EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
The Construction Contractor shall field verify the original vertical profile of
SAES-L-450
A2 the pipeline, the amount of cover, the location and degree of elastic and
Sec. 7.1.2
preformed bends, in accordance with the IFC drawings.
SAES-L-450
A3 Limits of the right of way shall be staked.
Sec. 7.1.1
Height or elevation of the right of way shall be staked and marked for SAES-L-450
A4
reference. Sec. 7.1.1
The construction right of way shall be graded either flat or to a smooth SAES-L-450
A7
rolling contour. Sec. 7.2.1
The final finished right of way shall be at least 5 meters wide, 6 meters in SAES-L-450
A9
Sabkha areas. Sec. 7.2.3
REMARKS:
REFERENCE DOCUMENTS:
1- SAES-L-450 -- Construction of On-Land and Near Shore Pipelines, 30 September 2003