation” of installation. This selection allows the inverter to au-
tomatically configure its parameters to ensure that compliance with local
standards; the default language corresponding to the selected “Nation”
will also be set.
After the grid standard was set you have 24 hours to make any changes to the grid standard
value; 24 hours later the “Nation Select.” functionality will be blocked, and any subsequent
changes can only be made using a password provided on request by ABB.
• After you have set the “Nation” value, the message “Inizializing...Please
Wait” is displayed. Depending on the input voltage value, the inverter will
show various messages on the display and change the behaviour of the
three LED 06 .
The inverter is powered ONLY by the voltage coming from the photovoltaic generator: pre-
sence of grid voltage alone IS NOT SUFFICIENT to permit the inverter to start up.
• With the inverter in “Missing Grid” status, close the AC switch downstre-
am the inverter so as to supply the grid voltage to the inverter: the inver-
ter performs the grid voltage check, measures the photovoltaic generator
insulation resistance against earth and carries out other self-diagnosis
checks. During the checks before the parallel with the grid, the green
000411AG
- 61 -
7 - Operation
• During the grid voltage check and measurement of the insulation re-
sistance, the values for the grid voltage and frequency and the insula-
tion resistance measured by the inverter are shown on the display. The
inverter completes parallel connection with the grid SOLELY if the grid
parameters meet the ranges provided for by the regulations in force and
if the insulation resistance is greater than 1Mohm.
• If the preliminary checks for parallel connection to the grid are suc-
cessful, the inverter connects to the grid and begins to export power to
the grid. At this stage, the display shows the inverter’s parameters in
cycles. The green LED stays lit whereas the others are off.
The “Nation” value (grid standard) that can be selected are listed in the
following table:
The list of grid standards given in the table was valid at the time of issue of the manual. It will
000411AG
be continually updated as new country standards with which the inverter is compatible are
introduced
- 62 -
7 - Operation
- 63 -
7 - Operation
LED behaviour
= LED On The following table shows all the possible activation combinations of LEDs
= LED flashing on the LED panel according to the operating status of the inverter.
= LED Off
= Any one of the conditions
described above
- 64 -
7 - Operation
In the case of malfunction it is extremely dangerous to intervene personally to try and elimi-
nate the defect. The instructions below must be followed scrupulously; if you do not have the
necessary experience and training to intervene safely, please contact a specialist.
You are advised to have the plant inspected by the installer or a specialist if this malfunction
occur repeatedly.
If the inverter doesn’t reconnect to the grid, isolate it on both the AC and
DC sides (by using the disconnect switches), then contact the installer or
authorised centre to repair the fault in the photovoltaic generator.
000412AG
- 65 -
7 - Operation
General information
While the inverter is operating, the display shows various items of infor-
mation on the main parameters measured, the operating conditions and
the inverter’s operating status.
The display cycles through the information when the icon is shown
on the display; if the icon shown on the display is a padlock it means
that the display of information is locked and the UP and DOWN buttons
can be used to scroll through the screens of information instead. You can
switch between the two display modes by pressing the ENTER button.
000412AG
- 66 -
7 - Operation
Errors/Warnings No
On Errors/Warnings
EXXX Inverter OK Inverter status. The code for any malfunction will be displayed.
Mon 22 Jan 15:55 Mon 22 Jan 15:55 Date and time as set on the inverter
DOWN UP DOWN UP
DOWN UP
COSp x.xxx Phase difference set for feeding in reactive power
>Regulation Type Reactive power regulation mode currently set
DOWN UP
Tboost xx.x`C Tboost: Internal temperature in the booster circuit (DC/DC)
Tinv xx.x`C Tinv: Internal temperature in the inverter circuit (DC/AC)
DOWN UP
Ppk xxxxxW Ppk: Maximum output power peak since the inverter was commissioned
Ppk-Day xxxxxW Ppk-Day: Maximum daily output power peak
DOWN UP
Vgrid xxxV Vgrid: Output voltage
Vgrid Avg xxxV Vgrid Avg: Average output voltage
DOWN UP
Igrid xx.xV Igrid: Output current
Fgrid xx.xxHz Fgrid: Output frequency
DOWN UP DOWN UP
Independent Parallel
inputs inputs
Vin1 xxxV Vin xxxV Vin: Input voltage Vin 1: Input voltage channel 1
Iin1 xx.xA Iin xx.xA Iin: Input current Iin 1: Input current channel 1
DOWN UP
Vin2 xxxV Vin 2: Input voltage channel 2
Iin2 xx.xA Iin 2: Input current channel 2
DOWN UP DOWN UP
Pin1 xxxxW Pin xxxxW Pin: Instantaneous input power
Pin1: Instantaneous input power channel 1
DOWN UP DOWN UP
Pin2 xxxxW Pin2: Instantaneous input power channel 2
DOWN UP
- 67 -
7 - Operation
Statistics Menu
Selecting STATISTICS from the three main sub-menus gives access to:
Statistics
ENTER
Lifetime 1
DOWN UP
Partial 2
DOWN UP
Today 3
DOWN UP
Last 7 days 4
DOWN UP
Last month 5
DOWN UP
Last 30 days 6
DOWN UP
User Period 8
1. Lifetime
This section of the menu displays the Lifetime statistics:
• Time: Total operating time
• E-tot: Total energy produced
• Val. : Total production value, calculated using the currency and conver-
sion coefficient set in the relevant section of the SETTINGS menu
• CO2: Amount of CO2 saved compared to fossil fuels
2. Partial
This section of the menu displays the Partial statistics:
• Time: Partial operating time
• E-par: Partial energy produced
• P-Peak: Peak power value
• Val. : Partial production value, calculated using the currency and con-
version coefficient set in the relevant section of the SETTINGS menu
• CO2: Partial amount of CO2 saved
To reset all the counters of this sub-menu, press the ENTER button for more than 3 seconds.
At the end of this time, you will hear a sound repeated 3 times.
