This document is a centrifugal pump data sheet that provides technical specifications and performance details. It includes information about the applicable standards, site and operating conditions, construction details, and performance curves. The data sheet specifies items like liquid characteristics, flow rates, pressures, power requirements, materials of construction, dimensions, weights, and other key parameters.

Uploaded by

Risyda Putri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views7 pages

Api 610 Datasheet PDF Free

This document is a centrifugal pump data sheet that provides technical specifications and performance details. It includes information about the applicable standards, site and operating conditions, construction details, and performance curves. The data sheet specifies items like liquid characteristics, flow rates, pressures, power requirements, materials of construction, dimensions, weights, and other key parameters.

Uploaded by

Risyda Putri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

CENTRIFUGAL PUMP DATA SHEET

1 Note APPLICABLE TO: APPLICABLE NTL/INTNTL STANDARD: Rev

2 FOR UNIT
3 SITE SERVICE
4 NO. REQ PUMP SIZE TYPE No. STAGES
5 MANUFACTURER MODEL SERIAL NO.

6 LIQUID CHARACTERISTICS

7 Units Maximum Minimum Note SERVICE :


8 LIQUID TYPE OR NAME : Max & min values refer • IF INTERMITTENT NO. OF STARTS :
9 VAPOR PRESSURE : kPa only to the property PUMPS OPERATE IN:
10 RELATIVE DENSITY : listed CORROSION DUE TO : (6.12.1.9)
11 SPECIFIC HEAT : kJ/(kg-K) EROSION DUE TO : (6.12.1.9)
12 VISCOSITY : Pa s H2S CONCENTRATION (ppm) : (6.12.1.12)

13 OPERATING CONDITIONS (6.1.2) CHLORIDE CONCENTRATION (ppm) :


14 Units Maximum Rated Normal Minimum PARTICULATE SIZE (DIA IN MICRONS)

15 NPSHa Datum: C.L. Impeller PARTICULATE CONCENTRATION (PPM)

16 PUMPING TEMPERATURE : °K
17 FLOW : m³/s
18 DISCHARGE PRESSURE : (6.3.2) kPa
19 SUCTION PRESSURE : kPa
20 DIFFERENTIAL PRESSURE : kPa 0
21 DIFFERENTIAL HEAD : m #DIV/0!
22 NPSHA : m #DIV/0!
23 HYDRAULIC POWER : kW 0,00

24 SITE AND UTILITY DATA


25 LOCATION: COOLING WATER : INLET

26

RETURN DESIGN
27 MOUNTED AT : m TROPICALISATION REQD TEMP °K MAX
28 ELECTRIC AREA CLASSIFICATION: 6.1.22 ZONE PRESS. kPa MIN
29 GROUP TEMP CLASS SOURCE
30 SITE DATA : COOLING WATER CHLORIDE CONCENTRATION: ppm
31 ELEVATION (MSL) : m BAROMETER : mmHg INSTRUMENT AIR : MAX kPa MIN kPa
32 RANGE OF AMBIENT TEMPS:MIN / MAX / °K STEAM
33 RELATIVE HUMIDITY: MIN / MAX / % DRIVERS HEATING
34 UNUSUAL CONDITIONS: TEMP °K Max

35 Min
36 UTILITY CONDITIONS : PRESS. kPa Max
37 ELECTRICITY : DRIVERS HEATING CONTROL SHUTDOWN Min
38 VOLTAGE
39 PHASE
40 HERTZ

41 PERFORMANCE DRIVER (7.1.5)

42 PROPOSAL CURVE NO. RPM Driver Type


43 As Tested Curve No. GEAR
44 IMPELLER DIA.: RATED MAX. MIN. mm VARIABLE SPEED REQUIRED
45 RATED POWER kW EFFICIENCY (%) SOURCE OF VARIABLE SPEED
46 RATED CURVE BEP FLOW (at rated impeller dia) m³/s OTHER
47 MIN FLOW : THERMAL m³/s STABLE m³/s MANUFACTURER
48 PREFERRED OPERATING REGION (6.1.11) to m³/s NAMEPLATE POWER kW

