RIPSTAR 49 is a high strength, shrinkage compensated, fiber reinforced, thixotropic,


cementitious grout.
Specification:
RIPSTAR 49 repair mortar is a one-component thixotropic, shrinkage-compensated, fiber
reinforced formulation for structural concrete repairs. RIPSTAR 49 can be applied vertically or
overhead by low-pressure wet-spraying or hand troweling. RIPSTAR 49 is reinforced with
specially designed bean shaped, alkali resistant polypropylene fibers for exceptional
resistance to cracking. The repair mortar shall not require polymer bonding agent as primer
and shall be thixotropic consistency, capable of applying 50 mm thick in single layer.

Uses:
 RIPSTAR 49 is recommended for repair situations requiring application of mortar up to 50
mm thickness in one layer.
 Extensive repairs to beams, columns and other structural elements.
 Repair of structural members subjected to repetitive loading.
 Repairs to industrial structures.

Advantages:

 One component – only addition of water, no additional bonding agent required.


 Dual shrinkage compensated.
 Quality controlled – uniform, predictable results.
 Impermeable to aggressive elements.
 Sprayable, virtually no rebound.

Typical properties:
Appearance Gray powder
W/P ratio, by weight 0.16
Fresh wet density 2.2 kg/Litre
Last Updated On: 17-08-2021
Version : 5

Compressive strength, : 10 MPa at 1 day


(ASTM C109, 7cm cube) : 20 MPa at 3 days
: 30 MPa at 7 days
: 40 MPa at 28 days

Packaging:
RIPSTAR 49 is supplied in 40 kg. moisture resistance bag.

Coverage:
One 40 kg bag of RIPSTAR 49 mixed with 6.4 liters water will yield approximately 21.0 liters.
Approximately two bags of 40 kg are needed per m2 area at 40 mm. thick application.

Application procedure:
Surface preparation:
Correct surface preparation is critical for optimum performance. The prepared surface should
be structurally sound and free from contaminants. Remove concrete that has been saturated
with oil or grease. Simple light sandblasting will not sufficient. Use an effective method for
removal of weak concrete such as, wet grit blasting, high pressure water jetting and needle
scaling. Saw cut the boundary of repair area perpendicular to the surface to at least 10 mm
depth and remove concrete within the saw-cut boundary at least to that depth. Where saw
cutting is not possible, after material removal, prepare the edge of the repair area vertical.
Prepare the final surface free from dust and debris and to a rough profile with at least 5 mm
level difference between surface troughs and peaks. Where rebars are corroded, cut back the
concrete to at least 20 mm behind rebars. Grit blast around the rebars to remove corrosion
products. Replace the affected part of rebar if the diameter after grit blasting is found reduced
by more than 20% of the original diameter.

Mixing:
RIPSTAR 49 must be mixed mechanically. Use a heavy-duty, slow speed drill with spiral mixing
paddle or a Pan type mixer etc. Place approximately 80% of the water in the mixer. Keeping
the mixer running, add RIPSTAR 49 slowly. Mix for 3-4 minutes or until a lump-free mix is
Last Updated On: 17-08-2021
Version : 5

obtained. Add from the balance 20% water, while continuing to mix, until the desired
consistency is achieved.
If ambient temperature is >30°C, use chilled water and condition the bagged product in an
air-conditioned store prior to use. Maximum mixed temperature should be no more than
35°C. RIPSTAR 49 can be used when the ambient temperature is between 5 and 40°C.
The water required for sprayable / trowellable consistency for 40 kg of RIPSTAR 49 is given:
Minimum: 13 % (5.2 lit.) Maximum: 16 % (6.4 lit.)

Placing:
RIPSTAR 49 has been formulated for placing both by trowel and spray application, depending
on the size and location of the repair area. For best results, before application by trowel, apply
the first layer by gloved hand including packing behind the rebars, and then firmly trowel on
the rest to required thickness.
When applying by hand force RIPSTAR 49 tightly onto the substrate to ensure intimate contact
with the pre-wetted substrate. If applying by spray, for best results, utilize the services of an
experienced nozzle-man. Finish the final surface smooth using a wood, plastic or synthetic
sponge faced trowel. When the material has stiffened to the point where finger pressure
lightly marks the surface, give a final firm troweling using a steel float.

Curing:
Good curing is essential. Particular care is required in hot and/or windy conditions. Cure either
by a single coat of curing membrane, which is compatible with most subsequent protective
coatings or by covering the work with plastic sheet fixed over wet hessian or wet foam rubber.

Storage and Shelf life:


Store under cover, out of direct sunlight and protect from extremes of temperature. In
tropical climates the product must be stored in an air-conditioned environment. Shelf life is 6
months when stored as above.
Last Updated On: 17-08-2021
Version : 5

Safety precautions:
As with all chemical products, care should be taken during use and storage to avoid contact
with eyes, mouth, skin and foodstuffs (which can also be tainted with vapour until product
fully cured or dried). Treat splashes to eyes and skin immediately. If accidentally ingested,
seek immediate medical attention. Keep away from children and animals. Reseal containers
after use. Do not reuse containers for storage of consumable item.

Disclaimer:
Whilst any information contained herein is true, accurate and represents our best knowledge
and experience, no warranty is given or implied with any recommendations made by us, our
representatives or distributors, as the conditions of use and the competence of any labour
involved in the application are beyond our control.

You might also like