3. Today
This section of the menu displays today's statistics:
• E-day: Energy produced today
• P-Peak: Today's peak power value
• Val. : Value of today's production, calculated using the currency and
conversion coefficient
set in the relevant section of the SETTINGS menu
000412AG
- 68 -
7 - Operation
4. Last 7 days
This section of the menu displays the statistics for the last 7 days:
• E-7d: Energy produced over the last 7 days
• Val. : Value of production over the last 7 days, calculated using the cur-
rency and conversion coefficient set in the relevant section of the SET-
TINGS menu
• CO2: Amount of CO2 saved over the last 7 days
5. Last month
This section of the menu displays the statistics for the last month:
• E-mon: Energy produced during the current month
• Val. : Value of the last month's production, calculated using the cur-
rency and conversion coefficient set in the relevant section of the SET-
TINGS menu
• CO2: Amount of CO2 saved during the current month
6. Last 30 days
This section of the menu displays the statistics for the last 30 days:
• E-30d: Energy produced over the last 30 days
• Val. : Value of production over the last 30 days, calculated using the
currency and conversion coefficient set in the relevant section of the
SETTINGS menu
• CO2: Amount of CO2 saved over the last 30 days
8. User period
This section of the menu displays the statistics for a period chosen by
the user:
Once the start and end dates for the period have been set, the following
data are available:
• E: Energy produced over the selected period
• Val. : Value of production over the selected period, calculated using
the currency and conversion coefficient set in the relevant section of the
SETTINGS menu
• CO2: Amount of CO2 saved over the selected period
000412AG
- 69 -
7 - Operation
Settings Menu
Selecting SETTINGS from the three main sub-menus brings up the first
screen, asking for the password.
The default password is "0000".
This can be changed by using the display buttons, following the same
procedure as always:
• ENTER scrolls through the digits (from left to right)
• ESC returns to the previous digit (from right to left)
• Press ESC several times to return to the previous menus
• DOWN scrolls down the numerical scale (from 9 to 0)
• UP scrolls up the numerical scale (from 0 to 9)
After entering the password, press ENTER to access the information in
this section:
Settings
ENTER
Password 0000
ENTER
Address 1
DOWN UP
Display Set 2
DOWN UP
Service 3
DOWN UP
New PW 4
DOWN UP
Cash 5
DOWN UP
Time 6
DOWN UP
Nation 7
DOWN UP
(*) Available for the Italian country Language 8
standard only. Refer to the section DOWN UP
Autotest 10*
DOWN UP
Alarm 11
DOWN UP
Remote Control 12
DOWN UP
UV Prot.Time 13
DOWN UP
MPPTScan En/Dis 14
DOWN UP
Scan Interval 15
DOWN UP
Alarm Message 16
DOWN UP
Reactive Power 17
DOWN UP
000412AG
Power Reduction 18
- 70 -
7 - Operation
1. Address
This section of the menu allows you to set the serial port addresses of the
individual inverters connected to the RS485 line.
The addresses that can be assigned are 2 to 63. The UP and DOWN
buttons scroll through the numerical scale.
‘AUTO’ selection cannot be used at present.
2. Display Set
This section of the menu allows you to set the display properties:
• Light: sets the lighting mode and adjusts the display backlight
ON: Light always on
OFF: Light always off
Auto: Automatic backlight control. The light is switched on whenever a
button is pressed and stays on for 30 sec, after which it gradually dims
out.
Intensity: adjusts display brightness (scale from 1 to 9)
• Contrast: adjusts display contrast (scale from 1 to 9)
• Buzzer: sets button sound
ON: button sound is on
OFF: button sound is off
3. Service
This section of the menu is reserved for installers.
A special access password is required, which may be obtained from the
website https://registration.ABBsolarinverters.com.
Before connecting to the site, make sure you have all the information
required to calculate your password:
Inverter Model, Serial Number, week of manufacture.
When you have a password you can set the parameters in the menu.
Changing the above-mentioned parameters may prevent disconnection from the grid if the
new values exceed those given in the standards of the country of installation. If these para-
meters are changed to values outside the standard range, an interface protection must be
installed external to the inverter in accordance with the requirements of the country of instal-
lation.
000412AG
- 71 -
7 - Operation
The table below shows the parameters that can be changed and the
range of values that may be set for each:
4. New PW
This section of the menu allows you to change the settings menu pas-
sword (default 0000).
If the Password is lost you will not have access to the inverter, since there is no Reset function
for security reasons
- 72 -
7 - Operation
5. Cash
This section of the menu allows you to set the name of the currency and
the value of 1 kWh of energy produced. Setting these parameters cor-
rectly allows the actual earnings/savings achieved by the system to be
displayed.
• Name: sets the desired currency (default is EUR)
• Val/KWh: indicates the cost/incentive for 1 kWh in the chosen currency
(default is 0.50).
6. Time
Allows you to set the current date and time (not counting summer time)
7. Nation
Allows you to change the grid standard (selected at the first switch on of
the inverter) within 24 hours when the inverter is working.
• Nation Select: set the desired grid standard
• Remaining Time: indicates the remaining time before the “Nation Se-
lect” function is blocked.
After the grid standard was set you have 24 hours to make any changes to the grid standard
value; 24 hours later the “Nation Select.” functionality will be blocked, and any subsequent
changes can only be made using a password provided on request by ABB.
8. Language
Allows you to set the language you prefer for the menus
9. Vstart
This section of the menu allows you to set the Vstart voltage (for the two
channels separately if they are configured independently) to suit the sy-
stem requirements.
We advise changing the activation voltage only if really necessary and to set it to the correct
value: the photovoltaic generator sizing tool available on the ABB website will indicate whe-
ther Vstart needs changing and what value to set it at.
10. Autotest
This section of the menu is available only for the Italian country standard.
Refer to the section on this topic in the manual.
000412AG
- 73 -
7 - Operation
11. Alarm
INVERTER RUN
- PRODUCTION - This section of the menu allows you to set the activation status of a relay
Relay State: Switched
N.C.
(available either as contact normally open – N.O. – or as contact normally
N.O.
closed – N.C.).
GRID DISCONNECTION This contact can be used, for example, to: activate a siren or a visual
- NO PRODUCTION -
Relay State: Idle
N.C. alarm, control the disconnect device of an external transformer, or control
N.O. an external device.
GRID RECONNECTION
t=based on Country Standard The relay can be set to switch in 2 different modes:
N.C.
Relay State: Idle
N.O.
• Production (display text “PRODUCTION”)
The relay is activated (state: switched) whenever the inverter connects
Yes DISCONNECTION No to the grid; as soon as the inverter is disconnected from the network (for
CAUSE IS STILL
PRESENT
whatever reason that caused disconnection), the relay is in its resting
position
INVERTER RUN • Alarm with reset at the end of the alarm signalling process (display
N.C.
text “FAULT”):
Relay State: Idle
N.O.
The relay is activated (state: switched) whenever an error is present
(code Exxx) on the inverter; this does not apply to warnings (Warning
– code Wxxx). The alarm returns to its resting position when the alarm
ERROR OCCURENCY
signal ends, i.e. before the inverter checks the grid parameters after the
alarm state. This is because grid control state is not an alarm state but a
ERROR MESSAGE state of normal operation.
t=15s
N.C.