49 ALLOWABLE OPERATING REGION to m³/s Nominal RPM


50 MAX HEAD @ RATED IMPELLER m RATED LOAD RPM
51 MAX POWER @ RATED IMPELLER (6.8.9) kW FRAME OR MODEL
52 NPSH3 AT RATED FLOW : m ORIENTATION
53 CL PUMP TO U/S BASEPLATE m LUBE
54 NPSH MARGIN AT RATED FLOW : m BEARING TYPE:
55 SPECIFIC SPEED (6.1.9) m3/s, rpm, m RADIAL /
56 SUCTION SPECIFIC SPEED LIMIT THRUST /
57 SUCTION SPECIFIC SPEED m3/s, rpm, m STARTING METHOD
58 MAX. ALLOW. SOUND PRESS. LEVEL REQD (6.1.14) (dBA) SEE DRIVER DATA SHEET
59 EST MAX SOUND PRESS. LEVEL (dBA)
60 MAX. SOUND POWER LEVEL REQ'D (6.1.14)
61 EST MAX SOUND POWER LEVEL

DATA SHEET No. Rev: SHEET of


1 Note CONSTRUCTION Rev
2 API PUMP TYPE: [Based on API 610 definitions] CASING MOUNTING:
3 CASING TYPE: (6.3.10)
4 NOZZLE CONNECTIONS: (6.5.5) OH3 BACKPULLOUT LIFTING DEVICE REQD. (9.1.2.6)
5 CASE PRESSURE RATING:
Size Facing Rating Position
6 SUCTION MAWP : (6.3.6) kPa @ °K
7 DISCHARGE HYDROTEST : kPa @ °K
8 PRESSURE CASING AUX. CONNECTIONS: (6.4.3.2)
9 No. Size Type Facing Rating Posn. HYDROTEST OH PUMP AS ASSEMBLY
10 BALANCE/LEAK OF SUCT'N PRESS. REGIONS DESIGNED FOR MAWP
11 DRAIN ROTATION: (VIEWED FROM COUPLING END)
12 VENT • IMPELLERS INDIVIDUALLY SECURED :
13 PRESSURE GAGE • BOLT OH 3/4/5 PUMP TO PAD / FOUNDATION :
14 TEMP GAGE • PROVIDE SOLEPLATE FOR OH 3/4/5 PUMPS
15 WARM-UP LINE ROTOR:
16 SHAFT FLEXIBILITY INDEX (SFI) (9.1.1.3)
17 Drain Valve Supplied By First Critical Speed Wet (Multi stage pumps only)
18 DRAINS MANIFOLDED COMPONENT BALANCE TO ISO 1940 G1.0
19 VENT Valve Supplied By SHRINK FIT -LIMITED MOVEMENT IMPELLERS (9.2.2.3)
20 VENTS MANIFOLDED
21 THREADED CONS FOR PIPELINE SERVICE & < 50°C (6.4.3.2)
COUPLING:(7.2.3) (7.2.13.f)
22 SPECIAL FITTINGS FOR TRANSITIONING (6.4.3.3)
MANUFACTURER
23 CYLINDRICAL THREADS REQUIRED (6.4.3.8) MODEL
24 GUSSET SUPPORT REQUIRED RATING (POWER/100 RPM)
25 MACHINED AND STUDDED CONNECTIONS (6.4.3 .12)
SPACER LENGTH mm
26 VS 6 DRAIN SERVICE FACTOR
27 DRAIN TO SKID EDGE RIGID
28 COUPLING WITH HYDRAULIC FIT (7.2.10)
29 MATERIAL (6.12.1.1)
COUPLING BALANCED TO ISO 1940-1 G6.3 (7.2.3)
30 APPENDIX H CLASS COUPLING WITH PROPRIETARY CLAMPING DEVICE (7.2.11)
31 MIN DESIGN METAL TEMP (6.12.4.1) °K
32 REDUCED-HARDNESS MATERIALS REQ'D (6.12.1.12.1) COUPLING IN COMPLIANCE WITH (7.2.4)
33 Applicable Hardness Standard (6.12.1.12.3) COUPLING GUARD STANDARD PER (7.2.13.a)
34 BARREL : Window on Coupling Guard
35 CASE :
36 DIFFUSERS BASEPLATE
37 IMPELLER : API BASEPLATE NUMBER :
38 IMPELLER WEAR RING : BASEPLATE CONSTRUCTION (7.3.14)
39 CASE WEAR RING : BASEPLATE DRAINAGE (7.3.1)
40 SHAFT: MOUNTING :
41 Bowl (if VS-type) NON-GROUT CONSTRUCTION : (7.3.13)
42 Inspection Class VERTICAL LEVELING SCREWS :
LONGITUDINAL DRIVER POSITIONING SCREWS :
43 BEARINGS AND LUBRICATION (6.10.1.1)

