Submission QT Forms To Syabas - 2016: ITE M NO. Form NO. Description Signatory by Remark

This document outlines 12 forms (QT1 to QT11) that must be submitted to SYABAS regarding testing, inspection, and handing over of external water reticulation systems. It specifies which parties (developer, plumber, consultant, SYABAS) are responsible for filling out and signing each form. The forms cover applications, test reports, inspection reports, disinfection certificates, and acceptance of handing over. The plumber must fill out several forms for verification by the consultant before submission to SYABAS.

Uploaded by

Lee Jia Qing
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
528 views2 pages

Submission QT Forms To Syabas - 2016: ITE M NO. Form NO. Description Signatory by Remark

This document outlines 12 forms (QT1 to QT11) that must be submitted to SYABAS regarding testing, inspection, and handing over of external water reticulation systems. It specifies which parties (developer, plumber, consultant, SYABAS) are responsible for filling out and signing each form. The forms cover applications, test reports, inspection reports, disinfection certificates, and acceptance of handing over. The plumber must fill out several forms for verification by the consultant before submission to SYABAS.

Uploaded by

Lee Jia Qing
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

SUBMISSION QT FORMS TO SYABAS - 2016

ITE
FORM
M DESCRIPTION SIGNATORY BY REMARK
NO.
NO.
Form QT3,
Application for test and QT4(a), QT4(b)
inspection of External Water and QT5 to be
1 QT1 Developer
Reticulation System/Supply ready prior
Main. submission of
QT1.
Response on application for Response by
test and inspection of External SYABAS after
2 QT2 SYABAS
Reticulation System/Supply QT 1
Main. submission.
Plumber to fill
up forms for
3 QT3 Material inspection reports. Consultant/SYABAS
verification by
consultant.
Plumber to fill
Hydrostatic Pressure Test and
up form for
4 QT4(a) Leakage Test report for Consultant/SYABAS
verification by
external pipeline.
consultant.
Hydrostatic Pressure Test - Plumber to fill
External Pipeline and Main up form for
5 QT4(b) Consultant/SYABAS
Pipe Complete with verification by
Ferrule and consultant.
Communication Pipe.
Water Tightness Test report
6 QT5* Consultant/SYABAS
for Reservoir/Suction Cistern.
Plumber to fill
up form for
Final Joint Inspection
7 QT6(a) Consultant/SYABAS verification by
report (External Pipeline).
consultant and
SYABAS.
Final Joint Inspection report
QT6(b) Plumber/Consultant/
8 (Reservoir/Suction/Cistern/Pu
* SYABAS
mp House).
Notification for submission of Letter from
bank guarantee over defect SYABAS request
9 QT7 SYABAS
liability period (External bank
Reticulation/Supply Main). guarantee.
Support letter from district Plumber/Consultant/
10 QT8
O&M for tapping works. SYABAS
Plumber/Consultant/ Plumber to fill
11 QT9 Certificate of Disinfection.
SYABAS up form.
12 QT10 Application for handing over Consultant/Develop Consultant to
of external water reticulation er compile

documents as
system. listed for
submission.
SUBMISSION QT FORMS TO SYABAS - 2016
Acceptance of handing over of
SYABAS letter
13 QT11 external water reticulation SYABAS
of acceptance.
system.