Relay State: Switched
If the alarm condition is persistent, the alarm contact cyclically switches from its resting state
to its activated state.
In the presence of W003 signalling (Grid Fail – Network parameters out of tolerance), the
alarm contact switches to then reset itself at the end of the alarm signal. This means that
during the absence of grid voltage (display message “Vac Absent”) the alarm contact remains
in its resting position.
In the presence of W002 signalling (UV Input – input voltage below the limit of operation),
the alarm contact switches to then reset itself at the end of the alarm signal. This means that
during the reduced input voltage (display message “Waiting sun”) the alarm contact remains
000412AG
- 74 -
7 - Operation
- 75 -
7 - Operation
• Cos-phi fixed: Sets the power rating to a fixed value. To enable this
mode, press Enter and set the Cos-Phi value (as either Over or Under
excited, from 1.000 to 0.800); press Enter to confirm.
0.85
0.9
1
Aurora Manager TL configuration 0.95
software 0.9
0.85
0.36
0.3
0.2
-0.1
software -0.2
-0.3
-0.36
Vout
210 220 230 240 250
- 76 -
7 - Operation
Info Menu
Selecting INFO from the three main sub-menus gives access to:
Info
ENTER
Part No. 1
DOWN UP
Serial No. 2
DOWN UP
Firmware 3
DOWN UP
Country Code 4
1. Part No.
Displays the model code.
2. Serial No.
Displays the serial number and week and year of manufacture of the
equipment .
3. Firmware
Displays the firmware version installed in the equipment.
4. Country Code
Displays information on the grid standard set.
000412AG
- 77 -
7 - Operation
UV Test – parameters:
U<<; U<
Disconnection from the distribution grid due to “Under-voltage”
OF Test – parameters:
F>> and F>
Disconnection from the distribution grid due to “Over-frequency”
UF Test – parameters:
F<< and F<
Disconnection from the distribution grid due to “Under-frequency”
ENTER
U>> autotest can be performed. These have the following meanings:
U<<
F>> N/A - Test cannot be performed because the relevant parameter is not
F<<
U>(10min)
active
U>
U<
Idle - Test enabled but not yet performed
F>
F<
OK - Test enabled and performed successfully
If one of the protections is disabled (from the Service menu), N/A (not
applicable) will appear next to the name of the test.
While one of the tests is being performed, the set limits will be gradually
increased/reduced (depending on the type of test) until the threshold at
which the inverter is disconnected from the grid is reached. The procedu-
000069CG
res for running the Autotest comply with the legislation in force.
- 78 -
7 - Operation
The display shows the message “Performing Test” when the test has
Test in corso started.
.....
At the end of the test, when the inverter has disconnected from the grid,
the results and values of the test performed will appear on the display.
You can move from one screen to another using the UP/DOWN arrow
keys.
Screen 1 of 3
Screen 2 of 3
Screen 3 of 3
The test results should be considered valid on the basis of the following
tolerances, as reported in the applicable legislation:
Press ESC to go back to the Autotest menu, from where you may select
000069CG
- 79 -
8
Maintenance
General conditions
Checking and maintenance operations must be carried out by specialized
staff assigned to carry out this work.
Maintenance operations must be performed with the apparatus disconnected from the grid
(power switch open) and the photovoltaic panels obscured or isolated, unless otherwise in-
dicated.
For cleaning, DO NOT use rags made of filamentary material or corrosive products that may
corrode parts of the equipment or generate electrostatic charges.
Avoid temporary repairs. All repairs should be carried out using only genuine spare parts.
The maintenance technician is under an obligation to promptly report any anomalies.
Always use the personal protective equipment provided by the employer and comply with the
safety conditions of the Accident prevention chapter. 000037DG
- 80 -
8 - Maintenance
Routine maintenance
Scheduled maintenance operations are not mandatory, but are recom-
mended to preserve the efficiency of the PV plant.
Troubleshooting
Follow the table shown in the following paragraph in order to understand
and resolve warning (Wxxx) and error (Exxx) messages displayed by the
inverter
The operations carried out on the inverter in order to identify and resolve malfunctions may be
carried out only by the organization that carried out the installation or by qualified personnel
Alarm Messages
The equipment is able to indicate errors/warnings on the display only if
the input voltage is higher than the Vdcmin voltage (POWER LED flash-
ing or on; see operation chapter).
The messages and their codes are indicated on the display 07 .
The following table gives the complete list of errors/warnings relating to string inverters. Some
000413AG
error/warning codes may not be used depending on the inverter model installed.
- 81 -
8 - Maintenance
- Code on display
- Error message Name of Alarm and Cause Solution
- Signal
• Measure the insulation resistance using a megohmmeter posi-
tioned in the photovoltaic field (positive terminal short-circuited
at the negative pole) compared to ground. The measurement is
strongly influenced by the environmental conditions, so must be
- No code Ground fault of photovoltaic generator:
taken under the same conditions in which the error occurred.
- Ground F The alarm is generated when a leakage current to
- If the value measured is lower than 1 megaohm, a check must
- Red LED ground is detected in the DC section of the system.
be carried out by a technician/installer on the photovoltaic gene-
rator to identify and eliminate the problem.
- If the value measured is higher than 1 megaohm and the error
signal persists, contact customer assistance.
• Link the components inside the inverter by accessing the “Set-
Lack of linkage of the new component:
- No code tings > Service > Accept boards” (refer to the procedure given in
The components inside the inverter (e.g. display, fuse
- NEW COMPONENT this manual).
board, communication and control board, etc.) are not
REFUSED!
inter-linked. This occurs following the replacement of one
- Yellow LED lamp. - If the signal persists also following the linking of the compo-
of the components inside the inverter.
nents, contact customer assistance.
- No code • Set the grid standard of the country of installation following the
SET COUNTRY or NO NATION:
- SET COUNTRY or NO instructions given in this manual for the inverter.
Indicates that in the installation phase the grid standard
NATION - If the signal persists also following setting the grid standard,
was not set on the inverter.
- No LED contact customer assistance.
- No code Vac absent: • Check the grid voltage on the inverter's AC terminal block.
- Vac absent The inverter displays the “Vac absent” message when it - Should it be absent, check any protection work on the line and
- Yellow LED does not record output voltage (AC side). the presence of grid voltage on the supply point.
