JSA Transformer Installation
JSA Transformer Installation
Check the object weight for using the approperiate sling . We have
Nil
approved 10 Ton x 3Mtr sling for this type of Transformer Erection.
Checking the weight and qty of object
3 Make sure stopper should be placed to stop movement of loaded
as per the document
vehicle. and also make sure that the brakes have been applied in order
Nil
to prevent the wheels from moving when material unloading from
trailer.
Inspect the area immediately around the load and the route for
Check the intended route and point of
4 Vehicle may stuck ,topple in uneven terrain,Slips, Falls clearance and tripping hazards. Clear movable objects from the route.
placement
Check for uneven terrain.
Fixing the Sling position with object & Strain or more serious Fall injury because the Height is more use of "A' Type ladder for fixing the sling D-sakle to tranformer lifting
5 Ladder may topple if not placed on even surface Ensure ladder must be placed on Even surface
Hydra hook. then 5mtr. hook.
Hand break must be applied to restrict tyres motion, Banks man should
Unloading of Trafo to respective Vehicle movement due to Hydra operation,crush or hit by be provide drive instructions to Hydra during backward direction of if hand break is not effective still vehicle can move
6 Stopper must be applied to rear wheels
foundation load in movement Hydra with hand & wistle. Keep a safe distance from suspended load, 2 while unloading by hydra
tag line must be used Guide the suspended load