Work Inspection Request
Work Inspection Request
JARALLAH RAYYAN
MEP CLEARANCE
Ref. No: LCC-MEP-CLRNC-001 Rev. 0 Date: 15/09/2021
Contractor: CANADIAN BUILDING & CONSTRUCTIONS Consultant: AL FEREEJ CONSULTANCY & DESIGNS
Sub-Contractor: LEAD COOLING & CONTRACTING
LOCATION:VILLA LEVEL: FF Area/Grid Lines: As per Highlighted
Architechtura
Discipline: Structural ✘ MEP Others
l
Shop Drawing Ref: __________As per attached____________ Method Statement _ Material Submittal__________________ Others: _______________________
WORK TO BE INSPECTED:
MEP CLEARANCE PRIOR TO CEILING WORKS (FF BEDROOM 3)
LCC-MECH-WIR-019 (GI Duct with Riser Connection at FF mockup bedroom 03) LCC-ELEC-WIR-017 Installation for Curtain control at Mockup first
floor bedroom 3
CONSULTANTS RESPONSE
A-
Approved C - Resubmit
A - Approved with
D - Not approved
comments