Memory broken: • Remove the memory board and check the welding of all the
- No code The inverter displays the “Memory broken” message connector's terminals. Subsequently reinsert the memory board
- Mem. broken when it records a communication problem with the me- and check that it is correctly inserted into the dedicated slot
- Yellow LED mory board on which the inverter saves the daily value - If the signal persists also following the above checks, contact
of energy produced. customer assistance.
Awaiting sun:
• Check the input voltage on the inverter.
- No code The inverter displays the “awaiting sun” message when,
- If it does not exceed Vstart, check for the presence of sufficient
- Awaiting sun following a W001 and/or W002 notice, the voltage from
irradiation and the correct composition of the system.
- Green LED lamp. the photovoltaic generator is less than the activation vol-
- If it exceeds Vstart, contact customer assistance
tage (Vstart).
Insufficient irradiation (Low input voltage on
• Check the input voltage on the inverter.
- W001 switching on the inverter):
- If it does not exceed Vstart, check for the presence of sufficient
- Sun Low Incorrect configuration of the PV generator or an “on the
irradiation and the correct composition of the system.
- Yellow LED limit” configuration for the inverter's minimum input vol-
- If it exceeds Vstart, contact customer assistance
tage.
Insufficient irradiation (Low input voltage on
• Check the input voltage on the inverter.
- W002 switching off):
- If it does not exceed Vstart, check for the presence of suffi-
- Input UV Incorrect configuration of the photovoltaic generator or
cient irradiation and the correct composition of the system.
- Yellow LED an “on the limit” configuration for the inverter's minimum
- If it exceeds Vstart, contact customer assistance
input voltage.
• Check the grid voltage on the inverter.
- Should it be absent, check for absence of grid voltage on the
supply point.
- If, on the other hand, the voltage tends to rise (when the inverter
is connected) there is high line or grid impedance.
Parameters of grid voltage outside range:
This error signal occurs when during the inverter's nor-
• Check the grid voltage also on the supply.
mal operation the grid parameters exceed the limits set
- W003 - If it is high, it means that there is high grid impedance. In this
by the operator:
- Grid Fail case, ask the operator to adjust the grid voltage. If the operator
- Grid voltage absent (after the signal the inverter goes
- Yellow LED authorises a change to the inverter's parameters, agree the new
to "Vac Absent")
limits with customer assistance
- Unstable grid voltage (down or up) -
- If the voltage at the point of supply is much lower than that me-
Unstable grid frequency
asured on the inverter, it is necessary to adjust the line (inverter-
contactor).
- If the voltage and the grid frequency come back within the limits
(also when the inverter is connected to the grid) contact customer
assistance
- W009
Characterisation board for the wind generator not compi-
- Empty Table (only WIND models)
000413AG
- 82 -
8 - Maintenance
- Code on display
- Error message Name of Alarm and Cause Solution
- Signal
- W010 *
- Fan broken! Fan broken:
• Error inside the inverter and cannot be checked externally.
- Yellow LED lamp. This error occurs when there is a malfunction in the fan/
- If the alarm repeats persistently, contact customer assistance.
*not visualised on di- fans inside the inverter.
splay
• Raise the value of the activation voltage (Vstart) so as to have
Bulk Under-voltage: sufficient power from the PV generator at the time of the inver-
- W011 The alarm (which is a warning and not an error) is gene- ter's grid connection.
- Bulk UV rated when the voltage at the heads of the bulk capaci- • Check the input voltage on the inverter.
- Yellow LED tors does not reach the threshold for the operation of the - If it does not exceed Vstart, check for the presence of suffi-
inverter (internal unchangeable threshold). cient irradiation and the correct composition of the system.
- If it exceeds Vstart, contact customer assistance
• Check that the date/time are set correctly and, if they are not,
set them.
- W012 *
Subsequently arrange to completely switch off the inverter (on
- Batt. Flat Battery flat:
both AC and DC) and wait a few minutes.
- Yellow LED The inverter displays the “Battery flat” message when it
Finally, restart the inverter and check whether the date/time are
*not visualised on di- records a voltage for the buffer battery which is too low.
now correctly set or whether they have reset to 01/01/2000. In this
splay
case replace the battery with the inverter completely switched off
(section AC and DC side) being careful to maintain the polarity
- W013 * Clock broken:
- Clock broken The alarm occurs when there is a difference of over 1
• Error inside the inverter and cannot be checked externally.
- Yellow LED minute in the time displayed compared to the internal
- If the alarm repeats persistently, contact customer assistance.
*not visualised on di- time of the microprocessors and indicates a malfunction
splay of the clock circuit.
• Check with a multimeter the state of the fuses (positioned on
the fuse boards).
- If one or more fuses is open, arrange to replace them and check
- W017*
that the input current on the string(s) does not exceed the rating
- String Err.
Error recorded in measuring string currents: of the fuses (should parallel strings have been made outside the
- Yellow LED lamp.
Damaged string protection fuse(s) inverter).
* (only for models with
- If there are no damaged string fuses and the inverter continues
monitored string fuses)
to show the alarm message check whether the settings to be
made through the Aurora Manager software are correct (presen-
ce or absence of one or more input strings).
- W022 *
- Reactive power mode Variation in means of managing reactive power: The variation in the means of managing reactive power is done
changed Variation in the means of managing reactive power; this directly by the customer/installer and is not an error. The informa-
- No LED change can be made through the display or advanced tion is only saved on the historic record of the events memorised
*not visualised on di- configuration software. by the inverter
splay
- W023 *
Variation in the inverter's date and time:
- date/time changed The variation in the inverter's date and time is done directly by the
Variation of the inverter's date and time; this change can
- No LED customer/installer and is not an error. The information is only sa-
be made through the display or advanced configuration
*not visualised on di- ved on the historic record of the events memorised by the inverter
software.
splay
Zeroing of the statistical energy data memorised in The zeroing of the partial energy values memorised by the inver-
- W024 *
the EEPROM: ter is done directly by the customer/installer and is not an error.
- Energy data reset
000413AG
Reset of the energy data saved in the inverter; this ope- The information is only saved on the historic record of the events
- No LED
ration can be handled through the display or advanced memorised by the inverter
*not visualised on di-
configuration software. • The notice may also occur on substitution of the Memory Card
splay
where the statistical production data is saved
- 83 -
8 - Maintenance
- Code on display
- Error message Name of Alarm and Cause Solution
- Signal
• Check whether the composition of the PV generator enables
Input over-current (photovoltaic generator):
- E001 input current which exceeds the maximum threshold allowed by
The alarm occurs when the inverter's input current
- Input OC the inverter and that the configuration of the inputs (independent
exceeds the inverter's threshold for maximum input cur-
- Yellow LED or in parallel) is carried out correctly.
rent.