44 BEARING (TYPE / NUMBER): (6.11.4) SUPPLIED WITH : l GROUT AND VENT HOLES
45 RADIAL / l DRAIN CONNECTION
46 THRUST / MOUNTING PADS SIZED FOR BASEPLATE LEVELING (7.3.5)
47 REVIEW AND APPROVE THRUST BEARING SIZE : (9.2.5.2.4) MOUNTING PADS TO BE MACHINED (7.3.6)
48 PROVIDE SPACER PLATE UNDER ALL EQUIPMENT FEET
49 LUBRICATION : (6.10.2.2) (6.11.3) (9.6.1) OTHER
50 PRESSURE LUBE SYSTEM TO ISO 10438- (9.2.6.5)
50 ISO 10438 DATA SHEETS ATTACHED
51 Pressurized Lube Oil System mtd on pump baseplate REMARKS :
52 Location of Pressurized Lube Oil System mounted on baseplate :
53
54 INTERCONNECTING PIPING PROVIDED BY
55
56 OIL VISC. ISO GRADE VG
57 CONSTANT LEVEL OILER :

DATA SHEET No. Rev: SHEET of


CENTRIFUGAL PUMP DATA SHEET

1 Note INSTRUMENTATION SEAL SUPPORT SYSTEM MOUNTING Rev


2 SEE ATTACHED API-670 DATA SHEET SEAL SUPPORT SYSTEM MOUNTED ON PUMP BASEPLATE
3 ACCELEROMETER (7.4.2.1) (7.5.1.4)
4 Number of Accelerometers IDENTIFY LOCATION ON BASEPLATE
5 Mounting Location of Accelerometers
6 INTERCONNECTING PIPING BY
7 PROVISION FOR MTG ONLY (6.10.2.10)
8 Number of Accelerometers MECHANICAL SEAL (6.8.1)

9 Mounting Location of Accelerometers SEE ATTACHED ISO 21049/API 682 DATA SHEET
10 ADDITIONAL CENTRAL FLUSH PORT (6.8.9)
11 FLAT SURFACE REQUIRED (6.10.2.11) HEATING JACKET REQ'D. (6.8.11)
12 Number of Accelerometers
13 Mounting Location of Accelerometers HEATING AND COOLING (6.1.17)

14 COOLING REQ'D
15 VIBRATION PROBES (7.4.2.2) COOLING WATER PIPING PLAN
16 PROVISIONS FOR VIB. PROBES COOLING WATER PIPING
17 NUMBER PER RADIAL BEARING FITTINGS
18 NUMBER PER AXIAL BEARING COOLING WATER PIPING MATERIALS
COOLING WATER REQUIREMENTS:
19 MONITORS AND CABLES SUPPLIED BY (7.4.2.4) BEARING HOUSING m³/s
20 HEAT EXCHANGER m³/s
21 TEMPERATURE (7.4.2.3) TOTAL COOLING WATER m³/s
22 PROVISIONS FOR TEMP PROBES HEATING MEDIUM
23 RADIAL BEARING TEMP. OTHER
24 NUMBER PER RADIAL BEARING HEATING PIPING
25 THRUST BEARING TEMP.

