OEE-calculation Exercise 1
OEE-calculation Exercise 1
Calculate PfOEE and OEE for a production cell during the following conditions.
Meetings: Department meeting every Thursday 13:30 – 14:30, with no production (NOTE:
no preventive maintenance is performed during this shift exchange).
Production: The machine has a bought cycle time of 9 minutes per item
Defects/scrap 8
Quality rate (Q) (553 – 8) / 553 0,986 Q = 98,6%
Calculate PfOEE and OEE for a production cell during the following conditions.
Meetings: Department meeting every Thursday 13:30 – 14:30, with no production (NOTE:
no preventive maintenance is performed during this shift exchange).
Production: The machine has a bought cycle time of 36 seconds per item
Defects/scrap 39
Quality rate (Q) (7893-39) / 7893 0,995 Q = 99,5%
Note that lack of material is considered as a planned stop. This is because the stop is not
caused by the machine itself, but rather by bad logistics.
OEE-calculation exercise 3
Calculate PfOEE and OEE for a production cell during the following conditions.
Shift hours: Night shift, 22:00 – 06:12, at Sundays the shift starts at 23:30
Morning shift, 06:00 – 14:12
Afternoon shift, 14:00 – 22:12, Fridays, 14:00 - 21:00
Production: The machine has a bought cycle time of 42 seconds per item type A and 54
seconds per item type B.
Production: 2113 type A produced from Sunday 23:30 to Tuesday 09:06, of which 37 were
defect.
4367 type B produced from Tuesday 09:06 to Friday 21:00, of which 52 were
defect.
Calculation
Scheduled working time 0.5h + 4x24h + 21h = 117.5h
Planning related stops 3x5x0.4h + 14x0.2h + 0.8h = 9.6h
Planning factor (Pf) (117.5 – 9.6) / 117.5 = 0.918 Pf = 91.8%
Defects/scrap 89
Quality rate (Q) (2113 + 4367 –89) / (2113 + 4367) 0.986 Q = 98.6%