- If both checks are positive, contact customer assistance.
Input over-voltage (photovoltaic generator):
• It is necessary to measure the input voltage inside the inverter
The alarm is generated when the input voltage (from the
with a voltmeter.
PV generator) exceeds the inverter's threshold of maxi-
- If it is higher than the maximum voltage of the operating range,
mum input voltage.
- E002 the alarm is genuine and it is necessary to check the configura-
The alarm occurs before reaching the absolute threshold
- Input OV tion of the PV generator. If the voltage has also exceeded the
over which the inverter is damaged.
- Yellow LED maximum input threshold the inverter could be damaged.
- If it is lower than the maximum voltage of the operating range,
When the inverter's input voltage exceeds the Over Vol-
the alarm is caused by an internal malfunction and it is necessary
tage threshold, the inverter will not start up due to the
to contact customer assistance.
generation of the alarm.
DSP initialisation error:
- E003 The main microcontroller cannot initialise correctly the • Error inside the inverter and cannot be checked externally.
- No Parameters two DSPs (booster stage and inverter stage). The error - If the problem (once the inverter has been switched off and back
- Yellow LED is caused by communication problems on the inverter's on) persists, contact customer assistance.
internal bus.
- E005 Communication error inside the inverter: • Error inside the inverter and cannot be checked externally.
- Comm.Error The alarm occurs when there are communication pro- - If the problem (once the inverter has been switched off and back
- Yellow LED blems between the control devices inside the inverter. on) persists, contact customer assistance.
Output over current:
- E006 • Error inside the inverter and cannot be checked externally.
The alarm occurs when the inverter's output current
- Output OC - If the problem (once the inverter has been switched off and back
exceeds the inverter's threshold for maximum output
- Yellow LED on) persists, contact customer assistance.
current.
Once the error occurs, the inverter tries to return to normal ope-
ration.
- E007 Saturation recorded on the IGBT components: - Should the error occur sporadically, it may be caused by a bru-
- IGBT Sat The alarm occurs when one of the inverter's active devi- sque transition of the grid voltage or of the input voltage, but is
- Yellow LED ces is in a saturated state. not due to a malfunction by the inverter.
- If the error is connected to an internal breakdown, it will continue
to appear and so it is necessary to contact customer assistance.
- 84 -
8 - Maintenance
- Code on display
- Error message Name of Alarm and Cause Solution
- Signal
• Check that the setting of the "IN MODE" switch is specifically
Incorrect configuration of inputs (set in parallel ra- set to "PAR" and that the bridges between the two input channels
ther than independent): have been included.
- E013 The alarm is generated solely when the inverter is con- - If the configuration of the inverter is correct, check that the input
- Wrong Mode figured with parallel inputs. In this particular configura- strings have the usual number of standard panels of the usual
- Yellow LED tion the inverter checks the input voltage of each of the brand and with the same inclination/orientation.
two channels and if the two voltages differ by more than - If both the configuration of the inverter and the characteristics
20Vdc, the alarm is raised . of the PV generator conform with the specifications, contact cu-
stomer assistance.
Excessive temperature inside the inverter: • Check that the inverter is not exposed to direct sunlight. Wait for
External temperature over 60°C. This parameter also de- the temperatures to which the inverter is exposed to return to the
- E014
pends on the power which the inverter must supply since operating range and for the inverter to cool down.
- Over Temp.
the measurement of temperatures is done internally and - If the problem (once the ambient temperature has returned to
- Yellow LED
is influenced by the heat dissipated by the components the range) persists, contact customer assistance. Remember to
of the inverter itself wait the time needed to allow the inverter to cool down
- E015 Breakdown recorded on the “Bulk” capacitor: • Error inside the inverter and cannot be checked externally.
- Bulk Cap Fail Error inside the inverter relating to a problem in the bulk - If the problem (once the inverter has been switched off and back
- Yellow LED capacitors. on) persists, contact customer assistance.
Error in the “Inverter” circuit (DC-AC side) recorded
- E016 • Error inside the inverter and cannot be checked externally.
by the “Booster” circuit (DC-DC side):
- Inverter Fail - If the problem (once the inverter has been switched off and back
The alarm is generated when a problem is recorded in
- Yellow LED on) persists, contact customer assistance.
the inverter circuit (DC/AC)
Long wait for “Inverter” regime to start up:
Error internal to inverter relating to start-up time for the - If the error signal occurs sporadically, it may be due to causes
DC-AC circuit regime (Inverter) external to the inverter (limited irradiation and so limited power
- E017 • The alarm may be triggered by causes external to the availability from the PV generator).
- Start Timeout inverter: a reduced input voltage on the inverter (just
- Yellow LED above the activation voltage) but which is not accompa- - If the problem occurs systematically also in conditions of high
nied by a sufficient availability of power from the pho- irradiation and with input voltage which is significantly higher than
tovoltaic generator (typical condition of the stages with the activation voltage, contact customer assistance.
limited irradiation)
• Measure the insulation resistance using a megohmmeter po-
sitioned between the photovoltaic field (positive terminal short-
High leakage current measured on the DC side (pho-
circuited at the negative pole) compared to ground. The measu-
tovoltaic generator):
rement is strongly influenced by the environmental conditions,
The alarm is generated when, during normal operation
- E018 so must be made under the same conditions in which the error
of the inverter, a leakage current to ground is detected in
- Ground Fault occurred.
the DC section of the system. It is also possible that the
- Red LED - If the value measured is lower than 1 megaohm, a check must
inverter generates the alarm E018 message also due to
be carried out by a technician/installer on the photovoltaic gene-
AC leakage currents connected to the capacitive nature
rator to identify and eliminate the problem.
of the photovoltaic generator compared to ground.
- If the value measured is higher than 1 megaohm and the error
signal persists, contact customer assistance.
Failure of test on sensor to measure the leakage cur-
rent (DC side):
Before connecting to the grid the inverter runs a self-test
• Error inside the inverter and cannot be checked externally.
regarding the sensor for the leakage current. The test
- E019 By its nature, the alarm only occurs prior to connection to the grid
is carried out by “forcing", in the sensor of the leakage
- Ileak sense.fail
current, a current with a known value: the micropro-
- Yellow LED - If the problem (once the inverter has been switched off and back
cessor compares the value read with the known value.
on) persists, contact customer assistance.