26 NUMBER PER THRUST BEARING ACTIVE SIDE PIPING & APPURTENANCES

27 NUMBER PER THRUST BEARING INACTIVE SIDE MANIFOLD PIPING FOR PURCHASER CONNECTION (7.5.1.6)
28 TEMP. GAUGES (WITH THERMOWELLS) (9.1.3.6) VENT
29 PRESSURE GAUGE TYPE DRAIN
30 Remarks COOLING WATER
31 TAG ALL ORIFICES (7.5.2.4)
32 SOCKET WELD CONN ON SEAL GLAND (7.5.2.8)
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65

DATA SHEET No. Rev: SHEET of


CENTRIFUGAL PUMP DATA SHEET

1 Note SURFACE PREPARATION AND PAINT TEST Rev


2 MANUFACTURER'S STANDARD SHOP INSPECTION (8.1.1)
3 OTHER (SEE BELOW) PERFORMANCE CURVE
4 SPECIFICATION NO. & DATA APPROVAL PRIOR TO SHIPMENT.

5 TEST WITH SUBSTITUTE SEAL (8.3.3.2.b)


6 PUMP: MATERIAL CERTIFICATION REQUIRED CASING
7 PUMP SURFACE PREPARATION (6.12.1.8) IMPELLER
8 PRIMER SHAFT
9 FINISH COAT OTHER
10 CASTING REPAIR W ELD PROCEDURE APPR REQD
BASEPLATE: (6.12.2.5) (6.12.3.1)
11 BASEPLATE SURFACE PREPARATION INSPECTION REQUIRED FOR CONNECTION WELDS (6.12.3.4.d)
12 PRIMER: (6.12.3.4.e) MAG PARTICLE
13 FINISH COAT RADIOGRAPHY
14 DETAILS OF LIFTING DEVICES LIQUID PENETRANT
15 ULTRASONIC
16 SHIPMENT: (8.4.1) INSPECTION REQUIRED FOR CASTINGS
17 EXPORT BOXING REQUIRED MAG PARTICLE
18 OUTDOOR STORAGE MORE THAN 6 MONTHS RADIOGRAPHY
LIQUID PENETRANT
19 SPARE ROTOR ASSEMBLY PACKAGED FOR: ULTRASONIC
20 ROTOR STORAGE ORIENTATION (9.2.8.2) HARDNESS TEST REQUIRED (8.2.2.7)
21 SHIPPING & STORAGE CONTAINER FOR VERT STORAGE (9.2.8.3) ADDNL SUBSURFACE EXAMINATION (6.12.1.5) (8.2.1.3)
22 FOR
23 N2 PURGE (9.2.8.4) METHOD
24 SPARE PARTS PMI TESTING REQUIRED (8.2.2.8)
25 START-UP COMPONENTS TO BE TESTED
26 NORMAL MAINTENANCE
27 WEIGHTS kg RESIDUAL UNBALANCE TEST (J.4.1.2)

