Lab: Kanban (Company-Managed) : 1: Configure A Kanban Board To Use A Separate Backlog
Lab: Kanban (Company-Managed) : 1: Configure A Kanban Board To Use A Separate Backlog
Kanban (Company-managed)
Estimated time: 20 minutes
In this lab, you will:
1. Configure a kanban board to use a separate backlog.
2. Assign work in progress limits on kanban board columns.
3. Add a "Development Done" column as a queue.
4. View a cumulative flow diagram.
5. View a cycle time control chart.
Note: These instructions assume that you have created a company-managed kanban projectA
project. They also assume that you are a project administrator for the project (see the previous lab).
1: Configure a kanban board to use a separate backlog.
1. In your company-managed projectA project, move some issues to the BACKLOG column of your
kanban board.
2. Navigate to the board settings (... > Board settings) .
3. Click the Columns tab.
4. Drag the BACKLOG status (the box at the bottom of the Backlog column- not the column itself)
from the first column to the Kanban backlog section on the left. You should now see the BACKLOG
status in the kanban backlog and the Backlog column of the board should not contain any
statuses.
Note: You can drag any status(es) except DONE to the kanban backlog. The status does not
have to be named BACKLOG .
5. View your kanban board. You should now see SELECTED FOR DEVELOPMENT as the first column. The
BACKLOG column has been moved to the kanban backlog.
6. Click on the Backlog tab (this was added by Jira when you enabled the kanban backlog).
7. Move issues between the backlog and the first visible column on the kanban board ( Selected for
Development ). This is where you can work on the backlog while the rest of the team is focussing on
the issues that are ready to be worked on.
Congratulations, you have configured a kanban backlog.
2: Assign work in progress (WIP) limits on kanban board columns.
Work in progress limits help ensure that started work gets finished and allows the team to easily see
bottlenecks in their workflow. You must be a project administrator or board administrator to specify
WIP limits. Project administrators are specified under the People tab of Project settings. Board
adminstrators are configured under the Administrators heading of the General tab in Board settings.
1. From your projectA kanban board, click the ... button and select Board settings.
2. Click the Columns tab.
3. Verify that the Column Constraint is set to Issue Count .
4. In the Selected for Development column, specify a minimum issue count of 2 . This means that
the column will be highlighted if there are less than two issues in the column, notifying the team that
more issues need to be added to the column.
5. In the In Progress column, specify a maximum issue count of 2 . This means that the column
will be highlighted if there are more than two issues in the column, notifying the team that there is
too much work-in-progress in that column.
6. Click Back to board.
7. You should now see a Min 2 indication in the Selected for Development column and a Max 2
indication in the In Progress column. These are the WIP limits.
8. Drag issues to the columns to violate the constraints. You may need to change the status of issues
in the backlog. You should see a highlighted column when the minimum or maximum constraint is
violated.
Congratulations, you have created WIP limits.
3: Add a "Development Done" column as a queue.
Right now, your kanban board should have a Review column before the Done column (the previous
lab added a Review column). In this part of the lab, you will add a Development Done column
before the Review column. This is so that an issue can be moved to Development Done when the In
Progress work is complete. When a reviewer is ready for another issue, they can pull the issue from
the Development Done column. This prevents a developer from pushing an issue into the Review
column directly.
1. Using a procedure similar to the previous lab, add a Development Done column (which also adds a
status) to your kanban board. Make sure to drag it to the column before Review .
2. Using a procedure similar to this lab, set a WIP limit of Max 2 for the Development Done column.
3. Test that your new column is working as expected.
Congratulations, you have added a queue to your board.
4: View a cumulative flow diagram.
1. Move all issues of the project to the Done column.
2. Click on the Reports tab in the sidebar.
3. Click on Cumulative Flow Diagram. Notice that Jira automatically creates reports for you. This
report might not look that great, but it shows the changing of issues' status that you have done so
far.
4. Zoom into any section of the report by clicking and dragging the cursor across the top chart or the
small chart below it. You can double-click on the small chart to reset the top chart.
Congratulations, you have viewed a cumulative flow diagram.
5: View a cycle time control chart.
1. Click on the Control Chart tab.
2. View the chart. This shows the cycle time for the issues of the project. This is the time between
when an issue is moved from the backlog to In Progress until the time that the issue is moved to
the Done column. Use the controls below the chart to change the horizontal timeframe of the chart.
This chart also might not look that great. A continuously improving team should show a cycle time
that decreases over time.
3. Explore the other reports related to your kanban project. Jira provides a lot of ways to analyze what
your team is doing.
Congratulations, you have viewed a cycle time control chart and completed this lab.