The error is generated if the comparison between the
read value and the known value during the test does not
fall within the allowed tolerance.
Failure of the test on the relay of the “Booster” (DC-
DC circuit):
Before connecting to the grid the inverter carries out in- • Error inside the inverter and cannot be checked externally.
- E020
ternal tests. One of these tests concerns the correct ope- By its nature, the alarm only occurs prior to connection to the grid
- Self Test Error 1
ration of the booster relay. The test is carried out by “for- - If the problem (once the inverter has been switched off and back
- Yellow LED
cing” the switching of the relay and checking its operation. on) persists, contact customer assistance.
The error is generated if a problem is found in actioning
the relay.
000413AG
- 85 -
8 - Maintenance
- Code on display
- Error message Name of Alarm and Cause Solution
- Signal
Failure of the test on the inverter's relay (DC-AC cir-
cuit):
Before connecting to the grid the inverter carries out in- • Error inside the inverter and cannot be checked externally.
- E021
ternal tests. One of these tests concerns the correct ope- By its nature, the alarm only occurs prior to connection to the grid
- Self Test Error 2
ration of the inverter relay. The test is carried out by “for- - If the problem (once the inverter has been switched off and back
- Yellow LED
cing” the switching of the relay and checking its operation. on) persists, contact customer assistance.
The error is generated if a problem is found in actioning
the relay.
Timeout of the tests undertaken on the relays inside
- E022 the inverter: • Error inside the inverter and cannot be checked externally.
- Self Test Error 4 Execution time for the self-test carried out on the relay - If the problem (once the inverter has been switched off and back
- Yellow LED of the DC_AC (inverter) circuit too high. It may indicate a on) persists, contact customer assistance.
problem connected to the aforementioned relays
Feeding of continuous current to grid outside of ran-
ge:
The error is generated if the continuous component of Once the error occurs, the inverter tries to return to normal ope-
the current supplied to the grid exceeds the threshold of ration.
- E023 0.5% of the normal operating current. - Should the error occur sporadically, it may be caused by a bru-
- DC in error In any case the inverter is not blocked due to the E023 sque transition of the grid voltage or of the input voltage, but is
- Yellow LED error, but tries to reconnect to the grid. not due to a malfunction by the inverter.
The sporadic repetition of the error is a sign of serious - If the error is connected to an internal breakdown, it will continue
grid distortions or sharp irradiation changes, while sy- to appear and so it is necessary to contact customer assistance.
stematic repetition of the error signal will indicate a bre-
akdown on the inverter
- E024 • Error inside the inverter and cannot be checked externally.
Error inside the inverter:
- Internal error - If the problem (once the inverter has been switched off and back
Error inside the inverter
- Yellow LED nor) persists, contact customer assistance.
Low value of insulation resistance:
Before connecting to the grid the inverter measures the
insulation resistance of the PV generator compared to
ground. Should the measurement of the insulation resi-
stance be below 1Mohm, the inverter does not connect • Measure the insulation resistance using a megohmmeter posi-
to the grid and shows the “Riso Low” error. The causes tioned in the photovoltaic field (positive terminal short-circuited
- E025*
may be: at the negative pole) compared to ground. The measurement is
- Riso Low
- PV panel(s) damaged; strongly influenced by the environmental conditions, so must be
- Yellow LED
- Junction box(es) of the panels not correctly sealed, so made under the same conditions in which the error occurred.
as to permit infiltration by water and/or humidity; - If the value measured is lower than 1 megaohm, a check must
*not visualised on di-
- Problems in connections between panels (not perfectly be carried out by a technician/installer on the photovoltaic gene-
splay
fit); rator to identify and eliminate the problem.
- Poor quality of cable joints; - If the value measured is higher than 1 megaohm and the error
- Presence in the DC section of unsuitable or damaged signal persists, contact customer assistance.
overvoltage surge arresters outside the inverter (redu-
ced ignition voltage compared to the characteristics of
the strings of the PV generator);
- Presence of humidity inside any junction box
- E026 • Error inside the inverter and cannot be checked externally.
Internal reference voltage outside of range:
- Vref Error - If the problem (once the inverter has been switched off and back
Wrong measurement of reference voltage inside inverter
- Yellow LED on) persists, contact customer assistance.
Grid voltage outside of range:
- E027 Error in the internal measurement of grid voltage (set by • Error inside the inverter and cannot be checked externally.
- Error Meas V law) in order to have a redundant measurement (2 mea- - If the problem (once the inverter has been switched off and back
- Yellow LED surements on the same parameter made by two different on) persists, contact customer assistance.
circuits)
Grid frequency outside of range:
• Error inside the inverter and cannot be checked externally.
- E028 Error in the internal measurement of grid frequency (set
- Error Meas F by law) in order to have a redundant measurement (2
- If the problem (once the inverter has been switched off and back
- Yellow LED measurements on the same parameter made by two dif-
on) persists, contact customer assistance.
ferent circuits)
- E029 Internal over voltage on the measurement of the • Error inside the inverter and cannot be checked externally.
- Mid Bulk OV “Mid bulk”: - If the problem (once the inverter has been switched off and back
- Yellow LED Error internal to the inverter (only triphase models) on) persists, contact customer assistance.
000413AG
- 86 -
8 - Maintenance
- Code on display
- Error message Name of Alarm and Cause Solution
- Signal
High leakage current (DC side):
Error in the internal measurement (made when the in-
- E030 verter is grid connected) of the leakage current of the • Error inside the inverter and cannot be checked externally.
- Error Meas Ileak DC side (PV generator) compared to ground (set by law) - If the problem (once the inverter has been switched off and back
- Yellow LED in order to have a redundant measurement (2 measu- on) persists, contact customer assistance.
rements on the same parameter made by two different
circuits)
Output relay damaged:
- E031 Measurement of internal voltage on heads of the output • Error inside the inverter and cannot be checked externally.
- Error Read V relay outside of range. There is too great a difference in - If the problem (once the inverter has been switched off and back
- Yellow LED voltage between the input and output of the grid connec- on) persists, contact customer assistance.
tion relay.
Imbalanced output currents:
- E032 • Error inside the inverter and cannot be checked externally.
Measurement of the unbalance in the output voltage
- Error Read I - If the problem (once the inverter has been switched off and back
(made across the three phases) outside of range (only
- Yellow LED on) persists, contact customer assistance.
in triphase models)
• Wait for the temperatures to which the inverter is exposed to
- E033
Low ambient temperature: return to the operating range.