28 ITEM No PUMP DRIVER GEAR BASE TOTAL NOTIFICATION OF SUCCESSFUL SHOP

29 PERFORMANCE TEST (8.1.1.c) (8.3.3.5)


30 BASEPLATE TEST (7.3.21)
31 HYDROSTATIC
32 HYDROSTATIC TEST OF BOWLS & COLUMN (9.3.13.2)
33 OTHER PURCHASER REQUIREMENTS PERFORMANCE TEST
34 COORDINATION MEETING REQUIRED (10.1.3) TEST IN COMPLIANCE WITH (8.3.3.2)
35 MAXIMUM DISCHARGE PRESSURE TO INCLUDE TEST DATA POINTS TO (8.3.3.3)
36 MAX RELATIVE DENSITY TEST TOLERANCES TO (8.3.3.4)
37 OPERATION TO TRIP SPEED NPSH (8.3.4.3.1) (8.3.4.3.4)
38 MAX DIA. IMPELLERS AND/OR NO OF STAGES NPSH-1ST STG ONLY (8.3.4.3.2)
39 CONNECTION DESIGN APPROVAL (9.2.1.4) NPSH TESTING TO HI 1.6 OR ISO 9906 (8.3.4.3.3)
40 TORSIONAL ANALYSIS / REPORT (6.9.2.10) TEST NPSHA LIMITED TO 110% SITE NPSHA (8.3.3.6)
41 PROGRESS REPORTS RETEST ON SEAL LEAKAGE (8.3.3.2.d)
42 OUTLINE OF PROC FOR OPTIONAL TESTS (10.2.5) RETEST REQUIRED AFTER FINAL HEAD ADJ (8.3.3.7.b)
43 ADDITIONNAL DATA REQUIRING 20 YEARS RETENTION (8.2.1.1) COMPLETE UNIT TEST (8.3.4.4.1)
44 SOUND LEVEL TEST (8.3.4.5)
45 LATERAL ANALYSIS REQUIRED (9.1.3.4) (9.2.4.1.3) CLEANLINESS PRIOR TO FINAL ASSEMBLY (8.2.2.6)
46 MODAL ANALYSIS REQUIRED (9.3.9.2) LOCATION OF CLEANLINESS INSPECTION
47 DYNAMIC BALANCE ROTOR (6.9.4.4) NOZZLE LOAD TEST
48 INSTALLATION LIST IN PROPOSAL (10.2.3.l) CHECK FOR CO-PLANAR MOUNTING PAD SURFACES
49 VFD STEADY STATE DAMPED RESPONSE ANALYSIS (6.9.2.3) MECHANICAL RUN TEST UNTIL OIL TEMP STABLE
50 4 HR. MECH RUN AFTER OIL TEMP STABLE (8.3.4.2.1)
51 TRANSIENT TORSIONAL RESPONSE (6.9.2.4) 4 HR. MECH RUN TEST (8.3.4.2.2)
52 BEARING LIFE CALCULATIONS REQUIRED (6.10.1.6)
IGNITION HAZARD ASSMT TO EN 13463-1 (7.2.13.e) BRG HSG RESONANCE TEST (8.3.4.7)
53 CASING RETIREMENT THICKNESS DRAW ING (10.3.2.3) STRUCTURAL RESONANCE TEST (9.3.9.2)
54 FLANGES RQD IN PLACE OF SKT WELD UNIONS (7.5.2.8) REMOVE / INSPECT HYDRODYNAMIC BEARINGS AFTER TEST
55 INCLUDE PLOTTED VIBRATION SPECTRA (6.9.3.3) (9.2.7.5)
56 CONNECTION BOLTING (7.5.1.7) AUXILIARY EQUIPMENT TEST (8.3.4.6)
57 CADMIUM PLATED BOLTS PROHIBITED EQUIPMENT TO BE INCLUDED IN AUXILLIARY TESTS
58 VENDOR TO KEEP REPAIR AND HT RCDS (8.2.1.1.c)
59 VENDOR SUBMIT TEST PROCEDURES (8.3.1.1) LOCATION OF AUXILIARY EQUIPENT TEST
60 SUBMIT INSPECTION CHECK LIST (8.1.5)
61 IMPACT TEST (6.12.4.3) PER EN 13445
62 PER ASME SECTION VIII
REMOVE CASING AFTER TEST