- UTH
Temperature outside the inverter below -25°C - If the problem persists, contact customer assistance. Remem-
- Yellow LED
ber to wait the time needed to allow the inverter to warm up
- E034 • Error inside the inverter and cannot be checked externally.
“IGBT” circuitry not ready:
- Interlock fail - If the problem (once the inverter has been switched off and back
Error inside the inverter
- Yellow LED on) persists, contact customer assistance.
• Switch back on the inverter remotely. If the unit does not switch
- E035*
Inverter awaiting “remote ON” command: back on, disable the remote off/on function and switch the
- Remote Off
The inverter has been switched off remotely (remote equipment off completely and subsequently switch it back on.
- Yellow LED
OFF) and remains awaiting the signal which will switch it - If the problem (once the Remote ON/OFF function from the di-
*not visualised on di-
back on (Remote ON) splay has been reactivated) persists, contact customer assistan-
splay
ce.
Average of the measurements of grid voltage out-
side of range:
The average value of the grid voltage (sampled every 10 • Check the grid voltage in the connection point to the inverter.
minutes) does not fall within the permitted ranges. The
- E036
grid voltage in the point connected to the inverter is too - If the grid voltage differs from the range due to the conditions of
- Vout Avg error
high. This may be caused by too high a grid impedance. the distribution grid, ask the operator to adjust the grid voltage.
- Yellow LED
In the final stage of the timeout, the inverter limits the po- If the operator authorises a change to the inverter's parameters,
wer to check whether the grid voltage has stabilised into agree the new limits with customer assistance
regular parameters. If this does not happen, the inverter
disconnects from the grid
• Check for the presence and correct contact between the two
Low value of the insulation resistance (only with the terminals of the grounding resistance installed inside the inverter
“Amorphous” mode activated): • Measure the insulation resistance using a megohmmeter posi-
This error can occur only should the “Amorphous” mode tioned in the photovoltaic field (positive terminal short-circuited
be on. This function is on only in inverters equipped with at the negative pole) compared to ground. The measurement is
- E037
a grounding kit and serves to monitor the voltage at the strongly influenced by the environmental conditions, so must be
- Riso Low
heads of the grounding resistance. The error occurs made under the same conditions in which the error occurred.
- Red LED
when the voltage at the heads of the resistance con- - If the value measured is lower than 1 megaohm, a check must
nected between ground and the pole of the photovoltaic be carried out by a technician/installer on the photovoltaic gene-
generator exceeds 30V for more than 30 minutes or rator to identify and eliminate the problem.
120V for more than one second. - If the value measured is higher than 1 megaohm and the error
signal persists, contact customer assistance.
• Section the inverter and check the polarity of the string(s) which
Error during the automatic check of the string volta-
the inverter has recorded as inverted.
ges (only in models with the “fuse-control” board):
- Once all the strings have been correctly connected, activate the
E046 In some inverter models it is possible to carry out the
system once again; the inverter will once again check the correct
- String self test fail check test of the polarity of the strings connected to the
polarity of the string inputs at the end of which it will carry out the
- No LED input (e.g.:TRIO-20.0/27.6kW).
checks for the grid connection.
This error signal occurs when, during the test stage, an
- If the problem (once the inverter has been switched off and back
inverted string is recorded
on) persists, contact customer assistance.
E049 • Error inside the inverter and cannot be checked externally.
Error in the “AC feed-forward” circuit:
- AC FF Error - If the problem (once the inverter has been switched off and back
Error inside the inverter
- Yellow LED on) persists, contact customer assistance.
000413AG
- 87 -
8 - Maintenance
- Code on display
- Error message Name of Alarm and Cause Solution
- Signal
• Check that the inverter is not exposed to direct sunlight. Wait for
Excessive temperature measured inside the inver-
E056 the temperatures to which the inverter is exposed to return to the
ter's wiring box:
- Over Temp. (from operating range and for the inverter to cool down.
High internal temperature.
external box) - If the problem (once the ambient temperature has returned to
This error relates to the temperature measured on exter-
- Yellow LED the range) persists, contact customer assistance. Remember to
nal boxes (e.g.:TRIO-20.0/27.6kW).
wait the time needed to allow the inverter to cool down
• It is necessary to measure the input voltage inside the inverter
with a voltmeter.
- If it is higher than the maximum voltage of the operating range,
Input voltage (Vin) higher than booster voltage
E057 the alarm is genuine and it is necessary to check the configura-
(Vbulk):
- Vbulk reading error tion of the PV generator. If the voltage has also exceeded the
The error occurs if the input voltage exceeds the Bulk
- Yellow LED maximum input threshold the inverter could be damaged.
voltage (voltage on the DC-DC circuit inside the inverter)
- If it is lower than the maximum voltage of the operating range,
the alarm is caused by an internal malfunction and it is necessary
to contact customer assistance.
E058 Error in the check of Pin vs Pout:
• Error inside the inverter and cannot be checked externally.
- Pin vs Pout check The error occurs if the difference between the measured
- If the problem (once the inverter has been switched off and back
error value of input power and that of output power is greater
on) persists, contact customer assistance.
- Yellow LED than the limit imposed internally to the inverter.
The following table gives the complete list of power limitation messages relating to string in-
verters. Some messages may not be used depending on the inverter model installed.
- Message on display
Name of Derating and Cause Solution
- Signal
Power limitation:
The message indicates that the user has set an output power
limitation for the inverter.
- LIMxxx% CODE:00 • Check the limitation value set in the “Settings >
LIM xxx% = Power reduction percentage
- Display symbol b6 Power Limitation” menu
Examples:
LIM 100% = no power limitation
LIM 50% = limitation to 50% of the output nominal power
Power limitation for over-frequency:
The message indicates that the user has set a power limitation
due to over frequency in order to reduce the maximum output po-
- LIMxxx% CODE:01 wer of the inverter when the grid frequency exceeds certain limits. • Check the limitation value set in the “Settings >
- Display symbol b6 LIM xxx% = Power reduction percentage Service > OF Derating” menu
Examples:
LIM 100% = no power limitation
LIM 50% = limitation to 50% of the output nominal power
000413AG
- 88 -
8 - Maintenance
- Message on display
Name of Derating and Cause Solution
- Signal
Power limitation for over-voltage:
The message indicates that the user has set a power limitation
due to over voltage (parameter U >(10 min)) in order to reduce
the maximum output power of the inverter when the reading of the
- LIMxxx% CODE:02 average grid voltage exceeds certain limits. • Check the limitation value set in the “Settings >
- Display symbol b6 The sampling of readings is done every 10 minutes (U>(10min)). Service > U > (10 min) Der.” menu
LIM xxx% = Power reduction percentage
Examples:
LIM 100% = no power limitation
LIM 50% = limitation to 50% of the output nominal power
Anti-islanding power limitation:
The message indicates that a power limitation is active since an
"islanding" condition has been recorded.