DATA SHEET No. Rev: SHEET of


VERTICAL PUMP SUPPLEMENTAL DATA SHEET

1 Note VERTICAL TYPE (FIG 1.1) Rev


2 REMARKS
3
4

6 VERTICAL PUMPS VERTICAL PUMPS (CONT'D)

7 PUMP THRUST: (+) UP (-) DOWN LINE SHAFT:


8 STATIC THRUST N N LINE SHAFT DIAMETER mm
9 AT MIN FLOW N N TUBE DIAMETER mm
10 AT RATED FLOW N N LINE SHAFT COUPLING:
11 AT MAX FLOW N N LINESHAFT CONNECTION
12 MAX THRUST N N
13 SOLEPLATE REQUIRED • SUCTION STRAINER TYPE
14 SOLEPLATE Length x Width m X m • LEVEL CONTROL
15 SOLEPLATE THICKNESS mm IMPELLER COLLETS ACCEPTABLE
16 MOUNTING FLANGE REQUIRED HARDENED SLEEVES UNDER BEARINGS (9.3.10.5)
17 COLUMN PIPE: RESONANCE TEST
18 DIAMETER mm STRUCTURAL ANALYSIS (9.3.5)
19 LENGTH m
20 NUMBER DRIVER ALIGNMENT SCREWS
21 SPACING m SUCTION CAN
22 GUIDE BUSHINGS: SUCTION CAN THICKNESS mm
23 NUMBER LENGTH m
24 LINE SHAFT BEARING SPACING mm DIAMETER mm
25 GUIDE BUSHING LUBE: SEPARTATE MOUNTING PLATE (9.3.8.3.1)
26 PROVIDE SEPARATE SOLEPLATE (9.3.8.3.3)
27 DRAIN PIPED TO SURFACE (9.3.13.5)
28 BOWL HEAD CALCULATION REQUIRED

29 MATERIALS (additional)
30 SUCTION CAN / BARREL: LINESHAFT SLEEVES :
31 DISCHARGE HEAD • BEARING RETAINER :
32 BOWL SHAFT : SHAFT ENCLOSING TUBE :
33 LINESHAFT : DISCHARGE COLUMN :
34 LINESHAFT HARDFACING : PRESSURE RATING: MAWP HYDRO
35 BELLMOUTH : HEAD
36 BOWL BEARING : COLUMN PIPE
37 LINESHAFT BEARING : BOWL

38 SUMP ARRANGEMENT
39 SUMP DIMENSIONS :
40 GRADE ELEVATION 1 m
41 LOW LIQUID LEVEL 2 m 1 2 3
42 C.L. OF DISCHARGE 3
43 m SUMP DEPTH l1
44
l3

m PUMP LENGTH l2
45 m GRADE TO DISCH. l 3
46 m GRADE TO LOW LIQUID LVL l 4
l4

47 m GRADE TO 1ST STG IMPL'R. l 5


l5

48 m SUBMERGENCE REQ'D l
l2

6
49 m SUMP DIAMETER Fd
l1

l6

50 m
51
52
53
54 Fd
55
56
57

DATA SHEET No. Rev: SHEET of


CENTRIFUGAL PUMP DATA SHEET

1 Note PRESSURE VESSEL DESIGN CODE REFERENCES Rev


2 THESE REFERENCES MUST BE LISTED BY THE MANUFACTURER
3 CASTING FACTORS USED IN DESIGN ( TABLE 3)
4 SOURCE OF MATERIAL PROPERTIES
5
6 WELDING AND REPAIRS

7 THESE REFERENCES MUST BE LISTED BY THE PURCHASER. (DEFAULT TO TABLE 10 IF NO PURCHASER PREFERENCE IS STATED)
8 ALTERNATE WELDING CODES AND STANDARDS
9 WELDING REQUIREMENT (APPLICABLE CODE OR STANDARD)
10 WELDER/OPERATOR QUALIFICATION
11 WELDING PROCEDURE QUALIFICATION
12 NON-PRESSURE RETAINING STRUCTURAL WELDING SUCH AS BASEPLATES OR SUPPORTS
13 MAGNETIC PARTICLE OR LIQUID PENETRANT EXAMINATION OF PLATE EDGES
14 POSTWELD HEAT TREATMENT
15 POSTWELD HEAT TREATMENT OF CASING FABRICATION WELDS
16
17 MATERIAL INSPECTION

18 THESE REFERENCES MUST BE LISTED BY THE PURCHASER DEFAULT TO TABLE 14


ALTERNATIVE MATERIAL INSPECTIONS AND ACCEPTANCE CRITERIA (SEE TABLE 14) (8.2.2.5)
19 TYPE OF INSPECTION METHOD FOR FABRICATIONS FOR CASTINGS

20 RADIOGRAPHY ULTRASONIC
21 INSPECTION MAGNETIC PARTICLE

22 INSPECTION LIQUID PENETRANT


23 INSPECTION VISUAL INSPECTION
24 (all surfaces)
25
26 REMARKS :
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64

DATA SHEET No. Rev: SHEET of


NOTES

1 Note Rev
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58

DATA SHEET No. Rev: SHEET of

You might also like