- LIMxxx% CODE:03 • If the inverter remains connected to the grid and
LIM xxx% = Power reduction percentage
- Display symbol b6 the limitation is active, contact customer assistance
Examples:
LIM 100% = no power limitation
LIM 50% = limitation to 50% of the output nominal power
Power limitation due to low grid voltage:
The message indicates that an output power limitation may occur
since a low grid voltage (AC) condition has been recorded. • Check that the grid voltage is lower than the mini-
- LIMxxx% CODE:04
LIM xxx% = Power reduction percentage mal voltage. Should this condition persist, contact
- Display symbol b6
Examples: the grid operator to resolve the problem.
LIM 100% = no power limitation
LIM 50% = limitation to 50% of the output nominal power
Power limitation due to excess temperature:
The message indicates that a power limitation is active since an
• Check that the inverter is not exposed to direct
excess temperature condition has been recorded inside the inver-
sunlight. Wait for the temperatures to which the in-
ter (This parameter depends also on the power which the inverter
verter is exposed to return to the operating range
- LIMxxx% CODE:05 must provide since the measurement of temperatures is taken and for the inverter to cool down.
internally and is influenced by the heat dissipated by the compo-
- Display symbol b7 nents of the inverter itself).
- If the problem (once the ambient temperature has
LIM xxx% = Power reduction percentage
returned within the range) persists, contact custo-
Examples:
mer assistance.
LIM 100% = no power limitation
LIM 50% = limitation to 50% of the output nominal power
• It is necessary to measure the input voltage inside
the inverter with a voltmeter.
Power limitation for input over-voltage: - If it is higher than the maximum voltage of the ope-
The message indicates that a power limitation is active since an rating range, the alarm is genuine and it is necessa-
- LIMxxx% CODE:06 input over voltage (AC) has been recorded. ry to check the configuration of the PV generator. If
- Display symbol LIM xxx% = Power reduction percentage the voltage has also exceeded the maximum input
b6 Examples: threshold the inverter could be damaged.
LIM 100% = no power limitation - If it is lower than the maximum voltage of the ope-
LIM 50% = limitation to 50% of the output nominal power rating range, the alarm is caused by an internal
malfunction and it is necessary to contact customer
assistance.
000413AG
- 89 -
8 - Maintenance
ENTER
Service
ENTER
Password 2°level
Stage 1 - Collection of information relating to the inverter.
Collect the following information relating to each inverter for which you
wish to have a password:
- S/N - Serial number of the inverter. This information can be found on the
label giving the identity details of the inverter or on the display by acces-
sing the “INFORMATION" menu"→Serial No.”
The serial number consists of 6 digits (the last 6 in models with a label
giving a 10-digit S/N)
- WK - Production week. This information can be found on the label gi-
ving the identity details of the inverter or on the display by accessing the
“INFORMATION" menu→Serial No.”
The production week consists of 4 figures, indicating the week (first 2
digits) and the year of production (last 2 digits)
- Update Version - This information is available only for some inver-
ter models and can be found on the display by accessing the menu
“INFORMATION→Firmware”.
- Insert the personal data requested and end the registration stage
- An email will be sent to the email address used with a link to complete
the registration process.
- Once the registration process is over, a further email will be sent with
the password to access the website.
000336BG
The password obtained enables access also to the advanced “Installer” mode present on
the configuration software for inverters. The configuration software can be downloaded in a
specific section of the website https://registration.ABBsolarinverters.com
- 90 -
8 - Maintenance
- Choose the inverter model from the drop-down list and insert Update
Ver., Serial Number and Week of Production of the inverter which were
obtained previously (Stage 1)
000336BG
- 91 -
8 - Maintenance
Should there be an error in inputting data, the fields containing the error
will be highlighted in red. If, on the other hand, the data are correct, the
passwords will be shown in a new window and at the same time sent to
the email address used for registration.
The second-level password enables access to the service menu which allows the inverter's
sensitive parameters to be changed. Proceed to changing the aforementioned parameters
only when requested by the grid operator or by customer assistance.
000336BG
- 92 -
8 - Maintenance
The 24 hours are counted only when the inverter is turned on.
Check that the date and time are set correctly. Otherwise it may not be possible to access the
“Nation Select” menu to reset the timer.
After this period the “Nation Select.” functionality will be blocked, and any
subsequent changes can only be made using a password provided on
request by ABB.
To request this password, contact the ABB Customer Service and com-
municate the serial number (S/N) of the inverter and the “Authorization
Key” code, which can be obtained by selecting the sub-menu SETTINGS
> NATION > NATION SELECT
Settings
ENTER
Password 0000
ENTER
Nation
ENTER
Nation Select
After obtaining the password, select SETTINGS > NATION > NATION
SELECT, press ENTER and digit the password supplied by ABB
Settings
ENTER
Password 0000
ENTER
Nation
ENTER
Nation Select
ENTER Password
0*****
After you have entered the password, the “Nation” value can be changed
for a further period of 24 hours.
000414AG
- 93 -
8 - Maintenance
4. Install the new battery, taking care to handle it with insulating gloves in
order not to compromise the charge and respecting the polarity shown on
the diagram on the motherboard.
- 94 -
8 - Maintenance
To check this, measure the voltage between the positive pole and ground
and between the negative pole (of the PV generator) and ground using a
voltmeter whose input accepts a voltage sufficient for the dimensions of
the photovoltaic generator.
Voc t
-Vs
(+)
Volt
000040DG
- 95 -
8 - Maintenance
200 V
300 V
Va Vb
1 2 3 4 5 6 7 8 9 10
50 V 50 V 50 V 50 V 50 V 50 V 50 V 50 V 50 V 50 V
(+) (-)
- 96 -
8 - Maintenance
IG
_
Once the short-circuit has been made, measure the insulation resistance
(Riso) using a megohmmeter positioned between the two shorted poles
and ground (of the inverter).
IG
_
Mega
Inverter
- 97 -
8 - Maintenance
Dispose of the various types of materials that the parts of the equipment consist of in dumps
that are suitable for the purpose.
- 98 -
Further information
For more information on ABB products and services for solar applica-
tions, navigate to www.abb.com/solarinverters
000339AG
- 99 -
Contact us
www.abb.com/solarinverters